CN203643831U - Lifting electromagnet control cabinet intelligent verifying device - Google Patents

Lifting electromagnet control cabinet intelligent verifying device Download PDF

Info

Publication number
CN203643831U
CN203643831U CN201320831420.5U CN201320831420U CN203643831U CN 203643831 U CN203643831 U CN 203643831U CN 201320831420 U CN201320831420 U CN 201320831420U CN 203643831 U CN203643831 U CN 203643831U
Authority
CN
China
Prior art keywords
pilot lamp
button
current
power supply
plc controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320831420.5U
Other languages
Chinese (zh)
Inventor
张承臣
张昆
刘博�
杨文峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longi Magnet Co Ltd
Original Assignee
Longi Magnet Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longi Magnet Co Ltd filed Critical Longi Magnet Co Ltd
Priority to CN201320831420.5U priority Critical patent/CN203643831U/en
Application granted granted Critical
Publication of CN203643831U publication Critical patent/CN203643831U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The utility model discloses a lifting electromagnet control cabinet intelligent verifying device. The intelligent verifying device comprises a main loop and a control circuit. Material suction and material discharge are performed through PLC and relay control in an alternating current power supply mode for a plurality cycles; Then the alternating current power supply of the control cabinet is turned off, a power failure magnetic keeping mode is accessed, and material suction and material discharge are performed for a plurality cycles; Then the control cabinet alternating current power supply mode is recovered, and material suction and material discharge are performed for a plurality cycles; and so on, automatic cycle is carried out. The intelligent verifying system has two counters which can display working cycle numbers in the two working modes. The intelligent verifying device has functions of one-button testing, fault indication, fault alarm and the like. A pause button, a manual control and automatic cycle switching switch and hand operation material suction and material discharge switches are arranged on a panel. The intelligent verifying device is advantaged by novel design and complete functions, fills gaps of intelligent verifying systems of this kind and is worthy of wide popularization and application.

