CN105297773A - Reverse construction method earth excavation method capable of reducing cover-excavation earth volume - Google Patents

Reverse construction method earth excavation method capable of reducing cover-excavation earth volume Download PDF

Info

Publication number
CN105297773A
CN105297773A CN201510734717.3A CN201510734717A CN105297773A CN 105297773 A CN105297773 A CN 105297773A CN 201510734717 A CN201510734717 A CN 201510734717A CN 105297773 A CN105297773 A CN 105297773A
Authority
CN
China
Prior art keywords
basement
layer
excavation
earth
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510734717.3A
Other languages
Chinese (zh)
Inventor
何浩宇
雷团结
杨大兵
帅学海
段涛
曹顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maanshan MCC 17 Engineering Science and Technology Co Ltd
Original Assignee
Maanshan MCC 17 Engineering Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maanshan MCC 17 Engineering Science and Technology Co Ltd filed Critical Maanshan MCC 17 Engineering Science and Technology Co Ltd
Priority to CN201510734717.3A priority Critical patent/CN105297773A/en
Publication of CN105297773A publication Critical patent/CN105297773A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a reverse construction method earth excavation method capable of reducing the cover-excavation earth volume. The method includes the following steps that firstly, a basement first layer is excavated to a certain position below the elevation of the basement first layer, and a ramp for vehicles to go in and out is reserved; secondly, a basement first layer bottom plate and a basement first layer top plate are constructed, and structures of the basement first layer bottom plate and the basement first layer top plate are completed; thirdly, earthwork of a basement second layer and earthwork of a basement third layer are excavated; fourthly, a basement third layer bottom plate is constructed firstly, then, a basement second layer bottom plate is constructed, the basement second layer is excavated at the same time, and construction of the structure of the basement second layer is completed; fifthly, the basement third layer is excavated, and construction of the structure of the basement third layer is completed; and sixthly, the overall structure of a basement is completed in a similar manner. According to the reserve construction method earth excavation method, safety of a foundation pit is ensured, meanwhile, the earth excavation efficiency is improved, the underground excavation earth volume is greatly reduced, construction cost is greatly reduced, and a construction period is greatly shortened.

