CN105714739A - Novel process for preventing secondary cracking repair in grooving-method leakage treatment - Google Patents

Novel process for preventing secondary cracking repair in grooving-method leakage treatment Download PDF

Info

Publication number
CN105714739A
CN105714739A CN201610067855.5A CN201610067855A CN105714739A CN 105714739 A CN105714739 A CN 105714739A CN 201610067855 A CN201610067855 A CN 201610067855A CN 105714739 A CN105714739 A CN 105714739A
Authority
CN
China
Prior art keywords
filling
mortar
secondary cracking
dove
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610067855.5A
Other languages
Chinese (zh)
Other versions
CN105714739B (en
Inventor
汪魁峰
张永先
夏海江
宋立元
刘波
徐志林
李括
宫旭
王烈
曹云龙
李�远
吴硕
马玉刚
韩东海
徐健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning water conservancy and Hydropower Research Institute Co., Ltd.
Original Assignee
Liaoning Water Conservancy Hydroelectricity Science Academy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Water Conservancy Hydroelectricity Science Academy filed Critical Liaoning Water Conservancy Hydroelectricity Science Academy
Priority to CN201610067855.5A priority Critical patent/CN105714739B/en
Publication of CN105714739A publication Critical patent/CN105714739A/en
Application granted granted Critical
Publication of CN105714739B publication Critical patent/CN105714739B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints

Abstract

A novel process for preventing secondary cracking repair in grooving-method leakage treatment integrates the two processes of making a set dovetail groove at the surface of a leak and filling the dovetail groove to prevent secondary cracking. Making the set dovetail groove at the surface of the leak includes making a dovetail groove with an opening width of 4 cm, a bottom width of 10 cm and a depth of 3 cm at the surface of a crack or an expansion joint; and filling the dovetail groove to prevent secondary cracking includes filling the dovetail groove with shrinkage-compensating high-performance mortar, and performing polishing treatment of the surface of the mortar after curing. A flow guiding pipe, a plastic packing and a rubber rod are arranged in the groove for flow guiding and filling, and the novel process is a groove filling process that prevents micro-cracks, reduces surface cracking, has a good bonding property, is easy in construction and is free of sagging, dropping and separation. The novel process provided by the invention can avoid mortar leakage and extruded joint mortar, improve the grouting quality and enhance the protection, repair, reinforcement and strengthening effects, and is an advanced process.

