CN203559439U - Underground engineering waterproof leaking stoppage structure - Google Patents

Underground engineering waterproof leaking stoppage structure Download PDF

Info

Publication number
CN203559439U
CN203559439U CN201320717897.0U CN201320717897U CN203559439U CN 203559439 U CN203559439 U CN 203559439U CN 201320717897 U CN201320717897 U CN 201320717897U CN 203559439 U CN203559439 U CN 203559439U
Authority
CN
China
Prior art keywords
material layer
adjacent
face
groove
jurisdiction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320717897.0U
Other languages
Chinese (zh)
Inventor
宋林涛
林庆芳
陈伟
金开建
祝立锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongsha Construction Group Co Ltd
Original Assignee
Zhongsha Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongsha Construction Group Co Ltd filed Critical Zhongsha Construction Group Co Ltd
Priority to CN201320717897.0U priority Critical patent/CN203559439U/en
Application granted granted Critical
Publication of CN203559439U publication Critical patent/CN203559439U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses an underground engineering waterproof leaking stoppage structure. The underground engineering waterproof leaking stoppage structure comprises two adjacent segments, wherein a groove is formed between the upper portions of two adjacent side walls of the two adjacent segments, and an aperture is formed between the lower portions of two adjacent side walls of the two adjacent segments. The aperture is communicated with the groove and is located below the groove. A grout injection layer is injected into the aperture through compression, and the groove is filled with an aperture sealing material layer and an aperture caulking material layer. The top surface of the grout injection layer contacts with the bottom surface of the aperture sealing material layer, the top surface of the aperture sealing material layer contacts with the bottom surface of the aperture caulking material layer, and a rendering coat is coated on the adjacent portions between the top surface of the aperture caulking material layer and the inner side walls of the segments at both sides of the aperture caulking material layer. The underground engineering waterproof leaking stoppage structure can ensure waterproof and leaking stoppage of apertures among segments and waterproof of the underground engineering is ensured.

