CN203613544U - Envelop enclosure for deep foundation pit partition simultaneous excavation - Google Patents

Envelop enclosure for deep foundation pit partition simultaneous excavation Download PDF

Info

Publication number
CN203613544U
CN203613544U CN201320765468.0U CN201320765468U CN203613544U CN 203613544 U CN203613544 U CN 203613544U CN 201320765468 U CN201320765468 U CN 201320765468U CN 203613544 U CN203613544 U CN 203613544U
Authority
CN
China
Prior art keywords
excavation
floor
foundation pit
underground
deep foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320765468.0U
Other languages
Chinese (zh)
Inventor
王勇
汪贵平
林靖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shipbuilding NDRI Engineering Co Ltd
Original Assignee
China Shipbuilding NDRI Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shipbuilding NDRI Engineering Co Ltd filed Critical China Shipbuilding NDRI Engineering Co Ltd
Priority to CN201320765468.0U priority Critical patent/CN203613544U/en
Application granted granted Critical
Publication of CN203613544U publication Critical patent/CN203613544U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses an envelop enclosure for deep foundation pit partition simultaneous excavation. The envelop enclosure comprises a foundation pit excavation area and a foundation fit base plate which are defined by an underground diaphragm wall. The envelop enclosure is characterized in that the foundation pit excavation area is divided by a partition wall into a plurality of excavation partitions of a horizontal supporting structure, the horizontal supporting structure is composed of a ground layer structural floor, a first underground floor structural floor and a second underground floor structural floor, the ground layer structural floor, the first underground floor structural floor and the second underground floor structural floor are arranged on a steel structural column, and the steel structural column is arranged on a filling pile. Compared with the prior art, the envelop enclosure has the advantages of being small in structural stability, small in excavation deformation and pit bottom resilience, and high in construction speed, the influence on the surrounding environment is small, the work efficiency is high, the engineering risk is low, and the envelop enclosure is particularly suitable for deep foundation pit construction of an extra-large type deep foundation pit under the complex surrounding environment situation.

