CN203583829U - Clean workshop stainless steel clad plate floor structure - Google Patents

Clean workshop stainless steel clad plate floor structure Download PDF

Info

Publication number
CN203583829U
CN203583829U CN201320749094.3U CN201320749094U CN203583829U CN 203583829 U CN203583829 U CN 203583829U CN 201320749094 U CN201320749094 U CN 201320749094U CN 203583829 U CN203583829 U CN 203583829U
Authority
CN
China
Prior art keywords
stainless steel
steel clad
layer
concrete
plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320749094.3U
Other languages
Chinese (zh)
Inventor
王雪莲
杨晓敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN201320749094.3U priority Critical patent/CN203583829U/en
Application granted granted Critical
Publication of CN203583829U publication Critical patent/CN203583829U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Floor Finish (AREA)

Abstract

The utility model discloses a clean workshop stainless steel clad plate floor structure which comprises a base soil layer (1). A concrete or reinforced concrete backing layer (2) is arranged on the base soil layer and provided with a leveling layer (3), connection steel plates (4) are arranged on the leveling layer, the bottom of each connection steel plate is provided with anchor bars (8) which stretch into the concrete or reinforced concrete backing layer, two stainless steel clad plates (6) are welded to the connecting steel plates, and bonding layers (5) are arranged between the stainless steel clad plates and the leveling layer. The stainless steel clad plates serve as a clean floor, and the base soil layer at the bottoms of the stainless steel clad plates is compact. The structure is attractive in appearance, simple, convenient to construct, capable of meeting the requirement of a grade level for bearing capacity and capable of meeting the requirement of cleanliness. Meanwhile, gaps produced during installation of the stainless steel clad plates are filled up with titanium powder or titanium slag fine powder in production of a workshop, so that cleanliness of products cannot be influenced and the requirements of a titanium sponge job shop for production are met.

