CN203583461U - Precast diaphragm wall guide wall - Google Patents

Precast diaphragm wall guide wall Download PDF

Info

Publication number
CN203583461U
CN203583461U CN201320880134.8U CN201320880134U CN203583461U CN 203583461 U CN203583461 U CN 203583461U CN 201320880134 U CN201320880134 U CN 201320880134U CN 203583461 U CN203583461 U CN 203583461U
Authority
CN
China
Prior art keywords
wall
panel
guide wall
steel mesh
led
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320880134.8U
Other languages
Chinese (zh)
Inventor
叶启军
鲁嘉
胡康虎
施炯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Construction Investment Group Co ltd
Original Assignee
ZHEJIANG CONSTRUCTION INVESTMENT GROUP Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG CONSTRUCTION INVESTMENT GROUP Corp Ltd filed Critical ZHEJIANG CONSTRUCTION INVESTMENT GROUP Corp Ltd
Priority to CN201320880134.8U priority Critical patent/CN203583461U/en
Application granted granted Critical
Publication of CN203583461U publication Critical patent/CN203583461U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model discloses a precast diaphragm wall guide wall, and belongs to the technical field of guide wall structures of buildings. The precast diaphragm wall guide wall comprises a guide wall I and a guide wall II arranged oppositely, wherein a steel mesh I is arranged in the guide wall I, a steel mesh II is arranged in the guide wall II, the panel of the guide wall II serves as the placing panel of a trenching machine, a preformed hole is formed in the panel, and a set of steel pipe piles are arranged below the guide wall panel at intervals. According to the precast diaphragm wall guide wall, the flange width and the concrete thickness of the concrete guide wall are increased at the side of the placing panel of the trenching machine, the steel pipe piles for reinforcing a soil body is arranged at the bottom of the panel so improve the firmness of the panel, and the preformed hole is formed in the panel for observing the change of the soil body below the panel, so that the change of the trench wall soil body in the trenching construction process can be dynamically controlled, the trenching quality is improved, the earthwork collapsing amount in the diaphragm wall trenching construction process is reduced, the extra casting amount of the diaphragm wall concrete is reduced, the wall forming quality of the diaphragm wall is increased, the precast diaphragm wall guide wall can be used repeatedly, and the construction economic benefit is enhanced.

