CN203559582U - Integrated hydraulic creeping formwork - Google Patents

Integrated hydraulic creeping formwork Download PDF

Info

Publication number
CN203559582U
CN203559582U CN201320487708.5U CN201320487708U CN203559582U CN 203559582 U CN203559582 U CN 203559582U CN 201320487708 U CN201320487708 U CN 201320487708U CN 203559582 U CN203559582 U CN 203559582U
Authority
CN
China
Prior art keywords
creeping formwork
wall
hydraulic
hydraulic cylinder
vertical main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320487708.5U
Other languages
Chinese (zh)
Inventor
张永前
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINGHEREN CONSTRUCTION TECHNOLOGY Co Ltd BEIJING
Original Assignee
XINGHEREN CONSTRUCTION TECHNOLOGY Co Ltd BEIJING
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINGHEREN CONSTRUCTION TECHNOLOGY Co Ltd BEIJING filed Critical XINGHEREN CONSTRUCTION TECHNOLOGY Co Ltd BEIJING
Priority to CN201320487708.5U priority Critical patent/CN203559582U/en
Application granted granted Critical
Publication of CN203559582U publication Critical patent/CN203559582U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides an integrated hydraulic creeping formwork. The integrated hydraulic creeping formwork comprises main assembly vertical frames, guide rails, wall attaching devices, steel screens, hydraulic oil pumps, climbing hydraulic cylinders, mold-pushing hydraulic cylinders, horizontal mold-pushing mechanisms, crossbeams, anti-falling climbing devices and templates. The main assembly vertical frames are hung on the wall attaching devices via hooks. The multiple main vertical frames are integrally connected as a whole via the crossbeams. A five-layer operation platform is arranged. An outer vertical surface is provided with the steel screens so as to be tidy and beautiful. The guide rails are attached to the wall-attaching devices. The main assembly vertical frames are capable of sliding up and down along the guide rails. The climbing hydraulic cylinders drive the anti-falling climbing devices to lift the main vertical frames so that an integral creeping formwork is driven to climb. By changing the directions of operation handles of the anti-falling climbing devices, frame bodies and the guide rails are climbed in an alternating manner. The templates are fixed on the horizontal mold-pushing mechanisms. By the mold-pushing hydraulic cylinders, mold-assembly and mold-disassembly operation are finished. The integrated hydraulic creeping formwork is high in safety and attractive in external appearance and is capable of saving cost and enhancing quality and safety of construction.