Description

The structure on clean room stainless steel clad plate ground
Technical field
the utility model relates to the structure on a kind of clean room stainless steel clad plate ground, belongs to SMT field, clean room ground.
Background technology
clean technology is used widely in departments such as electronics industry, aerospace industry, precision optical machinery, smelting, light industry industry and medical industry, food industry, medical treatment.Wherein the finishing of clean floor directly affects construction costs and quality.Current clean floor is mainly fitted up with materials such as polyurethane coating, epoxy or mylar mortar clay, polyvinyl chloride soft board and polyvinyl chloride hardboards.Some construction of above-mentioned clean floor is cumbersome, and some is yielding, and some bearing capacity is poor, and also some easily produces static, and is inconvenient to carry out grounding connection.As existing titanium sponge processing plant, in its explained hereafter flow process, titanium sponge stone roller takes out after ejector ejects, remove the impurity such as flaw-piece, and according to the quality of its quality, separate superfine and commerical grade titanium sponge, after shearing by different hydraulic presses respectively, pass through separately superfine titanium sponge crushing line, by what crusher in crushing, magnetic separation, screening, mixing, check and packing, become superfine titanium sponge finished product.The clean floor of existing titanium sponge processing plant should have higher bearing capacity and cleanliness factor requirement, and can bear certain impact force and anti-wear performance.And existing clean floor cannot meet the instructions for use of existing titanium sponge processing plant.
Summary of the invention
the purpose of this utility model is, the structure on a kind of clean room stainless steel clad plate ground is provided.To meet the instructions for use of existing titanium sponge processing plant to the higher bearing capacity in clean floor, cleanliness factor impact force and anti-wear performance.
the technical solution of the utility model:
the structure on clean room stainless steel clad plate ground, comprises base soil layer, and base soil layer is provided with concrete or steel bar concrete bed course, and concrete or steel bar concrete bed course are provided with leveling layer; Leveling layer is provided with junction steel plate, and junction steel plate bottom is provided with anchor bar, and anchor bar stretches in concrete or steel bar concrete bed course; On junction steel plate, be welded with two stainless steel clad plates, between stainless steel clad plate and leveling layer, be provided with tack coat.
in aforementioned structure, described anchor bar is L-type.
in aforementioned structure, in the gap between described two stainless steel clad plates, be provided with cementing agent.
in aforementioned structure, described tack coat and cementing agent are macromolecular antiseptic cementing agent.
compared with prior art, the utility model is with stainless steel clad plate as clean floor, and stainless steel clad plate and junction steel plate weld, the anchor bar welding of junction steel plate bottom, anchor bar is embedded in concrete or steel bar concrete bed course, the base soil layer compacting of concrete or steel bar concrete bed course bottom.The utility model good looking appearance, simple in structure, easy construction, do not ftracture in clean floor of the present utility model, and damp proof humidity resistance is good, is difficult for savings static, and bearing capacity and cleanliness factor can meet the production requirement of titanium sponge processing plant completely.Gap between two stainless steel clad plates is sealed with macromolecular antiseptic bonding agent, the gap that dust that the charing of terrace Concrete in Natural produces can not formed when stainless steel clad plate is installed, out enter factory building terrace inner surface, thereby guaranteed the requirement of cleanliness factor.Meanwhile, the gap producing when stainless steel clad plate is installed is filled by the titanium valve in factory building manufacturing process or titanium slag smalls, can not affect the cleanliness factor of product, has met the requirement that titanium sponge processing plant produces.
Accompanying drawing explanation
fig. 1 is structural representation of the present utility model.
being labeled as in accompanying drawing: 1-base soil layer, 2-steel bar concrete bed course, 3-leveling layer, 4-junction steel plate, 5-tack coat, 6-stainless steel clad plate, 7-cementing agent, 8-anchor bar.
The specific embodiment
below in conjunction with drawings and Examples, the utility model is described in further detail, but not as to any restriction of the present utility model.
the structure on clean room stainless steel clad plate ground, as shown in Figure 1.Comprise base soil layer 1, base soil layer 1 is provided with concrete or steel bar concrete bed course 2, and concrete or steel bar concrete bed course 2 are provided with leveling layer 3; Leveling layer 3 is provided with junction steel plate 4, and junction steel plate 4 bottoms are provided with anchor bar 8, and anchor bar 8 is L-type.Anchor bar 8 stretches in concrete or steel bar concrete bed course 2; On junction steel plate 4, be welded with in the gap between 6, two stainless steel clad plates 6 of two stainless steel clad plates and be provided with cementing agent 7.Between stainless steel clad plate 6 and leveling layer 3, be provided with tack coat 5.Described tack coat 5 and cementing agent 7 are macromolecular antiseptic cementing agent.
specific implementation process of the present utility model and principle
as shown in Figure 1, base soil layer 1 compaction in layers in Xian Jiang titanium sponge processing plant factory building, on the base soil layer 1 of compacting, do concrete or steel bar concrete bed course 2, on concrete or steel bar concrete bed course 2, smear again one deck cement mortar screeding layer 3, on leveling layer 3, press the pre-buried junction steel plate 4 of spacing, on leveling layer 3, lay macromolecular antiseptic cementing agent, finally 6 of stainless steel clad plates are welded on junction steel plate 4, have the gap of macromolecular antiseptic cementing agent between two blocks of stainless steels when compressing stainless steel clad plate 6, be extruded, by the cementing agent 7 between two blocks of stainless steels of the floating formation of extruding part.Described stainless steel clad plate 6 is to take carbon steel as base material, the stainless steel clad plate that the stainless steel of take is combined into as coating, its bond strength is high, satisfactory mechanical property, it is a kind of hot rolling composite steel plate, its coating thickness and substrate thickness can further reduce construction costs according to the demand any combination of Practical Project, and a blank of China's the sector has been filled up in the application of technique.

