CN203546882U - Novel catch basin for draining road surface accumulated water - Google Patents

Novel catch basin for draining road surface accumulated water Download PDF

Info

Publication number
CN203546882U
CN203546882U CN201320660107.XU CN201320660107U CN203546882U CN 203546882 U CN203546882 U CN 203546882U CN 201320660107 U CN201320660107 U CN 201320660107U CN 203546882 U CN203546882 U CN 203546882U
Authority
CN
China
Prior art keywords
catch basin
well
catch
basin
road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320660107.XU
Other languages
Chinese (zh)
Inventor
张忠桥
顾建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Municipal Design Institute Co Ltd
Original Assignee
Wuxi Municipal Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Municipal Design Institute Co Ltd filed Critical Wuxi Municipal Design Institute Co Ltd
Priority to CN201320660107.XU priority Critical patent/CN203546882U/en
Application granted granted Critical
Publication of CN203546882U publication Critical patent/CN203546882U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to a novel catch basin for draining road surface accumulated water. The novel catch basin comprises a catch basin, connection pipes, a steel fiber grate well seat and a steel fiber well grate cover; two round holes are formed in the side surface of the body of the catch basin and are used for mounting the connection pipes; the connection pipes are paved under flat side stones of a road; the steel fiber grate well seat is arranged on the body of the catch basin and is covered by the steel fiber well grate cover. The catch basin is additionally arranged at a road section with the accumulated water, and is connected to the existing catch basin nearby, the problem of road surface accumulated water can be better solved, and the volume of the additionally arranged catch basin is only 12% that of the traditional catch basin, therefore the excavation earth volume for building the novel catch basin is less; as the novel catch basin and the connection pipes are positioned under the flat side stones of the road, so the influence on the road surface structure is smaller.