Description

Integrated hydraulic creeping formwork
Technical field
The utility model relates to a kind of integrated hydraulic creeping formwork equipment, more specifically, relates to the working integrated hydraulic creeping formwork equipment of a kind of super highrise building Core Walls Structure.
Background technology
In the core letter template concreting engineering of super highrise building, in conventional construction method, need being dismounted for multiple times template, expend a large amount of artificial and time.For addressing this problem, the corresponding appearance of more domestic creeping formwork equipments, but all more complicated of its control system operate composition high manually, operating process complexity, and profile adopts close order safety net protection outward appearance poor more.
Summary of the invention
In order to address the above problem, the utility model proposes a kind of integrated hydraulic creeping formwork equipment, simplify the operation of current institute use creeping formwork, thereby reduce working hour, save cost of labor, and improve climbing form frame body profile aesthetic measure.All component completes in factory process, and as shown in Figure 1, it comprises: assembling vertical main framework 1 and guide rail 2, and wall-attaching equipment 3, expanded metal lath 4, hydraulic oil pump 5, the hydraulic cylinder 6 that climbs, pushes away mould hydraulic cylinder 7, horizontal former pushing mechanism 8, crossbeam 9, anti-fall climbing device 10, template 11.
The described vertical main framework 1 of wherein assembling is suspended in wall-attaching equipment 3 by hook, and multiple vertical main frameworks 1 connect into entirety by crossbeam 9, and 5 layer operation platforms are set, and outer facade is installed expanded metal lath 4 neat appearances; Guide rail 2 is attached in wall-attaching equipment 3, assembling vertical main framework 1 can slide up and down along guide rail 2, the utilization hydraulic cylinder 6 that climbs drives anti-fall climbing device 10 to promote vertical main framework 1 to drive entirety to climb, and by changing, the operating grip direction of anti-fall climbing device 10 can realize support body and guide rail alternately climbs; Template 11 is fixed on horizontal former pushing mechanism 8, by pushing away mould hydraulic cylinder 7, completes matched moulds and form removal work.
With respect to prior art, the utlity model has following advantage:
1. adopt modularized design, assembling main frame adopts split-type design, and single component weight is light, is convenient to Assembling, and between assembly, the bearing pins that adopt connect more, quick for installation.
2. level pushes away die device equipment hydraulic power, and matched moulds and form removal are easy and simple to handle, has reduced template manually and the time, thereby has accelerated construction speed.
3. outer protection adopts expanded metal lath, and intensity is high, long service life, profile neat appearance.
4. wall-attaching equipment adopts split-type design, and attached wall plate and guide holder are separate, uses bearing pin to connect, and during installation, can first attached wall plate lighter weight be arranged on body of wall, then guide holder is mounted on attached wall plate, and flexible operation is light.
The utility model integrated hydraulic creeping formwork feature is to adopt Integration Design, and all component all completes in factory process, and equipment degree is high, climb and tear matched moulds operation open all to adopt hydraulic power to complete, and processing ease, action is directly perceived, etc. feature.
Accompanying drawing explanation
Fig. 1 is the stereogram of integrated hydraulic creeping formwork equipment of the present utility model;
Fig. 2 is the stereogram of integrated hydraulic creeping formwork equipment main frame of the present utility model;
Fig. 3 is the structure chart of integrated hydraulic creeping formwork equipment main frame of the present utility model;
Fig. 4 is the wall-attaching equipment structure chart of integrated hydraulic creeping formwork equipment of the present utility model;
Fig. 5 is the horizontal former pushing mechanism structure chart of integrated hydraulic creeping formwork equipment of the present utility model;
Fig. 6 is integrated hydraulic creeping formwork equipment overall structure figure of the present utility model.
The specific embodiment
During use, first by professional, study decision constructure scheme, adjust load and each position stressing conditions of creeping formwork.When building creeping formwork, should organize special construction team and service technician, in strict accordance with construction, build.
At building structure exterior wall, set up fence operation scaffold, on construction wall, do built-in fitting, wall-attaching equipment 3 is installed structurally by bolt, wall-attaching equipment 3 as shown in Figure 4, by attached wall plate i, guide holder j, erection bolt k, off-load bearing pin m, safety plug l composition, its concrete mounting method is, attached wall plate i lighter weight is fixed on building structure exterior wall with erection bolt k, then guide holder j is mounted on attached wall i, use safety plug l to be fixed spacing, assembling vertical main framework 1 is arranged in wall-attaching equipment 3 by carrying hook, guide rail 2 is attached in wall-attaching equipment 3.
As shown in Figure 3, assemble in advance the vertical firmly framework 1 of assembling, it is by crossbeam a, column b, diagonal brace c, outer vertical rod d, upper frame e, lower suspension bracket f, hook g, the entirety that crown wall assembly h assembles by pin bolt, mounts on the off-load bearing pin m in wall-attaching equipment 3 by building site tower crane, adjust crown wall assembly h, assembly vertical main framework 1 is adjusted to vertical state.
So level pushes away die device if Fig. 5 is by pushing away mould track o, pushes away mould coaster p, template is installed vertical beam r; regulate a branch bar q, push away mould hydraulic cylinder mount pad s composition, in advance and push away mould hydraulic cylinder 7 and assembled; lifting, to the crossbeam a top of assembling vertical main framework 1, is in place by bolt.
As shown in Figure 2, by guide rail 2, the hydraulic cylinder 6 that climbs, anti-fall climbing device 10 and hydraulic oil pump 5 are in place, so far integrated hydraulic creeping formwork vertical structure installation.
As shown in Figure 6, by crossbeam 9, integrated hydraulic creeping formwork vertical structure is connected in flakes, on crossbeam, lay scaffold floor, the cat ladder for workman's walking is installed, expanded metal lath 4 is installed in periphery, form sealing protection.
After installing, treat that superstructure constructed, install after wall-attaching equipment 3, by hydraulic oil pump 5, provide power, the driving hydraulic cylinder 6 that climbs, promote the guide rail 2 of full wafer integrated form creeping formwork, after putting in place, guide rail 2 is fixed in upper strata wall-attaching equipment 3, then adjust the operating grip of anti-fall climbing device 10, drive hydraulic cylinder 6 to promote full wafer support body, when climbing behind desired position, use off-load bearing pin that the assembling vertical main framework of full wafer support body is fixed in wall-attaching equipment 3, so far complete one of integrated hydraulic creeping formwork and climb the cycle.
Superstructure reinforcing bar binding completes; the valve of hydraulic oil pump 5 is transferred to and is pushed away on mould hydraulic cylinder 7; by driving, pushing away mould hydraulic cylinder 7 makes horizontal former pushing mechanism 8 drive full wafer template moving forward; complete matched moulds work; treat that concreting completes; again drive and push away the horizontal former pushing mechanism 8 of mould hydraulic cylinder 7 drive template has been slided backward to form removal work, so far complete that one of integrated hydraulic creeping formwork closes, the form removal cycle.
Complete after work above integrated hydraulic creeping formwork and enter the next one and climb the cycle, repeat above step complete climb and close, the form removal cycle, repeatedly aforesaid operations until building structure bind.