Description

The space enclosing structure of the synchronous excavation of a kind of deep foundation ditch subregion
Technical field
The utility model relates to structure building Underground Space Excavation technical field, especially a kind of in environmental protection sensitizing range and the space enclosing structure of disposable excavation on the larger synchronous excavation of deep foundation ditch subregion of surrounding enviroment impacts.
Background technology
More difficult to the control ratio of environment deformation process when deep foundation pit construction, disposable excavation is larger on the impact of surrounding enviroment, and soil excavation huge in construction unloads, and the inner soil body resilience of foundation ditch will be also inevitable to the adverse effect on periphery stratum.
At present; for the safety that guarantees to close on important protection structure; reduce distortion risk out of control; general super-giant foundation pit adopts subregion excavation technique; first construct away from the subregion of protection building; treat that the excavation of foundation pit of constructing is in advance to hole bottom application work base plate, and upwards along accomplishing after ground floor, can excavate follow-up adjacent deep foundation ditch.
The subregion excavation construction method of prior art, exists long construction period, and programming is slow, the duration deficiency in economic performance of especially down town business land develop being utilized.
Utility model content
The purpose of this utility model is the synchronous space enclosing structure of excavating of a kind of deep foundation ditch subregion providing for the deficiencies in the prior art, adopt the subregion excavation structure of horizontal support, jump interval, storehouse synchronous excavation is set, make the environment adverse effect that excavation of foundation pit brings be reduced to bottom line, effectively reduce the impact that foundation ditch subregion is constructed on programming, safety and the environmental protection of the important structure of foundation ditch periphery in guaranteeing foundation ditch safety, are protected, be particularly useful for environmental protection sensitizing range and the disposable excavation open excavation on the larger deep foundation ditch of surrounding enviroment impact, improve duration economic benefit and social benefit, structural stability is good, excavation deformation and hole end resilience are little, the advantage that construction speed is fast.
The purpose of this utility model is achieved in that the space enclosing structure of the synchronous excavation of a kind of deep foundation ditch subregion, comprise the excavation of foundation pit district and the base plate of foundation pit that are surrounded by diaphragm wall, be characterized in that excavation of foundation pit district is divided into several and is provided with the excavation in zones of horizontal support structure by compartment wall, described horizontal support structure is made up of the ground floor structure floor, B1 structure floor and the underground two-layer structure floor that are arranged on steel structure column; Described ground floor structure floor, B1 structure floor and underground two-layer structure floor are connected for building with adjacent diaphragm wall and compartment wall.
Described steel structure column is arranged on castinplace pile.
Described compartment wall is that diaphragm wall or bored pile are constructed.
It is good that the utility model compared with prior art has structural stability; excavation deformation and hole end resilience are little; the advantage that construction speed is fast; and little to surrounding environment influence; operating efficiency is high; engineering risk is low; be particularly useful for the construction of deep foundation ditch under complicated surrounding enviroment condition; make the environment adverse effect that excavation of foundation pit brings be reduced to bottom line; effectively reduce the impact that foundation ditch subregion is constructed on programming, in guaranteeing foundation ditch safety, protected safety and the environmental protection of the important structure of foundation ditch periphery.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation;
Fig. 2 is the A-A sectional drawing of Fig. 1;
Fig. 3 is steel structure column and castinplace pile syndeton schematic diagram;
Fig. 4 is that the utility model is specifically applied schematic diagram;
Fig. 5 is subregion, stage excavation schematic diagram.
The specific embodiment
Consult accompanying drawing 1 ~ accompanying drawing 2, excavation of foundation pit district 3 and base plate of foundation pit 9 that the utility model is surrounded by diaphragm wall 1 form, described excavation of foundation pit district 3 is divided into by compartment wall 2 excavation in zones 31 that several are provided with horizontal support structure 4, and described horizontal support structure 4 is made up of the ground floor structure floor 41, B1 structure floor 42 and the underground two-layer structure floor 43 that are arranged on steel structure column 7; Described ground floor structure floor 41, B1 structure floor 42 and underground two-layer structure floor 43 are connected for building with adjacent diaphragm wall 1 and compartment wall 2; Described compartment wall 2 is constructed for diaphragm wall or bored pile.
Consult accompanying drawing 3, described steel structure column 7 is arranged on castinplace pile 8.
Take certain deep-foundation pit engineering as example, the utility model is described in further detail below.
Embodiment 1
This project east side is that operating subway line 13(is apart from the about 23m of basement), southern side is that 14(station, completed subway station and basement share exterior wall), west side is in city, to encircle overhead 15(apart from the about 17m of basement), north side is private residence 16, foundation ditch area is 56834m 2, cutting depth is 17.4 ~ 19.8m, its Specific construction step is as follows:
(1), construct inner interim compartment wall
Consult accompanying drawing 4, the excavation of foundation pit district 3 surrounding at diaphragm wall 1, the design thickness of diaphragm wall 1 is 1.0m, wall is 41.5m deeply, cuts off bottom artesian water; The length of every groove segment 5 is 6.0m, and groove section 5 is constructed by first, rear two phases and adopted locking notch pipe joint to connect.Excavation of foundation pit district 3 is divided into by compartment wall 2
Figure DEST_PATH_DEST_PATH_IMAGE001
~
Figure DEST_PATH_RE-DEST_PATH_IMAGE002
totally six excavation in zones 31, each excavation in zones area is pressed 10000m 2left and right arranges inner interim compartment wall 2, near contiguous important protection building, can suitably dwindle Division area.Interim compartment wall 2 adopts Φ 850 bored pile gear soil, three axle agitation pile water-stop curtains is set for interim sealing of construction period in excavation side.
(2), subregion, stage excavation
Consult accompanying drawing 5, implement in advance , ,
Figure DEST_PATH_RE-DEST_PATH_IMAGE004
excavation in zones 31 digs to B1 bottom (the about 8.3m of the degree of depth), adopts horizontal support structure 4 to carry out the construction of ground floor (B0) structure floor 41 and B1 (B1) structure floor 42; Described B0, B1 layer structure floor 41,42 are provided with the odd-job hole 44 of lower one deck soil excavation, and odd-job hole 44 is sealed after foundation pit structure base plate completes.
When what construct in advance ,
Figure DEST_PATH_738820DEST_PATH_IMAGE003
,
Figure DEST_PATH_196347DEST_PATH_IMAGE004
excavation in zones 31 digs to underground two layers of bottom (the about 13.2m of the degree of depth), adopts horizontal support structure 4 to carry out underground two layers of (B2) structure floor 43 when constructing, construction in later period
Figure DEST_PATH_DEST_PATH_IMAGE005
, ,
Figure DEST_PATH_138282DEST_PATH_IMAGE002
excavation in zones 31 synchronously digs to B1 bottom, and construct corresponding ground floor (B0) structure floor 4 and B1 (B1) structure floor 42, excavation in zones 31 formerly, only differ the earthwork height (approximately 4 ~ 5m height) of one deck in the process of later stage excavation, the B0 of construction in later period, the odd-job hole 44 that B1 layer structure floor 41,42 is provided with lower one deck soil excavation, odd-job hole 44 is sealed after foundation pit structure base plate completes.
Current first construction
Figure DEST_PATH_23062DEST_PATH_IMAGE001
,
Figure DEST_PATH_290095DEST_PATH_IMAGE003
, excavation in zones 31 digs to F3/B3 bottom (the about 17.4m of the degree of depth), adopts horizontal support structure 4 to carry out the construction of foundation pit structure base plate 9; Construction in later period
Figure DEST_PATH_220191DEST_PATH_IMAGE005
,
Figure DEST_PATH_213555DEST_PATH_IMAGE006
,
Figure DEST_PATH_30201DEST_PATH_IMAGE002
excavation in zones 31 synchronously digs to underground two layers of bottom, adopts horizontal support structure 4 to carry out the construction of underground two layers of (B2) structure floor 43.Construction in later period ,
Figure DEST_PATH_290598DEST_PATH_IMAGE006
,
Figure DEST_PATH_782759DEST_PATH_IMAGE002
excavation in zones 31 continues to be synchronously excavated to F3/B3 bottom (the about 17.4m of the degree of depth), adopts horizontal support structure 4 to carry out the construction of foundation pit structure base plate 9, and whole project basement foundation ditch construction is complete.The B2 layer structure floor 43 of construction in later period is provided with the odd-job hole 44 of lower one deck soil excavation, and odd-job hole 44 is sealed after foundation pit structure base plate completes.
More than just the utility model is further described, not in order to limit this patent, all is that the utility model equivalence is implemented, within all should being contained in the claim scope of this patent.

