CN203514740U - Rib filling device - Google Patents

Rib filling device Download PDF

Info

Publication number
CN203514740U
CN203514740U CN201320608686.3U CN201320608686U CN203514740U CN 203514740 U CN203514740 U CN 203514740U CN 201320608686 U CN201320608686 U CN 201320608686U CN 203514740 U CN203514740 U CN 203514740U
Authority
CN
China
Prior art keywords
tubing
charge
base plate
movable
veins
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320608686.3U
Other languages
Chinese (zh)
Inventor
王凯
黄斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201320608686.3U priority Critical patent/CN203514740U/en
Application granted granted Critical
Publication of CN203514740U publication Critical patent/CN203514740U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a rib filling device which is characterized by comprising a base plate, a fixed pipe and a movable pipe. A horizon adjustment device and a length measurement tool are arranged on the base plate, the fixed pipe and the movable pipe are perpendicularly installed on the base plate, the upper portion and the lower portion of the fixed pipe are connected with the movable pipe through horizon adjustment devices respectively, the upper end and the lower end of the movable pipe are respectively provided with a stretchable measurement tool, and the stretchable measurement tools are perpendicular to the movable pipe. According to the rib filling device, the technical requirements for workers are not high, and the rib filling construction process is simple, rapid and convenient to achieve; the marl cake making step is omitted, accumulated errors are avoided, the perpendicularity and the smoothness of marl ribs of the whole wall are easily unified, and the construction efficiency and the construction quality are remarkably improved.

