CN203593413U CN201320768237.5U CN201320768237U CN203593413U CN 203593413 U CN203593413 U CN 203593413U CN 201320768237 U CN201320768237 U CN 201320768237U CN 203593413 U CN203593413 U CN 203593413U
Authority
CN
China
Prior art keywords
fixture
connection platform
led lamp
feed track
driving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320768237.5U
Other languages
Chinese (zh)
Inventor
熊世伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Lidi Intelligent Technology Co ltd
Original Assignee
DONGGUAN LIDI ELECTRONIC TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DONGGUAN LIDI ELECTRONIC TECHNOLOGY Co Ltd filed Critical DONGGUAN LIDI ELECTRONIC TECHNOLOGY Co Ltd
Priority to CN201320768237.5U priority Critical patent/CN203593413U/en
Application granted granted Critical
Publication of CN203593413U publication Critical patent/CN203593413U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Treatment Of Fiber Materials (AREA)

Abstract

The utility model relates to the technical field of LED lamp production equipment, in particular to an automatic connecting device. The automatic connecting device comprises a machine case which is provided with a clamp conveying track and a connecting table used for containing an LED lamp clamp, one end of the connecting table is connected with the clamp conveying track, and a clamp pushing device used for pushing the LED lamp clamp to move in the direction of the clamp conveying track is arranged above the connecting table. According to the automatic connecting device, LED lamps can be smoothly conveyed to a next working procedure after glue on the LED lamps is dried in an LED production line, namely batches of LED lamps are orderly conveyed to the next working procedure one by one through the automatic connecting device after the glue on the LED lamps is dried, it is guaranteed that a working procedure before the glue on the LED lamps is dried and the working procedure after the glue on the LED lamps is dried are connected smoothly, the overall LED lamp production line operates more smoothly, and production efficiency of the overall LED lamp production line is improved.