Claims (3)

1. the space enclosing structure of the synchronous excavation of deep foundation ditch subregion, comprise the excavation of foundation pit district (3) and the base plate of foundation pit (9) that are surrounded by diaphragm wall (1), it is characterized in that excavation of foundation pit district (3) is divided into several excavation in zones that is provided with horizontal support structure (4) (31) by compartment wall (2), described horizontal support structure (4) is made up of the ground floor structure floor (41), B1 structure floor (42) and the underground two-layer structure floor (43) that are arranged on steel structure column (7); Described ground floor structure floor (41), B1 structure floor (42) and underground two-layer structure floor (43) are connected for building with adjacent diaphragm wall (1) and compartment wall (2).
2. the space enclosing structure that deep foundation ditch subregion synchronously excavates according to claim 1, is characterized in that described steel structure column (7) is arranged on castinplace pile (8).
3. the space enclosing structure of the synchronous excavation of deep foundation ditch subregion according to claim 1, is characterized in that described compartment wall (2) constructs for diaphragm wall or bored pile.
CN201320765468.0U 2013-11-29 2013-11-29 Envelop enclosure for deep foundation pit partition simultaneous excavation Expired - Lifetime CN203613544U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320765468.0U CN203613544U (en) 2013-11-29 2013-11-29 Envelop enclosure for deep foundation pit partition simultaneous excavation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320765468.0U CN203613544U (en) 2013-11-29 2013-11-29 Envelop enclosure for deep foundation pit partition simultaneous excavation

