CN207965077U - The test device of the external breaker of electric energy meter - Google Patents

The test device of the external breaker of electric energy meter Download PDF

Info

Publication number
CN207965077U
CN207965077U CN201820510353.XU CN201820510353U CN207965077U CN 207965077 U CN207965077 U CN 207965077U CN 201820510353 U CN201820510353 U CN 201820510353U CN 207965077 U CN207965077 U CN 207965077U
Authority
CN
China
Prior art keywords
tested
external breaker
module
breaker
normally opened
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820510353.XU
Other languages
Chinese (zh)
Inventor
孙万勇
邓虎
刘铖弟
周兵
夏明亮
卓亚雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weisheng Energy Technology Co ltd
Original Assignee
Wasion Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wasion Electric Co Ltd filed Critical Wasion Electric Co Ltd
Priority to CN201820510353.XU priority Critical patent/CN207965077U/en
Application granted granted Critical
Publication of CN207965077U publication Critical patent/CN207965077U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of test devices of the external breaker of electric energy meter, including controller, pressure regulator, transformer, detection of electrical leakage module, voltage signal detection module and switching switching group;Three phase mains signal connects external breaker input terminal to be tested;Voltage signal detection module connects external breaker output end to be tested;Pressure regulator input terminal connects power supply, if output end exports main line voltage signal by transformer and connects the control terminal of external breaker to be tested by switching switching group;Leakage tests module is connected in the control terminal and input terminal of transformer to be tested;Controller and detection of electrical leakage module, voltage signal detection module and switching switching group connects, for obtaining detection information and judging the performance of external breaker, while controlling the working condition that switching switchs.The utility model realizes comprehensive test of the test device to the external breaker of electric energy meter all the way, and test process is simple, and circuit is simple and reliable, and testing efficiency is high.

