CN104018526B - EPR deformation joint repairs water-stopping structure and construction method thereof - Google Patents

EPR deformation joint repairs water-stopping structure and construction method thereof Download PDF

Info

Publication number
CN104018526B
CN104018526B CN201410226014.5A CN201410226014A CN104018526B CN 104018526 B CN104018526 B CN 104018526B CN 201410226014 A CN201410226014 A CN 201410226014A CN 104018526 B CN104018526 B CN 104018526B
Authority
CN
China
Prior art keywords
deformation joint
epoxy resin
water
epr
stopping structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410226014.5A
Other languages
Chinese (zh)
Other versions
CN104018526A (en
Inventor
朱宏伟
毛晨阳
元文新
汪明珠
吴许杰
夏航
朱文君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU HONGXU CONSTRUCTION Co.,Ltd.
NINGBO CITY HIGH-TECH ZONE BAIMAO POLYMER MATERIALS Co.,Ltd.
Ping An Construction Group Co.,Ltd.
Original Assignee
HANGZHOU HONGXU CONSTRUCTION CO Ltd
KINGBIRD CONSTRUCTION GROUP
Ningbo High New District Baimao High Polymer Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU HONGXU CONSTRUCTION CO Ltd, KINGBIRD CONSTRUCTION GROUP, Ningbo High New District Baimao High Polymer Material Co Ltd filed Critical HANGZHOU HONGXU CONSTRUCTION CO Ltd
Priority to CN201410226014.5A priority Critical patent/CN104018526B/en
Publication of CN104018526A publication Critical patent/CN104018526A/en
Application granted granted Critical
Publication of CN104018526B publication Critical patent/CN104018526B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Sealing Material Composition (AREA)

Abstract

The invention discloses a kind of EPR deformation joint and repair water-stopping structure and construction method thereof, described deformation joint is formed between two concrete, and described water-stopping structure comprises the sealing barrier be made up of high-early (strength) cement, the epoxy resin filling layer be located at the epoxy resin impervious barrier between two described concrete, the sealing layer be made up of high-early (strength) cement and be poured in described deformation joint; Described sealing barrier is located at described deformation joint rear wall, and sealing layer is located at described deformation joint antetheca.Structure of the present invention is simple, easy construction, leak preventing effect lasting stability.