Description

Automatically the equipment of plugging into
Technical field
The utility model relates to LED lamp production facilities technical field, relates in particular to the equipment of automatically plugging into.
Background technology
The advantages such as LED light fixture has efficiently, energy-saving and environmental protection, wherein, the kind of LED lamp is also quite various, comprise lamp tube type, bulb-type, lamp pearl formula etc., be applied to respectively different fields according to the variety classes of LED lamp, therefore, people are devoted to the research and extension of LED lamp at present.And bulb-type LED lamp is mainly in hotel, the places such as market are as illumination and decorate use, bulb-type LED lamp is generally by lamp holder, lamp body, LED board and bulb assemble, wherein, LED lamp needs to relate to the operation of encapsulating in the process of encapsulation, and when having a process of waiting for the dry glue of glue after the operation that completes encapsulating, then, in the process of waiting for the dry glue of glue, can pile up half-blank LED lamp in batches, after dry glue, LED lamp in batches need to be proceeded next process, if adopt artificial mode of throwing in, can cause speed excessively slow, thereby cause the operation before dry glue to be connected inharmonious with the operation after dry glue, and then cause the production of whole production line not smooth, reduce production efficiency.
Utility model content
The purpose of this utility model is to provide a kind of equipment of automatically plugging into that can guarantee that the operation before and after the dry glue of the glue in LED lamp manufacturing line connects glibly for the deficiencies in the prior art, it can make whole piece LED lamp manufacturing line carry out more glibly, thereby can improve the production efficiency of LED lamp.
For achieving the above object, automatically the equipment of plugging into of the present utility model, comprise cabinet, cabinet is provided with fixture feed track and for placing the connection platform of LED lamp fixture, one end of connection platform is connected with fixture feed track, and the top of connection platform is provided with the fixture pusher moving towards fixture feed track direction for pushing LED lamp fixture.
Wherein, the top of connection platform is provided with crossbeam, and fixture pusher comprises guide rail, driven pulley, the first motor, driving pulley, belt, slide block and propelling movement piece; Guide rail is and is longitudinally arranged at crossbeam, driven pulley and the first motor are arranged at respectively the two ends of crossbeam, the main shaft socket of driving pulley and the first motor, belt is wound between driving pulley and driven pulley, slide block is slidably connected to guide rail and is fixedly connected with belt, and propelling movement piece is fixedly connected with and is positioned at the top of connection platform with slide block.
Wherein, cabinet is vertically arranged with several and is fixture conveying roller spaced apart, the top end face of connection platform is provided with several and is fixture support piece spaced apart, fixture support piece is below the gap between adjacent two fixture conveying rollers, and connection platform is connected with the first cylinder for driving connection platform to move up and down.
Wherein, fixture support piece is provided with several rotor wheels, and the top wheel face of rotor wheel protrudes from the top end face of fixture support piece.
Wherein, the end of fixture conveying roller is connected with belt wheel, and belt wheel is connected with the second motor rotating for driving pulley.
Wherein, fixture feed track is connected with fixture conveying device, fixture conveying device comprise be arranged at fixture feed track two ends idle pulley, be set around two fixture driving bands between idle pulley and the 3rd motor for driving fixture driving band to rotate, the 3rd motor is arranged in cabinet.
Wherein, the below of fixture feed track is provided with the stay bearing plate for LED lamp fixture being positioned to adjustment, and the bottom of stay bearing plate is connected with the second cylinder for driving this stay bearing plate to move up and down.
Wherein, cabinet is provided with radiator fan.
The beneficial effects of the utility model: the equipment of automatically plugging into of the present utility model, when having the fixture of the LED lamp after dry glue, several clampings are delivered to after the connection platform of cabinet setting, the fixture pusher that connection platform top arranges drives these several fixtures to move towards the direction of the fixture feed track of cabinet setting in the outer end of connection platform, because other one end of connection platform is connected with fixture feed track, be several fixtures along with fixture pusher promotion, enter seriatim in the fixture feed track being connected with connection platform, and be constantly transported on the Fabricating machinery of next process.The utility model makes in LED manufacturing line, after the dry glue of LED lamp, can be delivered to glibly next process, the LED lamp being about to after the dry glue of batch is delivered to next process in an orderly manner, seriatim by the utility model, guarantee that the operation before and after the dry glue of LED lamp connects glibly, thereby whole piece LED lamp manufacturing line is carried out more swimmingly, and then improved the production efficiency of whole piece LED lamp manufacturing line.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is that the utility model is hidden the structural representation after cabinet.
Fig. 3 is that the utility model is hidden another structural representation after cabinet.
Structural representation when Fig. 4 is the utility model hiding cabinet, fixture pusher and fixture conveying device.
Main TV structure schematic diagram when Fig. 5 is the utility model hiding cabinet, fixture pusher and fixture conveying device.
Fig. 6 is the structural representation that connection platform of the present utility model is connected with the first cylinder.
Fig. 7 is the local enlarged diagram at A place in Fig. 6.
Reference numeral comprises:
10-cabinet, 11-fixture feed track, 12-connection platform
13-fixture support piece, 14-fixture conveying roller the 15-the first cylinder
16-belt wheel, 17-the second motor 18-radiator fan
20-fixture pusher, 21-guide rail, 22-driven pulley
23-the first motor 24-driving pulley 25-belt
26-slide block 27-propelling movement piece, 30-crossbeam
40-fixture conveying device, 41-idle pulley, 42-fixture driving band
43-the three motor 50-stay bearing plate the 51-the second cylinder
60-fixture, 131-rotor wheel.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described in detail.
As shown in Figures 1 to 7, automatically the equipment of plugging into of the present utility model, comprise cabinet 10, cabinet 10 is provided with fixture feed track 11 and for placing the connection platform 12 of LED lamp fixture 60, one end of connection platform 12 is connected with fixture feed track 11, and the top of connection platform 12 is provided with the fixture pusher 20 moving towards fixture feed track 11 directions for pushing LED lamp fixture 60; When having the fixture 60 of the LED lamp after dry glue, several clampings are delivered to after the connection platform 12 that cabinet 10 arranges, the fixture pusher 20 that connection platform 12 tops arrange drives the direction of the fixture feed track 11 that these several fixtures 60 arrange towards cabinet 10 to move in the outer end of connection platform 12, because other one end of connection platform 12 is connected with fixture feed track 11, be several fixtures 60 along with fixture pusher 20 promotion, enter seriatim in the fixture feed track 11 being connected with connection platform 12, and be constantly transported on the Fabricating machinery of next process.The utility model makes in LED manufacturing line, after the dry glue of LED lamp, can be delivered to glibly next process, the LED lamp being about to after the dry glue of batch is delivered to next process in an orderly manner, seriatim by the utility model, guarantee that the operation before and after the dry glue of LED lamp connects glibly, thereby whole piece LED lamp manufacturing line is carried out more swimmingly, and then improved the production efficiency of whole piece LED lamp manufacturing line.