Description

A kind of prefabricated ground-connecting-wall is led wall
Technical field
The utility model belongs to the architectural wall construction technical field of leading, and is specifically related to a kind of prefabricated ground-connecting-wall and leads wall.
Background technology
Before ground-connecting-wall construction; in order to control grooving position and to prevent the notch earthwork to cave in and generally all want well in advance to lead wall; the way of leading at present wall is all that wall is led in cast-in-situ concrete, is not considered to scouring machine stop position, function singleness; disposable use; operation is loaded down with trivial details, and not only consumable quantity is large, also increases construction period and workload; efficiency of construction is low, runs counter to energy-conserving and environment-protective.
During the construction of current ground-connecting-wall, grooving machinery is parked a side and is often only made simple cure process, leads wall flange width and concrete thickness also very not enough, makes installation opportunity tool very large to groove side soil disturbance, and pore water pressure change is violent, has a strong impact on the stable of cell wall.
Utility model content
For the above-mentioned problems in the prior art, the purpose of this utility model is to provide a kind of prefabricated ground-connecting-wall to lead wall.
Described a kind of prefabricated ground-connecting-wall is led wall; comprise leading wall I and leading wall II of being oppositely arranged; described leading arranges steel mesh reinforcement I within the walls; lead the steel mesh reinforcement II that double-layer double-direction is set in wall II; it is characterized in that the described panel of leading wall II is that groover is shut down panel; at least one preformed hole is set on this panel, and this is led interval under shingle nail and arranges one group for soil mass consolidation and fix the steel pipe pile that this leads wall II.
Described a kind of prefabricated ground-connecting-wall is led wall, it is characterized in that the described wall II width of leading is 5-8m.
Described a kind of prefabricated ground-connecting-wall is led wall, it is characterized in that the spacing between described adjacent steel pile tube is 1-2m.
Described a kind of prefabricated ground-connecting-wall is led wall, it is characterized in that in described steel mesh reinforcement II, adjacent two rebar spacings are 6-10cm, two-layer steel mesh reinforcement spacing 10-25cm.
Described a kind of prefabricated ground-connecting-wall is led wall, it is characterized in that in described steel mesh reinforcement I, adjacent two rebar spacings are 10-15cm.
Described a kind of prefabricated ground-connecting-wall is led wall, it is characterized in that the distance between described adjacent two preformed holes 5 is 1-2m.
Above-mentioned a kind of prefabricated ground-connecting-wall is led wall; comprise leading wall I and leading wall II of being oppositely arranged; described leading arranges steel mesh reinforcement I within the walls; lead steel mesh reinforcement II is set in wall II; the panel of leading wall II is that groover is shut down panel; at least one preformed hole is set on this panel, and this is led interval under shingle nail and arranges one group for soil mass consolidation and fix the steel pipe pile that this leads wall II.The utility model is by adopting above-mentioned technology, adopt prefabricated reinforced concrete to lead wall, one side is led to wall and be made as groover shutdown panel, on this side ground, lay and strengthen concrete guide wall wing Citron width and concrete thickness, and be provided in panel bottom the steel pipe pile of reinforcing, improve its firmness, and one or more preformed holes are set on panel, be used for observing the beneath soil body changing condition of panel, also can be used as the loads such as groover the construction of the release aperture of cell wall generation soil pressure is used to hole, reduce the pore water pressure in cell wall soil layer, also can be used as soil pressure, WATER LEVEL CHANGES detects the construction in hole and detects with hole, thereby can reach the dynamic control that the cell wall soil body of trenching construction process is changed, improve grooving quality, reduce the cell wall earthwork amount of caving in ground-connecting-wall trenching construction process, reduce the additionally amount of building of ground-connecting-wall concrete, increase ground-connecting-wall quality of wall, can reuse, improve construction economy benefit.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1-leads wall I, 2-leads wall II, 3-steel mesh reinforcement I, 4-steel mesh reinforcement II, 5-preformed hole, 6-steel pipe pile.
The specific embodiment
Below in conjunction with Figure of description, the utility model will be further described:
As shown in Figure 1, a kind of prefabricated ground-connecting-wall is led wall, comprise leading wall I 1 and leading wall II 2 of being oppositely arranged, the described interior steel mesh reinforcement I 3 that arranges of wall 1 of leading, in steel mesh reinforcement I 3, adjacent two rebar spacings are 10-15cm, the described panel of leading wall II 2 is that groover is shut down panel, be used for being placed to scouring machine, its width widen, its width is 5-8m, lead the interior steel mesh reinforcement II 4 that double-layer double-direction is set of wall II 2, laterally two-layer, longitudinally two-layer, in steel mesh reinforcement II 4, adjacent two rebar spacings are 6-10cm, two-layer steel mesh reinforcement spacing 10-25cm, compare with the rebar spacing of steel mesh reinforcement I 3, reinforcing bar in steel mesh reinforcement II 4 is closeer, improve its fastness, avoid groover to damage by pressure, preformed hole 5 is also set on this panel, preformed hole 5 can be one, also can be a plurality of, distance between adjacent two preformed holes 5 is 1-2m, preformed hole 5 is for observing soil body changing condition under panel, also can be used as the loads such as groover the construction of the release aperture of cell wall generation soil pressure is used to hole, reduce the pore water pressure in cell wall soil layer, also can be used as soil pressure, WATER LEVEL CHANGES detects the construction in hole and detects with hole, thereby can reach the dynamic control that the cell wall soil body of trenching construction process is changed, improve grooving quality, this is led interval under shingle nail and arranges one group for soil mass consolidation and fix the steel pipe pile that this leads wall II, the spacing of adjacent steel pile tube 6 is 1-2m.
The utility model adopts prefabricated reinforced concrete to lead wall by employing, to lead wall II 2 and be made as groover shutdown panel, on this side ground, lay and strengthen concrete guide wall wing Citron width and concrete thickness, and be provided in panel bottom the steel pipe pile of reinforcing, improve its firmness, and one or more preformed holes are set on panel, be used for observing panel bottom soil body changing condition, can reach dynamic control trenching construction, be reduced to scouring machine pressure to cell wall when trenching construction, reduce the pore water pressure in cell wall soil layer, improve grooving quality, thereby reduce the cell wall earthwork amount of caving in ground-connecting-wall trenching construction process, reduce the additionally amount of building of ground-connecting-wall concrete, increase ground-connecting-wall quality of wall, can reuse, improve construction economy benefit.

Claims (6)

1. a prefabricated ground-connecting-wall is led wall; comprise leading wall I (1) and leading wall II (2) of being oppositely arranged; described leading arranges steel mesh reinforcement I (3) in wall (1); lead the steel mesh reinforcement II (4) that double-layer double-direction is set in wall II (2); it is characterized in that the described panel of leading wall II (2) is that groover is shut down panel; at least one preformed hole (5) is set on this panel, and this is led interval under shingle nail and arranges one group for soil mass consolidation and fix this steel pipe pile of leading wall II (2) (6).
2. a kind of prefabricated ground-connecting-wall according to claim 1 is led wall, it is characterized in that described to lead wall II (2) width be 5-8m.
3. a kind of prefabricated ground-connecting-wall according to claim 1 is led wall, it is characterized in that the spacing between described adjacent steel pile tube (6) is 1-2m.
4. a kind of prefabricated ground-connecting-wall according to claim 1 is led wall, it is characterized in that described upper adjacent two rebar spacings of steel mesh reinforcement II (4) are 6-10cm, and two-layer steel mesh reinforcement spacing is 10-25cm.
5. a kind of prefabricated ground-connecting-wall according to claim 1 is led wall, it is characterized in that described upper adjacent two rebar spacings of steel mesh reinforcement I (3) are 10-15cm.
6. a kind of prefabricated ground-connecting-wall according to claim 1 is led wall, it is characterized in that the distance between described adjacent two preformed holes (5) is 1-2m.
CN201320880134.8U 2013-12-30 2013-12-30 Precast diaphragm wall guide wall Expired - Lifetime CN203583461U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320880134.8U CN203583461U (en) 2013-12-30 2013-12-30 Precast diaphragm wall guide wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320880134.8U CN203583461U (en) 2013-12-30 2013-12-30 Precast diaphragm wall guide wall