Description

EPR deformation joint repairs water-stopping structure and construction method thereof
Technical field
The invention belongs to road construction field, especially relate to a kind of EPR deformation joint and repair water-stopping structure and construction method thereof.
Background technology
Along with the further propelling of urbanization process, Development of Underground Engineering space is more and more extensive, and the thing followed is underground project waterproof problem, has a strong impact on workmanship, the difficult point of deformation joint underground construction antiseep especially.Because deformation joint is in continuous motion change, theoretical by waterproofing design again, waterproofing materials, the impact of construction technology, deformation joint is easy to occur percolating water phenomenon, and deformation joint leak stopping is always the problem of having a headache most.
Commonplace in practice of construction, general unit in charge of construction is when processing percolating water, and employing water glass, cement tamp, also useful leak stopping king, also useful polymer cement mortar etc. method.But said method all belongs to rigidity waterproofing, because tensile strength is low, be not suitable with the needs of malformation, still occur infiltration.Though polyurethane grouting treatment belongs to elastomeric material, viscosity is comparatively large, and concrete castability is restricted, and intensity is lower, does over again many, easily again occur percolating water over time after construction.
A kind of effective underground construction deformation joint of research and development is repaired water-stop technology and will be with a wide range of applications.
Summary of the invention
The present invention, in order to overcome the deficiencies in the prior art, provides a kind of reliable in quality and the EPR deformation joint of easy construction repairing water-stopping structure and construction method thereof.
To achieve these goals, the present invention is by the following technical solutions: a kind of EPR deformation joint repairs water-stopping structure, described deformation joint is formed between two concrete, and described water-stopping structure comprises the sealing barrier be made up of high-early (strength) cement, the epoxy resin filling layer be located at the epoxy resin impervious barrier between two described concrete, the sealing layer be made up of high-early (strength) cement and be poured in described deformation joint; Described sealing barrier is located at described deformation joint rear wall, and sealing layer is located at described deformation joint antetheca.
Further, described sealing layer is provided with grouting port and exhaust opening.
Flax silk layer is filled with in described deformation joint.
The present invention also provides a kind of EPR deformation joint to repair the construction method of water-stopping structure, comprises the steps:
1) on the deformation joint leaked, boring, until drill, is injected high-early (strength) cement slurry until block and leak as standard, is formed sealing barrier after the wall of deformation joint;
2) check the concrete compaction rate of deformation joint both sides, find the seepage water spot in the layer of concrete of deformation joint both sides, with epoxy resin reinforcing to form impervious barrier;
3) after deformation joint fluting takes out polyphenyl plate, fill flax silk simultaneously, then adopt in the front side of deformation joint high-early (strength) cement to form sealing layer, and the grouting port left on sealing layer for grouting and gas outlet;
4) in the middle of deformation joint, inject epoxide resin material to form epoxy resin filling layer by grouting port, after the solidification of this epoxide resin material, namely form described EPR deformation joint repair water-stopping structure.
As preferably, described step 2) epoxide resin material of epoxy resin packed layer is made up of A, B two components, and component A comprises epoxy resin 100 parts, reactive diluent 10 parts, flexibilizer 29 parts, coupling agent 1 part; B component comprises 22 parts, curing compound, tough curing agent 6.5 parts, blowing agent 2 parts, defoamer 0.5 part, rheological agent 4 parts; Described number is number meter by weight, and the weight ratio of component A and B component is 4:1; The preparation method of this epoxide resin material comprises the steps:
1) each composition of component A is proportionally configured, place mix and blend 5-8min in same container at normal temperatures, to evenly, divide a bucket to pack; Each composition of B component is proportionally configured, places mix and blend 5-8min in same container at normal temperatures, to evenly, divide a bucket to pack;
2) proportionally configured by each composition of filler, each composition is independently packed;
3) the component A be adjusted to, B component are placed in same container according to the ratio of 4:1 at normal temperatures, mix and blend 2-3min, to evenly, namely obtain the neo-epoxy resin material of described perfusion.
As preferably, described reactive diluent is butyl glycidyl ether, and flexibilizer is polypropylene glycol diglycidyl ether, silane coupler is γ-glycidol ether propyl trimethoxy silicane, curing compound is N-aminoethyl piperazine, and tough curing agent is polyetheramine, and rheological agent is aerosil.
