CN203465180U - Roadway surrounding rock two-dimensional stress simulation plane experimental apparatus - Google Patents
Roadway surrounding rock two-dimensional stress simulation plane experimental apparatus Download PDFInfo
- Publication number
- CN203465180U CN203465180U CN201320507400.2U CN201320507400U CN203465180U CN 203465180 U CN203465180 U CN 203465180U CN 201320507400 U CN201320507400 U CN 201320507400U CN 203465180 U CN203465180 U CN 203465180U
- Authority
- CN
- China
- Prior art keywords
- lifting jack
- upright post
- roadway
- experimental apparatus
- surrounding rock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
The utility model discloses a roadway surrounding rock two-dimensional stress simulation plane experimental apparatus which comprises a left upright post and a right upright post arranged on two sides of a base, wherein a transverse beam is fixed at the top ends of the left upright post and the right upright post; an upper lifting jack and an upper force transfer plate are arranged below the transverse beam; a hollow pipe support frame is arranged on the inner side of the right upright post; a lateral lifting jack and a lateral force transfer plate are arranged on the hollow pipe support frame; an oriented rod is fixed on the lateral force transfer plate; the device also comprises channel steel used for side protection in the process of filling a testing mold. The experimental apparatus has the advantages of reasonable design, simple structure, simplicity and convenience in operation and capacity of loading in vertical and horizontal directions and can serve as a similar simulation plane experimental apparatus for performing similar simulation loading tests under different horizontal pressure coefficient conditions and performing simulation tests of determining roadway cross-section parameters, selecting roadway supporting modes, predicting roadway deformation damage and the like.
Description
Technical field
The utility model relates to a kind of analog simulation experimental provision, is specifically related to roadway surrounding rock two-dimensional stress simulation plane experimental provision.
Background technology
Analog simulation experiment is widely used in the fields such as ground, geology, mine, and becomes one of effective ways of the on-the-spot problem of research.Based on analog simulation, theoretical and different scientific research object, by the analog simulation to research contents such as tunnel, chambers, draws Specifications and parameter, and the foundation of science can be provided the design in above field and production practices.
Tradition analog simulation plane experimental provision General Requirements simulation Overlying Strata In A Face transport conditions, the inside dimension needing is large, general length all surpasses 3m, when carrying out the relevant simulated experiment of roadway surrounding rock, because tunnel size is little, experimental provision length reaches 2m and just can meet the requirements, so traditional experiment device volume is large, consumption steel are many and cause the whole heavier mobile difficulty of device; Enough analog materials of need to mating formation during experiment fill experiment device inside, cause the waste of material, and need a large amount of manpower and time.Traditional experiment device relies on merely top counterweight or jack pair material to load, there is not charger in horizontal direction, cannot simulate and determine under coefficient of horizontal pressure condition and roadway surrounding rock situation of change during different coefficient of horizontal pressure, make experimental provision limit greatly the simulation to roadway surrounding rock under full-scale condition.
Summary of the invention
Technical problem to be solved in the utility model is the shortcoming that overcomes that above-mentioned traditional analog simulation experimental provision volume is large, consumable material is many, can not side direction loads, provide a kind of reasonable in design, simple in structure, easy and simple to handle, can carry out vertical and tunnel that horizontal direction loads two-dimensional stress simulation plane experimental provision simultaneously.
Solving the problems of the technologies described above adopted technical scheme is: it comprises left column and the right column that is fixed on base both sides, left column, right column top are fixed with crossbeam, crossbeam below is provided with lifting jack and upper force transmitting board, right column inner side is provided with hollow tube bracing frame, on hollow tube bracing frame, be provided with side direction lifting jack and side direction force transmitting board, on side direction force transmitting board, be fixed with orientation lever, it also comprises the channel-section steel protecting for side when die trial paving is filled out.
On the utility model, lifting jack is positioned at top, Pu Tian district.
On the utility model, lifting jack and side direction lifting jack are 3.
The utility model utilizes physical acting force and reacting force principle, has realized the demand that horizontal direction loads.Compare with conventional planar analog simulation experimental provision, that this experimental provision has is reasonable in design, simple in structure, easy and simple to handle, can carry out vertical simultaneously and the advantage such as horizontal direction loading, can be used as analog simulation plane experimental provision, carry out the analog simulation loading experiment under the different coefficient of horizontal pressure conditions in tunnel, carry out the selection of the determining of drift section parameter, drift support type, the simulated experiments such as prediction that roadway deformation destroys.