Publications (1)

Publication Number Publication Date
CN203613544U true CN203613544U (en) 2014-05-28

Family

ID=50766200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320765468.0U Expired - Lifetime CN203613544U (en) 2013-11-29 2013-11-29 Envelop enclosure for deep foundation pit partition simultaneous excavation

Country Status (1)

Country Link
CN (1) CN203613544U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631824A (en) * 2014-12-28 2015-05-20 上海建工一建集团有限公司 Support-changing construction method of structural slabs at temporary division walls
CN104846830A (en) * 2015-03-24 2015-08-19 中建三局第二建设工程有限责任公司 Deep foundation pit construction method for reducing underground space deformation
CN109339827A (en) * 2018-11-12 2019-02-15 上海建工集团股份有限公司 The excavating construction method of multi-layer underground structure
WO2024037586A1 (en) * 2022-08-19 2024-02-22 中建三局集团(浙江)有限公司 Double-foundation-pit double-working-condition construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631824A (en) * 2014-12-28 2015-05-20 上海建工一建集团有限公司 Support-changing construction method of structural slabs at temporary division walls
CN104846830A (en) * 2015-03-24 2015-08-19 中建三局第二建设工程有限责任公司 Deep foundation pit construction method for reducing underground space deformation
CN109339827A (en) * 2018-11-12 2019-02-15 上海建工集团股份有限公司 The excavating construction method of multi-layer underground structure
WO2024037586A1 (en) * 2022-08-19 2024-02-22 中建三局集团(浙江)有限公司 Double-foundation-pit double-working-condition construction method

Similar Documents

Publication Publication Date Title
CN103590406A (en) Construction method for synchronously excavating ultra-large type deep foundation pits in partitioned mode
CN105298507B (en) A kind of underground pipe gallery construction method of top open cut bottom tunneler construction
CN101775988B (en) Method for constructing from inclined shaft to main tunnel in weak surrounding rock
CN203613544U (en) Envelop enclosure for deep foundation pit partition simultaneous excavation
CN204098043U (en) After staying soil, excavation is in conjunction with inner support Retaining Structure with Double-row Piles
CN204551487U (en) A kind of steel support structure that can realize Adjacent Pit synchronous construction
CN103306682B (en) Long-span and high-side-wall underground space building and excavation support method thereof
CN104131565A (en) Construction method of using down-top method for excavating earthworks in top-down construction
CN103235853B (en) Adopt the multiple base pool layout method based on earthwork balance in limit for coal-mining subsidence rand
CN107700496A (en) The inverse suitable combining construction method of deep basal pit
CN203238649U (en) Combined type waterproof curtain
CN203161244U (en) Existing subway underground excavation running tunnel protection structure
CN104164878A (en) Earth excavation technology for ultra-large type deep foundation pit
CN105297773A (en) Reverse construction method earth excavation method capable of reducing cover-excavation earth volume
CN203924071U (en) A kind of foundation pit supporting construction
CN203499695U (en) Reinforcing structure for shallow-buried tunnel in bustling urban area
CN105804084B (en) A kind of small excavation method for closing on deep pit excavation
CN205088686U (en) Support structure of foundation pit
CN104405402A (en) Symmetric middle separation wall construction method for hidden type middle wall multi-arch tunnel
CN204609897U (en) A kind of pipe curtain freezing process supporting and protection structure
CN103306248A (en) High dam spillway foundation drainage system and excavation method
CN103276706B (en) The construction method of diversion tunnel lower curved section leakage preventing structure
CN202370539U (en) Front tunnel face excavated soil pre-reinforcing structure of tunnel
CN204608798U (en) A kind of water-seal pile/within the walls inserts the foundation pit supporting construction that H profile steel and prefabricated tubular pile are formed
CN104404963B (en) A kind of subway transfer station deep basal pit crossed construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20140528

CX01 Expiry of patent term