Description

A kind of charge veins device
Technical field
The utility model relates to the plastering technique of civil engineering project in construction work, especially a kind of charge veins device.
Background technology
In civil engineering, complete after concrete or brick wall, need to carry out cement or gypsum is plastered, levelling, adjust degree of gravity vertical forwall surface, planeness and headroom size, and then complete putty and coating project.
The mode that at present conventional cement or gypsum plastering technique adopt is first, to paste grid cloth.(unlike material concrete and brick wall junction); Then, according to control line, set ash cake (20mm * 20mm * T) T by looked for height according to control line, this stage requires high to constructor's handicraft, easily produce error or crooked; Secondly, wait for that ash cake parches, the stand-by period in this stage is long, affects construction progress; The 4th, be linked to be muscle in the middle of cement or gypsum are packed into upper and lower 2 ash cakes, (20mm * T * H) H is that smallpox height is arrived on ground) finished surface is with former ash cake size.This stage easily produces accumulated error; The 5th, check and accept, confirm verticality, planeness and the headroom size of muscle, if any error adjustment.Because being not easy to control, plus-minus tolerance now causes waste of material.In each stage of above-mentioned construction, the problem that all easily runs into various errors and affect engineering progress.
Utility model content
For the problems referred to above, the utility model provides a charge veins device, and the measurer carrying by device and activity adjustment mechanism, to overcome all errors of bringing due to manual operation.
The utility model discloses a kind of charge veins device, it is characterized in that, comprising: a base plate, is provided with a Horizon adjusting device and a length measurer on described base plate; One fixedly tubing and a movable tubing, be vertically mounted on described base plate, described fixedly tubing is respectively connected with described movable tubing by a level(l)ing device up and down, and the upper and lower two ends of described movable tubing respectively arrange a scalable measurer, and described scalable measurer is vertical with described movable tubing.
Reasonable, charge veins device of the present utility model, is characterized in that, the top of described fixedly tubing and the bottom of nearly described base plate are respectively provided with a pair of spacing corner fittings device, in order to prevent that described movable tubing from tilting, and guarantees described tubing parallel.
Reasonable, charge veins device of the present utility model, is characterized in that, described Horizon adjusting device further comprises a spirit bubble and set screw and nut, with so that the relative ground of described base plate is adjusted to horizontal level.
Reasonablely be, charge veins device of the present utility model, it is characterized in that, described level(l)ing device comprises at least one group of adjustment screw and bearing, described bearing is arranged on the dorsal part of described movable tubing, be connected with the set screw of described fixedly tubing, with so that described movable tubing relative to described fixedly tubing, move.
Reasonable, charge veins device of the present utility model, is characterized in that, described charge veins device further comprises:
Valve rubber, is arranged on the top of described fixedly tubing, in order to described charge veins device is fixed between ceiling and ground.
Reasonable, charge veins device of the present utility model, is characterized in that, described length measurer is a rule, described scalable measurer is movable steel ruler, and the zero graduation position of described movable steel ruler and the measurement of described movable tubing are in the face of neat, to check the displacement of described movable tubing.
Reasonable, charge veins device of the present utility model, is characterized in that, described fixedly tubing and described movable tubing comprise some sections of compositions, between described each section, by connector, are fixedly connected with.
Reasonable, charge veins device of the present utility model, is characterized in that, described connector comprises U-shaped groove.
This charge veins device is not high to workman's technical requirements, and floating screed construction process is simple, quick.Saved the step of doing ash cake, avoided the generation of cumulative errors, the verticality peace lift face of whole face wall ash muscle is easily unified, and efficiency of construction and quality significantly improve.
Accompanying drawing explanation
Below, with reference to accompanying drawing, for those skilled in the art, to detailed description of the present utility model, above and other object of the present utility model, feature and advantage will be apparent.
Fig. 1 is the structural representation of the charge veins device of the utility model one preferred embodiment;
Fig. 2 is the decomposing schematic representation of another preferred embodiment of the present utility model;
Fig. 3 is the application schematic diagram of charge veins device shown in application drawing 1.
The specific embodiment
Shown in Figure 1, charge veins device 100 of the present utility model comprises that 1, one of a base plate is vertically mounted on fixedly tubing 2 and the movable tubing 3 on base plate 1.
One spirit bubble 11 is installed on base plate 1, and set screw 12 and nut 13, so that whole charge veins device device is adjusted to horizontal level on ground.On base plate 1, install perpendicular to the rule 14 of base plate 1 parallel with control line to guarantee charge veins device.
Fixedly the bottom of the top of tubing 2 and nearly base plate 1 is respectively provided with a pair of spacing corner fittings device 211,212, and this setting tilts in order to prevent movable tubing 3, guarantees accurately parallel of movable tubing 3.Fixedly tubing 2 is respectively equipped with a set screw 221,222 up and down, to be connected with movable tubing 3.Fixedly valve rubber 23 is installed on tubing 2 tops, so that fixing whole device plays anti-skidding effect in smallpox.
In addition, at movable tubing, Shang Xia 3, two ends are respectively installed by a movable steel ruler 311,312, it is vertical with movable tubing 3 that steel ruler 311,312 is adjustable to spacer, and the zero graduation position of steel ruler 311,312 and the A of this activity tubing 3 are in the face of neat, to check movable tubing 3 displacements.
Movable tubing 3 dorsal parts are installed two bearings 321,322 and are connected with the fixing set screw 221,222 of tubing 2, and this setting is for movable tubing 3 can be realized and the fixedly movement between tubing 2.
Consider charge veins device 100 of the present utility model due to tubing too long causing carry inconvenience, therefore, Fig. 2 has provided another group preferred embodiment of the present utility model, be about to fixedly tubing 2 and middle isometric two sections 201,202 and 301,302 of being divided into of movable tubing 3, two sections are fixedly connected with by two U-shaped grooves 41,42 respectively, so that whole device is extending and shortening, adapt to the metope of different floor heights.
Fig. 3 has illustrated to apply the process of charge veins device 100 of the present utility model, below in conjunction with Fig. 1, whole process is described:
First, metope is being plastered wall while plastering, first laser level 800 is being placed on to the B place, control line position finishing in advance on wall limit, adjusting horizontal level, after adjusting vertical line, on wall limit, locating motionless.
Next, the A face of the movable tubing 3 of charge veins device 100 of the present utility model is placed by wall, two parallel rules 14 on base plate 1 are extracted out, the infrared rays penetrating by laser level 800 is adjusted base plate 1, infrared rays is flushed, once after flushing, allow the fixedly valve rubber 23 on tubing 2 tops withstand ceiling with moving scale chi 14 scales, set screw 12 on locking base plate 1, is fixed between smallpox and ground whole device.Three set screw 12 on last regulating base board 1, check spirit bubble 11 on base plate 1, so that base plate 1 is adjusted to horizontal level.
The 3rd, from movable tubing 3, pull out upper and lower two steel rulers 311 and 312, make steel ruler 311,312 perpendicular to movable tubing 3.By the good infrared radiation of laser level 800 adjustment on steel ruler 311,312, by regulating the fixedly upper and lower set screw 221,222 of tubing 2, movable tubing 3 is moved, the vertical line that the corresponding laser level 800 of graduation mark adjustment required on steel ruler 311,312 is sent.
The 4th, between metope and the A face of movable tubing 3, mortar is filled up in gap, makes grey muscle, after grey muscle is dry, takes off this charge veins device 100.
Adopt the charge veins device of said structure, due to wall is located after vertical lines with level 800, level 800 no longer moves, so by the graduation mark that on the corresponding charge veins device 100 of laser rays of level 800, steel ruler 14 is assert, at some grey muscle of metope upper punch, these grey muscle all, in a vertical elevation, have guaranteed that these muscle have higher planeness.Finally that metope is carried out to mortar knife filling, owing to there being verticality, the grey muscle that flatness error is very little, and also this kind of grey muscle is smooth smooth, so use floating rule to scrape the light leicht fallen D/A of mortar.With Mortar spraying machine, be mated, can really realize the construction of high-efficiency high-quality.
Adopt the charge veins device of said structure, brought the technique effect of following several respects:
1. workman's handicraft is required to reduce in construction, make it to operate applicable to more people.
2. utilize instrument that originally issuable accumulated error is reduced.
3. simplification of flowsheet, reduces step as far as possible, corresponding raising the efficiency.
4. utilize instrument can accurately control finished surface ± tolerance, to reach the object of saving material.
Before the description to preferred embodiment is provided so that any technician in this area can use or utilize the utility model.Various modifications to these embodiment are evident for personnel skilled in the art, and total application of principle described here can not used to creativeness to other embodiment.Thereby the utility model is the embodiment shown in being not limited to here, and should be according to meeting the principle that disclosed and the wide region of new feature here.

