CN203641693U - Pipe hanger fixing device - Google Patents

Pipe hanger fixing device Download PDF

Info

Publication number
CN203641693U
CN203641693U CN201320875126.4U CN201320875126U CN203641693U CN 203641693 U CN203641693 U CN 203641693U CN 201320875126 U CN201320875126 U CN 201320875126U CN 203641693 U CN203641693 U CN 203641693U
Authority
CN
China
Prior art keywords
board
connecting plate
gap
fixing device
clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320875126.4U
Other languages
Chinese (zh)
Inventor
李宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Electric Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Electric Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN201320875126.4U priority Critical patent/CN203641693U/en
Application granted granted Critical
Publication of CN203641693U publication Critical patent/CN203641693U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a pipe hanger fixing device. The pipe hanger fixing device comprises a connection board and a clamping board, wherein the connection board is detachably connected with the clamping board; the middle portion of the connection board is provided with a groove, and the bottom surface of the groove is provided with a hanging rod connection hole; the clamping board is located above the connection board, a first gap is formed between the clamping board and the connection board, and a bottom board of a steel beam is fixed in the first gap. The middle portion of the clamping board is provided with a second gap located above the groove, and the middle portion of the steel beam penetrates through the second gap. The two ends of the connection board are connected with the clamping board through bolts. According to the pipe hanger fixing device, the clamping board is connected with the connection board through the bolts, so that the steel beam is connected with a hanger, the structure of the steel beam can not be damaged, and hanging quality is stable; the bolts are screwed sequentially so that connection can be achieved, operation is convenient, and construction speed is high.