Accompanying drawing explanation
Fig. 1 is front view of the present utility model.
Fig. 2 is the A-A sectional view of Fig. 1.
Fig. 3 is the structural representation of side direction force transmitting board in Fig. 1, orientation lever and hollow tube bracing frame.
Embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is elaborated.
As shown in Figure 1, 2, a kind of roadway surrounding rock two-dimensional stress simulation plane experimental provision, comprise the left column 2 and the right column 3 that are located at base 1 both sides, left column 2, right column 3 tops are fixed with crossbeam 4, crossbeam 4 belows are provided with lifting jack 5 and upper force transmitting board 6, and right column 3 inner sides are provided with hollow tube bracing frame 7, are provided with side direction lifting jack 8 and side direction force transmitting board 9 on hollow tube bracing frame 7, on side direction force transmitting board 9, be fixed with orientation lever 10, also comprise the channel-section steel 11 protecting for side when die trial paving is filled out.Base 1, left column 2, right column 3, the orthogonal framed structure of crossbeam 4 weld connection, make framework inside dimension be: length * wide * height=2 ×0.3× 2(units: m).On left column 2, right column 3, fore-and-aft direction processing is porose, and for channel-section steel 11 is installed, channel-section steel 11 length are 2.2m.One end of channel-section steel 11 with screw threads for fastening connector be arranged on left column 2, the other end is arranged on right column 3 with screw threads for fastening connector.Hollow tube bracing frame 7 is placed on base 1 right side, by screw threads for fastening connector, is arranged on right column 3.Side direction lifting jack 8 is placed in the U-shaped groove of hollow tube bracing frame 7 horizontal stands.After hollow tube bracing frame 7 is close to side direction force transmitting board 9, cumulative volume is of a size of: length * wide * height=0.5×0.3× 1.5(unit: m), make reserved Pu Tian district volume size be: length * wide * height=1.5×0.3× 1.5(unit: m).
As shown in Figure 3, orientation lever 10 of four jiaos of side direction force transmitting board 9 each weld connections, orientation lever 10 stretches in four border tubes of hollow tube bracing frame 7 horizontal transverse direction.Hollow tube bracing frame 7 is controlled the moving range of side direction force transmitting board 9 by orientation lever 10.
On the utility model, lifting jack 5 and side direction lifting jack 8 quantity are 3, and upper lifting jack 5 is positioned at top, Pu Tian district.Upper lifting jack 5 promotes upper force transmitting board 6 and moves downward, and side direction lifting jack 8 promotes side direction force transmitting board 9 to left movement, and the upper surface of die trial and right flank are loaded, and realizes the loading experiment to die trial.
Claims (3)
1. a roadway surrounding rock two-dimensional stress is simulated plane experimental provision, it is characterized in that: it comprises left column (2) and the right column (3) that is fixed on base (1) both sides, left column (2), right column (3) top is fixed with crossbeam (4), crossbeam (4) below is provided with lifting jack (5) and upper force transmitting board (6), right column (3) inner side is provided with hollow tube bracing frame (7), on hollow tube bracing frame (7), be provided with side direction lifting jack (8) and side direction force transmitting board (9), on side direction force transmitting board (9), be fixed with orientation lever (10), it also comprises the channel-section steel (11) protecting for side when die trial paving is filled out.
2. according to roadway surrounding rock two-dimensional stress simulation plane experimental provision claimed in claim 1, it is characterized in that lifting jack (5) is positioned at top, Pu Tian district.
