CN203667806U - 一种变压器套管的吊运工装 - Google Patents

一种变压器套管的吊运工装 Download PDF

Info

Publication number
CN203667806U
CN203667806U CN201320857164.7U CN201320857164U CN203667806U CN 203667806 U CN203667806 U CN 203667806U CN 201320857164 U CN201320857164 U CN 201320857164U CN 203667806 U CN203667806 U CN 203667806U
Authority
CN
China
Prior art keywords
steel plate
lifting
anchor ear
plate hoop
bushing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320857164.7U
Other languages
English (en)
Inventor
王彩娟
聂鹏
陈继浩
张丙旭
赵贺亮
韩秀龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianwei Transformer Co Ltd (qinhuangdao)
Original Assignee
Tianwei Transformer Co Ltd (qinhuangdao)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianwei Transformer Co Ltd (qinhuangdao) filed Critical Tianwei Transformer Co Ltd (qinhuangdao)
Priority to CN201320857164.7U priority Critical patent/CN203667806U/zh
Application granted granted Critical
Publication of CN203667806U publication Critical patent/CN203667806U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

本实用新型涉及一种变压器套管的吊运工装,属于变压器技术领域。技术方案是:包含钢板抱箍(1)、橡胶板(2)和紧固件(3),钢板抱箍内部布置一层橡胶板,钢板抱箍外面设有相匹配的紧固件,吊点设置在钢板抱箍上,两侧各设有两件加强铁;钢板抱箍固定在变压器套管护筒外部,钢板抱箍上的吊点连接一根吊带(5),另一根吊带(6)连接在套管(4)顶部自带的吊点。本实用新型不拆除护筒,寻找其他方式代替套管下部吊点;通过专用工装吊运套管,简化了原吊运操作,显著提高了工作效率。

Description

一种变压器套管的吊运工装
技术领域
本实用新型涉及一种变压器套管的吊运工装,属于变压器技术领域。
背景技术
换流变压器阀侧套管结构特殊,套管下部吊点布置在一个护筒内部,吊运套管时,需将套管自带的护筒拆除,这样,在变压器的制造过程中,由于吊运需拆装护筒四次,工作量较大。同时因频繁拆装护筒,直接影响护筒与套管的连接质量。
实用新型内容
本实用新型目的提供了一种变压器套管的吊运工装,通过专用工装吊运套管,简化了吊运操作,显著提高了工作效率,解决背景技术中存在的上述问题。
本实用新型的技术方案是:一种变压器套管的吊运工装,包含钢板抱箍、橡胶板和紧固件,钢板抱箍内部布置一层橡胶板,用于工装卡紧护筒以及起到良好的减震、防护作用,钢板抱箍外面设有相匹配的紧固件,吊点设置在钢板抱箍上,两侧各设有两件加强铁。
钢板抱箍固定在变压器套管护筒外部,钢板抱箍上的吊点连接一根吊带,另一根吊带连接在套管顶部自带的吊点。
将两根吊带挂至天车吊钩上,直接吊运即可完成,不需要拆卸套管护筒。钢板抱箍,通过紧固件连接,紧固件采用高强度螺栓,整体强度满足套管吊运要求。使用吊钩起吊两个吊点,根据需求调整套管装配角度,直接安装至变压器即可。
本实用新型的积极效果:本实用新型本实用新型不拆除护筒,寻找其他方式代替套管下部吊点;通过专用工装吊运套管,简化了原吊运操作,显著提高了工作效率。
附图说明
图1是本实用新型实施例工装示意图;
图2是本实用新型实施例工装俯视示意图;
图3是本实用新型实施例工装侧视示意图;
图4是本实用新型实施例吊运示意图;
图中:钢板抱箍1、橡胶板2、紧固件3、套管4、一根吊带5、另一根吊带6、吊钩7。
具体实施方式
下面结合附图,通过实施例对本实用新型作进一步说明
一种变压器套管的吊运工装,包含钢板抱箍1、橡胶板2和紧固件3,钢板抱箍内部布置一层橡胶板,用于工装卡紧护筒以及起到良好的减震、防护作用,钢板抱箍外面设有相匹配的紧固件,吊点设置在钢板抱箍上,两侧各设有两件加强铁。
钢板抱箍固定在变压器套管护筒外部,钢板抱箍上的吊点连接一根吊带5,另一根吊带6连接在套管4顶部自带的吊点;将两根吊带挂至天车吊钩7上,直接。

Claims (1)

1.一种变压器套管的吊运工装,其特征在于包含钢板抱箍(1)、橡胶板(2)和紧固件(3),钢板抱箍内部布置一层橡胶板,钢板抱箍外面设有相匹配的紧固件,吊点设置在钢板抱箍上,两侧各设有两件加强铁;钢板抱箍固定在变压器套管护筒外部,钢板抱箍上的吊点连接一根吊带(5),另一根吊带(6)连接在套管(4)顶部自带的吊点。
CN201320857164.7U 2013-12-24 2013-12-24 一种变压器套管的吊运工装 Expired - Fee Related CN203667806U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320857164.7U CN203667806U (zh) 2013-12-24 2013-12-24 一种变压器套管的吊运工装

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320857164.7U CN203667806U (zh) 2013-12-24 2013-12-24 一种变压器套管的吊运工装

Publications (1)

Publication Number Publication Date
CN203667806U true CN203667806U (zh) 2014-06-25

Family

ID=50964125

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320857164.7U Expired - Fee Related CN203667806U (zh) 2013-12-24 2013-12-24 一种变压器套管的吊运工装

Country Status (1)

Country Link
CN (1) CN203667806U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111261394A (zh) * 2020-04-07 2020-06-09 江西赣电电气有限公司 一种变压器套管安装装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111261394A (zh) * 2020-04-07 2020-06-09 江西赣电电气有限公司 一种变压器套管安装装置
CN111261394B (zh) * 2020-04-07 2021-06-08 江西赣电电气有限公司 一种变压器套管安装装置

Similar Documents

Publication Publication Date Title
CN202897799U (zh) 一种环形工件吊具
CN203095401U (zh) 一种卡环式翻转吊装尾耳卡具
CN201756400U (zh) 一种磨辊吊装装置
CN103663128A (zh) 一种变压器套管的吊运方法
CN203667806U (zh) 一种变压器套管的吊运工装
CN205705382U (zh) 一种摩擦压力机工作台
CN104500495A (zh) 油缸支座
CN204714310U (zh) 大型设备起吊辅助工装
CN205705383U (zh) 一种多功能摩擦压力机工作台
CN203565333U (zh) 新型大型强制同步圆振动筛
CN202856246U (zh) 绝缘子更换器
CN204917741U (zh) 一种大跨度秸秆门式抓斗起重机结构
CN203735078U (zh) 一种用于收割机的大粮箱结构
CN202575708U (zh) 细长杆件吊装用活套卡箍装置
CN203715156U (zh) 一种轻便起重架
CN202594025U (zh) 倾倒方便的金属切屑收集箱
CN201990379U (zh) 一种柴油机轴承盖专用吊具
CN202245671U (zh) 蒸发器组件吊装横梁
CN203419385U (zh) 一种轴类零件装框架
CN2851220Y (zh) 双联炭块夹具
CN202499648U (zh) 一种减震吊环
CN204059454U (zh) 一种新型单向阀固定座
CN209974089U (zh) 一种专用于大型构件吊装的吊耳
CN204148304U (zh) 型钢平直机
CN204226122U (zh) 筋板结构式风电法兰

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140625

Termination date: 20161224