As preferably, described epoxy resin is bisphenol E-type epoxy resin.
The present invention is when when underground structure original deformation joint water slop failure, adopt one to have flexile epoxy resin and replace original water-stopping structure as deformation joint central filler material, its pliability feature meets the Deformation Demands of deformation joint, and the physical property of its solidfied material meets water-stopping seepage-proof demand simultaneously.Before this epoxy resin of filling, by injecting high-early (strength) cement slurry to form one deck sealing barrier after the wall of deformation joint, utilizing the plasticity of cement, to improve the soil layer property after wall, thus reaching i.e. reinforcing soil layer but also setting up the object of temporary leaking water barricade; Second step checks the concrete compaction rate of deformation joint both sides, finds deformation joint both sides concrete seepage water spot injection ring epoxy resins to form impervious barrier, utilizes the Thief zone performance of epoxy resin to carry out anti-seepage reinforcing; 3rd step need be taken out polyphenyl plate at deformation joint fluting and be filled flax silk simultaneously, then adopts microdilatancy high-early (strength) cement to seal, and installs grouting port and gas outlet; Last injection in the middle of deformation joint has flexile epoxy resin, and after the solidification of its epoxide resin material, institute is formed is exactly complete EPR deformation joint repairing water-stopping structure.
The invention is characterized in: (1) this water-stop technology is a kind of repairing technique adopted when original deformation joint water slop failure; (2) the neo-epoxy resin of institute's cementation of fissures sealing is made up of A, B two components, can give birth to curing reaction by hybrid concurrency at normal temperatures, and reaction speed can control within a certain period of time; (3) must inject cement paste after distortion slotted wall before the enforcement of this technology to invade to prevent water, set up first waterproof barrier; (4) this technology also must use hydrophily Thief zone epoxy resin to carry out anti-seepage reinforcing by the concrete in deformation joint both sides before implementing; (5) need take out polyphenyl plate at deformation joint fluting and fill flax silk simultaneously, then with the sealing of microdilatancy high-early (strength) cement, and grouting port and gas outlet are installed.
Present invention also offers a kind of neo-epoxy resin material to be used for filling deformation joint, its performance meets following table 1:
Table 1:
The characteristic sum performance requirement of pliability neo-epoxy resin
The high-early (strength) cement adopted in the present invention can commercially be purchased, and the performance requirement of its demand fulfillment is with reference to following table 2.
Table 2:
High-early (strength) cement index
Fineness <10% 0.080mm square hole screen tails over
Time of setting >5 min
<40 min
Compressive strength/MPa 4h 3.6
8h 12
1d 20
Rupture strength/MPa 4h 1.4
8h 2.2
1d 3.5
Can commercially purchase for the Thief zone epoxide resin material at concrete seepage water spot place, deformation joint both sides in the present invention, be prior art, and its performance meets table 3 and requires.
Table 3:
The characteristic sum performance requirement of Thief zone epoxy resin
In sum, the present invention has the following advantages: this water-stopping structure is simple, easy construction, and leak preventing effect is lasting, stable.
Accompanying drawing explanation
Fig. 1 is water-stopping structure schematic diagram of the present invention.
Fig. 2 is the partial schematic diagram of water-stopping structure of the present invention.
Detailed description of the invention
Better the present invention program is understood in order to make those skilled in the art person, below in conjunction with the embodiment of the present invention, clear, complete description is carried out to the technical scheme in the embodiment of the present invention, obviously, described embodiment is only a part of embodiment of the present invention, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, should belong to the scope of protection of the invention.
Embodiment 1:
As shown in Figure 1, 2, a kind of EPR deformation joint repairs water-stopping structure, described deformation joint 11 is formed between two concrete 12, and described water-stopping structure comprises the sealing barrier 21 be made up of high-early (strength) cement, the epoxy resin filling layer 25 be located at the epoxy resin impervious barrier 22 between two described concrete 12, the sealing layer 24 be made up of high-early (strength) cement and be poured in described deformation joint; Described sealing barrier 21 is located at described deformation joint 11 rear wall, sealing layer 24 is located at described deformation joint 11 antetheca, is filled with flax silk layer in deformation joint, described sealing layer 24 is worn and has penetrated a Grouting Pipe 241, Grouting Pipe be provided with grouting port and, sealing layer is also provided with the exhaust opening for getting rid of gas.
Embodiment 2:
Certain community underground automobile garage deformation joint is seriously badly in need of because former water slop failure leaks repairing:
Designing requirement: adopt EPR deformation joint to repair water-stop technology and repair deformation joint, meet the normal use of underground automobile garage deformation joint.
Concrete implementation step:
(1) on the deformation joint leaked, boring, until drill, installs grouting port, and the rear wall to deformation joint injects high-early (strength) cement slurry to form sealing barrier, and injection rate is greater than every meter of 100kg, leaks as standard until block, and sets up first waterproof barrier;
(2) find the concrete seepage water spot in deformation joint both sides, repair with the epoxy resin of hydrophilic Thief zone, to form one deck impervious barrier, be able to sealing and reinforcement, this epoxy resin is the current material with hydrophilic Thief zone;
(3) take out polyphenyl plate at deformation joint fluting and fill flax silk simultaneously, then with the sealing of microdilatancy high-early (strength) cement, form sealing layer, before injection high-early (strength) cement, a Grouting Pipe is first installed, this Grouting Pipe one end is stretched in deformation joint, the other end through sealing layer 24, and reserves a gas outlet on sealing layer.
Before construction, first configure described step 2) epoxide resin material of epoxy resin packed layer, it is made up of A, B two components, and component A comprises epoxy resin 100 parts, reactive diluent 10 parts, flexibilizer 29 parts, coupling agent 1 part; B component comprises 22 parts, curing compound, tough curing agent 6.5 parts, blowing agent 2 parts, defoamer 0.5 part, rheological agent 4 parts; Described number is number meter by weight, and the weight ratio of component A and B component is 4:1; Wherein said reactive diluent is butyl glycidyl ether, flexibilizer is polypropylene glycol diglycidyl ether, silane coupler is γ-glycidol ether propyl trimethoxy silicane, curing compound is N-aminoethyl piperazine, tough curing agent is polyetheramine, rheological agent is aerosil, and described epoxy resin is bisphenol E-type epoxy resin.
Preparation method is as follows:
1) each composition of component A is proportionally configured, place mix and blend 5-8min in same container at normal temperatures, to evenly, divide a bucket to pack; Each composition of B component is proportionally configured, places mix and blend 5-8min in same container at normal temperatures, to evenly, divide a bucket to pack;
2) proportionally configured by each composition of filler, each composition is independently packed;
3) the component A be adjusted to, B component are placed in same container according to the ratio of 4:1 at normal temperatures, mix and blend 2-3min, to evenly, namely obtain the neo-epoxy resin material of described perfusion.
Engineering construction: will prepare neo-epoxy resin material, adopts low-pressure grouting machine to inject in deformation joint, until fill by Grouting Pipe.The characteristic sum performance of this neo-epoxy resin material should meet the regulation of table 4.
Table 4:
The characteristic sum performance requirement of pliability neo-epoxy resin
Health and time-based maintenance, reach designing requirement through 72 hours epoxy resin intensity, and such EPR deformation joint is repaired water-stop technology and completed.But due to sedimentation, concretely to expand with heat and contract with cold, deformation joint is in change all the time, causes middlely producing minute crack, finally cause there is drainage, therefore want time-based maintenance.
Embodiment 3:
Metro station deformation joint occurs that Seepage is badly in need of repairing
Designing requirement: adopt EPR deformation joint to repair water-stop technology and repair deformation joint, meet deformation joint sealing and Deformation Demands.
Concrete enforcement:
(1) on the deformation joint leaked, boring is until drill, and install grouting port and inject high-early (strength) cement slurry, injection rate is greater than every meter of 100kg, leaks as standard, set up first waterproof barrier to block.
(2) find deformation joint both sides concrete and whether have constructional deficiency, be able to sealing and reinforcement with Thief zone epoxy resin.
(3) take out polyphenyl plate at deformation joint fluting and fill flax silk simultaneously, then with micro-expansion cement sealing, and grouting port and gas outlet are installed.
(4) engineering construction: the neo-epoxy resin material preparing toughness according to method in embodiment 2 and proportioning, the regulation of its performance requirement demand fulfillment table 5, then adopt high-pressure grout injector in deformation joint, to inject this neo-epoxy resin material, until fill by Grouting Pipe.
Table 5:
The characteristic sum performance requirement of pliability neo-epoxy resin
Health and time-based maintenance, reach designing requirement through 72 hours epoxy resin intensity, and such EPR deformation joint is repaired water-stop technology and completed deformation joint sealing reinstatement works task.But due to sedimentation, concretely to expand with heat and contract with cold, deformation joint is in change all the time, causes middlely producing minute crack, finally cause there is drainage, therefore want time-based maintenance.