Description

A kind of underground project waterproof leak stopping structure
Technical field:
The utility model relates to underground building construction waterproof technical field, relates in particular a kind of underground project waterproof leak stopping structure.
Background technology:
In underground construction, because design is inconsiderate, structure is dealt with improperly, selection is bad, construction quality is bad, setting of ground and artificial or natural calamity etc. cause near the hydrogeological factors such as change engineering, the engineering that causes Hot work in progress or be completed, the phenomenon that percolating water occurs is more common.
The mode that the section of jurisdiction that existing underground construction adopts connects, and the mode that adopts section of jurisdiction to connect, generally between section of jurisdiction, to adopt the mode of waterproof sealing gasket sealing to seal, yet it uses and between section of jurisdiction, produces long afterwards or easily percolating water phenomenon, can make the inner molten mistake of calcium hydroxide existing of steel concrete, pH value diminishes, easily cause the reinforcing bar generation corrosion in concrete structure, and can accelerate the alkali-aggregate reaction of structural concrete, thereby the structural safety of having influence on, has shortened service life of engineering.
The seepage of present underground construction, must adopt mechanical draining throughout the year and use dehumidifier or with hygroscopic agent dehumidifying, all can cause energy loss, and cost rises violently.
Utility model content:
The purpose of this utility model is to overcome the deficiencies in the prior art, and a kind of underground project waterproof leak stopping structure is provided, and it can make the gap between the section of jurisdiction in underground construction carry out waterproofing and leakage-stopping, guarantees the water proofing property of underground construction.
The scheme that the utility model solve the technical problem is:
A kind of underground project waterproof leak stopping structure, comprise two adjacent sections of jurisdiction, between the adjacent side wall upper part of described two adjacent sections of jurisdiction, form groove, between the adjacent lower sidewall of two adjacent sections of jurisdiction, form gap, gap communicates with groove, it is below groove;
In described gap, by enhancing perfusion, there is slip casting liquid layer, in groove, be filled with joint seal material layer and caulking material layer, the upper end face of slip casting liquid layer contacts with the bottom surface of joint seal material layer, the end face of joint seal material layer contacts with the bottom surface of caulking material layer, on the adjacent part of the upper end face of caulking material layer and the inside wall of its section of jurisdiction, both sides, all scribbles float coat.
The adjacent part of the upper end face of described caulking material layer and the inside wall of its section of jurisdiction, both sides maintains an equal level.
Described slip casting liquid layer is solidified and is formed by soluble polyurethane slurries.
Described joint seal material layer is solidified and is formed by double-quick cement.
Described caulking material layer is epoxy tar coating.
Float coat is neoprene polymer mortar float coat.
The upper end face of described slip casting liquid layer is arcwall face.
Outstanding effect of the present utility model is:
Compared with prior art, the utility model is simple to operate, and leak stopping is convenient, and it can make the gap between the section of jurisdiction in underground construction carry out waterproofing and leakage-stopping, guarantees the water proofing property of underground construction.
Accompanying drawing explanation:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of the utility model moulding groove;
Fig. 3 is the structural representation that the utility model does not pour into slip casting liquid layer.
The specific embodiment:
Embodiment, see shown in Fig. 1 to Fig. 2, a kind of underground project waterproof leak stopping structure, comprise two adjacent sections of jurisdiction 10, between the adjacent side wall upper part of described two adjacent sections of jurisdiction 10, form groove 1, between the adjacent lower sidewall of two adjacent sections of jurisdiction 10, form gap 2, gap 2 communicates with groove 1, it is below groove 1;
In described gap 2, by enhancing perfusion, there is slip casting liquid layer 3, in groove 1, be filled with joint seal material layer 4 and caulking material layer 5, the upper end face of slip casting liquid layer 3 contacts with the bottom surface of joint seal material layer 4, the end face of joint seal material layer 4 contacts with the bottom surface of caulking material layer 5, on the adjacent part of the upper end face of caulking material layer 5 and the inside wall 11 of its section of jurisdiction, both sides 10, all scribbles float coat 7.
The adjacent part of the upper end face of described caulking material layer 4 and the inside wall 11 of its section of jurisdiction, both sides 10 maintains an equal level.
Described slip casting liquid layer 3 is solidified and is formed by soluble polyurethane slurries.
Described joint seal material layer 4 is solidified and is formed by double-quick cement.
Described caulking material layer 5 is epoxy tar coating.
Float coat 7 is neoprene polymer mortar float coat.
The upper end face of described slip casting liquid layer 3 is arcwall face, and the bottom surface of joint seal material layer 4 is arc-shaped concave.
See shown in Fig. 1 to 3, its operational sequence comprises: hacking, cutting, tick slot; Take out pipe, filleting, wipe one's face, slip casting.
1, dabbing, slot, tick slot dabbing; At two adjacent section of jurisdiction 10 seam two upper lateral parts, respectively cut a hole wide 20cm, manually use chip-axe dabbing, expose fresh concrete basal plane and make it coarse, for enhancing rigidity, wipe one's face and lay the first stone with concrete bonds well.Then carry out slot, tick slot; With the cutting of diamond saw blade concrete cutting machine, cutting width 4~5cm, ditch depth 5~6cm, then uses electric impact drill tick slot, finally with power shovel, becomes with artificial refine the groove 1 that 5~6cm is dark.
Then take out pipe operation, adopt φ 14mmPVC sebific duct to be placed on the bottom of groove 1, double-quick cement or other fast setting cement pressure pipe joint seals form joint seal material layer 4, then take out pipe operation, sebific duct is extracted out from one end of groove 1, and the other end stays a diversion Grouting Pipe 20.
After wherein taking out pipe, just make the bottom surface of joint seal material layer 4 be shaped to arc-shaped concave, while facilitating follow-up perfusion injection slurry, conveniently, perfusion thoroughly in circulation.
2, then carry out filleting, caulking material can be selected: (1) upper tunnel board 851 tar polyurethane coating; (2) TPU polyurethane bicomponent sealing amine; (3) TPU polyurethane sealing putty; (4) 888 swell soil polyurethane sealants; (5) coal-tar epoxy caulking material.First with wire brush and hairbrush, clean out floating ash, the earth of groove 1 and both sides, then embed seam material (being undertaken by the construction technology of various caulking materials in construction), after requirement pointing, be repeatedly squeezed to closely knit, the most handy scraper or manually press twice in caulking material solidification process, so that bonding is better, finally form caulking material layer 5.
3, finally wipe one's face, can adopt neoprene polymer mortar to wipe one's face and form float coat 7.The waterproof of wiping one's face also can be implemented by the five layers of waterproofing process of wiping one's face.After having wiped one's face, take water seasoning 3~4 days.
4, first slip casting use hand-lift type grouting pump to diversion Grouting Pipe 20 setting-out, and then pressure injection soluble polyurethane slurries (or other chemical grouting materials).After slurries solidify, form slip casting liquid layer 3, with pocket knife, slice off pre-buried diversion Grouting Pipe 20, then seal with double-quick cement.
This is simple in structure, and leak stopping is convenient, and it can make the gap between the section of jurisdiction in underground construction carry out waterproofing and leakage-stopping, guarantees the water proofing property of underground construction.

Claims (7)