Description

The test device of the external breaker of electric energy meter
Technical field
The utility model is specifically related to a kind of test device of the external breaker of electric energy meter.
Background technology
With the development and the improvement of people's living standards of national economy technology, electric energy has become people's production and life One of most important energy in work, endless facility is brought to the production and life of people.
Electric energy meter is the extremely important electric energy measuring equipment of electric system, and the external breaker of electric energy meter is then electric energy meter reality Now take the critical component of control function.With the continuous improvement that electric system requires electric power safety and tariff recovery, electric network consecutive The technical standard of the external breaker of electric energy meter is issued.External breaker is traditional miniature circuit breaker and modern electronic technology In conjunction with core is automatic divide-shut brake and feedback of status.Therefore, the performance quality of external breaker is also directly related to electric energy The quality of table or even electric network performance.
The core of external breaker is automatic divide-shut brake and feedback of status, it increases control list compared with conventional small breaker There is control terminal and feedback end, conventional small breaker only to have phase line end for element module, control unit module.External breaker The acting characteristic and feedback of AC220V level control external breaker when referring to the AC220V level changes of phase line end or control terminal The feedback of status situation at end;Manual/auto pattern switching refers to external breaker automatic divide-shut brake and " hand under " automatic " pattern It is dynamic " characteristic of dynamic circuit connector of saying good-bye automatically under pattern;Leakage Current is the steady of external breaker not bringing onto load time control end and phase line end State current value;Remote auto branch wire time be external breaker receive control terminal signal intensity start to switch complete division The time of lock action;When delayed indicates that phase line end and control terminal re-power, control end signal changes immediately, external open circuit Response time of the device to control signal;The external breaker of driving capability expression is wanted can be in 60%-120% rated operational voltages 220V In the range of work normally, and cannot be damaged when applying 380V voltages;Mechanical life indicates that external breaker receives certain frequency The control end signal of rate remains to normal work and use after carrying out the no less than breaking-closing operating bout of setting number.
Due to the particularity of external breaker function, the breaker detection device of conventional small cannot meet external breaker The requirement of detection, and there is no the test functions that any type test device can realize above-mentioned external breaker now.
Utility model content
The purpose of this utility model is to provide a kind of circuit is simple and reliable, the external breaker detection of electric energy meter can be completed The external breaker of electric energy meter test device.
The test device of the external breaker of this electric energy meter provided by the utility model, including controller, pressure regulator, transformation Device, detection of electrical leakage module, voltage signal detection module and switching switching group;Three phase mains signal is directly connected to be tested external disconnected The input terminal of road device;Voltage signal detection module is directly connected to the output end of external breaker to be tested and detects to be tested external The feedback line signal of the output voltage signal of breaker and external breaker to be tested;The input terminal of pressure regulator connects three phase mains Signal, if the output end of pressure regulator is waited for by exporting main line voltage signal after transformer transformation, and by switching switching group connection Test the control terminal of external breaker;Leakage tests module is connected in the control terminal and input terminal of transformer to be tested, is used for Detect the leakage current of external breaker to be tested;Controller is switched with detection of electrical leakage module, voltage signal detection module and switching Group connects, the detection information for obtaining detection of electrical leakage module and voltage signal detection module and the property for judging external breaker Can, while controller also sends out the working condition of control command control switching switch, to realize several external breaker Working condition switches.
The test device of the external breaker of the electric energy meter further includes protection module;Three phase mains signal is by protecting mould The input terminal of pressure regulator or external breaker to be tested is reconnected after block;Protection module is used for protection tester.
The test device of the external breaker of the electric energy meter further includes indicating module;Indicating module is connect with controller, It is used to indicate the working condition of the test device of the external breaker of the electric energy meter.
The input terminal of the transformer inputs for 220V, and the output end of transformer includes 10V output ends, 132V outputs End, 220V output ends, 264V output ends and 380V output ends.
The test device of the external breaker of this electric energy meter provided by the utility model, is set by reasonable and complete circuit Meter, realizes comprehensive test of the test device to the external breaker of electric energy meter all the way, and test process is simple, circuit simply may be used It leans on, testing efficiency is high.
Description of the drawings
Fig. 1 is the functional block diagram of the utility model.
Fig. 2 is the circuit diagram of the utility model.
Specific implementation mode