Claims (5)

1. an EPR deformation joint repairs water-stopping structure, described deformation joint (11) is formed between two concrete (12), it is characterized in that: described water-stopping structure comprises the sealing barrier (21) be made up of high-early (strength) cement, the epoxy resin filling layer (25) be located at the epoxy resin impervious barrier (22) between described two concrete (12), the sealing layer (24) be made up of high-early (strength) cement and be poured in described deformation joint; Described sealing barrier (21) is located at described deformation joint (11) rear wall, and sealing layer (24) is located at described deformation joint (11) antetheca; Described sealing layer (24) is provided with grouting port and exhaust opening, is filled with flax silk layer in described deformation joint.
2. EPR deformation joint as claimed in claim 1 repairs the construction method of water-stopping structure, it is characterized in that: comprise the steps:
1) on the deformation joint leaked, boring, until drill, is injected high-early (strength) cement slurry until block and leak as standard, is formed sealing barrier (21) after the wall of deformation joint;
2) check the concrete compaction rate of deformation joint both sides, find the seepage water spot in the layer of concrete of deformation joint both sides, with epoxy resin reinforcing to form impervious barrier (22);
3) after deformation joint fluting takes out polyphenyl plate, fill flax silk simultaneously, then adopt in the front side of deformation joint high-early (strength) cement to form sealing layer (24), and the grouting port left on sealing layer for grouting and gas outlet;
4) in the middle of deformation joint, inject epoxide resin material to form epoxy resin filling layer (25) by grouting port, after the solidification of this epoxide resin material, namely form described EPR deformation joint repair water-stopping structure.
3. EPR deformation joint according to claim 2 repairs the construction method of water-stopping structure, it is characterized in that: described step 2) epoxide resin material of epoxy resin packed layer is made up of A, B two components, and component A comprises epoxy resin 100 parts, reactive diluent 10 parts, flexibilizer 29 parts, coupling agent 1 part; B component comprises 22 parts, curing compound, tough curing agent 6.5 parts, blowing agent 2 parts, defoamer 0.5 part, rheological agent 4 parts; Described number is number meter by weight, and the weight ratio of component A and B component is 4:1.
4. EPR deformation joint according to claim 3 repairs the construction method of water-stopping structure, it is characterized in that: described reactive diluent is butyl glycidyl ether, flexibilizer is polypropylene glycol diglycidyl ether, silane coupler is γ-glycidol ether propyl trimethoxy silicane, curing compound is N-aminoethyl piperazine, tough curing agent is polyetheramine, and rheological agent is aerosil.
5. EPR deformation joint according to claim 4 repairs the construction method of water-stopping structure, it is characterized in that: described epoxy resin is bisphenol E-type epoxy resin.
CN201410226014.5A 2014-05-26 2014-05-26 EPR deformation joint repairs water-stopping structure and construction method thereof Active CN104018526B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410226014.5A CN104018526B (en) 2014-05-26 2014-05-26 EPR deformation joint repairs water-stopping structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410226014.5A CN104018526B (en) 2014-05-26 2014-05-26 EPR deformation joint repairs water-stopping structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN104018526A CN104018526A (en) 2014-09-03
CN104018526B true CN104018526B (en) 2015-09-30

Family

ID=51435499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410226014.5A Active CN104018526B (en) 2014-05-26 2014-05-26 EPR deformation joint repairs water-stopping structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN104018526B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104480965B (en) * 2014-12-22 2016-08-31 中建六局土木工程有限公司 A kind of clear water reserviors training wall construction method
CN104830030B (en) * 2015-02-05 2017-05-31 宁波高新区百茂高分子材料有限公司 Epoxide resin material of sealing and preparation method thereof is repaired for concrete joint
CN104963257B (en) * 2015-06-15 2017-03-08 中国建筑第八工程局有限公司 Stone pavements cementation of fissures structure and its construction method
CN106088160B (en) * 2016-06-06 2018-01-12 国网山东省电力公司青岛供电公司 Tunnel deformation seam processing method
CN106013259B (en) * 2016-06-30 2018-07-10 陈梦圆 Shake the underground engineering concrete structure deformation joint blocking method under bumpy weather
CN106436771B (en) * 2016-09-07 2018-07-10 南京正隆顺达高分子材料有限公司 A kind of tunnel, city piping lane leakage expansion joint method for repairing and mending and expansion gap device
CN111910785B (en) * 2020-08-06 2022-04-19 北京建工集团有限责任公司 Ground anti-seismic deformation joint structure and construction method thereof
CN113249071B (en) * 2021-04-23 2022-11-04 中科院广州化灌工程有限公司 High-elasticity epoxy resin grouting material and preparation method and application thereof
CN113235652A (en) * 2021-05-28 2021-08-10 中国二十冶集团有限公司 Leakage plugging method for deformation joint of comprehensive pipe gallery
CN115232586B (en) * 2022-08-02 2023-09-15 山东省公路桥梁建设集团有限公司 Concrete structure crack repairing process