In the present embodiment, the top of connection platform 12 is provided with crossbeam 30, and fixture pusher 20 comprises guide rail 21, driven pulley 22, the first motor 23, driving pulley 24, belt 25, slide block 26 and pushes piece 27, guide rail 21 is and is longitudinally arranged at crossbeam 30, and wherein, take Fig. 1 as standard, fixture pusher 20 is longitudinally to arrange, driven pulley 22 and the first motor 23 are arranged at respectively the two ends of crossbeam 30, the main shaft socket of driving pulley 24 and the first motor 23, belt 25 is wound between driving pulley 24 and driven pulley 22, slide block 26 is slidably connected to guide rail 21 and is fixedly connected with belt 25, pushes piece 27 and slide block 26 and be fixedly connected with and be positioned at the top of connection platform 12, the concrete Fig. 2 that refers to, Fig. 3 and Fig. 6, the first motor 23 starts, the driving pulley 24 that drive is socketed on the first motor 23 main shafts rotates, drive the belt 25 being wound between driving pulley 24 and driven pulley 22 to rotate thereby realize, , belt 25 drives and is fixedly connected with the guide rail 21 that is arranged at along the longitudinal crossbeam 30 with its slide block 26 and slides, thereby realizing slide block 26 drives and pushes the longitudinal direction that pieces 27 arrange along guide rail 21 and move, in the time having LED lamp fixture 60 on the connection platform 12 that is positioned at crossbeam 30 belows, 60 of this fixtures can promote to be to vertically move by pushing piece 27, move towards the direction of fixture feed track 11, this fixture 60 is until pushed pushing to soon in fixture feed track 11, then this fixture 60 is being delivered to next process by fixture feed track 11, whole working process pushes soon in an orderly manner, seriatim several clampings there is is the fixture 60 of LED lamp to be delivered in fixture feed track 11, the operation that realizes the dry glue of LED lamp front and back connects swimmingly, enhance productivity.
After having the dry glue of LED lamp in batches to complete, the technical program is fixture conveying roller 14 spaced apart by be vertically arranged with several in cabinet 10, the top end face of connection platform 12 is provided with several and is fixture support piece 13 spaced apart, fixture support piece 13 is below the gap between adjacent two fixture conveying rollers 14, and connection platform 12 is connected with for driving the first cylinder 15(that connection platform 12 moves up and down referring to Fig. 4 and Fig. 5), , fixture conveying roller 14 spaced apart has clamping in batches the fixture 60 of LED lamp to roll and be delivered to the fixture conveying roller 14 that is positioned at connection platform 12 tops from the position away from connection platform 12, now, the first cylinder 15 starts and drives connection platform 12 to move up, the gap of the fixture support piece 13 of the top end face setting of connection platform 12 between fixture conveying roller 14 upwards jack-up is positioned at the fixture 60 fixture conveying roller 14, until the end face of the top end face of fixture support piece 13 and fixture feed track 11 maintains an equal level, then the first motor 23 drives propelling movement piece 27 to be moved towards the direction of fixture feed track 11 by the fixture 60 of fixture support piece 13 jack-up of connection platform 12, until the fixture 60 that several clampings are had to a LED lamp in an orderly manner, be delivered to seriatim on fixture feed track 11, whole working process can be by fixture 60 in batches high efficiency conveying in an orderly manner, thereby the production process before and after the dry glue of LED lamp is connected swimmingly, effectively utilize the time, enhance productivity, increase productivity effect.
Concrete, refer to Fig. 6 and Fig. 7, in the time that the first motor 23 drives propelling movement piece 27 to promote to be positioned at the fixture 60 on fixture support piece 13, because fixture support piece 13 is provided with several rotor wheels 131, and the top wheel face of rotor wheel 131 protrudes from the top end face of fixture support piece 13, make in process that fixture 60 moves towards fixture feed track 11, fixture 60 can roll on rotor wheel 131, when guaranteeing to push piece 27 and pushing fixture 60, fixture 60 moves to more swimmingly on fixture feed track 11 under the rotation that forwards wheel to.
More specifically, the end of fixture conveying roller 14 is connected with belt wheel 16, belt wheel 16 is connected with the second motor 17 rotating for driving pulley 16, the belt wheel 16 that the second motor 17 drives fixture conveying roller 14 ends to connect rotates (referring to Fig. 4), thereby fixture conveying roller 14 is rotated, in the time that clamping in batches has the fixture 60 of the LED lamp of dry glue to be delivered on fixture conveying roller 14, fixture conveying roller 14 rotates fixture 60 is in batches delivered on the fixture conveying roller 14 that is positioned at connection platform 12 tops from the fixture conveying roller 14 away from connection platform 12 in an orderly manner, afterwards, started by the first cylinder 15 again and drive connection platform 12 to move up, the gap of the fixture support piece 13 of the top end face setting of connection platform 12 between fixture conveying roller 14 upwards jack-up is positioned at the fixture 60 fixture conveying roller 14, until the end face of the top end face of fixture support piece 13 and fixture feed track 11 maintains an equal level, and push on fixture feed track 11 with regard to fixture 60 by pushing piece 27.
In the present embodiment, fixture feed track 11 is connected with fixture conveying device 40, fixture conveying device 40 comprise be arranged at fixture feed track 11 two ends idle pulley 41, be set around two fixture driving bands 42 between idle pulley 41 and for driving the 3rd motor 43, the three motors 43 that fixture driving band 42 rotates to be arranged in cabinet 10; See Fig. 3, the 3rd motor 43 is worked, the idle pulley 41 that the connected fixture driving band 42 of drive of the 3rd motor 43 arranges around fixture feed track 11 two ends rotates, send and bring while being placed with LED lamp fixture 60 when fixture 60 transmissions, fixture 60 belt conveyor can be realized LED lamp fixture 60 is carried, until be delivered to next process, further realize operation before and after dry LED lamp glue is connected swimmingly, also further improve the work efficiency to LED lamp manufacturing line.
In the present embodiment, the below of fixture feed track 11 is provided with the stay bearing plate 50 for LED lamp fixture 60 being positioned to adjustment, and the bottom of stay bearing plate 50 is connected with the second cylinder 51 for driving this stay bearing plate 50 to move up and down; In the time that LED lamp folder pushes on fixture feed track 11 by fixture pusher 20, for guaranteeing that fixture 60 is just on the fixture driving band 42 on fixture feed track 11, start the second cylinder 51, the second cylinder 51 carries out the adjustment of upper-lower position by controlling connected stay bearing plate 50 support fixtures 60, fixture 60 is adjusted to and is just positioned on fixture driving band 42, while facilitating fixture driving band 42 to rotate, fixture 60 is delivered to next process, unit design is reasonable, practical.
In the present embodiment, cabinet 10 is provided with radiator fan 18, the mechanical part that radiator fan 18 arranges cabinet 10 and cabinet 10 dispels the heat, prevent that mechanical part from occurring because longevity of service causes the problem of excess Temperature, prevent that high temperature from producing and destroying mechanical part, extend service life of the present invention, indirectly manufacturer is increased to productivity effect.
Above content is only preferred embodiment of the present utility model, for those of ordinary skill in the art, according to thought of the present utility model, all will change in specific embodiments and applications, this description should not be construed as restriction of the present utility model.