Description

A kind of pipeline elevator fixing device
Technical field
The utility model relates to a kind of frock securing means, particularly a kind of pipeline elevator fixing device.
Background technique
In steel building, have various pipes as ventilation duct, water supply and drainage pipeline, fire protection pipeline and threading spool etc., these pipeline elevators and steel roof generally adopt welding or punching is connected on structural steel method to be fixed at present.
Welding method is that the suspension bracket of pipeline is welded direct on the girder steel of steel roof, and this way exists a lot of drawbacks: the one, destroy the anticorrosive coat of steel structure, and in welding process, the anticorrosive coat of steel structure is destroyed under high temperature action; The 2nd, adopt when welding manner, if the welding machine of selecting, welding consumables or welding method are improper, easily the structure of girder steel are caused and had a strong impact on, the temperature control of welding is improper easily will cause the structure stability of girder steel seriously influenced; In welding process, select improperly due to method or material, the most easily cause steel structure distortion, distortion not only affects outward appearance, more can affect steel structure bearing capacity, and distortion is processed to rectification also needs very large physical resources and financial resources.
Although the impact that adopts the method for punching to cause the structure stability of girder steel is little, a lot of inconvenient places of same existence.The height of general factory building is all higher, and what have even reaches more than 10 meter.Under high altitude environment, to girder steel punching, be first to operate more difficultly, secondly also have very large potential safety hazard, moreover the girder steel of steel building is all thicker, steel hardness is higher, and adopting general electric drill and drill bit to be all difficult to beat thoroughly or to beat also needs for a long time, and efficiency is lower.
Model utility content
(1) technical problem that will solve
The technical problems to be solved in the utility model is: between girder steel and suspension bracket, by being welded to connect, can destroy the anticorrosive coat of girder steel, affect the stability of steel structure or cause girder steel distortion; When fixing by punching, high-altitude punch operation is dangerous, and steel structure is thicker, and hardness is also higher, punches consuming time long or do not get through at all.
(2) technological scheme
In order to solve the problems of the technologies described above, the utility model provides a kind of pipeline elevator fixing device, comprises connecting plate and clamping plate, and described connecting plate and clamping plate removably connect; The middle part of described connecting plate is provided with a groove, and the bottom surface of described groove is provided with suspension rod attachment hole; Described clamping plate are positioned at described connecting plate top, leave gap one between described clamping plate and connecting plate, and the base plate of girder steel is fixed in described gap one.
Described clamping plate middle part is provided with gap two, and described gap two is positioned at described groove top, and the middle part of girder steel is through described gap two.
The two ends of described connecting plate are connected with clamping plate by bolt.
(3) beneficial effect
Technique scheme tool has the following advantages: be bolted clamping plate and connecting plate, can realize being connected between girder steel and suspension bracket, can not destroy the structure of girder steel, lifting steady quality; Bolt tightening can be realized connection by order, easy to operate, and speed of application is fast.
Brief description of the drawings
Fig. 1 is the use view of fixing device described in the utility model embodiment.
Wherein, 1, girder steel; 2, clamping plate; 3, bolt; 4, connecting plate; 5, suspension rod.
Embodiment
Below in conjunction with drawings and Examples, embodiment of the present utility model is described in further detail.Following examples are used for illustrating the utility model, but are not used for limiting scope of the present utility model.
As shown in Figure 1, the two ends of connecting plate 4 and clamping plate 2 removably connect by bolt 3, and the middle part of connecting plate 4 is provided with a groove, and the bottom surface of groove is provided with suspension rod 5 attachment holes, for the suspension rod 5 of connecting hanging top of the trellis, to realize being connected of connecting plate 4 and suspension bracket; Clamping plate 2 are positioned at the top of connecting plate 4, between clamping plate 2 and connecting plate 4, leave gap one, and for girder steel 1 and connecting plate 4 are linked together, the base plate of girder steel 1 is fixed in the gap one between clamping plate 2 and connecting plate 4.The length of clamping plate 2 should be determined according to the width of girder steel 1 base plate.Clamping plate 2 middle parts are provided with gap two, and clamping plate 2 are divided into two by gap two, and girder steel 1 is generally I-steel, and two clamping plates 2 is arranged on respectively on the base plate of I-steel waist both sides, and the waist of as far as possible close I-steel, to ensure fastening quality.
Preferably, the two ends of connecting plate 4 are connected with two clamping plates 2 respectively by bolt 3, can certainly be fastenedly connected by other dismountable Placement.
Suspension rod 5 connects by the groove floor of suspension rod 5 attachment hole connecting plates 4, the upper surface of connecting plate 4 is close to the bottom surface of girder steel 1, two clamping plates 2 is connected with the two ends of connecting plate 4 by bolt 3 respectively, fastening nut, girder steel 1 base plate is clamped between connecting plate 4 and clamping plate 2, can completes the attended operation between girder steel 1 and suspension bracket.
The device that can realize by be connected locking nut etc. at suspension rod 5 tops self-locking between suspension rod 5 and connecting plate 4 connects, and prevents that suspension rod 5 from coming off.The groove size of connecting plate 4 and shape, should determine with the Placement of connecting plate 4 according to suspension rod 5 and suspension rod 5, groove floor is plane structure, stressed even to ensure, ensures lifting quality; The position of the width of connecting plate 4 and the bolt at two ends 3 attachment holes should be determined according to the width of girder steel 1 base plate, should ensure to connect rear bolt 3 and is close to girder steel 1 base plate or leaves a small amount of gap.Bolt 3 attachment holes on connecting plate 4 can also play positioning action for bolt 3, prevent that clamping plate 2 from coming off or sliping off.
As can be seen from the above embodiments, the utility model, by adopting the mode of bolt 3 connecting cleats 2 and connecting plate 4, has been realized being connected between girder steel 1 and suspension bracket, simple to operate, easy for installation, it is shorter that operator install the time needing, indefatigability, the amount of labour is less, has ensured personal security.Do not destroy the anticorrosive coat of steel structure and girder steel 1, ensure the lifting quality of girder steel 1 and suspension bracket entirety.
The above is only preferred implementation of the present utility model; should be understood that; for those skilled in the art; do not departing under the prerequisite of the utility model know-why; can also make some improvement and replacement, these improvement and replacement also should be considered as protection domain of the present utility model.