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004285801A (en) * 2003-03-25 2004-10-14 Kumagai Gumi Co Ltd Water cut off joining method and structure between members
DE102006053186A1 (en) * 2006-11-09 2008-05-15 Hochtief Construction Ag Tunnel sealing method, involves carrying concrete layer from reinforced concrete under formation of joint gutter within floor area of tunnel, and sealing wall joint with wall water stop, which covers joint within wall area of tunnel
CN202450557U (en) * 2012-02-29 2012-09-26 叶香雄 Deformation joint of basement foundation slab
CN102776905A (en) * 2012-07-21 2012-11-14 金坛建工集团有限公司 Grouting stoppage and guide repair method for leakage of deformation joint and special grouting device for grouting stoppage and guide repair method for leakage of deformation joint
CN102775737A (en) * 2012-08-17 2012-11-14 上海市建筑科学研究院(集团)有限公司 Solvent-free elastic epoxy grouting material and preparation method and application thereof
CN203559439U (en) * 2013-11-14 2014-04-23 中厦建设集团有限公司 Underground engineering waterproof leaking stoppage structure
CN203924150U (en) * 2014-05-26 2014-11-05 宁波高新区百茂高分子材料有限公司 EPR deformation joint is repaired water-stopping structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004285801A (en) * 2003-03-25 2004-10-14 Kumagai Gumi Co Ltd Water cut off joining method and structure between members
DE102006053186A1 (en) * 2006-11-09 2008-05-15 Hochtief Construction Ag Tunnel sealing method, involves carrying concrete layer from reinforced concrete under formation of joint gutter within floor area of tunnel, and sealing wall joint with wall water stop, which covers joint within wall area of tunnel
CN202450557U (en) * 2012-02-29 2012-09-26 叶香雄 Deformation joint of basement foundation slab
CN102776905A (en) * 2012-07-21 2012-11-14 金坛建工集团有限公司 Grouting stoppage and guide repair method for leakage of deformation joint and special grouting device for grouting stoppage and guide repair method for leakage of deformation joint
CN102775737A (en) * 2012-08-17 2012-11-14 上海市建筑科学研究院(集团)有限公司 Solvent-free elastic epoxy grouting material and preparation method and application thereof
CN203559439U (en) * 2013-11-14 2014-04-23 中厦建设集团有限公司 Underground engineering waterproof leaking stoppage structure
CN203924150U (en) * 2014-05-26 2014-11-05 宁波高新区百茂高分子材料有限公司 EPR deformation joint is repaired water-stopping structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
地铁车站主体结构渗漏水控制;周志鹏;《现代隧道技术》;20120430;第49卷(第2期);第164-170页 *
隧道渗漏整治方法及工程应用;李金枝等;《建材世界》;20100430;第31卷(第02期);第109-111,125页 *