It is the functional block diagram of the utility model as shown in Figure 1:The external open circuit of this electric energy meter provided by the utility model The test device of device, including controller, pressure regulator, transformer, detection of electrical leakage module, voltage signal detection module, switching switch Group, protection module and indicating module;Three phase mains signal is directly connected to the input terminal of external breaker to be tested;Voltage signal is examined Survey module be directly connected to the output end of external breaker to be tested and detect external breaker to be tested output voltage signal and The feedback line signal of external breaker to be tested;The input terminal of pressure regulator connects three phase mains signal, and the output end of pressure regulator is logical If exporting main line voltage signal after crossing transformer transformation, and the control of external breaker to be tested is connected by switching switching group End;Leakage tests module is connected in the control terminal and input terminal of transformer to be tested, for detecting external breaker to be tested Leakage current;Controller is connect with detection of electrical leakage module, voltage signal detection module and switching switching group, for obtaining electric leakage inspection It surveys the detection information of module and voltage signal detection module and judges the performance of external breaker, while controller also sends out control The working condition of order control switching switch, to realize the working condition switching of several external breaker;Three phase mains is believed Number by reconnecting the input terminal of pressure regulator or external breaker to be tested after protection module, protection module is for protecting test dress It sets;Indicating module is connect with controller, is used to indicate the working condition of the test device of the external breaker of the electric energy meter.
It is illustrated in figure 2 the circuit diagram of the utility model:Such as figure, it can be seen that, power supply input signal is by protecting mould Block circuit breaker Q F1 (breaker total as test device) generates power supply signal afterwards, and power supply signal separates to be signally attached to all the way The input terminal of pressure regulator;The normally opened node (KA1, KA2 and KA3) and starting switch QF2 that power supply signal passes through the first relay group Afterwards, it is connected with the normally closed node of third detection switch KA24 again by the normally opened node of input relay KA11 to be tested external The input terminal of breaker, and the both ends of the normally closed node of third detection switch KA24 are parallel with the third detection switch after series connection The normally opened node and detection of electrical leakage module of KA24;Indicator light H1, H2 and H3 are attempted by between three-phase power line and zero curve, for referring to Show the state of power cord;The output end of pressure regulator is by exporting 5 road power supply signals, respectively 10V output ends, 132V after transformer Output end, 220V output ends, 264V output ends and 380V output ends;Switching switching group include switch KA1, KA2, KA3, KA9, KA10, KA11, KA24 and KA25, and above-mentioned switch is the contact switch of relay or contactor, it can therefore be seen that There are multiple KA9 switch contacts in figure, indicates that multiple KA9 switch contacts (including normally-closed contact and open contacts) are same The contact switch of a relay or contactor, and all switch contacts marked as KA9 act simultaneously;Three phase mains signal is logical External open circuit to be tested is connected after overprotection circuit breaker Q F1, switch KA1~KA3, starting switch QF2 and relay switch KA11 The input terminal of device (product is indicated in figure);The feedback line output terminal (feedback line 1F-1 is indicated in figure) of external breaker to be tested is logical Diode D2 connection voltage signal detection modules are crossed, zero curve is connected simultaneously also by indicator light;Voltage signal detection module passes through Output relay (switch KA25) connects the output end of external breaker (indicating product in figure) to be tested and detects to be tested outer The output voltage signal of breaker is set, voltage signal detection module is also used for detecting the feedback line of external breaker to be tested simultaneously Voltage;The secondary side output end of the primary side of the output end connection transformer of pressure regulator, transformer includes 10V output ends, 132V outputs End, 220V output ends, 264V output ends and 380V output ends, 10V output ends connect the connection of 10V switches KA4,132V output end 132V switches KA5,220V output end connects 220V switches KA6,264V output end connection 264V switches KA7,380V output end and connects 380V switches KA8, KA4~KA8 are met by being divided into three road signals after insuring F1, and first via signal is opened by the detection of switch first The normally closed node and voltmeter of pass KA9 are connected to the ends 0V of transformer secondary, and second road signal passes through the first detection switch KA9's Power cord A phase lines are connected after the normally opened node of normally closed node and the second detection switch KA10;Third road signal passes through the first detection After the normally opened node and diode D1 of switch KA9 and the normally opened node of the first detection switch KA9, then pass through the second detection switch The normally opened node of KA10 connects power cord A phase lines;The output end of second road signal and third road signal passes through third detection switch The normally opened node of the normally closed node of KA24, resistance R and the 4th detection switch KA17 is connected to the control of external breaker to be tested End, while the output end of second road signal and third road signal is also surveyed by the normally opened node of third detection switch KA24 and electric leakage Die trial block connects the control terminal of external breaker to be tested.
The test device of the above-mentioned external breaker of electric energy meter, the course of work are as follows:
In description below, if description relay KA9 is closed, show that the control coil of relay KA9 is closed, at this time The action of the action node of relay KA9 should be:It is originally used for the action node of normally closed node (as shown in Figure 2 and voltage The concatenated normally closed node KA9 of table) will be switched off, and be originally used for normally opened node action node (as shown in Figure 2 with diode D1 Concatenated normally opened node KA9) it will be closed;The working condition of remaining relay is as foregoing description acts.
1) AC220V level Control experiment:Intermediate relay KA1, KA2, KA3 closure, pressure regulator secondary side export 220V, Intermediate relay KA6 is closed, and relay KA4, KA5, KA7, KA8, KA9 and KA10 are failure to actuate, and relay KA11 is closed, relay Device KA24 is failure to actuate;
At this point, voltage signal detection module is devoted oneself to work;If relay KA17 is controlled by controller and energized action, The normally opened contact of KA17 is closed, then external circuit breaker to be tested should be able to automatic closing, and then phase line leading-out terminal A1, B1, C1, N1 and feedback line have voltage output, then voltage signal detection module output end DI0-DI3 output signals, the input of DI0-DI3 signals Controller;Controller judges that the external breaker to be tested is qualified or not in this tests according to the voltage signal received.
