CN205210271U - Switchgear life test control system - Google Patents

Switchgear life test control system Download PDF

Info

Publication number
CN205210271U
CN205210271U CN201520926179.3U CN201520926179U CN205210271U CN 205210271 U CN205210271 U CN 205210271U CN 201520926179 U CN201520926179 U CN 201520926179U CN 205210271 U CN205210271 U CN 205210271U
Authority
CN
China
Prior art keywords
time relay
auxiliary reclay
circuit
combined floodgate
normally opened
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520926179.3U
Other languages
Chinese (zh)
Inventor
刘志强
陈金根
陈自然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Seven Stars Electric Co Ltd
Original Assignee
QUANZHOU SEVENSTARS ELECTRIC CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QUANZHOU SEVENSTARS ELECTRIC CO Ltd filed Critical QUANZHOU SEVENSTARS ELECTRIC CO Ltd
Priority to CN201520926179.3U priority Critical patent/CN205210271U/en
Application granted granted Critical
Publication of CN205210271U publication Critical patent/CN205210271U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Elevator Control (AREA)

Abstract

The utility model provides a switchgear life test control system, including being used for to the combined floodgate circuit of being surveyed the contace sending switching signal and the separating brake circuit that is used for surveying contace sending separating brake signal to the quilt, it to respond the branch to be had by the survey switch, the switching signal carries out the automatic opening/closing switching control circuit that moves, the combined floodgate circuit is parallelly connected with the separating brake circuit, set to and trigger the combined floodgate circuit and send the switching signal, and suspend the switching signal after postponing the very first time, it sends the separating brake signal to postpone second time post -trigger separating brake circuit again, and suspend the separating brake signal after the time at the delay third, it gets into next circulation to postpone fourth time post -trigger combined floodgate circuit again, the utility model has the advantages of simple structure, low, the action accuracy of energy consumption.