Also Published As

Publication number Publication date
CN104018526A (en) 2014-09-03

Similar Documents

Publication Publication Date Title
CN104018526B (en) EPR deformation joint repairs water-stopping structure and construction method thereof
CN105442862B (en) A kind of distress in concrete infiltration water collision reinforcement and repair method
CN101235632B (en) Grouting leak-stopping technique
CN107060116B (en) A kind of high-pressure slip-casting blocking method for building settlement seam
CN106566501B (en) Flexible plugging agent and preparation method and application thereof
CN110396186A (en) A kind of hydrophilic polyether, preparation method and its usage
CN103467708A (en) Flexible epoxy resin material with low elastic modulus and high elongation
CN210395361U (en) Pile-first method straight pile jacket type jacket underwater grouting construction system
CN108716410A (en) Mechanical Method service channel high-strength elastic grouting behind shaft or drift lining slurries and grouting method
CN108457485A (en) A kind of concrete floor cracking percolating water repairerment technique
CN103276735B (en) Integrated form high polymer grouting system
CN112459010A (en) Hydraulic engineering concrete dam leakage-repairing reinforcing grouting method
CN104131532B (en) A kind of blocking method for karst and structure
CN206128318U (en) Stagnant water structure is repaired to movement joint
CN205369329U (en) Reinforced structure is repaired on wind -powered electricity generation field fan pylon basis
CN112960942B (en) Thixotropic slurry for earth pressure balance jacking pipe in anhydrous sand layer, preparation method thereof, grouting method and slurry replacement method
CN101870575A (en) Hydropower station pressure pipeline grouting construction method and gel material
CN112360518B (en) Rapid maintenance structure and maintenance method for tunnel circumferential construction joint
CN203924150U (en) EPR deformation joint is repaired water-stopping structure
CN104712145A (en) Grouting method for middle embedded grouting water stop belt
CN105714739A (en) Novel process for preventing secondary cracking repair in grooving-method leakage treatment
CN104060529B (en) The using method of the U-shaped flange body of the stainless steel for shrinkage joint
CN114411640B (en) Construction method for reinforcing and repairing rock-fill core wall dam
CN104830030B (en) Epoxide resin material of sealing and preparation method thereof is repaired for concrete joint
CN113024193B (en) Special acrylate water-stopping and leaking-stopping grouting material for pipeline box culvert of non-excavation well chamber

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: KINGBIRD CONSTRUCTION GROUP CO., LTD.,OFF HANGZHOU

Effective date: 20150731

Owner name: NINGBO HIGH NEW DISTRICT BAIMAO HIGH POLYMER MATER

Free format text: FORMER OWNER: KINGBIRD CONSTRUCTION GROUP CO., LTD.,OFF

Effective date: 20150731

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhu Hongwei

Inventor after: Mao Chenyang

Inventor after: Yuan Wenxin

Inventor after: Wang Mingzhu

Inventor after: Wu Xujie

Inventor after: Xia Hang

Inventor after: Zhu Wenjun

Inventor before: Mao Chenyang

Inventor before: Zhu Hongwei

Inventor before: Yuan Wenxin

Inventor before: Wang Mingzhu

Inventor before: Wu Xujie

Inventor before: Xia Hang

Inventor before: Yu Wen

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: MAO CHENYANG ZHU HONGWEI YUAN WENXIN WANG MINGZHU WU XUJIE XIA HANG YU WEN TO: ZHU HONGWEI MAO CHENYANG YUAN WENXIN WANG MINGZHU WU XUJIE XIA HANG ZHU WENJUN

TA01 Transfer of patent application right

Effective date of registration: 20150731

Address after: 8020-49, room 1558, 315040 Jiangnan Road, Ningbo hi tech Development Zone, Zhejiang, Ningbo

Applicant after: Ningbo High New District Baimao High Polymer Material Co., Ltd.

Applicant after: Kingbird Construction Group

Applicant after: Hangzhou Hongxu Construction Co., Ltd.

Address before: Hangzhou City, Zhejiang Province, Binjiang District 310053 South Road No. 3688 building 11 floor sink trendsetter

Applicant before: Kingbird Construction Group

C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: Room 8020-49, No. 1558, Jiangnan Road, Ningbo hi tech Zone, Ningbo 315040, Zhejiang Province

Patentee after: NINGBO CITY HIGH-TECH ZONE BAIMAO POLYMER MATERIALS Co.,Ltd.

Patentee after: Ping An Construction Group Co.,Ltd.

Patentee after: HANGZHOU HONGXU CONSTRUCTION Co.,Ltd.

Address before: Room 8020-49, No. 1558, Jiangnan Road, Ningbo hi tech Zone, Ningbo 315040, Zhejiang Province

Patentee before: NINGBO CITY HIGH-TECH ZONE BAIMAO POLYMER MATERIALS Co.,Ltd.

Patentee before: KINGBIRD CONSTRUCTION GROUP Co.,Ltd.

Patentee before: HANGZHOU HONGXU CONSTRUCTION Co.,Ltd.

CP01 Change in the name or title of a patent holder