Description

Preventing secondary cracking process of repairing in fluting method seepage treatment
Technical field
The present invention relates to Leakage Processing Technology in hydraulic engineering, particularly relate to preventing secondary cracking process of repairing in fluting method seepage treatment.
Background technology
Usual chemical grouting adopts three kinds of methods to construct, and one is surface-closed grouting method, and this method mainly uses rapid hardening inorganic plugging material first to carry out the encapsulation process of seam surface.The usually leak stopping spirit of concrete surface trowelling a layer thickness 2cm after polishing, width 10cm, after maintenance 24 hours, carries out chemical grouting, cuts the serosity of surface plugging material, cleaning seepage after grouting.This construction method, when the internal serosity propelling pressure in crack increases, is generally held
Easily in plugging material and concrete faying face place running pulp.
Another kind of method is that crack surface part closes method, namely first carries out shallow-layer chemical grouting on top layer, crack, and control slurry infiltration is internal 20~30cm to crack.Then arrange deep hole again, carry out crack deep layer grouting.Serosity after solidification encloses crack, top layer thus the serosity that deep layer is in the milk is advanced to the internal deeper wider array of region of lining concrete, and even up to the interface of concrete Yu rock, the penetrating passage of can also meeting having advances, and fills rock fracture.This method can reach the grouting effect that fluting is closed, it is possible to prevents serosity from leaking outside, but the cloth hole number of top layer grouting is greatly increased, and also needs to arrange substantial amounts of deep layer grout hole, outside after concrete repair simultaneously
Sight has impact.
The third method is slotted closure grouting method exactly, namely digs U-shaped, V-type, the dove-tail form groove of certain size at concrete surface, uses mortar to fill groove.
In the process digging groove, generally it is difficulty with digging effect preferably, a lot of situations
Under, generally with dig U-shaped, V-groove is in the majority.
Split channel process process generally adopt mending mortar to carry out the filling of groove, levelling.The common mending mortar being generally adopted only has higher comprcssive strength, tensile strength and fracture resistance preferably mostly, and does not possess the function of prevention construction joint cracking.Processing in technique in fluting method, after solidifying due to mending mortar, autogenous shrinkage can cause producing new application property crack between mortar face and both sides concrete joint surface, and when crack internal pressure increases, micro-crack also easily occurs in mortar middle part.The appearance in these cracks can cause occurring the problem such as spillage, running pulp when carrying out chemical grouting.It addition, ordinary mortar is carrying out vertical and end face construction operation occurs owing to initial stage adhesive property is relatively low and the problems such as concrete surface not easily bonding, adhesive effect is bad, sagging, disengagement often.It is therefore desirable to study that a kind of preventing secondary cracking, adhesive property be good, easily construction, sagging is not sagging, the construction technology that do not disengage.
Summary of the invention
The technical problem to be solved in the present invention is, preventing secondary cracking process of repairing in a kind of fluting method seepage treatment is provided, this technique prevention micro-crack, reduce that face checking, adhesive property be good, easily construction, sagging is not sagging, the trench fill process that do not disengage.Thus strengthening sealing effect, improving grouting quality, it is ensured that construction quality.
The technical scheme is that
Preventing secondary cracking process of repairing in fluting method seepage treatment, integrated by two techniques laying the dove-tail form groove set and filling dove-tail form groove preventing secondary cracking at seepage seam surface.Described lay the dove-tail form groove set at seepage seam surface, be lay A/F in crack or surface, expansion joint to be 4cm, bottom width be 10cm, the degree of depth is the dove-tail form groove of 3cm;Described filling dove-tail form groove preventing secondary cracking, is its surface of grinding process after use compensation shrinkage type High Performance Mortar filling dove-tail form groove, maintenance, arranges mozzle in the trench, moulds
Property filler, rubber bar, carry out water conservancy diversion and filling, prevention micro-crack, reduce that face checking, adhesive property be good, easily construction, sagging is not sagging, the trench fill process that do not disengage.
Above-mentioned compensation shrinkage type High Performance Mortar, polymer glue powder, silica flour, super fine extender, high-performance water reducing agent and aggregate and cement mixing is adopted to form, good with having micro-expansibility, groove filled by water conservation, good waterproof performance, easily bonding compensation shrinkage type mortar, and reach predetermined strength through maintenance, it is prevented that produce micro-crack and secondary cracking.
The present invention is by effectively closing the dove-tail form flute surfaces dug, it is possible to avoid spillage, running pulp, raising grouting quality.This process is applicable to the fluting forensic chemistry grouting construction at crack, expansion joint, can be commonly used in the hydraulic engineerings such as tunnel, inverted-siphon, culvert, it is possible to improves protection and repairs the effect of reinforcing, is the process of a kind of advanced person.
Accompanying drawing explanation
Fig. 1 is that present invention preventing secondary cracking in method seepage treatment of slotting repairs schematic diagram.
Detailed description of the invention
Preventing secondary cracking process of repairing in fluting method seepage treatment, by over one hundred time test, it is determined that lay A/F in crack or surface, expansion joint to be 4cm, bottom width be 10cm, the degree of depth is the method for dove-tail form groove of 3cm.Using the equipment such as wall saw, angle grinding machine, bevel protractor in construction, fluting form is realized well.By bevel protractor and wall saw with the use of, it may be determined that the angle of groove hypotenuse, saw guide rail by wall and realize working continuously, by using the instruments such as angle grinding machine, little electric pick to realize the harmless cutting of groove, it is ensured that groove hypotenuse is not destroyed.Concrete technology flow process: lay rubber 8 in expansion joint (this example is expansion joint) 2 up and down respectively
With mozzle 4, plastic filler 7 is filled at the expansion joint between bottom mozzle 4 to dove-tail form groove 5, and caulking material 3 is filled at 4 times expansion joints 2 of mozzle.Concrete 1 in side, expansion joint 2 bores grout hole 10, the dove-tail form groove 5 that A/F to be 4cm, bottom width be 10cm, the degree of depth are 3cm is poured into mortar 6, its mortar 6 adopts and compensates shrinkage type High Performance Mortar, formed by polymer glue powder, silica flour, super fine extender, high-performance water reducing agent and aggregate and cement mixing, good with having micro-expansibility, groove filled by water conservation, good waterproof performance, easily bonding compensation shrinkage type mortar 6, and reach predetermined strength through maintenance, it is prevented that produce micro-crack and secondary cracking.Fluting its surface-closed mortar of closure grouting method is used to provide bigger closing resistance, make chemical sizwe 11 can be advanced to the internal deeper wider array of region of lining concrete by grout hole 10, arrive the interface of concrete and rock, even can also meet penetrating passage and drive in the wrong direction, fill rock fracture.Fluting closure grouting method can make defect in concrete be completely filled with as far as possible, and concrete and rock junctional area defect, rock interior defect also can be filled full by the serosity of high pressure simultaneously, intercepted beyond lining concrete layer by percolating water.Remove outside mozzle and block mortar 9 maintenance with surface again.
This compensation shrinkage type High Performance Mortar for chemical grouting is in fluting forensic chemistry grouting, by effectively closing the dove-tail form flute surfaces dug, it is possible to avoid spillage, running pulp,
Improve grouting quality.Construct when temperature relatively low (8 DEG C), it is also possible to normally use.This process is applicable to the fluting forensic chemistry grouting construction at crack, expansion joint, can be commonly used in the hydraulic engineerings such as tunnel, inverted-siphon, culvert, it is possible to improves protection and repairs the effect of reinforcing, is the process of a kind of advanced person.