1. a underground project waterproof leak stopping structure, comprise adjacent two sections of jurisdiction (10), it is characterized in that: between the adjacent side wall upper part of described adjacent two sections of jurisdiction (10), form groove (1), between the adjacent lower sidewall of adjacent two sections of jurisdiction (10), form gap (2), gap (2) communicate with groove (1), its below in groove (1);
In described gap (2), by enhancing perfusion, there is slip casting liquid layer (3), in groove (1), be filled with joint seal material layer (4) and caulking material layer (5), the upper end face of slip casting liquid layer (3) contacts with the bottom surface of joint seal material layer (4), the end face of joint seal material layer (4) contacts with the bottom surface of caulking material layer (5), on the adjacent part of the inside wall (11) of the upper end face of caulking material layer (5) and its section of jurisdiction, both sides (10), all scribbles float coat (7).
2. a kind of underground project waterproof leak stopping structure according to claim 1, is characterized in that: the adjacent part of the inside wall (11) of the upper end face of described caulking material layer (5) and its section of jurisdiction, both sides (10) maintains an equal level.
3. a kind of underground project waterproof leak stopping structure according to claim 1, is characterized in that: described slip casting liquid layer (3) is solidified and formed by soluble polyurethane slurries.
4. a kind of underground project waterproof leak stopping structure according to claim 1, is characterized in that: described joint seal material layer (4) is solidified and formed by double-quick cement.
5. a kind of underground project waterproof leak stopping structure according to claim 1, is characterized in that: described caulking material layer (5) is epoxy tar coating.
6. a kind of underground project waterproof leak stopping structure according to claim 1, is characterized in that: float coat (7) is neoprene polymer mortar float coat.
7. a kind of underground project waterproof leak stopping structure according to claim 1, is characterized in that: the upper end face of described slip casting liquid layer (3) is arcwall face.
CN201320717897.0U 2013-11-14 2013-11-14 Underground engineering waterproof leaking stoppage structure Expired - Fee Related CN203559439U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320717897.0U CN203559439U (en) 2013-11-14 2013-11-14 Underground engineering waterproof leaking stoppage structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320717897.0U CN203559439U (en) 2013-11-14 2013-11-14 Underground engineering waterproof leaking stoppage structure

Publications (1)

Publication Number Publication Date
CN203559439U true CN203559439U (en) 2014-04-23

Family

ID=50509170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320717897.0U Expired - Fee Related CN203559439U (en) 2013-11-14 2013-11-14 Underground engineering waterproof leaking stoppage structure

Country Status (1)

Country Link
CN (1) CN203559439U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018526A (en) * 2014-05-26 2014-09-03 鲲鹏建设集团有限公司 EPR deformation joint repair water stopping structure and construction method thereof
CN107514017A (en) * 2016-06-16 2017-12-26 南京坤佳防水防腐保温工程有限公司 Leakage preventing mechanism in a kind of basement connected entrance deformation
CN113863402A (en) * 2021-10-12 2021-12-31 南昌工程学院 Seepage-proofing and leakage-stopping device for underground engineering and construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018526A (en) * 2014-05-26 2014-09-03 鲲鹏建设集团有限公司 EPR deformation joint repair water stopping structure and construction method thereof
CN104018526B (en) * 2014-05-26 2015-09-30 宁波高新区百茂高分子材料有限公司 EPR deformation joint repairs water-stopping structure and construction method thereof
CN107514017A (en) * 2016-06-16 2017-12-26 南京坤佳防水防腐保温工程有限公司 Leakage preventing mechanism in a kind of basement connected entrance deformation
CN113863402A (en) * 2021-10-12 2021-12-31 南昌工程学院 Seepage-proofing and leakage-stopping device for underground engineering and construction method
CN113863402B (en) * 2021-10-12 2022-09-02 南昌工程学院 Seepage-proofing and leakage-stopping device for underground engineering and construction method

Similar Documents

Publication Publication Date Title
CN105239789A (en) Construction process for plugging and consolidating concrete crack through chemical grouting
CN107387123B (en) The construction method of pressure grouting leak stopping is carried out for shield duct piece piece leakage phenomenon
CN1982541A (en) Underground channel of hydroelectric station and cavity group waterproofing and leakage-stopping construction
CN104912574B (en) A kind of tunnel-liner percolating water Treatment Methods
CN102505663B (en) Method for repairing seepage of concentration tank and water tank
CN109336531A (en) A kind of two-component penetrant crystalline distress in concrete waterproof repair liquid and construction method
CN203559439U (en) Underground engineering waterproof leaking stoppage structure
CN205557856U (en) Leakage structure is prevented at building expansion joint
CN103553538B (en) Architecture indoor percdation solidifies not damaged waterproofing agent
CN108412222A (en) A kind of construction leakage internal maintenance waterproof layer structure and construction technology
CN202787329U (en) Large leakage treatment structure for underground continuous wall
CN105274967A (en) Repairing method for hydraulic concrete crack
CN106284998A (en) Plastering on inner walls completely spreads fiberglass gridding cloth construction method
CN207904991U (en) A kind of underground engineering repairing concrete crack construction
CN105696522B (en) Grouting gallery permanent expansion joint water seepage treatment method
CN109235668A (en) Residential building curtain wall and wall crack plugging structure
CN104343246A (en) Method for preventing water and plugging
CN101586367B (en) Method for preventing decorative surfaces of ceramic tiles in shower room from leaking water
CN108729414A (en) A kind of concrete gravity dam transverse joint seepage treatment method
CN105781580A (en) Tunnel crack repair method
CN102322077B (en) Construction method of plastic draining plate type diversion reduced pressure impermeable body structure
CN106150528A (en) A kind of special slow release water-stop glue construction method
CN1651688A (en) Roof leak proof technology and material
CN201598645U (en) Advanced water stop post-pouring belt for base soleplate
CN212294546U (en) Structure for fixing copper water stop between new and old concrete

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140423

Termination date: 20201114