Claims (8)

1. a charge veins device, is characterized in that, comprising:
One base plate, is provided with a Horizon adjusting device and a length measurer on described base plate;
One fixedly tubing and a movable tubing, be vertically mounted on described base plate, described fixedly tubing is respectively connected with described movable tubing by a level(l)ing device up and down, and the upper and lower two ends of described movable tubing respectively arrange a scalable measurer, and described scalable measurer is vertical with described movable tubing.
2. charge veins device according to claim 1, is characterized in that,
The top of described fixedly tubing and the bottom of nearly described base plate are respectively provided with a pair of spacing corner fittings device, in order to prevent that described movable tubing from tilting, and guarantees described tubing parallel.
3. charge veins device according to claim 1 and 2, is characterized in that,
Described Horizon adjusting device further comprises a spirit bubble and set screw and nut, with so that the relative ground of described base plate is adjusted to horizontal level.
4. charge veins device according to claim 3, is characterized in that,
Described level(l)ing device comprises at least one group of adjustment screw and bearing, and described bearing is arranged on the dorsal part of described movable tubing, be connected with the set screw of described fixedly tubing, with so that described movable tubing relative to described fixedly tubing, move.
5. charge veins device according to claim 4, is characterized in that, described charge veins device further comprises:
Valve rubber, is arranged on the top of described fixedly tubing, in order to described charge veins device is fixed between ceiling and ground.
6. charge veins device according to claim 5, is characterized in that,
Described length measurer is a rule, and described scalable measurer is movable steel ruler, and the zero graduation position of described movable steel ruler and the measurement of described movable tubing are in the face of neat, to check the displacement of described movable tubing.
7. charge veins device according to claim 6, is characterized in that,
Described fixedly tubing and described movable tubing comprise some sections of compositions, between described each section, by connector, are fixedly connected with.
8. charge veins device according to claim 7, is characterized in that,
Described connector comprises U-shaped groove.
CN201320608686.3U 2013-09-29 2013-09-29 Rib filling device Expired - Fee Related CN203514740U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320608686.3U CN203514740U (en) 2013-09-29 2013-09-29 Rib filling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320608686.3U CN203514740U (en) 2013-09-29 2013-09-29 Rib filling device