Claims (4)

1. the structure on clean room stainless steel clad plate ground, is characterized in that: comprise base soil layer (1), base soil layer (1) is provided with concrete or steel bar concrete bed course (2), and concrete or steel bar concrete bed course (2) are provided with leveling layer (3); Leveling layer (3) is provided with junction steel plate (4), and junction steel plate (4) bottom is provided with anchor bar (8), and anchor bar (8) stretches in concrete or steel bar concrete bed course (2); On junction steel plate (4), be welded with two stainless steel clad plates (6), between stainless steel clad plate (6) and leveling layer (3), be provided with tack coat (5).
2. structure according to claim 1, is characterized in that: described anchor bar (8) is L-type.
3. structure according to claim 2, is characterized in that: in the gap between described two stainless steel clad plates (6), be provided with cementing agent (7).
4. structure according to claim 3, is characterized in that: described tack coat (5) and cementing agent (7) are macromolecular antiseptic cementing agent.
CN201320749094.3U 2013-11-25 2013-11-25 Clean workshop stainless steel clad plate floor structure Expired - Lifetime CN203583829U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320749094.3U CN203583829U (en) 2013-11-25 2013-11-25 Clean workshop stainless steel clad plate floor structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320749094.3U CN203583829U (en) 2013-11-25 2013-11-25 Clean workshop stainless steel clad plate floor structure

Publications (1)

Publication Number Publication Date
CN203583829U true CN203583829U (en) 2014-05-07

Family

ID=50581769

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320749094.3U Expired - Lifetime CN203583829U (en) 2013-11-25 2013-11-25 Clean workshop stainless steel clad plate floor structure

Country Status (1)

Country Link
CN (1) CN203583829U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759854A (en) * 2016-11-23 2017-05-31 上海交通大学 Complex load steel plate concrete platform
CN106758656A (en) * 2016-11-23 2017-05-31 上海交通大学 complex load steel plate concrete platform construction method
CN110080489A (en) * 2019-05-15 2019-08-02 北京建工四建工程建设有限公司 It is a kind of for bearing the stainless steel plate ground structure and its construction method of larger load
WO2021087636A1 (en) * 2019-11-04 2021-05-14 深圳市能源环保有限公司 Method for manufacturing stainless steel floor of discharge chamber of garbage transfer station

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759854A (en) * 2016-11-23 2017-05-31 上海交通大学 Complex load steel plate concrete platform
CN106758656A (en) * 2016-11-23 2017-05-31 上海交通大学 complex load steel plate concrete platform construction method
CN110080489A (en) * 2019-05-15 2019-08-02 北京建工四建工程建设有限公司 It is a kind of for bearing the stainless steel plate ground structure and its construction method of larger load
WO2021087636A1 (en) * 2019-11-04 2021-05-14 深圳市能源环保有限公司 Method for manufacturing stainless steel floor of discharge chamber of garbage transfer station

Similar Documents

Publication Publication Date Title
CN203583829U (en) Clean workshop stainless steel clad plate floor structure
CN207211427U (en) A kind of prefabricated assembled concrete shear wall
CN101649655A (en) Wall and manufacturing method thereof
CN201809932U (en) Construction system of polyvinyl chloride (PVC) floor
CN201660975U (en) Insulation system with built-in large mold
CN103556798B (en) The preparation method of aluminum Concha Arcae wall floor decoration module
CN203856096U (en) Novel free stone masonry building structure
CN205088807U (en) High strength composite insulation board
CN107351457A (en) A kind of environment-friendly waterproof high-strength bathroom panel and preparation method thereof
CN104988839B (en) Subgrade and pavement pave edge no formwork erection construction paving help plant equipment
CN103541533B (en) Wall floor decoration module preparation method
CN202482897U (en) Concrete structure
CN1669738A (en) Method for manufacturing horizontal hard terrace
CN208088774U (en) A kind of composite building board
CN204343529U (en) The building block of complex heat-preservation veneer type
CN206256570U (en) Novel belt tenon stone walling
CN206987118U (en) A kind of house internal partition wall
CN206928198U (en) A kind of composite reinforced steel corrugated plating box culvert
CN202937001U (en) Novel wood-plastic compound building formwork
CN201169889Y (en) Floor tiles with conical legs
CN204983362U (en) Multilayer coincide sound insulation heat preservation plate
CN207143989U (en) Combined type basic component
CN105058924B (en) A kind of high temperature compound part forming die composite board and production technology
CN207314745U (en) A kind of diatom ooze floor
CN204081313U (en) Coiled material edge banding machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20140507

CX01 Expiry of patent term