Description

A kind of top-down method earth excavation method reducing lid earth excavation amount
Technical field
The invention belongs to Top-down Construction Technique field, particularly relate to a kind of top-down method earth excavation method reducing lid earth excavation amount.
Background technology
Top-down Construction Technique is as a ripe Foundation Pit Construction technology, nowadays large-scale multi-storey basement deep foundation ditch has been widely used in, relative to traditional suitable practice open type construction, reverse construction digs owing to taking lid, soil excavation difficulty of construction is large, and efficiency is low, and soil excavation is a key link in reverse construction, the efficiency of top-down method earth excavation, directly determining contrary sequence method could successful Application.Adopt full-reverse method relative conventional construction method total lever factor of constructing to reduce, but the earthwork need be covered and dug, soil excavation difficulty strengthens, and the duration of basement part will extend relatively.Although semi-inverse method has drawn the advantage of the suitable practice and contrary sequence method, but still exist and inverse make district's area and the still larger problem of lid earth excavation amount.
Summary of the invention
The object of the present invention is to provide a kind of top-down method earth excavation method reducing lid earth excavation amount, to solve the problem proposed in above-mentioned background technology.
For achieving the above object, present invention employs following technical scheme:
Reduce a top-down method earth excavation method for lid earth excavation amount, comprise the following steps:
S1, elder generation are according to geologic information and main body basement structure plan, determine that soil outlet reserved location and foundation ditch surrounding reserve back-pressure soil width and the gradient, then excavate basement first floor to the following certain position place of basement first floor absolute altitude and the reserved ramp for earth-working vehicles turnover;
S2, construction basement first floor base plate and basement first floor top board, and excavate surrounding and reserve back-pressure soil, complete basement first floor base plate and basement first floor top board structure, form twice and support;
S3, the excavation basement second layer, the earthwork of basement third layer, the back-pressure soil of one fixed width, down to foundation ditch ground, is reserved in reserved ramp simultaneously around foundation ditch;
S4, first construction basement third layer base plate, then basement second layer base plate of constructing, excavate the basement second layer and reserved back-pressure soil simultaneously, complete basement second layer structure construction;
S5, excavation basement third layer also reserved back-pressure soil, completes basement third layer structure construction;
S6, complete basement overall structure by that analogy.
Compared with prior art, beneficial effect of the present invention is as follows:
The method that the present invention proposes, the basement first floor adopts heavy excavation mode, and meanwhile, earth moving plant directly can enter foundation ditch from reserved ramp, improves shoveling efficiency while ensure that deep pit monitor; The excavation basement second layer, third layer make this part soil excavation still be equivalent to open cut simultaneously, greatly reduce tunneling earth volume; Before the excavation basement second layer, the third layer earthwork, basement first floor top board and base plate have been constructed, form twice inner support, compared to stepping type basin excavation in the past, reduce foundation ditch surrounding remaining soils width, be equivalent to decrease tunneling earth volume.The medium-and-large-sized earth moving plant of whole Excavation Process all enters excavation of foundation pit by reserved ramp and loads transport, and operating expenses and duration all greatly reduce.
Accompanying drawing explanation
Fig. 1 is the schematic diagram after completing of step S1.
Fig. 2 is the schematic diagram after completing of step S2.
Fig. 3 is the schematic diagram after completing of step S3.
Fig. 4 is the schematic diagram after completing of step S5.
Detailed description of the invention
Below in conjunction with embodiment, preferred embodiment of the present invention is described in further detail.
As shown in Figure 1, a kind of top-down method earth excavation method reducing lid earth excavation amount, comprises the following steps:
S1, elder generation are according to geologic information and main body basement structure plan, determine that soil outlet reserved location and foundation ditch surrounding reserve back-pressure soil width and the gradient, then excavate the following certain position place of basement first floor 1 to basement first floor 1 absolute altitude and the reserved ramp for earth-working vehicles turnover.
S2, construction basement first floor base plate 11 and basement first floor top board 12, and excavate surrounding and reserve back-pressure soil, complete basement first floor base plate 11 and basement first floor top board 12 structure, form twice and support.
S3, the excavation basement second layer 2, basement third layer 3 cubic metres of earth, the back-pressure soil of one fixed width, down to foundation ditch ground, is reserved in reserved ramp simultaneously around foundation ditch.
S4, first construction basement third layer base plate 31, then basement second layer base plate 21 of constructing, excavate the basement second layer 2 and reserved back-pressure soil simultaneously, complete the basement second layer 2 structure construction.
S5, excavation basement third layer 3 also reserved back-pressure soil, completes basement third layer 3 structure construction.
S6, complete basement overall structure by that analogy.
The present invention proposes a kind of top-down method earth excavation method reducing lid earth excavation amount, first heavy excavation basement first floor 1 cubic metre of earth is to basement first floor base plate less than 11 certain position place and construct basement first floor top board 12 and basement first floor base plate 11; Secondly, the disposable excavation basement second layer 2, basement third layer 3 cubic metres of earth; Then construction basement second layer base plate 21 and corresponding construction is made from basement third layer base plate 31 is up suitable; Finally excavate the back-pressure soil that the basement second layer 2, basement third layer 3 foundation ditch surrounding are reserved, complete the basement second layer 2, basement third layer 3 is constructed.The present invention reduces lid earth excavation amount, improve shoveling and unearthed efficiency, saved duration and cost.
Above embodiment is only be described the preferred embodiment of the present invention; not scope of the present invention is limited; under not departing from the present invention and designing the prerequisite of spirit; the various distortion that those of ordinary skill in the art make technical scheme of the present invention and improvement, all should fall in protection domain that claims of the present invention determines.