Publications (1)

Publication Number Publication Date
CN203583461U true CN203583461U (en) 2014-05-07

Family

ID=50581404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320880134.8U Expired - Lifetime CN203583461U (en) 2013-12-30 2013-12-30 Precast diaphragm wall guide wall

Country Status (1)

Country Link
CN (1) CN203583461U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208581A (en) * 2018-10-31 2019-01-15 佛山科学技术学院 A kind of novel H profile steel sheet pile ground-connecting-wall
CN111877315A (en) * 2020-07-31 2020-11-03 山东大学 Local prefabricated diaphragm wall guide wall under underground facility and construction method
CN111926800A (en) * 2020-08-12 2020-11-13 山东大学 Underground construction underground diaphragm wall construction method
CN114293570A (en) * 2022-01-25 2022-04-08 同济大学 Construction method for movable anchoring steel plate ground wall guide wall
CN117211302A (en) * 2023-11-09 2023-12-12 中建交通建设集团有限公司 Assembled steel-concrete guide wall and construction method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208581A (en) * 2018-10-31 2019-01-15 佛山科学技术学院 A kind of novel H profile steel sheet pile ground-connecting-wall
CN111877315A (en) * 2020-07-31 2020-11-03 山东大学 Local prefabricated diaphragm wall guide wall under underground facility and construction method
CN111926800A (en) * 2020-08-12 2020-11-13 山东大学 Underground construction underground diaphragm wall construction method
CN111926800B (en) * 2020-08-12 2021-08-24 山东大学 Underground construction underground diaphragm wall construction method
CN114293570A (en) * 2022-01-25 2022-04-08 同济大学 Construction method for movable anchoring steel plate ground wall guide wall
CN117211302A (en) * 2023-11-09 2023-12-12 中建交通建设集团有限公司 Assembled steel-concrete guide wall and construction method thereof
CN117211302B (en) * 2023-11-09 2024-02-27 中建交通建设集团有限公司 Assembled steel-concrete guide wall and construction method thereof

Similar Documents

Publication Publication Date Title
CN203583461U (en) Precast diaphragm wall guide wall
CN102797252B (en) Construction method of underground continuous walls
CN103981896B (en) The seamless link construction method of a kind of outer wall of basement and fender post
CN202323962U (en) Composite supporting structure of drainage pipe pile and soil nailing wall
CN208219694U (en) A kind of prefabricated barricade
CN203229955U (en) Foundation pit enclosure structure allowing supporting while excavating
CN203161244U (en) Existing subway underground excavation running tunnel protection structure
CN207211165U (en) A kind of compound antiskid piling wall retaining structure suitable for reservoir stability
CN104594297A (en) Double-deck concrete faced rock-fill dam and construction method thereof
CN204326032U (en) A kind of concrete dam internal drainage gallery structure
CN203530958U (en) Thin-wall prefabricated overlapped concrete underground diaphragm wall
CN202830952U (en) Novel soft soil foundation structure
CN204266216U (en) A kind of bamboo beam anchoring support structure of side slope
CN102943480A (en) Loess foundation pit supporting method
CN203320538U (en) Water resource recycling and deep drainage device for landslides and underground water inside landslides
CN205205848U (en) Cavity gravity type marine wind power basis
CN204803898U (en) Subway station basement supporting construction
CN203160258U (en) Digging pile soil nail type retaining wall structure
CN210827422U (en) Peripheral shallow structure foundation reinforced structure that buries of deep basal pit
CN202148530U (en) Curtain water stop slope wall
CN101892663A (en) Pile foundation manufacturing method
CN203429642U (en) Bored pile structure
CN203654311U (en) Novel retaining wall of mechanical hole-forming excavated foundation
CN204849780U (en) Utilize excavation supporting system of vacuum gravity dam body as self stabilization
CN103572778A (en) Rope fixture type shearing resisting, dip angle changing and mutual inlaying barricade block and rope fixing method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 310012 No. 52 Wensan West Road, Xihu District, Hangzhou City, Zhejiang Province

Patentee after: ZHEJIANG CONSTRUCTION INVESTMENT GROUP CO.,LTD.

Address before: 310012 Zhejiang Construction Investment Group Co., Ltd. No. 20 Wensan Road, Xihu District, Hangzhou City, Zhejiang Province

Patentee before: ZHEJIANG CONSTRUCTION INVESTMENT GROUP Corp.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140507