Description

A kind of switchgear durability test control system
Technical field
The utility model relates to a kind of switchgear durability test control system.
Background technology
Looped network cabinet switch requires K unit (loading switch cabinet) 5000 times, T unit (on-load switch-fuse combined cabinet) 5000 times, V unit (breaker cabinet) 10000 times mechanical life.In order to test the mechanical life of looped network cabinet switch, Chinese patent literature CN104569797A discloses a kind of life tests system and life detecting method of contact switch.The life tests system of this contact switch comprises by slowdown monitoring switch, drive unit, the first counting assembly and the second counting assembly, wherein, drive unit comprises and drives described tested switch opens and the driver closed, to be connected with described actuator electrical and to control the controller that described driver moves, and driver is specially air gun; First counting assembly is electrically connected the driving number of times to record drive unit with drive unit; Second counting assembly is electrically connected with by slowdown monitoring switch to record the conducting number of times by slowdown monitoring switch, the test mode of technique scheme is driven by drive unit to be carried out perseveration by the action button of slowdown monitoring switch, has that action is insensitive, energy consumption large, a complex structure and cannot testing by the serviceable life of the automatic divide-shut brake control circuit of slowdown monitoring switch.
Utility model content
The purpose of this utility model is for the deficiencies in the prior art, provides a kind of based on by the switchgear durability test control system of the automatic divide-shut brake control circuit of slowdown monitoring switch, has that energy consumption is little, the accurate advantage of action.
The purpose of this utility model realizes by following technical solution:
A kind of switchgear durability test control system, comprise for sent by slowdown monitoring switch switching signal combined floodgate circuit and for sending the opening circuit of sub-gate signal to by slowdown monitoring switch, had by slowdown monitoring switch and can to respond point, switching signal carries out the automatic divide-shut brake control circuit of action, combined floodgate circuit is in parallel with opening circuit, be arranged to trigger combined floodgate circuit and send switching signal, and switching signal is interrupted after the delay very first time, trigger opening circuit after postponing for the second time again and send sub-gate signal, and sub-gate signal is interrupted after delay control three time, trigger combined floodgate circuit again after delay control four time and enter next circulation.
Further, the utility model also comprise for postpone the very first time and disconnect opening circuit very first time relay, for postponed for the second time and second time relay of conducting opening circuit, for delay control three time and disconnect combined floodgate circuit the 3rd time relay, for delay control four time and the 4th time relay of conducting combined floodgate circuit.
Further, described combined floodgate circuit is provided with the switch-on controlling module that energising can produce switching signal, and described opening circuit is provided with the separating brake control module that energising can produce sub-gate signal.
Further, the utility model also comprises first, second, third, fourth auxiliary reclay, described combined floodgate circuit comprises the 3rd time relay normally closed contact, the first control part and second control part of connecting successively, first control part comprises the first auxiliary reclay normally opened contact parallel with one another and the 4th time relay normally opened contact, second control part comprises five route roads parallel with one another, and the first via comprises the second auxiliary reclay normally closed contact and switch-on controlling module of series connection mutually; Second tunnel comprises the first auxiliary reclay coil; 3rd tunnel comprises the second time relay normally closed contact and the very first time relay coil of series connection mutually; 4th tunnel comprises very first time relay normally open contact, the second auxiliary reclay first normally opened contact and the second auxiliary reclay coil, with the second auxiliary reclay coils connected in series after very first time relay normally open contact is in parallel with the second auxiliary reclay first normally opened contact; 5th tunnel comprises the second auxiliary reclay second normally opened contact and second time relay coil of series connection mutually.
Further, the first control part of described combined floodgate circuit comprises the first auxiliary reclay normally opened contact parallel with one another, the 4th time relay normally opened contact and starting switch.
Further, described opening circuit comprises very first time relay normally closed contact, the first control part and second control part of connecting successively, first control part comprises the 3rd auxiliary reclay normally opened contact parallel with one another and the second time relay normally opened contact, second control part comprises five route roads parallel with one another, and the first via comprises the 4th auxiliary reclay normally closed contact and the separating brake control module of series connection mutually; Second tunnel comprises the 3rd auxiliary reclay coil; 3rd tunnel comprises the 4th time relay normally closed contact and the 3rd time relay coil of series connection mutually; 4th tunnel comprises the 3rd time relay normally opened contact, the 4th auxiliary reclay first normally opened contact and the 4th auxiliary reclay coil, with the 4th auxiliary reclay coils connected in series after the 3rd time relay normally opened contact is in parallel with the 4th auxiliary reclay first normally opened contact; 5th tunnel comprises the 4th auxiliary reclay second normally opened contact and the 4th time relay coil of series connection mutually.
Further, described combined floodgate circuit is provided with the combined floodgate counter for detecting the switch-on controlling module number of starts, and described opening circuit is provided with the separating brake counter for detecting the separating brake control module number of starts.
Further, described combined floodgate counter is in parallel with switch-on controlling module, and described separating brake counter is in parallel with separating brake control module.
Further, described switch-on controlling module and described separating brake control module are the AC/DC changeover switch for by AC conversion being direct current light current.
Further, the utility model also comprises the power module to combined floodgate circuit and opening circuit supply 220V alternating current.
The utility model has following beneficial effect:
The utility model carries out based on by the automatic divide-shut brake control circuit of slowdown monitoring switch, realize being interrupted sending to automatic divide-shut brake control circuit repeatedly by multiple time delay and divide, switching signal, automatic divide-shut brake control circuit is made to control automatically to be divided/feed motion by slowdown monitoring switch, thus the life-span of testing by the mechanical life of slowdown monitoring switch and automatic divide-shut brake control circuit, because automatic divide-shut brake control circuit is light current circuit, (divide therefore only need to the faint electric signal of automatic divide-shut brake control circuit one, switching signal) just can realize being controlled by the divide-shut brake of slowdown monitoring switch, there is structure simple, energy consumption is low, the advantages such as action is accurate, point, switching signal by point, switch-on controlling module produces, point, the principle of work of switch-on controlling module is that energising can produce point, switching signal, thus raising control accuracy, the utility model also divides by arranging, the work times of combined floodgate counter records divide-shut brake control module, thus determines by the test volume of slowdown monitoring switch.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in further detail.
Fig. 1 is circuit theory diagrams of the present utility model.
Embodiment
With reference to shown in Fig. 1, a kind of switchgear durability test control system, by slowdown monitoring switch have can to respond point, automatic divide-shut brake control circuit that switching signal carries out action, as the Remote circuit in ring main unit low-pressure cabinet.
A kind of switchgear durability test control system, comprise 220V AC power supply module and combined floodgate circuit parallel with one another and opening circuit, be arranged to trigger combined floodgate circuit and send switching signal, and switching signal is interrupted after the delay very first time, trigger opening circuit after postponing for the second time again and send sub-gate signal, and after delay control three time, interrupt sub-gate signal, then trigger after delay control four time combined floodgate circuit enter next circulation.
Concrete components and parts comprise switch-on controlling module MK1, separating brake control module MK2, combined floodgate counter BZ1, separating brake counter BZ2, very first time relay K T1, the second time relay KT2, the 3rd time relay KT3, the 4th time relay KT4, the first auxiliary reclay KA1, the second auxiliary reclay KA2, the 3rd auxiliary reclay KA3, the 4th auxiliary reclay KA4, starting switch SB2, shutdown switch SB1.
Combined floodgate circuit comprises the 3rd time relay KT3 normally closed contact, the first control part and second control part of connecting successively, first control part comprises the first auxiliary reclay KA1 normally opened contact, the 4th time relay KT4 normally opened contact and starting switch SB2 parallel with one another, second control part comprises five route roads parallel with one another, the first via comprises the second auxiliary reclay KA2 normally closed contact, switch-on controlling module MK1 and combined floodgate counter BZ1, switch-on controlling module MK1 and connects with the second auxiliary reclay KA2 with combined floodgate counter BZ1 parallel connection again; Second tunnel comprises the first auxiliary reclay KA1 coil; 3rd tunnel comprises the second time relay KT2 normally closed contact and the very first time relay K T1 coil of series connection mutually; 4th tunnel comprises very first time relay K T1 normally opened contact, the second auxiliary reclay KA2 first normally opened contact and the second auxiliary reclay KA2 coil, with the second auxiliary reclay KA2 coils connected in series after very first time relay K T1 normally opened contact is in parallel with the second auxiliary reclay KA2 first normally opened contact; 5th tunnel comprises the second auxiliary reclay KA2 second normally opened contact and second time relay KT2 coil of series connection mutually.
Opening circuit comprises very first time relay K T1 normally closed contact, the first control part and second control part of connecting successively, first control part comprises the 3rd auxiliary reclay KA3 normally opened contact parallel with one another and the second time relay KT2 normally opened contact, second control part comprises five route roads parallel with one another, the first via comprises the 4th auxiliary reclay KA4 normally closed contact, separating brake control module MK2 and separating brake counter BZ2, separating brake control module MK2 is in parallel with separating brake counter BZ2, then connects with the 4th auxiliary reclay KA4 normally closed contact; Second tunnel comprises the 3rd auxiliary reclay KA3 coil; 3rd tunnel comprises the 4th time relay KT4 normally closed contact and the 3rd time relay KT3 coil of series connection mutually; 4th tunnel comprises the 3rd time relay KT3 normally opened contact, the 4th auxiliary reclay KA4 first normally opened contact and the 4th auxiliary reclay KA4 coil, with the 4th auxiliary reclay KA4 coils connected in series after the 3rd time relay KT3 normally opened contact is in parallel with the 4th auxiliary reclay KA4 first normally opened contact; 5th tunnel comprises the 4th auxiliary reclay KA4 second normally opened contact and the 4th time relay KT4 coil of series connection mutually.Switch-on controlling module MK1 and separating brake control module MK2 is the AC/DC changeover switch for by AC conversion being direct current weak electric signal, starting switch SB2 is for often to leave reset switch for starting characteristics test, shutdown switch SB1 is connected on power supply output line road, for normally closed reset switch is for stopping test.
Concrete test method is: received by the signal output part of separating brake control module MK2 and switch-on controlling module MK1 by the input interface of the low-pressure cabinet Remote circuit of slowdown monitoring switch, then by starting switch SB2 starting characteristics test, very first time relay K T1 disconnects opening circuit and disconnects switch-on controlling module MK1 by the second auxiliary reclay KA2 after postponing the very first time, second time relay KT2 coordinates very first time relay K T1 conducting opening circuit after postponing for the second time, 3rd time relay KT3 disconnects combined floodgate circuit and disconnects separating brake control module MK2 by the 4th auxiliary reclay KA4 after being used for delay control three time, 4th time relay KT4 coordinates the 3rd time relay KT3 conducting combined floodgate circuit after being used for delay control four time, sub-gate signal and switching signal can be produced to control to be carried out divide-shut brake action by slowdown monitoring switch in the time of separating brake control module MK2 and switch-on controlling module MK1 conducting.
The above, be only preferred embodiment of the present utility model, therefore can not limit with this scope that the utility model implements, the equivalence namely done according to the utility model claim and description change with modify, all should still belong in scope that the utility model patent contains.