Claims (2)

1. preventing secondary cracking process of repairing in fluting method seepage treatment, integrated by two techniques laying the dove-tail form groove set and filling dove-tail form groove preventing secondary cracking at seepage seam surface, it is characterized in that the described dove-tail form groove laid at seepage seam surface and set, be lay A/F in crack or expansion joint (2) surface to be 4cm, bottom width be 10cm, the degree of depth is the dove-tail form groove (5) of 3cm;Described filling dove-tail form groove preventing secondary cracking, it is use to compensate shrinkage type High Performance Mortar (6) filling dove-tail form groove (5), its surface of grinding process after maintenance, mozzle (4), plastic filler (7), rubber bar (8) are set in the trench, carry out water conservancy diversion and filling, prevention micro-crack, reduce that face checking, adhesive property be good, easily construction, sagging is not sagging, the trench fill process that do not disengage.
2. preventing secondary cracking process of repairing in fluting method seepage treatment according to claim 1, it is characterized in that described compensation shrinkage type High Performance Mortar (6), polymer glue powder, silica flour, super fine extender, high-performance water reducing agent and aggregate and cement mixing is adopted to form, good with having micro-expansibility, groove filled by water conservation, good waterproof performance, easily bonding compensation shrinkage type mortar, and reach predetermined strength through maintenance, it is prevented that produce micro-crack and secondary cracking.
CN201610067855.5A 2016-02-01 2016-02-01 Preventing secondary cracking process of repairing in fluting method seepage treatment Active CN105714739B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610067855.5A CN105714739B (en) 2016-02-01 2016-02-01 Preventing secondary cracking process of repairing in fluting method seepage treatment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610067855.5A CN105714739B (en) 2016-02-01 2016-02-01 Preventing secondary cracking process of repairing in fluting method seepage treatment

Publications (2)

Publication Number Publication Date
CN105714739A true CN105714739A (en) 2016-06-29
CN105714739B CN105714739B (en) 2017-12-12

Family

ID=56155358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610067855.5A Active CN105714739B (en) 2016-02-01 2016-02-01 Preventing secondary cracking process of repairing in fluting method seepage treatment

Country Status (1)