2) Leakage Current is tested:Intermediate relay KA1, KA2 and KA3 is closed, and pressure regulator secondary side exports 220V, it is intermediate after Electric appliance KA6 is closed, and relay KA4, KA5, KA7, KA8, KA9 and KA10 are failure to actuate, and relay KA11 and KA24 are closed, to be measured It tries the corresponding detection of electrical leakage module of external breaker to devote oneself to work, the phase line Leakage Current to external breaker to be tested and control End steady-state current test and test result is uploaded controller;Controller is to be tested outer according to the upload result judgement of reception Whether qualified set breaker.
3) remote auto branch wire time is tested:Intermediate relay KA1, KA2 and KA3 are closed, the output of pressure regulator secondary side 220V, intermediate relay KA6 are closed, and relay KA4, KA5, KA7, KA8, KA9 and KA10 are failure to actuate, and relay KA11 is closed It closes, relay KA24 is failure to actuate, and voltage signal detection module is devoted oneself to work;
When this tests, controller control relay KA17 powers on action, and starts simultaneously at timing (timing may be used The crystal oscillation signal of controller itself institute band carries out timing or external standard timing unit carries out timing), and examined in voltage signal It surveys when module detects the output end voltage of external circuits device to be tested and stops timing, timing time at this time is remote switching Time;
In addition, controller control relay KA17 dead electricity resets and start timing, and detected in voltage signal detection module Until the Voltage Drop of external breaker output end to be tested and stop timing, when timing time at this time is long-range separating brake Between;
Controller judges whether external breaker to be tested is qualified according to the long-range branch wire time detected.
4) the delayed time tests:Intermediate relay KA1, KA2 and KA3 are closed, and pressure regulator secondary side exports 220V, in Between relay KA6 be closed, relay KA4, KA5, KA7, KA8, KA9 and KA10 are failure to actuate, and relay KA11 is closed, relay KA24 is failure to actuate, and voltage signal detection module is devoted oneself to work;
When this tests, relay KA1, KA2 and KA3 obtain it is electric after, control relay KA11 is closed, and controls relay KA17 must not electricity, so that the expense control of external breaker to be tested is switched and be placed in arrearage state, then controller control relay KA1, KA2 and KA3 is disconnected, and makes system cut-off, is then controlled relay KA1, KA2, KA3 and KA17 and is closed at, system telegram in reply.This When, controller records system telegram in reply until the voltage signal detection module of external breaker to be tested detects corresponding voltage Time be the delayed time;Controller judges whether external breaker to be tested closes according to the delayed time detected Lattice.
5) driving capability is tested:
When pressure regulator secondary side exports 10V, intermediate relay KA1 is closed, and relay KA2 and KA3 are failure to actuate, intermediate relay Device KA4 and KA9 obtain electric closure, and relay KA5, KA6, KA7, KA8 and KA10 are failure to actuate;Relay KA11 and KA17 are closed, after Electric appliance KA24 is failure to actuate;External breaker to be tested at this time should be at off-state, and voltage signal detection module is without output;
Pressure regulator secondary side export 132V when, intermediate relay KA1, KA2 and KA3 are failure to actuate, intermediate relay KA5 and KA10 obtains electric closure, and relay KA4, KA6, KA7, KA8 and KA9 are failure to actuate;Relay KA11 is closed, and relay KA24 is motionless Make;If relay KA17 is closed at this time, the output end of external breaker to be tested should output voltage signal, voltage signal inspection Surveying module DI0-DI3 has output;If relay KA17 is disconnected, the output end of external breaker to be tested should be without output voltage Signal, voltage signal detection module DI0-DI3 is without output;
When pressure regulator secondary side exports 264V, intermediate relay KA7 and KA10 obtain electric closure, relay KA4, KA5, KA6, KA8 and KA9 are failure to actuate;Relay KA11 is closed, and relay KA24 is failure to actuate;If relay KA17 is closed at this time, to be tested The output end of external breaker should output voltage signal, voltage signal detection module DI0-DI3 has output;If relay KA17 It disconnects, then the output end of external breaker to be tested should be without output voltage signal, and voltage signal detection module DI0-DI3 is without defeated Go out;
When pressure regulator secondary side exports 380V, intermediate relay KA8 and KA10 obtain electric closure, relay KA4, KA5, KA6, KA7 and KA9 are failure to actuate;Relay KA11 and KA17 are closed, and relay KA24 is failure to actuate;380V voltages are carried out under this kind of state After experiment, it should 132V and 264V is carried out to external breaker to be tested again and is tested, is judged after being tested by 380V, it is to be tested outer Whether qualified set breaker.
6) mechanical endurance test:Intermediate relay KA1, KA2 and KA3 is closed, and pressure regulator secondary side exports 220V, it is intermediate after Electric appliance KA6 is closed, and relay KA4, KA5, KA7, KA8, KA9 and KA10 are failure to actuate, and relay KA11 is closed, relay KA17 It is closed or is disconnected according to measurement condition, relay KA24 is failure to actuate, and voltage signal detection module is devoted oneself to work at this time;
When this tests, if " product test power-off time " is set as A seconds, " product test conduction time " is set as B Second, then controller control intermediate relay KA17 obtains the electric and then A seconds dead electricity that are closed for B seconds in the second per (A+B) and resets.In relay During KA17 obtains electric closure, external breaker to be tested at this time answers automatic closing, leading-out terminal and feedback end to have voltage output, in turn Corresponding voltage signal detection module DI0-DI3 has signal output;And during relay KA17 power-off, external breaker to be tested Automatic brake separating, leading-out terminal and feedback end Non voltage output are answered, and then corresponding voltage signal detection module DI0-DI3 no signals are defeated Go out;Test result and the total degree of accumulative mechanical life and unqualified number of the controller judgement per (A+B) second one bout, from And judge that external breaker to be tested is qualified or not.
In the specific implementation, the test device of the external breaker of the electric energy meter can more set concurrent workings, it is each Test device can share a controller, i.e. a controller controls all relays in several test devices, to Complete corresponding test.In that case, for testing efficiency compared to the test device that separate unit covers, testing efficiency is more high Effect.