Claims (8)

1. the equipment of automatically plugging into, it is characterized in that: comprise cabinet (10), cabinet (10) is provided with fixture feed track (11) and for placing the connection platform (12) of LED lamp fixture (60), one end of connection platform (12) is connected with fixture feed track (11), and the top of connection platform (12) is provided with the fixture pusher (20) moving towards fixture feed track (11) direction for pushing LED lamp fixture (60).
2. the equipment of automatically plugging into according to claim 1, it is characterized in that: the top of connection platform (12) is provided with crossbeam (30), fixture pusher (20) comprises guide rail (21), driven pulley (22), the first motor (23), driving pulley (24), belt (25), slide block (26) and pushes piece (27); Guide rail (21) is and is longitudinally arranged at crossbeam (30), driven pulley (22) and the first motor (23) are arranged at respectively the two ends of crossbeam (30), driving pulley (24) is socketed with the main shaft of the first motor (23), belt (25) is wound between driving pulley (24) and driven pulley (22), slide block (26) is slidably connected to guide rail (21) and is fixedly connected with belt (25), pushes piece (27) and is fixedly connected with and is positioned at the top of connection platform (12) with slide block (26).
3. the equipment of automatically plugging into according to claim 1, it is characterized in that: cabinet (10) is vertically arranged with several and is fixture conveying roller (14) spaced apart, the top end face of connection platform (12) is provided with several and is fixture support piece (13) spaced apart, fixture support piece (13) is positioned at the below in the gap between adjacent two fixture conveying rollers (14), and connection platform (12) is connected with the first cylinder (15) for driving connection platform (12) to move up and down.
4. the equipment of automatically plugging into according to claim 3, is characterized in that: fixture support piece (13) is provided with several rotor wheels (131), the top wheel face of rotor wheel (131) protrudes from the top end face of fixture support piece (13).
5. the equipment of automatically plugging into according to claim 3, is characterized in that: the end of fixture conveying roller (14) is connected with belt wheel (16), and belt wheel (16) is connected with the second motor (17) rotating for driving pulley (16).
6. the equipment of automatically plugging into according to claim 1, it is characterized in that: fixture feed track (11) is connected with fixture conveying device (40), fixture conveying device (40) comprise be arranged at fixture feed track (11) two ends idle pulley (41), be set around fixture driving band (42) between two idle pulleys (41) and the 3rd motor (43) for driving fixture driving band (42) to rotate, the 3rd motor (43) is arranged in cabinet (10).
7. the equipment of automatically plugging into according to claim 1, it is characterized in that: the below of fixture feed track (11) is provided with the stay bearing plate (50) for LED lamp fixture (60) being positioned to adjustment, and the bottom of stay bearing plate (50) is connected with the second cylinder (51) for driving this stay bearing plate (50) to move up and down.
8. according to the equipment of automatically plugging into described in claim 1-7 any one, it is characterized in that: cabinet (10) is provided with radiator fan (18).
CN201320768237.5U 2013-11-29 2013-11-29 Automatic connecting device Expired - Lifetime CN203593413U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320768237.5U CN203593413U (en) 2013-11-29 2013-11-29 Automatic connecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320768237.5U CN203593413U (en) 2013-11-29 2013-11-29 Automatic connecting device