Publications (1)

Publication Number Publication Date
CN203514740U true CN203514740U (en) 2014-04-02

Family

ID=50373695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320608686.3U Expired - Fee Related CN203514740U (en) 2013-09-29 2013-09-29 Rib filling device

Country Status (1)

Country Link
CN (1) CN203514740U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196214A (en) * 2014-09-25 2014-12-10 张涛 Screeding technology and screeding ruler for plaster work
CN110242019A (en) * 2018-04-26 2019-09-17 金华有成建设有限公司 A kind of quick-installed metope leveling unit of construction
CN110593585A (en) * 2019-08-23 2019-12-20 中国十七冶集团有限公司 High-rise building outer wall external corner base layer painting perpendicularity control method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196214A (en) * 2014-09-25 2014-12-10 张涛 Screeding technology and screeding ruler for plaster work
CN104196214B (en) * 2014-09-25 2016-08-24 张涛 The floating screed technique of a kind of plastering engineering and floating screed chi
CN110242019A (en) * 2018-04-26 2019-09-17 金华有成建设有限公司 A kind of quick-installed metope leveling unit of construction
CN110242019B (en) * 2018-04-26 2020-08-25 金华有成建设有限公司 Wall leveling device capable of being installed quickly for building construction
CN110593585A (en) * 2019-08-23 2019-12-20 中国十七冶集团有限公司 High-rise building outer wall external corner base layer painting perpendicularity control method
CN110593585B (en) * 2019-08-23 2021-09-17 中国十七冶集团有限公司 High-rise building outer wall external corner base layer painting perpendicularity control method

Similar Documents

Publication Publication Date Title
CN203514740U (en) Rib filling device
CN104514358A (en) Screeding machine
CN204531310U (en) A kind of metope leveling mechanism
CN104631829A (en) Technique for high-precision leveling of structural flooring
CN105822048A (en) Wall surface plastering robot
CN102127971A (en) Adjustable leveling stool and method for controlling floorslab thickness by using same
CN103912127A (en) Building formwork or floor slab construction control method and special straightedge
CN201386378Y (en) Building plaster tool
CN206873881U (en) A kind of quick ash cake construction tool
CN202744907U (en) Concrete leveling, paste lifting and elevation control integrated device for bed plates
CN204703535U (en) Equipment built by laying bricks or stones by brick wall
CN201972409U (en) Adjustable leveling bench
CN201495782U (en) Concrete thickness control frame
CN112361913B (en) Guiding rule for building coke oven head and using method thereof
CN101871258B (en) Implement for quickly and accurately pasting sanitary wall tiles and method of reserving gaps, arranging tiles, filling mortar and pasting tiles
CN213654134U (en) Parallel plastering gypsum screeding device
CN207277830U (en) The jacking structure of formwork erection
CN213021453U (en) Control device suitable for brickwork construction
CN213774572U (en) Wall building auxiliary equipment
CN206397090U (en) Patch block leveling chi
CN206397079U (en) Ground floating screed chi
CN205822733U (en) A kind of wall-surface screeding robot
CN218758563U (en) Wall floating device for house building engineering construction
CN204552115U (en) For the floating screed part that structure flooring high accuracy is levelling
CN2503458Y (en) Horizontal bricks paving instrument

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140402

Termination date: 20150929

EXPY Termination of patent right or utility model