Description

A kind of lifting electromagnet switch board intelligence verifying attachment
One, technical field
The utility model belongs to magnet control cabinet inspection technology field, is specifically related to a kind of lifting electromagnet switch board intelligence verifying attachment.
Two, background technology
Lifting electromagnet is mainly used in the various steel such as shipyard, steel plant, welded structure factory and slag, the handling of steel scrap, transhipment, is normally made up of iron core and coil and magnetic conductive cylinder (plate).Its principle of work is to generate an electromagnetic field in the time of coil electricity, makes iron core have magnetic field suction, and then has been used for transporting the object of ferromagnetic materials.In fact electromagnet is a kind of magnetic apparatus with solenoid, and electromagnet all has supporting switch board.Switch board generally has Alternating Current Power Supply and two kinds of patterns of storage battery power supply, and every kind of pattern needs multiple cycles of testing fatigue.When two kinds of mode checkings, need to automatically switch.Therefore need a kind of intelligent verifying attachment, for checking switch board.To judge that whether switch board is qualified.
Three, summary of the invention
The purpose of this utility model is to provide the lifting electromagnet switch board intelligence verifying attachment of a kind of applicable Alternating Current Power Supply and two kinds of pattern switch board inspections of storage battery power supply.
The technical solution adopted in the utility model is: lifting electromagnet switch board intelligence verifying attachment comprises major loop and control loop, major loop by 380V three-phase alternating-current supply after circuit breaker Q F1, connect inspection switch board through A.C. contactor KM10 normally opened contact again, A.C. contactor KM10 coil is connected in AC power through auxiliary reclay KA20 normally opened contact; 380V three-phase alternating-current supply connection transformer TC1, transformer TC1 output 220V AC power connecting valve power ps 1, Switching Power Supply PS1 output+12V ,-12V direct supply are powered to current transducer H1, H2, current transducer H1, H2 output is connected to the expansion module of PLC controller, through current transducer H1, H2, be connected to switch board to be checked by shunt RS two ends extension line; Control loop is powered to PLC controller by Switching Power Supply PS1 output+24V, 0V direct supply, and PLC controller input end connects button and switch, and output terminal connects pilot lamp, hummer and auxiliary reclay coil.Intelligence verifying attachment adopts PLC and Control automatic circulating operation under Alternating Current Power Supply pattern and storage battery power supply pattern, and automatically switches between two kinds of patterns.Suction under Alternating Current Power Supply pattern, blowing, work some cycles, automatic cutting-off controlling cabinet communication power supply afterwards, and access power failure protector magnetic pattern is carried out suction, blowing, works some cycles.And then recover switch board Alternating Current Power Supply pattern, and carry out suction, blowing, work some cycles.Carry out by that analogy automatic cycle.This intelligent verifying attachment adopts pilot lamp to show work at present state.Adopt current transformer to detect the duty of switch board.If no current is operation irregularity, verifying attachment alarm equipment alarm, switch board quits work.Checking system panel arranges two counters and indicates Alternating Current Power Supply and battery-driven work period number of times.One key testing button is set, can automatic each circulation primary Alternating Current Power Supply and two kinds of lower work periods of pattern of storage battery power supply.Digital display ammeter is set, and whether monitoring checking system exciting current is consistent with switch board exciting current.Pause button, manually control, automatic cycle change-over switch and manually suction, blowing switch are also set simultaneously.
The utility model modern design, multiple functional, the blank of having replenished this type of intelligent checking system, is worth applying widely.
Four, brief description of the drawings
Fig. 1 is electrical schematic diagram of the present utility model.
Five, embodiment
Lifting electromagnet switch board intelligence verifying attachment comprises major loop and control loop, major loop by 380V three-phase alternating-current supply after circuit breaker Q F1, connect inspection switch board through A.C. contactor KM10 normally opened contact again, A.C. contactor KM10 coil is connected in AC power through auxiliary reclay KA20 normally opened contact; 380V three-phase alternating-current supply connection transformer TC1, transformer TC1 output 220V AC power connecting valve power ps 1, Switching Power Supply PS1 output+12V ,-12V direct supply are powered to current transducer H1, H2, current transducer H1, H2 output is connected to the expansion module of PLC controller, through current transducer H1, H2, be connected to switch board to be checked by shunt RS two ends extension line; Control loop is powered to PLC controller by Switching Power Supply PS1 output+24V, 0V direct supply, and PLC controller input end connects button and switch, and output terminal connects pilot lamp, hummer and auxiliary reclay coil.
PLC controller is made up of controller body and expansion module, and PLC controller input end connects start/stop switch SA1, suction/blowing switch SA2 and loop start button SB1, cycle stop push button SB2, a key test starting button SB3, manual test stop button SB4, the complete button SB5 that circulates, a key are completed button SB6; The coil of output terminal connection auxiliary reclay KA20, KA21, KA22 and suction pilot lamp HL1, blowing pilot lamp HL2, the complete pilot lamp HL3 that circulates, loop start pilot lamp HL4, a key test starting pilot lamp HL5, KM4 adhesion pilot lamp HL6, major loop no current pilot lamp HL7, circulation completed alarm YB1, major loop power-off alarm YB2, KM4 adhesion alarm YB3, major loop no current alarm YB4.Auxiliary reclay control follow-up function, in addition, unlikely burning when also indirect protection PLC controller runs into fault.
Control suction auxiliary reclay KA21 normally opened contact and receive two suction switch ends of tested cabinet, obtain the suction action that both can realize tested cabinet after electric, also as being connected of drive part and display section, the signal acquisition of guarantee counter and expansion module.
Control blowing auxiliary reclay KA22 normally opened contact and receive the blowing switch ends of tested cabinet, normally closed contact is received expansion module output terminal, both can realize the blowing action of tested cabinet after electric, also ensure can not have influence at power-off guarantor magnetic tester environment the misoperation of expansion module, strengthen the reasonable and science of design.
Power-off is protected magnetic auxiliary reclay KA20 and is controlled A.C. contactor KM10 coil, in the time of PLC controller output power-off signal, auxiliary reclay KA20 energized action, A.C. contactor KM10 dead electricity disconnects, major loop dead electricity, enters power-off environmental preparation test correlation function, in addition, auxiliary reclay KA20 normally opened contact is linked into digital display counting device, and counter shows testing time.
Suction that PLC director demon is integrated, blowing, power-off are protected magnetic, automatic cycle, are stopped circulation, warnings that circulate, a key test, test stop, circulation timing counting, auto-manual switching, manual suction/blowing, entirety complete the several functions such as warning, supporting expansion module has been realized the advantage functions such as the warning of main circuit current disappearance, D.C. contactor adhesion warning, simulating signal and digital signal conversion, output speed Microsecond grade, has ensured the promptness of reporting to the police.
Main components model: Programmable Logic Controller adopts: TWDLCAA40DRF A.C. contactor: NC2-150/380V digital display ammeter KLY-D3ADC/200A/75mV/220V counter: HB48-II.