3. according to roadway surrounding rock two-dimensional stress simulation plane experimental provision claimed in claim 1, it is characterized in that lifting jack (5) and side direction lifting jack (8) are 3.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320507400.2U CN203465180U (en) | 2013-08-19 | 2013-08-19 | Roadway surrounding rock two-dimensional stress simulation plane experimental apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320507400.2U CN203465180U (en) | 2013-08-19 | 2013-08-19 | Roadway surrounding rock two-dimensional stress simulation plane experimental apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203465180U true CN203465180U (en) | 2014-03-05 |
Family
ID=50177533
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320507400.2U Expired - Fee Related CN203465180U (en) | 2013-08-19 | 2013-08-19 | Roadway surrounding rock two-dimensional stress simulation plane experimental apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203465180U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106290783A (en) * | 2016-07-29 | 2017-01-04 | 湖南科技大学 | Horizontal multi-angle mining plane analog simulation experimental device and experimental technique |
CN109406281A (en) * | 2018-12-11 | 2019-03-01 | 中国矿业大学(北京) | A kind of tunnel butterfly destruction area similarity simulation experiment platform and experimental method |
CN110702062A (en) * | 2019-09-06 | 2020-01-17 | 山东科技大学 | Plane movement deformation measurement system and application thereof in two-dimensional analog simulation experiment |
CN117074168A (en) * | 2023-07-05 | 2023-11-17 | 中国矿业大学(北京) | Surrounding rock deformation experimental device and method for horizontal and vertical linkage mechanics simulation |
-
2013
- 2013-08-19 CN CN201320507400.2U patent/CN203465180U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106290783A (en) * | 2016-07-29 | 2017-01-04 | 湖南科技大学 | Horizontal multi-angle mining plane analog simulation experimental device and experimental technique |
CN106290783B (en) * | 2016-07-29 | 2018-11-23 | 湖南科技大学 | Horizontal multi-angle mining plane analog simulation experimental device and experimental method |
CN109406281A (en) * | 2018-12-11 | 2019-03-01 | 中国矿业大学(北京) | A kind of tunnel butterfly destruction area similarity simulation experiment platform and experimental method |
CN110702062A (en) * | 2019-09-06 | 2020-01-17 | 山东科技大学 | Plane movement deformation measurement system and application thereof in two-dimensional analog simulation experiment |
CN110702062B (en) * | 2019-09-06 | 2020-11-17 | 山东科技大学 | Plane movement deformation measurement system and application thereof in two-dimensional analog simulation experiment |
CN117074168A (en) * | 2023-07-05 | 2023-11-17 | 中国矿业大学(北京) | Surrounding rock deformation experimental device and method for horizontal and vertical linkage mechanics simulation |
CN117074168B (en) * | 2023-07-05 | 2024-05-24 | 中国矿业大学(北京) | Surrounding rock deformation experimental device and method for horizontal and vertical linkage mechanics simulation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205301062U (en) | A horizontal loading device for simulation test is experimental | |
CN102175516B (en) | Large-scale combined dynamic and static multifunctional geotechnical engineering simulation test device | |
CN203465180U (en) | Roadway surrounding rock two-dimensional stress simulation plane experimental apparatus | |
CN102175517B (en) | Large-size freely combined model test device for high ground stress underground engineering | |
CN201983988U (en) | Large-scale combined static and dynamic multifunctional geotechnical engineering model test device | |
CN104297052B (en) | Tunnel excavation three-dimensional model experiment loading device | |
CN108717107B (en) | Side slope physical experiment model | |
CN101344445B (en) | Self-balancing type true three-dimensional loading model testing bench frame with sliding wall | |
CN103398861A (en) | Physical simulation test system for true triaxial rockburst of deep-buried tunnel | |
CN103806926A (en) | Span-changing and height-changing device of concrete lining steel bench vehicle | |
CN102768146B (en) | Adjustable analog simulation experimental device | |
CN103234830A (en) | Anchoring property experiment platform of anchor rod | |
CN104458428A (en) | Large-sized fluid-solid-heat multi-field coupling test loading system | |
CN105699203A (en) | Test device and method for measuring compressive strength of building materials under ambient pressure | |
CN202939101U (en) | Direct shearing instrument device with multi-layer shearing function | |
CN112881166B (en) | Device and method for testing stability of foundation in mining overall process and mining subsidence area | |
CN201266124Y (en) | Self-balancing type true three-dimensional loading model testing bench frame with sliding wall | |
CN203376215U (en) | Rock direct shear apparatus applicable to large-span loads and multi-scale samples | |
CN101477097B (en) | Horizontal and vertical combined loading analogue simulation experiment frame | |
CN204649537U (en) | Floor Heave in Roadway Equivalent Materials Testing model groove | |
CN221238768U (en) | Multifunctional visual model box for rock-soil model test | |
CN203629965U (en) | Dual-purpose testing device of tire reinforced soil structure drawing model | |
CN204594988U (en) | A kind of indoor geotechnical model experimental provision | |
CN204128887U (en) | A kind of tunnel excavation dimensional model experiment charger | |
CN205679471U (en) | A kind of large-scale experiment case for spiral anchor pile pull-out test |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140305 Termination date: 20140819 |
|
EXPY | Termination of patent right or utility model |