Claims (1)

1. can reduce a top-down method earth excavation method for lid earth excavation amount, it is characterized in that, comprise the following steps:
S1, elder generation are according to geologic information and main body basement structure plan, determine that soil outlet reserved location and foundation ditch surrounding reserve back-pressure soil width and the gradient, then excavate basement first floor (1) to the following certain position place of basement first floor (1) absolute altitude and the reserved ramp for earth-working vehicles turnover;
S2, construction basement first floor base plate (11) and basement first floor top board (12), and excavate surrounding and reserve back-pressure soil, complete basement first floor base plate (11) and basement first floor top board (12) structure, form twice and support;
S3, the excavation basement second layer (2), basement third layer (3) earthwork, the back-pressure soil of one fixed width, down to foundation ditch ground, is reserved in reserved ramp simultaneously around foundation ditch;
S4, first construction basement third layer base plate (31), then basement second layer base plate (21) of constructing, excavate the basement second layer (2) and reserved back-pressure soil simultaneously, complete the basement second layer (2) structure construction;
S5, excavation basement third layer (3) reserved back-pressure soil, complete basement third layer (3) structure construction;
S6, complete basement overall structure by that analogy.
CN201510734717.3A 2015-10-30 2015-10-30 Reverse construction method earth excavation method capable of reducing cover-excavation earth volume Pending CN105297773A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510734717.3A CN105297773A (en) 2015-10-30 2015-10-30 Reverse construction method earth excavation method capable of reducing cover-excavation earth volume

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510734717.3A CN105297773A (en) 2015-10-30 2015-10-30 Reverse construction method earth excavation method capable of reducing cover-excavation earth volume

Publications (1)

Publication Number Publication Date
CN105297773A true CN105297773A (en) 2016-02-03

Family

ID=55195534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510734717.3A Pending CN105297773A (en) 2015-10-30 2015-10-30 Reverse construction method earth excavation method capable of reducing cover-excavation earth volume

Country Status (1)

Country Link
CN (1) CN105297773A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926669A (en) * 2016-04-29 2016-09-07 广州地铁设计研究院有限公司 Construction method of subway station
CN106284410A (en) * 2016-08-27 2017-01-04 廊坊师范学院 The complete rapid constructing method of covered back-digging subway transfer station
CN106320377A (en) * 2016-08-31 2017-01-11 中铁二局工程有限公司 Water-rich soft soil area deep foundation pit cover and excavation top-down construction method
CN106436785A (en) * 2016-11-08 2017-02-22 重庆市基础工程有限公司 Side slope rescuing counter pressure adverse construction method and structure thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006083610A (en) * 2004-09-16 2006-03-30 Shimizu Corp Inverted construction method
CN1948633A (en) * 2005-10-14 2007-04-18 上海市第七建筑有限公司 Tray type excarvating contrary construction method
CN103103988A (en) * 2013-01-21 2013-05-15 安徽省城建设计研究院 Foundation ditch construction method of horizontal bracing structure of central island floor slaps
CN103628487A (en) * 2013-11-28 2014-03-12 中冶天工集团有限公司 Circular deep foundation pit retaining wall reverse construction method
CN104234082A (en) * 2014-08-29 2014-12-24 中国电建集团华东勘测设计研究院有限公司 Jump-layer reversed construction method for deep foundation pit
CN104695445A (en) * 2015-01-21 2015-06-10 中国建筑第八工程局有限公司 Basement earth excavation method adopting reverse construction method
CN104762974A (en) * 2015-03-18 2015-07-08 中天建设集团有限公司 Soil excavation method for increasing quantity of open excavated soil in reverse construction of foundation pit earthwork

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006083610A (en) * 2004-09-16 2006-03-30 Shimizu Corp Inverted construction method
CN1948633A (en) * 2005-10-14 2007-04-18 上海市第七建筑有限公司 Tray type excarvating contrary construction method
CN103103988A (en) * 2013-01-21 2013-05-15 安徽省城建设计研究院 Foundation ditch construction method of horizontal bracing structure of central island floor slaps
CN103628487A (en) * 2013-11-28 2014-03-12 中冶天工集团有限公司 Circular deep foundation pit retaining wall reverse construction method
CN104234082A (en) * 2014-08-29 2014-12-24 中国电建集团华东勘测设计研究院有限公司 Jump-layer reversed construction method for deep foundation pit
CN104695445A (en) * 2015-01-21 2015-06-10 中国建筑第八工程局有限公司 Basement earth excavation method adopting reverse construction method
CN104762974A (en) * 2015-03-18 2015-07-08 中天建设集团有限公司 Soil excavation method for increasing quantity of open excavated soil in reverse construction of foundation pit earthwork

