CN107514017A - Leakage preventing mechanism in a kind of basement connected entrance deformation - Google Patents
Leakage preventing mechanism in a kind of basement connected entrance deformation Download PDFInfo
- Publication number
- CN107514017A CN107514017A CN201610451318.0A CN201610451318A CN107514017A CN 107514017 A CN107514017 A CN 107514017A CN 201610451318 A CN201610451318 A CN 201610451318A CN 107514017 A CN107514017 A CN 107514017A
- Authority
- CN
- China
- Prior art keywords
- casting
- pressure slip
- back side
- injected hole
- oiliness
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/16—Arrangement or construction of joints in foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
- E02D31/04—Watertight packings for use under hydraulic pressure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0001—Rubbers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0006—Plastics
- E02D2300/0014—PU
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0098—Bitumen
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Hydrology & Water Resources (AREA)
- Sealing Material Composition (AREA)
- Road Paving Structures (AREA)
Abstract
Leakage preventing mechanism in a kind of basement connected entrance deformation, its primary structure include:Back side (1), water-proof concrete (2), the uncured rubber of high-pressure slip-casting (grout material) (3), high-pressure slip-casting polyurethane (oiliness) (4), in bury rubber fastening band (5), uncured rubber asphalt film (6), water expandable waterstop (7), leaching emulsified asphalt flax silk (8), injected hole (9) etc.;An injected hole (9) is made a call on back side (1), the face injection uncured rubber of high-pressure slip-casting (grout material) (3) into groove;In another part of back side (1), an injected hole (9) is made a call to again, toward groove middle-high pressure grouting polyurethane (oiliness) (4), high-pressure slip-casting polyurethane (oiliness) (4) is set to bury rubber fastening band (5) in being no more than;Uncured rubber asphalt film (6) is smeared in bottom land, pitch film is covered with water expandable waterstop (7);Finally gap is filled and led up with leaching emulsified asphalt flax silk (8).
Description
Technical field
The present invention relates to leakage preventing mechanism, especially sandwich construction in a kind of deformation of basement connected entrance, and containing the poly- ammonia that foams
The waterproof construction of ester gum band.Belong to building waterproofing technique field.
Background technology
The seepage of building basement connection movement joint is common common quality defect, is known as " ten seam nine leakage " and says how to prevent
Only seepage is an important topic.Present basement connected entrance deformation leakage preventing mechanism has a variety of waterproofing and leakage-stopping measures, such as Shen
Please (patent) number:CN201220336326.8 waterproof constructions, there is poor in timeliness, profile is unsightly, general with new material
And application, it has been not suitable with the requirement of existing building waterproof.
The content of the invention
Leakage preventing mechanism in a kind of basement connected entrance deformation, its primary structure include:Back side (1), water-proof concrete
(2), the uncured rubber of high-pressure slip-casting (grout material) (3), high-pressure slip-casting polyurethane (oiliness) (4), in bury rubber fastening band (5),
Uncured rubber asphalt film (6), water expandable waterstop (7), leaching emulsified asphalt flax silk (8), injected hole (9) etc.;In backwater
An injected hole (9) is made a call on face (1), the face injection uncured rubber of high-pressure slip-casting (grout material) (3) into groove;In back side (1)
Another part, then make a call to an injected hole (9), toward groove middle-high pressure grouting polyurethane (oiliness) (4), make the poly- ammonia of high-pressure slip-casting
Ester (oiliness) (4) buries rubber fastening band (5) in being no more than;Uncured rubber asphalt film (6) is smeared in bottom land, uses water-swellable
Sealing rod (7) covers pitch film;Finally gap is filled and led up with leaching emulsified asphalt flax silk (8).