Claims (10)

1. a switchgear durability test control system, comprise for sent by slowdown monitoring switch switching signal combined floodgate circuit and for sending the opening circuit of sub-gate signal to by slowdown monitoring switch, had by slowdown monitoring switch and can to respond point, switching signal carries out the automatic divide-shut brake control circuit of action, combined floodgate circuit is in parallel with opening circuit, be arranged to trigger combined floodgate circuit and send switching signal, and switching signal is interrupted after the delay very first time, trigger opening circuit after postponing for the second time again and send sub-gate signal, and sub-gate signal is interrupted after delay control three time, trigger combined floodgate circuit again after delay control four time and enter next circulation.
2. a kind of switchgear durability test control system according to claim 1, is characterized in that: also comprise for postpone the very first time and disconnect opening circuit very first time relay, for postponed for the second time and second time relay of conducting opening circuit, for delay control three time and disconnect combined floodgate circuit the 3rd time relay, for delay control four time and the 4th time relay of conducting combined floodgate circuit.
3. a kind of switchgear durability test control system according to claim 2, it is characterized in that: described combined floodgate circuit is provided with the switch-on controlling module that energising can produce switching signal, described opening circuit is provided with the separating brake control module that energising can produce sub-gate signal.
4. a kind of switchgear durability test control system according to claim 3, it is characterized in that: also comprise first, second, third, fourth auxiliary reclay, described combined floodgate circuit comprises the 3rd time relay normally closed contact, the first control part and second control part of connecting successively, first control part comprises the first auxiliary reclay normally opened contact parallel with one another and the 4th time relay normally opened contact, second control part comprises five route roads parallel with one another, and the first via comprises the second auxiliary reclay normally closed contact and switch-on controlling module of series connection mutually; Second tunnel comprises the first auxiliary reclay coil; 3rd tunnel comprises the second time relay normally closed contact and the very first time relay coil of series connection mutually; 4th tunnel comprises very first time relay normally open contact, the second auxiliary reclay first normally opened contact and the second auxiliary reclay coil, with the second auxiliary reclay coils connected in series after very first time relay normally open contact is in parallel with the second auxiliary reclay first normally opened contact; 5th tunnel comprises the second auxiliary reclay second normally opened contact and second time relay coil of series connection mutually.
5. a kind of switchgear durability test control system according to claim 4, is characterized in that: the first control part of described combined floodgate circuit comprises the first auxiliary reclay normally opened contact parallel with one another, the 4th time relay normally opened contact and starting switch.
6. a kind of switchgear durability test control system according to claim 4, it is characterized in that: described opening circuit comprises very first time relay normally closed contact, the first control part and second control part of connecting successively, first control part comprises the 3rd auxiliary reclay normally opened contact parallel with one another and the second time relay normally opened contact, second control part comprises five route roads parallel with one another, and the first via comprises the 4th auxiliary reclay normally closed contact and the separating brake control module of series connection mutually; Second tunnel comprises the 3rd auxiliary reclay coil; 3rd tunnel comprises the 4th time relay normally closed contact and the 3rd time relay coil of series connection mutually; 4th tunnel comprises the 3rd time relay normally opened contact, the 4th auxiliary reclay first normally opened contact and the 4th auxiliary reclay coil, with the 4th auxiliary reclay coils connected in series after the 3rd time relay normally opened contact is in parallel with the 4th auxiliary reclay first normally opened contact; 5th tunnel comprises the 4th auxiliary reclay second normally opened contact and the 4th time relay coil of series connection mutually.
7. a kind of switchgear durability test control system according to claim 3 or 4 or 5, it is characterized in that: described combined floodgate circuit is provided with the combined floodgate counter for detecting the switch-on controlling module number of starts, described opening circuit is provided with the separating brake counter for detecting the separating brake control module number of starts.
8. a kind of switchgear durability test control system according to claim 7, it is characterized in that: described combined floodgate counter is in parallel with switch-on controlling module, described separating brake counter is in parallel with separating brake control module.
9. a kind of switchgear durability test control system according to claim 3 or 4 or 5, is characterized in that: described switch-on controlling module and described separating brake control module are the AC/DC changeover switch for by AC conversion being direct current light current.
10. a kind of switchgear durability test control system according to any one of claim 1 to 6, is characterized in that: also comprise the power module to combined floodgate circuit and opening circuit supply 220V alternating current.
CN201520926179.3U 2015-11-19 2015-11-19 Switchgear life test control system Withdrawn - After Issue CN205210271U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520926179.3U CN205210271U (en) 2015-11-19 2015-11-19 Switchgear life test control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520926179.3U CN205210271U (en) 2015-11-19 2015-11-19 Switchgear life test control system