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
杨保全: "成都地铁交大车站全盖挖顺做施工方法", 《四川建材》 *
郑骐: "盖挖逆作法地铁车站的中间桩施工技术", 《市政技术》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926669A (en) * 2016-04-29 2016-09-07 广州地铁设计研究院有限公司 Construction method of subway station
CN105926669B (en) * 2016-04-29 2018-04-20 广州地铁设计研究院有限公司 A kind of Construction Method of Metro Station
CN106284410A (en) * 2016-08-27 2017-01-04 廊坊师范学院 The complete rapid constructing method of covered back-digging subway transfer station
CN106284410B (en) * 2016-08-27 2019-04-19 廊坊师范学院 The complete rapid constructing method of covered back-digging subway transfer station
CN106320377A (en) * 2016-08-31 2017-01-11 中铁二局工程有限公司 Water-rich soft soil area deep foundation pit cover and excavation top-down construction method
CN106320377B (en) * 2016-08-31 2019-03-08 中铁二局集团有限公司 A kind of rich water soft clay area deep basal pit covered back-digging construction method
CN106436785A (en) * 2016-11-08 2017-02-22 重庆市基础工程有限公司 Side slope rescuing counter pressure adverse construction method and structure thereof
CN106436785B (en) * 2016-11-08 2019-04-26 重庆市基础工程有限公司 Insuring highway' slope back-pressure reversed construction method and its structure

Similar Documents

Publication Publication Date Title
CN103590406A (en) Construction method for synchronously excavating ultra-large type deep foundation pits in partitioned mode
CN104763433A (en) Underground excavation construction method of large-span subway station in flexible-top and hard-bottom stratum
CN103290849B (en) Pit-in-pit supporting structure of half topdown construction method and construction method thereof
CN106522241A (en) Deep foundation pit supporting method of ultrahigh floor height type basement structure
CN104131565B (en) A kind of against making the construction method that the earthwork is just made to excavate
CN204098043U (en) After staying soil, excavation is in conjunction with inner support Retaining Structure with Double-row Piles
CN105297773A (en) Reverse construction method earth excavation method capable of reducing cover-excavation earth volume
CN104963705B (en) A kind of underground space tunneling construction method
CN103912134B (en) Existing building underground space structure and construction method in situ
CN104047623A (en) Large-span grotto excavation construction method
CN103775110A (en) Underground excavation construction method for multilayer underground space of soft soil area
CN207003499U (en) A kind of anti-floating lifting device of underground tunnel upper excavation of foundation pit
CN104695445B (en) Basement top-down method earth excavation method
CN105421464B (en) Small-scale pit earthwork digging method
CN103410152B (en) A kind of construction method for long and narrow deep foundation pit earthwork digging
CN105464134A (en) Top-down and bottom-up combined construction method and supporting structure of multi-layer underground space below existing facility
CN103290847A (en) Inner oblique beam supporting structure for oversized-area deep foundation pit and construction method
CN104652444B (en) Construction method for overall reverse operation of ultra-large type deep foundation pit center island type alternative earth excavation
CN111139837A (en) Method for simultaneously excavating multiple base pits at crossed subway in soft soil area
CN101736756B (en) Method for constructing soft soil foundation reverse interlayer
CN104846832A (en) Construction method of circular deep foundation pit enclosure of discrete pile support
CN104131566A (en) Method for constructing basement foundation pit without horizontal braces
CN105840216B (en) A kind of tunneling construction method of underground space development
CN203613544U (en) Envelop enclosure for deep foundation pit partition simultaneous excavation
CN101319501B (en) Construction method of deep foundation ditch

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160203