CN202353136U CN2011205289490U CN201120528949U CN202353136U CN 202353136 U CN202353136 U CN 202353136U CN 2011205289490 U CN2011205289490 U CN 2011205289490U CN 201120528949 U CN201120528949 U CN 201120528949U CN 202353136 U CN202353136 U CN 202353136U
Authority
CN
China
Prior art keywords
steel tube
distribution box
angle steel
steel pipe
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205289490U
Other languages
English (en)
Inventor
李繁生
李娜
亢军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANXI FIRST CONSTRUCTION ENGINEERING Corp
Shanxi First Construction Group Co Ltd
Original Assignee
SHANXI FIRST CONSTRUCTION ENGINEERING Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANXI FIRST CONSTRUCTION ENGINEERING Corp filed Critical SHANXI FIRST CONSTRUCTION ENGINEERING Corp
Priority to CN2011205289490U priority Critical patent/CN202353136U/zh
Application granted granted Critical
Publication of CN202353136U publication Critical patent/CN202353136U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型涉及建筑安装固定装置,具体为一种后砌墙配电箱安装固定装置,解决了现有后砌墙配电箱安装时存在费时费力影响施工效率的问题。后砌墙配电箱安装固定装置,包括套在一起且均开有调节孔的上钢管和下钢管,上钢管与下钢管之间对应的调节孔内穿有伸缩调节螺杆,下钢管上连接有下支撑角钢,且下钢管与下支撑角钢通过穿过下钢管调节孔的高低调节螺杆连接,上钢管的上部固定有上压紧角钢,上压紧角钢与下支撑角钢上均拧有竖直设置的压紧螺杆。本实用新型结构设计合理可靠,在砌墙前,把配电箱和进出户管固定牢固,能最大限度的减少结构和安装的交叉配合,既操作简便、结构简单、成本低,又提高了施工效率,缩短了工期。

Description

后砌墙配电箱安装固定装置
技术领域
本实用新型涉及建筑安装固定装置,具体为一种后砌墙配电箱安装固定装置。
背景技术
在建筑领域,后砌墙上的配电箱,一般的施工工艺是先砌墙,后放置配电箱,再砌墙或者先砌墙,预留配电箱箱洞,再安装配电箱,这样施工存在的缺陷是:施工交叉作业多,配管和砌墙过程费时费力,影响施工效率。
发明内容
本实用新型为了解决现有后砌墙配电箱安装时存在费时费力影响施工效率的问题,提供了一种后砌墙配电箱安装固定装置。
本实用新型是采用如下技术方案实现的:后砌墙配电箱安装固定装置,包括套在一起且均开有调节孔的上钢管和下钢管,上钢管与下钢管之间对应的调节孔内穿有伸缩调节螺杆,下钢管上连接有下支撑角钢,且下钢管与下支撑角钢通过穿过下钢管调节孔的高低调节螺杆连接,上钢管的上部固定有上压紧角钢,上压紧角钢与下支撑角钢上均拧有竖直设置的压紧螺杆。使用时,通过高低调节螺杆控制下支撑角钢的位置,然后通过伸缩调节螺杆控制上钢管的位置,进而控制上压紧角钢的位置,然后将配电箱放置在上压紧角钢和下支撑角钢之间,调节压紧螺杆固定配电箱位置,然后将进出户管与配电箱固定,克服了现有后砌墙配电箱安装时存在费时费力影响施工效率的问题。
本实用新型结构设计合理可靠,在砌墙前,把配电箱和进出户管固定牢固,能最大限度的减少结构和安装的交叉配合,既操作简便、结构简单、成本低,又提高了施工效率,缩短了工期。
附图说明
图1为本实用新型的结构示意图。
图中:1-上钢管,2-下钢管,3-伸缩调节螺杆,4-下支撑角钢,5-高低调节螺杆,6-上压紧角钢,7-压紧螺杆。
具体实施方式
后砌墙配电箱安装固定装置,包括套在一起且均开有调节孔的上钢管1和下钢管2,上钢管1与下钢管2之间对应的调节孔内穿有伸缩调节螺杆3,下钢管2上连接有下支撑角钢4,且下钢管2与下支撑角钢4通过穿过下钢管2调节孔的高低调节螺杆5连接,上钢管1的上部固定有上压紧角钢6,上压紧角钢6与下支撑角钢4上均拧有竖直设置的压紧螺杆7。

Claims (1)

