CN203396395U - 高效大钢模垂直度检测装置 - Google Patents
高效大钢模垂直度检测装置 Download PDFInfo
- Publication number
- CN203396395U CN203396395U CN201320516714.9U CN201320516714U CN203396395U CN 203396395 U CN203396395 U CN 203396395U CN 201320516714 U CN201320516714 U CN 201320516714U CN 203396395 U CN203396395 U CN 203396395U
- Authority
- CN
- China
- Prior art keywords
- detection device
- bracket
- efficiency
- steel mould
- large steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
本实用新型涉及施工用检测装置,具体为一种高效大钢模垂直度检测装置,解决了现有模板合模之前检测费时费力、效率低下且存在安装隐患的问题。高效大钢模垂直度检测装置,包括由镀锌方钢制成且由两根横杆和一根竖杆组成的F状支架,支架下横杆的直径小于上横杆的直径,且支架的上横杆下侧设置有穿线孔,支架的竖杆上固定有缠线把,缠线把上缠绕有另一端穿过穿线孔且连接有线锤的细绳。本实用新型结构设计合理可靠,检测过程中,省时省力,有效的提高了施工效率,而且杜绝了安全隐患现象的发生,具有结构简单稳定、加工方便且成本低的优点。
Description
技术领域
本实用新型涉及施工用检测装置,具体为一种高效大钢模垂直度检测装置。
背景技术
在大钢模的施工过程中,保证模板的架设位置及其垂直度是此项施工工艺的质量控制的关键点。
传统的方法是在模板合模之前,要在墙根部弹出模板控制线(一般为20cm),安放时,需由两名管理人员同时对其进行板面垂直度检查,做好过程控制,一人在模板上部把持架线杆(属于高空作业),并与下面的作业者同时工作。需两人操作,容易造成安全隐患,而且费时费人,工作效率不高,影响后续施工。
发明内容
本实用新型为了解决现有模板合模之前检测费时费力、效率低下且存在安装隐患的问题,提供了一种高效大钢模垂直度检测装置。
本实用新型是采用如下技术方案实现的:高效大钢模垂直度检测装置,包括由镀锌方钢制成且由两根横杆和一根竖杆组成的F状支架,支架下横杆的直径小于上横杆的直径,且支架的上横杆下侧设置有穿线孔,支架的竖杆上固定有缠线把,缠线把上缠绕有另一端穿过穿线孔且连接有线锤的细绳。
通过设置缠线把,进行线锤高低的调整,检测过程中,只需一人手握支架,即可保证支架竖杆与大钢模平行,克服了现有模板合模之前检测费时费力、效率低下且存在安装隐患的问题。
本实用新型结构设计合理可靠,检测过程中,省时省力,有效的提高了施工效率,而且杜绝了安全隐患现象的发生,具有结构简单稳定、加工方便且成本低的优点。
附图说明
图1为本实用新型的结构示意图。
图中:1-支架,2-缠线把,3-线锤,4-细绳。
具体实施方式
高效大钢模垂直度检测装置,包括由镀锌方钢制成且由两根横杆和一根竖杆组成的F状支架1,支架1下横杆的直径小于上横杆的直径,且支架1的上横杆下侧设置有穿线孔,支架1的竖杆上固定有缠线把2,缠线把2上缠绕有另一端穿过穿线孔且连接有线锤3的细绳4。
具体实施过程中,细绳4向下穿出的吊线距离上部支架右侧端部为195mm(大钢模的模板厚度为5mm,共200mm),下部的控制线为200mm,如果改变控制线的距离其上部的支架尺寸要相应进行调整加工。
Claims (1)
1.一种高效大钢模垂直度检测装置,其特征在于:包括由镀锌方钢制成且由两根横杆和一根竖杆组成的F状支架(1),支架(1)下横杆的直径小于上横杆的直径,且支架(1)的上横杆下侧设置有穿线孔,支架(1)的竖杆上固定有缠线把(2),缠线把(2)上缠绕有另一端穿过穿线孔且连接有线锤(3)的细绳(4)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320516714.9U CN203396395U (zh) | 2013-08-23 | 2013-08-23 | 高效大钢模垂直度检测装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320516714.9U CN203396395U (zh) | 2013-08-23 | 2013-08-23 | 高效大钢模垂直度检测装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203396395U true CN203396395U (zh) | 2014-01-15 |
Family
ID=49907919
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320516714.9U Expired - Lifetime CN203396395U (zh) | 2013-08-23 | 2013-08-23 | 高效大钢模垂直度检测装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203396395U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109612450A (zh) * | 2019-02-20 | 2019-04-12 | 山西三建集团有限公司 | 混凝土浇筑墙体模板垂直度便捷检测装置及检测方法 |
-
2013
- 2013-08-23 CN CN201320516714.9U patent/CN203396395U/zh not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109612450A (zh) * | 2019-02-20 | 2019-04-12 | 山西三建集团有限公司 | 混凝土浇筑墙体模板垂直度便捷检测装置及检测方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204076373U (zh) | 一种建筑装饰板安装专用的打孔装置 | |
CN204473818U (zh) | 一种纱管整理装置 | |
CN205819688U (zh) | 纸箱开箱装置 | |
CN204111061U (zh) | 用于ppr盘管的升降式收管轮结构 | |
CN203396395U (zh) | 高效大钢模垂直度检测装置 | |
CN202925896U (zh) | 建筑工程用孔洞预留装置 | |
CN203045226U (zh) | 对中夹紧机构 | |
CN202353136U (zh) | 后砌墙配电箱安装固定装置 | |
CN203269424U (zh) | 一种用于盘柜倒运及就位的装置 | |
CN204009580U (zh) | 带有位置传感器的控制升降装置 | |
CN203394941U (zh) | 一种地脚螺栓固定装置 | |
CN104153590A (zh) | 装配式住宅叠合墙板快速就位调整装置 | |
CN201474318U (zh) | 砌墙垂直参照器 | |
CN204370564U (zh) | 楼板下构造柱混凝土浇筑结构 | |
CN204848090U (zh) | 管材起吊装置 | |
CN204163356U (zh) | 一种安装内墙板用的设备 | |
CN204109063U (zh) | 管材收集装置 | |
CN202943306U (zh) | 一种打通天孔用的装置 | |
CN201711468U (zh) | 一种引线成型机进线放线盒 | |
CN204996956U (zh) | 涨管器 | |
CN203875434U (zh) | 可调式钢管套丝装置 | |
CN204754225U (zh) | 一种可周转支托 | |
CN203007980U (zh) | 墙体多变钢筋限界装置 | |
CN203109432U (zh) | 管桩的笼筋骨架滚焊定位装置 | |
CN204314119U (zh) | 全自动压样机 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Jia Shuying Inventor after: Song Lei Inventor after: Guo Shuai Inventor after: Lv Feng Inventor before: Guo Shuai Inventor before: Lv Feng Inventor before: Jia Shuying |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: GUO SHUAI LV FENG JIA SHUYING TO: JIA SHUYING SONG LEI GUO SHUAI LV FENG |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20140115 |