Publications (1)

Publication Number Publication Date
CN203593413U true CN203593413U (en) 2014-05-14

Family

ID=50674314

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320768237.5U Expired - Lifetime CN203593413U (en) 2013-11-29 2013-11-29 Automatic connecting device

Country Status (1)

Country Link
CN (1) CN203593413U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106241329A (en) * 2016-08-03 2016-12-21 苏州市吴中区木渎晓云模具加工厂 The connecting rod transport establishment of valve upper cover processing line

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106241329A (en) * 2016-08-03 2016-12-21 苏州市吴中区木渎晓云模具加工厂 The connecting rod transport establishment of valve upper cover processing line
CN106241329B (en) * 2016-08-03 2018-08-03 芜湖航天特种电缆厂股份有限公司 The connecting rod transport establishment of valve upper cover processing line

Similar Documents

Publication Publication Date Title
CN203566219U (en) Automatic screw locking equipment with manipulator
CN101391666B (en) Injection type charging rotary order mechanism
CN202213976U (en) Multifunctional accessory installing production line for automobile windshield
CN203593413U (en) Automatic connecting device
CN205708728U (en) A kind of conveying transferring device of heat insulating decorative board
CN208757938U (en) A kind of turnover mechanism of two-sided dispenser
CN206059363U (en) PV glass panel infiltrates positioning feeder
CN103662179B (en) A kind of full-automatic tray paper machine
CN202109738U (en) Medical appliance drying system
CN106743606A (en) Workpiece conveying equipment
CN204365571U (en) A kind of automation equipment of axle sleeve inner ring gluing
CN104003165A (en) Pop-up roller transfer machine
CN206384558U (en) Workpiece conveying equipment
CN113634449B (en) Efficient multifunctional workpiece machining system
CN203037153U (en) Automatic feeding firecracker lead inserting machine
CN204607180U (en) A kind of stretch wrap film Fabricating machinery
CN209454344U (en) A kind of PVC card plate printer
CN202846360U (en) Paper tube conveying fixing clamp
CN207434347U (en) The assist in synchronization device of synchronous conveyer band
CN207087310U (en) A kind of flat lamp assembly line
CN202330634U (en) Moving device for testing LED (Light-Emitting Diode) chip
CN215363903U (en) Brushless outer rotor magnetic ring material distributing mechanism
CN102531357B (en) Processing method for double-spiral energy-saving fluorescent tube
CN205812646U (en) Portable feed appliance
CN205687078U (en) A kind of fluorescent tube flattening device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191009

Address after: 523000 No. 9, Jing Rong Road, Niu Shan outer diameter Industrial Park, Dongcheng Street, Dongguan, Guangdong

Patentee after: GUANGDONG LIDI INTELLIGENT TECHNOLOGY Co.,Ltd.

Address before: Dalingshan Town Village on the Guangdong city of Dongguan Province Gu Ling 523000

Patentee before: DONGGUAN LIDI ELECTRONIC TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20140514

CX01 Expiry of patent term