Claims (5)

1. an integrated hydraulic creeping formwork, is characterized in that: comprising: assemble vertical main framework (1), guide rail (2), wall-attaching equipment (3), expanded metal lath (4), hydraulic oil pump (5), the hydraulic cylinder that climbs (6), push away mould hydraulic cylinder (7), horizontal former pushing mechanism (8), crossbeam (9), anti-fall climbing device (10) and template (11);
It is upper that described assembling vertical main framework (1) is suspended on wall-attaching equipment (3) by hook, and multiple vertical main frameworks (1) connect into entirety by crossbeam (9), and outer facade is installed expanded metal lath (4) protection; Guide rail (2) is attached in wall-attaching equipment (3), vertical main framework (1) can slide up and down along guide rail (2), utilization climb hydraulic cylinder (6) drive anti-fall climbing device (10) promote vertical main framework (1) drive entirety climb, by changing, the operating grip direction of anti-fall climbing device (10) can realize support body and guide rail (2) alternately climbs; It is upper that template (11) is fixed on horizontal former pushing mechanism (8), by pushing away mould hydraulic cylinder (7), completes matched moulds and form removal work.
2. integrated hydraulic creeping formwork as claimed in claim 1, is characterized in that, assembling vertical main framework (1) is assembled by bearing pin and bolt by crossbeam, column, diagonal brace, outer vertical rod, upper frame, lower suspension bracket, hook, crown wall assembly.
3. integrated hydraulic creeping formwork as claimed in claim 1, is characterized in that, between described vertical main framework (1) and wall-attaching equipment (3), uses off-load bearing pin and safety plug to fix.
4. integrated hydraulic creeping formwork as claimed in claim 1, is characterized in that, described horizontal former pushing mechanism (8) and push away mould hydraulic cylinder (7) all install with assembling main frame crossbeam (9) on.
5. integrated hydraulic creeping formwork as claimed in claim 1, is characterized in that, support body climbs and level pushes away die device and all adopts hydraulic cylinder mode to operate.
CN201320487708.5U 2013-08-11 2013-08-11 Integrated hydraulic creeping formwork Expired - Fee Related CN203559582U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320487708.5U CN203559582U (en) 2013-08-11 2013-08-11 Integrated hydraulic creeping formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320487708.5U CN203559582U (en) 2013-08-11 2013-08-11 Integrated hydraulic creeping formwork