Claims (3)

1. a pipeline elevator fixing device, is characterized in that, comprises connecting plate and clamping plate, and described connecting plate and clamping plate removably connect; The middle part of described connecting plate is provided with a groove, and the bottom surface of described groove is provided with suspension rod attachment hole; Described clamping plate are positioned at described connecting plate top, leave gap one between described clamping plate and connecting plate, and the base plate of girder steel is fixed in described gap one.
2. a kind of pipeline elevator fixing device as claimed in claim 1, is characterized in that, described clamping plate middle part is provided with gap two, and described gap two is positioned at described groove top, and the middle part of girder steel is through described gap two.
3. a kind of pipeline elevator fixing device as claimed in claim 1, is characterized in that, the two ends of described connecting plate are connected with clamping plate by bolt.
CN201320875126.4U 2013-12-27 2013-12-27 Pipe hanger fixing device Expired - Fee Related CN203641693U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320875126.4U CN203641693U (en) 2013-12-27 2013-12-27 Pipe hanger fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320875126.4U CN203641693U (en) 2013-12-27 2013-12-27 Pipe hanger fixing device

Publications (1)

Publication Number Publication Date
CN203641693U true CN203641693U (en) 2014-06-11

Family

ID=50872938

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320875126.4U Expired - Fee Related CN203641693U (en) 2013-12-27 2013-12-27 Pipe hanger fixing device

Country Status (1)

Country Link
CN (1) CN203641693U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107152566A (en) * 2017-06-02 2017-09-12 安徽奥睿德科技发展有限公司 A kind of denoising pipe installing mechanism for I-steel
CN113872141A (en) * 2021-09-09 2021-12-31 国网河南省电力公司孟州市供电公司 Electric power pipeline plugging device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107152566A (en) * 2017-06-02 2017-09-12 安徽奥睿德科技发展有限公司 A kind of denoising pipe installing mechanism for I-steel
CN113872141A (en) * 2021-09-09 2021-12-31 国网河南省电力公司孟州市供电公司 Electric power pipeline plugging device
CN113872141B (en) * 2021-09-09 2023-02-17 国网河南省电力公司孟州市供电公司 Electric power pipeline plugging device

Similar Documents

Publication Publication Date Title
CN203641670U (en) U-shaped fixing device for pipe hanger
CN201496669U (en) Pipeline supporting and hanging frame
CN206016225U (en) One kind is without counterweight fixture type gondola-hanging mechanism
CN203641693U (en) Pipe hanger fixing device
CN206769170U (en) A kind of furred ceiling conversion layer structure
CN202388112U (en) Mounting device of arc striking and extinguishing plate
CN208292485U (en) TBM headstock turnniing over and lifting device
CN204205470U (en) A kind of composite cable bridge-rack
CN103089010A (en) Cradle construction device replacing reinforced concrete beam bottom protection layer and cradle construction method
CN203308107U (en) Removable load-bearing bracket for I-steel upright
CN202767547U (en) Nuclear plant construction safety rope fixing clamping rod
CN105648918A (en) Deviation device and construction method thereof
CN102425713B (en) Temporary supporting device and method for installation and transportation of wind driven generator cabin
CN206376517U (en) A kind of scaffold wall connecting piece
CN204081984U (en) The assembling cat ladder that a kind of Construction of Steel Structure is general
CN105932619A (en) Apparatus convenient for fixing and installing bus duct
CN203719096U (en) Air conditioner outdoor unit support frame
CN204641742U (en) Bolt connecting type diesel locomotive vibration damping cooling room structure
CN203878845U (en) Conversion layer hung ceiling structure
CN204265232U (en) A kind of I-beam section uses stressed suspension rod
CN206467872U (en) Adjustable derrick rig in large span space grid structure furred ceiling
CN104141823A (en) Detachable supporting hanging frame
CN206034905U (en) Board combination design mould falls in bathroom
CN204953578U (en) Foundary weight removes hanging flower basket device
CN204620407U (en) A kind of sieve plate fastener

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140611

Termination date: 20201227

CF01 Termination of patent right due to non-payment of annual fee