Brief description of the drawings
Fig. 1 is that the basement connected entrance of the present invention deforms the profile of leakage preventing mechanism
Embodiment
Leakage preventing mechanism in a kind of basement connected entrance deformation, its primary structure include:Back side (1), water-proof concrete
(2), the uncured rubber of high-pressure slip-casting (grout material) (3), high-pressure slip-casting polyurethane (oiliness) (4), in bury rubber fastening band (5),
Uncured rubber asphalt film (6), water expandable waterstop (7), leaching emulsified asphalt flax silk (8), injected hole (9) etc.;In backwater
An injected hole (9) is made a call on face (1), the face injection uncured rubber of high-pressure slip-casting (grout material) (3) into groove;In back side (1)
Another part, then make a call to an injected hole (9), toward groove middle-high pressure grouting polyurethane (oiliness) (4), make the poly- ammonia of high-pressure slip-casting
Ester (oiliness) (4) buries rubber fastening band (5) in being no more than;Uncured rubber asphalt film (6) is smeared in bottom land, uses water-swellable
Sealing rod (7) covers pitch film;Finally gap is filled and led up with leaching emulsified asphalt flax silk (8).
Claims (1)
1. leakage preventing mechanism in a kind of basement connected entrance deformation, its primary structure include:Back side (1), water-proof concrete (2),
The uncured rubber of high-pressure slip-casting (grout material) (3), high-pressure slip-casting polyurethane (oiliness) (4), in bury rubber fastening band (5), non-solid
Change rubber asphalt film (6), water expandable waterstop (7), leaching emulsified asphalt flax silk (8), injected hole (9) etc.;In back side (1)
It is upper to make a call to an injected hole (9), the face injection uncured rubber of high-pressure slip-casting (grout material) (3) into groove;In back side (1) in addition
One part, then an injected hole (9) is made a call to, toward groove middle-high pressure grouting polyurethane (oiliness) (4), make high-pressure slip-casting polyurethane (oil
Property) (4) bury rubber fastening band (5) in being no more than;Uncured rubber asphalt film (6) is smeared in bottom land, with water-swellable sealing
Bar (7) covers pitch film;Finally gap is filled and led up with leaching emulsified asphalt flax silk (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610451318.0A CN107514017A (en) | 2016-06-16 | 2016-06-16 | Leakage preventing mechanism in a kind of basement connected entrance deformation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610451318.0A CN107514017A (en) | 2016-06-16 | 2016-06-16 | Leakage preventing mechanism in a kind of basement connected entrance deformation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107514017A true CN107514017A (en) | 2017-12-26 |
Family
ID=60720184
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610451318.0A Pending CN107514017A (en) | 2016-06-16 | 2016-06-16 | Leakage preventing mechanism in a kind of basement connected entrance deformation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107514017A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108316241A (en) * | 2018-04-13 | 2018-07-24 | 上海公路桥梁(集团)有限公司 | Blocking method is stitched in waterwall concrete wall structure and its serious leakage water crack |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202658626U (en) * | 2012-07-12 | 2013-01-09 | 振华集团(昆山)建设工程有限公司 | Basement communicating port deformation joint waterproof plugging structure |
CN203559439U (en) * | 2013-11-14 | 2014-04-23 | 中厦建设集团有限公司 | Underground engineering waterproof leaking stoppage structure |
CN203960915U (en) * | 2014-07-22 | 2014-11-26 | 上海家树建筑工程有限公司 | Basement connected entrance Anti-seepage mechanism |
CN204266252U (en) * | 2014-04-10 | 2015-04-15 | 南京坤佳防水防腐保温工程有限公司 | A kind of basement connected entrance is out of shape outside leakage preventing mechanism |
CN104878783A (en) * | 2015-05-22 | 2015-09-02 | 中国十七冶集团有限公司 | Super-long basement concrete base plate deformation joint leakage prevention and leakage treatment method |
CN105220713A (en) * | 2015-10-27 | 2016-01-06 | 中国建筑第八工程局有限公司 | The waterproof construction of outer wall of basement settlement joint |
CN105442862A (en) * | 2015-11-19 | 2016-03-30 | 江苏鼎达建筑新技术有限公司 | Method for leakage water plugging, strengthening and repairing against concrete crack |