Country Link
CN (1) CN105714739B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759116A (en) * 2017-01-04 2017-05-31 中国电建集团华东勘测设计研究院有限公司 A kind of method for repairing and mending in the roomy crack of concrete
CN107604801A (en) * 2017-10-13 2018-01-19 苏州东振路桥工程有限公司 The reparation structure and its gap casting glue restorative procedure of a kind of impaired bituminous paving
CN113958148A (en) * 2021-11-15 2022-01-21 广东科顺修缮建筑技术有限公司 Groove for repairing cracks of back pressure water leakage and grooving process and application thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011111803A (en) * 2009-11-26 2011-06-09 Hayakawa Rubber Co Ltd Joint water leakage preventing structure and construction method of the same
CN102121243A (en) * 2011-01-17 2011-07-13 华北水利水电学院 Processing method for rolling construction joint surface of concrete dam
CN203808015U (en) * 2014-03-12 2014-09-03 中国水电顾问集团贵阳勘测设计研究院有限公司 Rebar waterstop processing structure
CN104088254A (en) * 2014-07-11 2014-10-08 泛华建设集团有限公司 Leakage repairing device for pressure-bearing reinforced concrete structure and construction method thereof
CN104912574A (en) * 2015-06-29 2015-09-16 中南大学 A tunnel lining leakage water treatment method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011111803A (en) * 2009-11-26 2011-06-09 Hayakawa Rubber Co Ltd Joint water leakage preventing structure and construction method of the same
CN102121243A (en) * 2011-01-17 2011-07-13 华北水利水电学院 Processing method for rolling construction joint surface of concrete dam
CN203808015U (en) * 2014-03-12 2014-09-03 中国水电顾问集团贵阳勘测设计研究院有限公司 Rebar waterstop processing structure
CN104088254A (en) * 2014-07-11 2014-10-08 泛华建设集团有限公司 Leakage repairing device for pressure-bearing reinforced concrete structure and construction method thereof
CN104912574A (en) * 2015-06-29 2015-09-16 中南大学 A tunnel lining leakage water treatment method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李迁: "《土木工程材料》", 31 August 2015 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759116A (en) * 2017-01-04 2017-05-31 中国电建集团华东勘测设计研究院有限公司 A kind of method for repairing and mending in the roomy crack of concrete
CN107604801A (en) * 2017-10-13 2018-01-19 苏州东振路桥工程有限公司 The reparation structure and its gap casting glue restorative procedure of a kind of impaired bituminous paving
CN107604801B (en) * 2017-10-13 2019-09-06 苏州东振路桥工程有限公司 A kind of the reparation structure and its gap casting glue restorative procedure of impaired bituminous pavement
CN113958148A (en) * 2021-11-15 2022-01-21 广东科顺修缮建筑技术有限公司 Groove for repairing cracks of back pressure water leakage and grooving process and application thereof

Also Published As

Publication number Publication date
CN105714739B (en) 2017-12-12

Similar Documents

Publication Publication Date Title
CN108517899A (en) Mouth high-pressure grouting leak stopping processing method is buried in the leakage drilling of deep basal pit diaphram wall
CN106013259B (en) Shake the underground engineering concrete structure deformation joint blocking method under bumpy weather
CN107387123B (en) The construction method of pressure grouting leak stopping is carried out for shield duct piece piece leakage phenomenon
CN109371861A (en) A kind of culvert of reinforced concrete subsiding crack infiltration Treatment Methods and repair structure
CN202788022U (en) Wall crack combined type repair structure
CN106321121A (en) Vibration disturbance resistant crack leaking stoppage and reinforcement method applied to underground works
CN105134248B (en) The antidetonation and shock-dampening method of a kind of shield tunnel and vertical shaft connecting portion
CN104018526B (en) EPR deformation joint repairs water-stopping structure and construction method thereof
CN104912574B (en) A kind of tunnel-liner percolating water Treatment Methods
CN107326868A (en) A kind of large reservoir concrete dam body fracture plugging method
CN105951859A (en) Treatment method of plugging water stop construction for foundation pit dewatering well to penetrate through concrete base plate of basement
CN109915180A (en) A kind of Tunnel Second Lining cracking method for treating seepage
CN105019404B (en) A kind of construction method of sealing rod and its water sealing structure and water sealing structure
CN106381840A (en) Leaking stoppage grouting method for cracks under high pressure flowing water state
CN105714739B (en) Preventing secondary cracking process of repairing in fluting method seepage treatment
CN206143827U (en) Underground works crack repairing structure
CN103939669B (en) Antiseep underground pipeline structures and construction technology thereof in a kind of weak soil substrate
CN104988815A (en) Method for treating post-construction settlement disease of railroad bed
CN106801768A (en) PCCP pipeline socket rings and steel cylinder weld seam Micro blazed-grating handling process have been installed
CN109339824A (en) A kind of duct pieces of shield tunnel Treatment Measures to Leakage method
CN109457571A (en) The construction method of ground deformation slot repairing
CN106088095A (en) Process the injecting grout through steel perforated pipe method of works uneven settlement of foundation
CN109667607A (en) A kind of tunnel partitioning waterproofing construction technology
CN109208412A (en) Inter-city passenger rail fragment-free track slab Disease Treatment method and operating system
CN109235668A (en) Residential building curtain wall and wall crack plugging structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180723

Address after: No. 1, fourteen weft Road, peace zone, Shenyang, Liaoning, Liaoning

Patentee after: Liaoning water conservancy and Hydropower Research Institute Co., Ltd.

Address before: No. 1, fourteen weft Road, peace zone, Shenyang, Liaoning, Liaoning

Patentee before: Liaoning Water-Conservancy Hydroelectricity Science Academy