Claims (2)

1. a lifting electromagnet switch board intelligence verifying attachment, comprise major loop and control loop, it is characterized in that: major loop by 380V three-phase alternating-current supply after circuit breaker Q F1, connect inspection switch board through A.C. contactor KM10 normally opened contact again, A.C. contactor KM10 coil is connected in AC power through auxiliary reclay KA20 normally opened contact; 380V three-phase alternating-current supply connection transformer TC1, transformer TC1 output 220V AC power connecting valve power ps 1, Switching Power Supply PS1 output+12V ,-12V direct supply are powered to current transducer H1, H2, current transducer H1, H2 output is connected to the expansion module of PLC controller, through current transducer H1, H2, be connected to switch board to be checked by shunt RS two ends extension line; Control loop is powered to PLC controller by Switching Power Supply PS1 output+24V, 0V direct supply, and PLC controller input end connects button and switch, and output terminal connects pilot lamp, hummer and auxiliary reclay coil.
2. lifting electromagnet switch board intelligence verifying attachment according to claim 1, it is characterized in that: PLC controller is made up of controller body and expansion module, PLC controller input end connects start/stop switch SA1, suction/blowing switch SA2 and loop start button SB1, cycle stop push button SB2, a key test starting button SB3, manual test stop button SB4, the complete button SB5 that circulates, a key are completed button SB6; The coil of output terminal connection auxiliary reclay KA20, KA21, KA22 and suction pilot lamp HL1, blowing pilot lamp HL2, the complete pilot lamp HL3 that circulates, loop start pilot lamp HL4, a key test starting pilot lamp HL5, KM4 adhesion pilot lamp HL6, major loop no current pilot lamp HL7, circulation completed alarm YB1, major loop power-off alarm YB2, KM4 adhesion alarm YB3, major loop no current alarm YB4.
CN201320831420.5U 2013-12-17 2013-12-17 Lifting electromagnet control cabinet intelligent verifying device Expired - Fee Related CN203643831U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320831420.5U CN203643831U (en) 2013-12-17 2013-12-17 Lifting electromagnet control cabinet intelligent verifying device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320831420.5U CN203643831U (en) 2013-12-17 2013-12-17 Lifting electromagnet control cabinet intelligent verifying device

Publications (1)

Publication Number Publication Date
CN203643831U true CN203643831U (en) 2014-06-11

Family

ID=50875062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320831420.5U Expired - Fee Related CN203643831U (en) 2013-12-17 2013-12-17 Lifting electromagnet control cabinet intelligent verifying device

Country Status (1)

Country Link
CN (1) CN203643831U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105945567A (en) * 2016-05-16 2016-09-21 重庆市机电设计研究院 Automobile key assembly control circuit based on machine vision
CN113565055A (en) * 2021-07-23 2021-10-29 徐州徐工挖掘机械有限公司 Electromagnetic chuck control system and excavator

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105945567A (en) * 2016-05-16 2016-09-21 重庆市机电设计研究院 Automobile key assembly control circuit based on machine vision
CN105945567B (en) * 2016-05-16 2017-12-01 重庆市机电设计研究院 Automobile key assembling control circuit based on machine vision
CN113565055A (en) * 2021-07-23 2021-10-29 徐州徐工挖掘机械有限公司 Electromagnetic chuck control system and excavator

Similar Documents

Publication Publication Date Title
CN102710026B (en) Remote power utilization management system
CN203643831U (en) Lifting electromagnet control cabinet intelligent verifying device
CN203561732U (en) Apparatus for detecting service life of electromagnetic relay
CN204536853U (en) A kind of magnetic part magnet charger control system based on PLC
CN101393080B (en) Feedback system for automobile remote control central control lock system life test console
CN103092184B (en) A kind of automatic testing stand of integrated protection and monitoring device
CN106216580B (en) Steel ball automatic cold header electrical system
CN202049390U (en) Hardware function test case of hybrid power whole vehicle controller
CN204649867U (en) Switch cart detects commissioning device
CN205303334U (en) Self -diagnostic function contactor
CN207965077U (en) The test device of the external breaker of electric energy meter
CN205210271U (en) Switchgear life test control system
CN203849387U (en) Switch power supply repetition switch testing circuit of power supply adapter
CN204316073U (en) A kind of secondary current mutual inductor interstar connection loop high-voltage protection system
CN202651895U (en) Remote electricity using management system
CN203365596U (en) Intelligent microcomputer relay protection rapid testing device
CN102169769A (en) Conductive contact surface performance online diagnosing and repairing system and using method thereof
CN208316103U (en) Anti-misoperation power supply box
CN201725017U (en) Quick detecting instrument for mold plate detecting switches
CN105182963A (en) Testing apparatus of fireproof roller shutter door controller
CN205281156U (en) Valve falls quick drive arrangement of electricity
CN105914864A (en) Energy-saving cabinet
CN103439746B (en) A kind of electricity meter hook automatic detection device
CN203929923U (en) The pick-up unit of Dual-speed multi-purpose lift winch
CN103576537A (en) Detector for double-power supply conversion time

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140611

Termination date: 20181217