Publications (1)

Publication Number Publication Date
CN205210271U true CN205210271U (en) 2016-05-04

Family

ID=55847980

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520926179.3U Withdrawn - After Issue CN205210271U (en) 2015-11-19 2015-11-19 Switchgear life test control system

Country Status (1)

Country Link
CN (1) CN205210271U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105277880A (en) * 2015-11-19 2016-01-27 泉州七星电气有限公司 A switch device life test control system
CN106154155A (en) * 2016-09-19 2016-11-23 南京南瑞继保电气有限公司 A kind of protection device signal relay test system and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105277880A (en) * 2015-11-19 2016-01-27 泉州七星电气有限公司 A switch device life test control system
CN105277880B (en) * 2015-11-19 2018-01-12 七星电气股份有限公司 A kind of switchgear life test control system
CN106154155A (en) * 2016-09-19 2016-11-23 南京南瑞继保电气有限公司 A kind of protection device signal relay test system and method
CN106154155B (en) * 2016-09-19 2019-02-15 南京南瑞继保电气有限公司 A kind of protective device signal relay test macro and method

Similar Documents

Publication Publication Date Title
CN105277880A (en) A switch device life test control system
CN103346578B (en) Intelligent phase selection switch controller
CN102608465B (en) Automatic testing system for feed terminals
CN103308797B (en) Intelligent automatic standby power supply switching device calibration system
CN207503869U (en) For the low-voltage combination switch of reactive power compensator
CN1291433C (en) Low power consumption digital controlled contact device and control system thereof
CN205210271U (en) Switchgear life test control system
CN203365563U (en) Intelligent simulated circuit breaker
CN205679739U (en) The test device of Auxiliary System in Power Plant source fast switching system
CN102856137A (en) Low-voltage intelligent double-power-source change-over switch
CN103064001A (en) Detecting method and detecting device of driving board of inverter compressor
CN202548291U (en) Special controller for testing mechanical behavior of pole-mounted vacuum automatic distribution switch
CN202363966U (en) Automatic switching device for emergency power supply
CN107632198B (en) Dual-power electric quantity acquisition device and application method thereof
CN203433084U (en) A thyristor electronic switch online monitoring apparatus
CN202471865U (en) Automatic test system for feeder terminal
CN103612743B (en) A kind of Novel aerofoil folding controller and control method
CN103578803A (en) Driving control device of double-way permanent magnetic mechanism
CN203643831U (en) Lifting electromagnet control cabinet intelligent verifying device
CN207424027U (en) A kind of modular power amplifier for quickly experiment Process Control System
CN206773057U (en) High- and low-voltage circuit dead electricity warning device
CN201732732U (en) Small voltage controlling device of relay
CN205281156U (en) Valve falls quick drive arrangement of electricity
CN204239218U (en) Water pump controller
CN104052056A (en) Self-adaptive zero crossing switching driver of low-voltage contact switch

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 362000 Qixing Industrial Park, Jiangnan high tech electronic Park, Quanzhou, Fujian

Patentee after: Seven Star Electric Limited by Share Ltd

Address before: 362000 Qixing Industrial Park, Jiangnan high tech electronic Park, Quanzhou, Fujian

Patentee before: Quanzhou Sevenstars Electric Co., Ltd.

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20160504

Effective date of abandoning: 20180112