Claims (5)

1. a kind of test device of the external breaker of electric energy meter, it is characterised in that including controller, pressure regulator, transformer, electric leakage Detection module, voltage signal detection module and switching switching group;Three phase mains signal is directly connected to external breaker to be tested Input terminal;Voltage signal detection module is directly connected to the output end of external breaker to be tested and detects external breaker to be tested Output voltage signal and external breaker to be tested feedback line signal;The input terminal of pressure regulator connects three phase mains signal, If the output end of pressure regulator is connected by exporting main line voltage signal after transformer transformation, and by switching switching group outside to be tested Set the control terminal of breaker;Leakage tests module is connected in the control terminal and input terminal of transformer to be tested, is waited for for detecting Test the leakage current of external breaker;Controller is connect with detection of electrical leakage module, voltage signal detection module and switching switching group, Detection information for obtaining detection of electrical leakage module and voltage signal detection module and the performance for judging external breaker, same to time control Device processed also sends out the working condition of control command control switching switch, to realize that the working condition of several external breaker is cut It changes.
2. the test device of the external breaker of electric energy meter according to claim 1, it is characterised in that further include protection module; Three phase mains signal passes through the input terminal of reconnection pressure regulator or external breaker to be tested after protection module;Protection module is used for Protection tester.
3. the test device of the external breaker of electric energy meter according to claim 1, it is characterised in that outside the electric energy meter The test device for setting breaker further includes indicating module;Indicating module is connect with controller, and it is external to be used to indicate the electric energy meter The working condition of the test device of breaker.
4. the test device of the external breaker of electric energy meter according to one of claims 1 to 3, it is characterised in that the change The input terminal of depressor inputs for 220V, and the output end of transformer includes 10V output ends, 132V output ends, 220V output ends, 264V Output end and 380V output ends.
5. the test device of the external breaker of electric energy meter according to claim 4, it is characterised in that power supply input signal is logical Power supply signal is generated after overprotection module breaker, power supply signal separates the input terminal for being signally attached to pressure regulator all the way;Power supply After normally opened node and starting switch that signal passes through the first relay group, again by the normally opened node and third of input relay The normally closed node of detection switch connects the input terminal of external breaker to be tested, and the both ends of the normally closed node of third detection switch It is parallel with the normally opened node and detection of electrical leakage module of the third detection switch after series connection;After the output end of pressure regulator is by transformer Export 5 road power supply signals, respectively 10V output ends, 132V output ends, 220V output ends, 264V output ends and 380V output ends; The feedback line output terminal of external breaker to be tested is by connecting voltage signal detection module;Voltage signal detection module passes through defeated Go out relay to connect the output end of external breaker to be tested and detect the output voltage signal of external breaker to be tested, voltage Signal detection module is also used for detecting the feedback line voltage of external breaker to be tested simultaneously;The output end of pressure regulator connects transformation The primary side of device, the secondary side output end of transformer include 10V output ends, 132V output ends, 220V output ends, 264V output ends and 380V output ends, 10V output ends connect 10V and switch normally opened node, and 132V output ends connect 132V and switch normally opened node, and 220V is defeated Outlet connects 220V and switchs normally opened node, and 264V output ends connect 264V and switch normally opened node, and 380V output ends connection 380V is opened Normally opened node is closed, 10V switchs normally opened node, 132V switchs normally opened node, 220V switchs normally opened node, 264V switchs normally opened node Normally opened node is switched by being divided into three road signals after insurance with 380V, and first via signal is normal by the first detection switch of switch Close node and voltmeter are connected to the ends 0V of transformer secondary, and second road signal passes through the normally closed node of the first detection switch and Power cord is connected after the normally opened node of two detection switch;Normally opened node, the diode that third road signal passes through the first detection switch Power cord is connected after the normally opened node of the first detection switch, then by the normally opened node of the second detection switch;Second road signal Connected by the normally opened node of the normally closed node of third detection switch, resistance and the 4th detection switch with the output end of third road signal It is connected to the control terminal of external breaker to be tested, while the output end of second road signal and third road signal is also detected by third The normally opened node of switch connects the control terminal of external breaker to be tested with leakage tests module.
CN201820510353.XU 2018-04-11 2018-04-11 The test device of the external breaker of electric energy meter Active CN207965077U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820510353.XU CN207965077U (en) 2018-04-11 2018-04-11 The test device of the external breaker of electric energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820510353.XU CN207965077U (en) 2018-04-11 2018-04-11 The test device of the external breaker of electric energy meter