1.一种后砌墙配电箱安装固定装置,其特征在于:包括套在一起且均开有调节孔的上钢管(1)和下钢管(2),上钢管(1)与下钢管(2)之间对应的调节孔内穿有伸缩调节螺杆(3),下钢管(2)上连接有下支撑角钢(4),且下钢管(2)与下支撑角钢(4)通过穿过下钢管(2)调节孔的高低调节螺杆(5)连接,上钢管(1)的上部固定有上压紧角钢(6),上压紧角钢(6)与下支撑角钢(4)上均拧有竖直设置的压紧螺杆(7)。
CN2011205289490U 2011-12-16 2011-12-16 后砌墙配电箱安装固定装置 Expired - Fee Related CN202353136U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205289490U CN202353136U (zh) 2011-12-16 2011-12-16 后砌墙配电箱安装固定装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205289490U CN202353136U (zh) 2011-12-16 2011-12-16 后砌墙配电箱安装固定装置

Publications (1)

Publication Number Publication Date
CN202353136U true CN202353136U (zh) 2012-07-25

Family

ID=46542101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205289490U Expired - Fee Related CN202353136U (zh) 2011-12-16 2011-12-16 后砌墙配电箱安装固定装置

Country Status (1)

Country Link
CN (1) CN202353136U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103208762A (zh) * 2013-04-19 2013-07-17 成都市第二建筑工程公司 嵌入式配电箱安装方法及一种建筑方法
CN103321436A (zh) * 2013-07-10 2013-09-25 成都市第八建筑工程公司 建筑砖砌体上线盒预安装施工方法及其预安装支架
CN104092165A (zh) * 2014-08-01 2014-10-08 朱德仲 一种用于接线盒的安装支架
CN107171233A (zh) * 2017-06-23 2017-09-15 陕西建工第三建设集团有限公司 建筑后砌墙暗装配电箱一次到位安装方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103208762A (zh) * 2013-04-19 2013-07-17 成都市第二建筑工程公司 嵌入式配电箱安装方法及一种建筑方法
CN103208762B (zh) * 2013-04-19 2015-07-15 成都市第二建筑工程公司 嵌入式配电箱安装方法及一种建筑方法
CN103321436A (zh) * 2013-07-10 2013-09-25 成都市第八建筑工程公司 建筑砖砌体上线盒预安装施工方法及其预安装支架
CN103321436B (zh) * 2013-07-10 2015-07-15 成都市第八建筑工程公司 建筑砖砌体上线盒预安装施工方法及其预安装支架
CN104092165A (zh) * 2014-08-01 2014-10-08 朱德仲 一种用于接线盒的安装支架
CN107171233A (zh) * 2017-06-23 2017-09-15 陕西建工第三建设集团有限公司 建筑后砌墙暗装配电箱一次到位安装方法
CN107171233B (zh) * 2017-06-23 2019-01-04 陕西建工第三建设集团有限公司 建筑后砌墙暗装配电箱一次到位安装方法

Similar Documents

Publication Publication Date Title
CN202353136U (zh) 后砌墙配电箱安装固定装置
CN203097307U (zh) 用于安装装配式外墙板时调整外墙板的水平调整器
CN203475823U (zh) 建筑工地用棚顶支撑装置
CN204510804U (zh) 一种多功能建筑模板支撑架
CN207749850U (zh) 一种电梯钢结构框架的水平调节装置
CN202969897U (zh) 一种盘扣式脚手架托梁系统
CN203269424U (zh) 一种用于盘柜倒运及就位的装置
CN204212415U (zh) 模板支撑顶杆
CN201704948U (zh) 一种现浇板支架
CN202925883U (zh) 大型木模板围檩装置
CN202899643U (zh) 满堂钢管可调顶杆支撑
CN201439640U (zh) 钢管脚手架多功能底座
CN201598824U (zh) 一种高度可调的建筑用支架
CN201435445Y (zh) 一种通信户外天线安装架
CN201671336U (zh) 一种顶底两用钢管支撑托
CN202102646U (zh) 一种立体字安装构件
CN204290825U (zh) 利用抱箍安装的光伏防雷汇流箱安装结构
CN202064584U (zh) 墙板连接件
CN202064585U (zh) 墙板的安装结构
CN201162924Y (zh) 一种支撑螺栓
CN203542514U (zh) 柱塞泵总成简易拆卸装置
CN204481741U (zh) 一种太阳能发电电池板支撑架
CN202787935U (zh) 快速装拆组合架承重螺旋上托
CN203307904U (zh) 二次水利用装置中的一体化支架
CN220319204U (zh) 一种装配式飘窗施工用底部可调支撑装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120725

Termination date: 20201216

CF01 Termination of patent right due to non-payment of annual fee