Publications (1)

Publication Number Publication Date
CN203559582U true CN203559582U (en) 2014-04-23

Family

ID=50509313

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320487708.5U Expired - Fee Related CN203559582U (en) 2013-08-11 2013-08-11 Integrated hydraulic creeping formwork

Country Status (1)

Country Link
CN (1) CN203559582U (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104120876A (en) * 2014-07-30 2014-10-29 北京市建筑工程研究院有限责任公司 Novel hydraulic control formwork operation device
CN104131703A (en) * 2014-05-16 2014-11-05 中国建筑第四工程局有限公司 Method for constructing core tube wall through self-climbing formwork and adopted self-climbing formwork
CN104314304A (en) * 2014-10-23 2015-01-28 中建三局第一建设工程有限责任公司 Outside-steel, inside-aluminum, outside-climbing and inside-crossing comprehensive formwork system
CN105401717A (en) * 2015-12-14 2016-03-16 中交一公局第三工程有限公司 Novel climbing formwork frame body
CN105781101A (en) * 2016-05-02 2016-07-20 北京星河人施工技术有限责任公司 Truss type hydraulic entire steel platform climbing formwork
CN106013776A (en) * 2016-07-01 2016-10-12 绍兴文理学院 Hydraulic climbing type elevator shaft finalization operation platform and construction method
CN107762132A (en) * 2017-11-02 2018-03-06 深圳市特辰科技股份有限公司 A kind of side pendulum-type mechanical arm and its application method
CN109403622A (en) * 2018-10-29 2019-03-01 高渭泉 A kind of track hangs modular system and its construction method from hoisting type suspension levelling
CN110017019A (en) * 2019-05-14 2019-07-16 中建海峡建设发展有限公司 A kind of hydraulic climbing die block system and its construction method
CN110388048A (en) * 2019-07-16 2019-10-29 中交一公局第二工程有限公司 Hydraulic climbing formwork device
CN111926712A (en) * 2020-08-12 2020-11-13 中交武汉港湾工程设计研究院有限公司 Intelligent construction method for main tower with large inclination angle
CN113896124A (en) * 2021-11-23 2022-01-07 中国建筑第四工程局有限公司 Super high-rise tower crane bottom attached hydraulic self-climbing hard protection platform, installation process and climbing method thereof