Publications (1)

Publication Number Publication Date
CN207965077U true CN207965077U (en) 2018-10-12

Family

ID=63727597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820510353.XU Active CN207965077U (en) 2018-04-11 2018-04-11 The test device of the external breaker of electric energy meter

Country Status (1)

Country Link
CN (1) CN207965077U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113567856A (en) * 2021-08-31 2021-10-29 广东电网有限责任公司 Detection device and detection method for external circuit breaker of electric energy meter
CN113589218A (en) * 2021-08-06 2021-11-02 广西电网有限责任公司贵港供电局 Action tester of external circuit breaker of cost control electric energy meter

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113589218A (en) * 2021-08-06 2021-11-02 广西电网有限责任公司贵港供电局 Action tester of external circuit breaker of cost control electric energy meter
CN113567856A (en) * 2021-08-31 2021-10-29 广东电网有限责任公司 Detection device and detection method for external circuit breaker of electric energy meter

Similar Documents

Publication Publication Date Title
CN201993444U (en) Relay testing device and system
CN201477186U (en) Tester for residual current circuit breaker
CN102072997B (en) Spare automatic switching logic test method for checking main transformer mutual switching mode
CN107064790B (en) Voltage time type logic tester and testing method
CN102890235A (en) Fault detection method and device
CN207380206U (en) It is a kind of to take the control external System for Circuit Breaker device for detecting performance of electric energy meter
CN110426627B (en) Power relay contact performance test system for relay protection device
CN207965077U (en) The test device of the external breaker of electric energy meter
CN210129032U (en) Device for on-line monitoring fault of current transformer
CN110031756B (en) DC contactor performance test conversion circuit and service life test method
CN201287997Y (en) Elevator control system with gate interlock automatic detection
CN104330730A (en) Contactor connecting and breaking test monitoring protection device and operation mode thereof
CN207752134U (en) Portable electric test apparatus function inspection device
CN211043532U (en) Transformer test system
CN105067998A (en) Voltage and current fluctuation detector
CN204719205U (en) Isolating switch time-parameters test simulator
CN102096037B (en) Testing system and method of high-voltage processing plate of thyristor
CN208172187U (en) A kind of detection device of electronic time relay
CN104345267A (en) Aging and early failure detection method and detection apparatus of solid relay
CN109828203A (en) A kind of relay contact automatic detection device and detection method
CN102854452A (en) Printed circuit board assembly (PCBA) function testing device and testing method thereof
CN206557547U (en) Relay actuation time test circuit
CN102095951B (en) Spare power automatic switching logic test method for checking automatic switching mode of low-pressure side section switch
CN209728128U (en) A kind of relay contact automatic detection device
CN110672940B (en) Distribution automation integration testing arrangement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 411201 28 Bai Shi Road, Jing Kai District, Xiangtan, Hunan

Patentee after: Weisheng Energy Technology Co.,Ltd.

Address before: 411201 28 Bai Shi Road, Jing Kai District, Xiangtan, Hunan

Patentee before: WASION ELECTRIC Co.,Ltd.

CP01 Change in the name or title of a patent holder