-
2016
- 2016-06-16 CN CN201610451318.0A patent/CN107514017A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202658626U (en) * | 2012-07-12 | 2013-01-09 | 振华集团(昆山)建设工程有限公司 | Basement communicating port deformation joint waterproof plugging structure |
CN203559439U (en) * | 2013-11-14 | 2014-04-23 | 中厦建设集团有限公司 | Underground engineering waterproof leaking stoppage structure |
CN204266252U (en) * | 2014-04-10 | 2015-04-15 | 南京坤佳防水防腐保温工程有限公司 | A kind of basement connected entrance is out of shape outside leakage preventing mechanism |
CN203960915U (en) * | 2014-07-22 | 2014-11-26 | 上海家树建筑工程有限公司 | Basement connected entrance Anti-seepage mechanism |
CN104878783A (en) * | 2015-05-22 | 2015-09-02 | 中国十七冶集团有限公司 | Super-long basement concrete base plate deformation joint leakage prevention and leakage treatment method |
CN105220713A (en) * | 2015-10-27 | 2016-01-06 | 中国建筑第八工程局有限公司 | The waterproof construction of outer wall of basement settlement joint |
CN105442862A (en) * | 2015-11-19 | 2016-03-30 | 江苏鼎达建筑新技术有限公司 | Method for leakage water plugging, strengthening and repairing against concrete crack |
Non-Patent Citations (1)
Title |
---|
陈森森: "化学灌浆在交通隧道堵漏施工中抗震动扰动的运用", 《复杂地基化学灌浆技术 第14次全国化学灌浆学术交流会论文集》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108316241A (en) * | 2018-04-13 | 2018-07-24 | 上海公路桥梁(集团)有限公司 | Blocking method is stitched in waterwall concrete wall structure and its serious leakage water crack |
CN108316241B (en) * | 2018-04-13 | 2023-08-04 | 上海公路桥梁(集团)有限公司 | Water retaining wall concrete wall structure and severe leakage crack plugging method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207314560U (en) | A kind of prefabricated outer wall panel vertical abutment joint waterproofing node | |
CN100416006C (en) | Method for constructing water-proof telescopic seam between new and old concrete building joints and structure thereof | |
CN105220713A (en) | The waterproof construction of outer wall of basement settlement joint | |
CN110630277B (en) | Protection structure of existing tunnel under shield short-distance crossing working condition and construction method | |
CN105780940B (en) | building expansion joint anti-leakage structure | |
CN103938859A (en) | Sealing element and sealing structure for building formwork | |
CN107514017A (en) | Leakage preventing mechanism in a kind of basement connected entrance deformation | |
CN105625876B (en) | The sealing rod and its application method of a kind of waterproof sealing | |
CN108560612B (en) | Water stop device | |
CN207454000U (en) | A kind of tunnel arch wall waterproofing of movement joints node | |
CN103225283A (en) | Connection structure of barrage foundation diaphragm wall and gate dam building | |
CN204589922U (en) | A kind of composite rubber water stop | |
CN104712145A (en) | Grouting method for middle embedded grouting water stop belt | |
JP2014208970A (en) | Rear face injection water cut-off method | |
CN213979354U (en) | Anti-seepage device for concrete structure deformation joint | |
CN114150684A (en) | Plugging device for dewatering well and construction method | |
KR102037163B1 (en) | Water Leakage Repair Method and Construction Equipment of Concrete Structures | |
CN211289026U (en) | A waterproof construction for basement roof poling | |
CN205476133U (en) | Antiseep structure of parapet and roofing combination department | |
CN103334758A (en) | Anti-leakage and anti-permeability concrete meshed combined well wall and construction method | |
CN203201048U (en) | Roof waterproof structure with parapet wall | |
CN209723254U (en) | A kind of civil engineering floor waterproof construction | |
JP5567728B2 (en) | Back side injection water stop method | |
CN207512792U (en) | A kind of subsiding crack water distributor of basement bottom board | |
CN107246148B (en) | Water stopping structure and water stopping process for thin-wall concrete split screw |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
DD01 | Delivery of document by public notice |
Addressee: Guo Zhonghuai Document name: Notification of Acceptance of Request for Reexamination |
|
DD01 | Delivery of document by public notice | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171226 |
|
RJ01 | Rejection of invention patent application after publication |