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131703A (en) * 2014-05-16 2014-11-05 中国建筑第四工程局有限公司 Method for constructing core tube wall through self-climbing formwork and adopted self-climbing formwork
CN104120876A (en) * 2014-07-30 2014-10-29 北京市建筑工程研究院有限责任公司 Novel hydraulic control formwork operation device
CN104314304A (en) * 2014-10-23 2015-01-28 中建三局第一建设工程有限责任公司 Outside-steel, inside-aluminum, outside-climbing and inside-crossing comprehensive formwork system
CN104314304B (en) * 2014-10-23 2016-02-03 中建三局第一建设工程有限责任公司 The comprehensive formwork system of varus is climbed outside aluminium in a kind of outer steel
CN105401717B (en) * 2015-12-14 2018-08-21 中交一公局第三工程有限公司 Creeping formwork frame body
CN105401717A (en) * 2015-12-14 2016-03-16 中交一公局第三工程有限公司 Novel climbing formwork frame body
CN105781101A (en) * 2016-05-02 2016-07-20 北京星河人施工技术有限责任公司 Truss type hydraulic entire steel platform climbing formwork
CN106013776A (en) * 2016-07-01 2016-10-12 绍兴文理学院 Hydraulic climbing type elevator shaft finalization operation platform and construction method
CN107762132A (en) * 2017-11-02 2018-03-06 深圳市特辰科技股份有限公司 A kind of side pendulum-type mechanical arm and its application method
CN107762132B (en) * 2017-11-02 2020-02-04 深圳市特辰科技股份有限公司 Side-swinging mechanical arm and use method thereof
CN109403622A (en) * 2018-10-29 2019-03-01 高渭泉 A kind of track hangs modular system and its construction method from hoisting type suspension levelling
CN110017019B (en) * 2019-05-14 2024-03-01 中建海峡建设发展有限公司 Hydraulic climbing formwork system and construction method thereof
CN110017019A (en) * 2019-05-14 2019-07-16 中建海峡建设发展有限公司 A kind of hydraulic climbing die block system and its construction method
CN110388048A (en) * 2019-07-16 2019-10-29 中交一公局第二工程有限公司 Hydraulic climbing formwork device
CN111926712B (en) * 2020-08-12 2021-09-17 中交武汉港湾工程设计研究院有限公司 Intelligent construction method for main tower with large inclination angle
CN111926712A (en) * 2020-08-12 2020-11-13 中交武汉港湾工程设计研究院有限公司 Intelligent construction method for main tower with large inclination angle
CN113896124A (en) * 2021-11-23 2022-01-07 中国建筑第四工程局有限公司 Super high-rise tower crane bottom attached hydraulic self-climbing hard protection platform, installation process and climbing method thereof
CN113896124B (en) * 2021-11-23 2024-04-19 中国建筑第四工程局有限公司 Attached hydraulic self-climbing hard protection platform at bottom of super high-rise tower crane, mounting process and climbing method thereof

Similar Documents

Publication Publication Date Title
CN203559582U (en) Integrated hydraulic creeping formwork
CN205742991U (en) A kind of truss-like hydraulic pressure integral steel platform jumping formwork
CN201826525U (en) Climbing shuttering system device for buildings
CN103758341B (en) Steel column drum rack support type hydraulic lifting overall steel platform cross truss layer construction method
CN202830776U (en) Bridge variable cross-section rectangular high pier cantilever creeping formwork construction device
CN102587646A (en) Hydraulic lifting self-ascending template system of intelligent independent unit structure
CN105781101A (en) Truss type hydraulic entire steel platform climbing formwork
CN103741947B (en) Tube-frame-supporting type hydraulic climbing integral steel platform formwork truss layer construction method
CN105544984A (en) Large-span steel structure jig frame integrity slip construction process
CN100365237C (en) Autolifting type variable-shape diassembllable integrated lifting steel plateform system and construction method thereof
WO2009017354A3 (en) Multi-horizontal structure member forming method
CN101319560A (en) Double-acting integral hydraulic automatic lifting platform system and construction method using the same
CN1975069A (en) Reciprocating self-climbing type climbing form system and its climbing form method
CN202347842U (en) Hydraulic climbing template device of high-rise building
CN102718109A (en) Method for transforming construction elevator into passenger-goods elevator
CN203452375U (en) Hydraulic self-jacking oblique creeping formwork
CN204371360U (en) A kind of chassis for the construction of cut-and-cover tunnel concrete pouring
CN101979800B (en) Electric climbing formwork system
JP2006299559A (en) Self climbing scaffold and self climbing method by use of it
CN202450775U (en) Hydraulic jacking and self-climbing template device with intelligent independent unit structure
CN202924620U (en) Installing support that installation equipment was used in narrow and small space
CN202380721U (en) Hydraulic self-elevating climbing system
CN203867198U (en) Slip equipment for high-rise steel structure transfer layer truss
CN217761022U (en) Comprehensive operation trolley for construction of air cushion type surge chamber of hydropower station
CN204111122U (en) Optimize the composition component without scaffold lift-mounting

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140423

Termination date: 20190811

CF01 Termination of patent right due to non-payment of annual fee