Description

Get rid of the rain well of surface gathered water
Technical field
The utility model relates to a kind of rain well of getting rid of surface gathered water, specifically for laying pipeline underground and well array, removes rainwater on road surface, belongs to municipal traffic field.
Background technology
When having larger rainfall, urban road has ponding during local section, has a strong impact on vehicle and pedestrian's safety.Analyze the reason that ponding produces, mainly contain two: though 1, ponding section rainy well catch-basin quantity is on the low side, cannot get rid of in time rainwater on road surface, thereby local section produces ponding; 2, catch-basin is generally positioned at road low spot and implements the same period with road, after road is open to the traffic, roadbed generation sedimentation easily produces new low spot, because new low spot is difficult to prediction, therefore often new low spot place does not arrange catch-basin, if when built catch-basin and new low spot are distant, often this place becomes ponding section.For above reason, produce the problem of surface gathered water, existing solution: for the rainy well in ponding section, often adopt and open catch basin cover, thereby accelerate rainwater, flow into catch-basin; For ponding section without catch-basin, adopt hand sweeping or adopt small-size water pumping equipment to make ponding drain into catch-basin nearby.Above-mentioned deficiency still has is worth improved place.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned weak point, and a kind of rain well of getting rid of surface gathered water is provided; In ponding section, set up catch-basin, can better solve the problem of surface gathered water; Catch-basin volume is only 12% of traditional catch-basin volume, and earth excavation amount is less, and road pavement structure influence is less.
The technical scheme providing according to the utility model, the rain well of getting rid of surface gathered water comprises catch-basin body, tube connector, steel fibre grate well seat, steel fibre well grating, and described catch-basin body side surface is provided with two circular holes, and two circular holes are used for installing tube connector; Described tube connector is laid under the flat kerbstone of road; On described catch-basin body, be provided with steel fibre grate well seat, on steel fibre grate well seat, be stamped steel fibre well grating.
As further improvement of the utility model, described catch-basin body length is 43cm, and width is 27 cm; Be highly 45 cm.
As further improvement of the utility model, described tube connector adopts DN200 HDPE pipe.
As further improvement of the utility model, described catch-basin body is that metal material or plastics are made.
As further improvement of the utility model, described catch-basin body is connected by tube connector and built catch-basin.
Compared with the prior art the utility model has the following advantages:
The utility model is set up catch-basin in ponding section, is connected to existing catch-basin nearby, can better solve the problem of surface gathered water; Construction method is easy, and the catch-basin of setting up is rain well, and volume is only 12% of traditional catch-basin volume, therefore builds rain well earth excavation amount less; Because rain well and tube connector are all positioned under the flat kerbstone of road, build rain well and tube connector, road pavement structure influence is less.
Accompanying drawing explanation
Fig. 1 is left surface stereogram of the present utility model.
Fig. 2 is right flank stereogram of the present utility model.
Fig. 3 is the utility model catch-basin minor face sectional view.
Fig. 4 is the long limit of the utility model catch-basin sectional view.
Fig. 5 is ponding road surface schematic diagram.
Fig. 6 is the utility model catch-basin position view.
The specific embodiment
The utility model is further described in connection with the embodiment in accompanying drawing below:
As shown in Fig. 1-Fig. 6, comprise catch-basin body 1, tube connector 2, steel fibre grate well seat 3, steel fibre well grating 4, built catch-basin 5, flat kerbstone 6, flat stone 7, road surface 8.
The rain well of getting rid of surface gathered water comprises catch-basin body 1, tube connector 2, steel fibre grate well seat 3, steel fibre well grating 4, in described catch-basin body 1 side, is provided with two circular holes, and two circular holes are used for installing tube connector 2; On described catch-basin body 1, be provided with steel fibre grate well seat 3, on steel fibre grate well seat 3, be stamped steel fibre well grating 4; Described catch-basin body 1 is connected by tube connector 2 and built catch-basin 5; The be laid in flat kerbstone of road 6 times of described tube connector.
Described catch-basin body 1 length is 43cm, and width is 27 cm; Be highly 45 cm.Described tube connector 2 adopts DN200 HDPE pipe.
The construction method of a kind of rain well of getting rid of surface gathered water of the utility model, comprises following construction sequence:
1,, according to road surface 8 ponding situations, position and the quantity of rain well is implemented in measuring and calculating;
2, implementing catch-basin place, excavating that to dig length downwards after flat kerbstone 6 be that 48-52cm, width are the foundation ditch that 33-37cm, the degree of depth are 53-57cm again; At foundation ditch bottom pour mold, build 10cm C15 concrete basis, lay catch-basin body 1, catch-basin body periphery gap, perfusion C15 concrete;
3, in described catch-basin body 1 side, be provided with two circular holes, two circular holes are used for installing tube connector 2; Described catch-basin body 1 length is 43cm, and width is 27 cm; Be highly 45 cm.Described tube connector 2 adopts DN200 HDPE pipe.Described catch-basin body 1 is for metal or plastics are prefabricated forms.
4, between built catch-basin 5 and catch-basin, slot grooving tube connector 2, the be laid in flat kerbstone of road 6 times of described tube connector 2; Described catch-basin is connected by tube connector 2 and built catch-basin 5; The described tube connector gradient 1%, the gradient is to built catch-basin;
5, on described catch-basin body 1, be provided with steel fibre grate well seat 3, on steel fibre grate well seat 3, be stamped steel fibre well grating 4;
6, at extremely 7 ends of flat stone of tube connector 2 place's backfill C15 concretes;
7, flat kerbstone 6 is finally installed.The same prior art of all the other construction requirements.
The utility model rain well, adopts and sets up rain well and tube connector, gets rid of surface gathered water.Because the Novel rainwater well location of setting up is in the low spot in ponding section, when having larger rainfall, the ponding in the local section of urban road, can conflux rapidly to the rain well of setting up, again by Novel rainwater well array in the built Storm Sewer Network of road, finally by Storm Sewer Network, drain into beyond river course or road scope, therefore can solve preferably the problem of section ponding.
Due to rain well, volume is only 12% of traditional catch-basin volume, and construction rain well earth excavation amount is less; Rain well and tube connector are all positioned under the flat kerbstone of road, and road pavement structure influence is less.The utility model is set up the construction of rain well and tube connector to ponding section, less and construction cost is lower on the impact of original road surface, gets rid of surface gathered water effect better.

Claims (5)

1. get rid of the rain well of surface gathered water for one kind, it is characterized in that: comprise catch-basin body (1), tube connector (2), steel fibre grate well seat (3), steel fibre well grating (4), described catch-basin body (1) side is provided with two circular holes, and two circular holes are used for installing tube connector (2); Described tube connector (2) is laid under the flat kerbstone of road (6); On described catch-basin body (1), be provided with steel fibre grate well seat (3), on steel fibre grate well seat (3), be stamped steel fibre well grating (4).
2. the rain well of eliminating surface gathered water as claimed in claim 1, is characterized in that: described catch-basin body (1) length is 43cm, and width is 27 cm; Be highly 45 cm.
3. the rain well of eliminating surface gathered water as claimed in claim 1, is characterized in that: described tube connector (2) adopts DN200 HDPE pipe.
4. the rain well of eliminating surface gathered water as claimed in claim 1, is characterized in that: described catch-basin body (1) is made for metal material or plastics.
5. the rain well of eliminating surface gathered water as claimed in claim 1, is characterized in that: described catch-basin body (1) is connected by tube connector (2) and built catch-basin (5).
CN201320660107.XU 2013-10-24 2013-10-24 Novel catch basin for draining road surface accumulated water Expired - Fee Related CN203546882U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320660107.XU CN203546882U (en) 2013-10-24 2013-10-24 Novel catch basin for draining road surface accumulated water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320660107.XU CN203546882U (en) 2013-10-24 2013-10-24 Novel catch basin for draining road surface accumulated water

Publications (1)

Publication Number Publication Date
CN203546882U true CN203546882U (en) 2014-04-16

Family

ID=50465017

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320660107.XU Expired - Fee Related CN203546882U (en) 2013-10-24 2013-10-24 Novel catch basin for draining road surface accumulated water

Country Status (1)

Country Link
CN (1) CN203546882U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103526822A (en) * 2013-10-24 2014-01-22 无锡市政设计研究院有限公司 Novel catch-basin removing accumulated water on road surface and construction method
CN104088356A (en) * 2014-07-23 2014-10-08 刘晓禾 Auxiliary water drain well auxiliary device capable of preventing blocking and easy to clean up
CN107524213A (en) * 2016-06-21 2017-12-29 五冶集团上海有限公司 A kind of job site water discharge method using sump

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103526822A (en) * 2013-10-24 2014-01-22 无锡市政设计研究院有限公司 Novel catch-basin removing accumulated water on road surface and construction method
CN104088356A (en) * 2014-07-23 2014-10-08 刘晓禾 Auxiliary water drain well auxiliary device capable of preventing blocking and easy to clean up
CN107524213A (en) * 2016-06-21 2017-12-29 五冶集团上海有限公司 A kind of job site water discharge method using sump

Similar Documents

Publication Publication Date Title
CN202031005U (en) Ecological drainage channel
CN205100360U (en) Urban road rainwater holds stagnant structure
CN203701255U (en) Device for collecting rainwater on road to supplement underground water
CN201068550Y (en) Road drainage structure
CN103981785A (en) Pervious concrete paving system with penetration and drainage guide tubes
CN111042293A (en) Construction process of road central green belt seepage-proofing drainage structure
CN203546882U (en) Novel catch basin for draining road surface accumulated water
CN106351309A (en) Urban road rainwater detention and seepage system applicable to North
CN103526822B (en) Novel catch-basin removing accumulated water on road surface and construction method
CN109826065B (en) High-fill roadbed protection system and construction method thereof
CN205711605U (en) Permeable pavement structure
CN106320494A (en) Sponge engineering system based on existing urban road and drainage condition and construction method of sponge engineering system
CN106013400A (en) Integrated pipe network and water storage and drainage system for pavements
CN102864833A (en) Application of finished plastic inspection well in outdoor drainage system
CN210797803U (en) Anti-blocking drain pipe
CN204266137U (en) A kind of novel municipal porous pavement road drainage structure
CN203795269U (en) Blind drainage ditch for highway pavement
CN210856844U (en) Sewage intercepting and draining system suitable for sunken type pedestrian ways beside greenbelts
CN209114263U (en) A kind of waterproof anti-settling highway subgrade
CN113550397A (en) Road water storage and drainage system and road construction method
CN203213266U (en) Rainwater permeation type side gutter
CN202214684U (en) Special washable pipe for highway drainage sewers
CN206607657U (en) Road runoff discarding system and road runoff filtration system
CN205677022U (en) The dirty same groove structure of drainpipe of a kind of rain
CN220336059U (en) Biological detention facility suitable for waterfront greenway

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140416

Termination date: 20211024

CF01 Termination of patent right due to non-payment of annual fee