CN203380596U - Double-blade pencil sharpener assembling device - Google Patents
Double-blade pencil sharpener assembling device Download PDFInfo
- Publication number
- CN203380596U CN203380596U CN201320471842.6U CN201320471842U CN203380596U CN 203380596 U CN203380596 U CN 203380596U CN 201320471842 U CN201320471842 U CN 201320471842U CN 203380596 U CN203380596 U CN 203380596U
- Authority
- CN
- China
- Prior art keywords
- blade
- screw
- cutter shell
- cylinder
- blanking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Control Of Cutting Processes (AREA)
Abstract
The utility model discloses a double-blade pencil sharpener assembling device which comprises a working table, a blade shell feeding vibration disc, a finished product delivery track, a blade shell moving air cylinder, a first blade shell limit air cylinder, a second blade shell limit air cylinder, a first blade material collection groove, a second blade material collection groove, a first blade pushing air cylinder, a second blade pushing air cylinder, a first blade positioning air cylinder, a second blade positioning air cylinder, screw vibration feeding discs, screw installation mechanisms and a finished product delivery air cylinder. The finished product delivery track and the blade shell moving air cylinder are arranged on the working table. The first blade shell limit air cylinder and the second blade shell limit air cylinder are arranged on a push rod of the blade shell moving air cylinder, and a blade shell limit plate is arranged on a push rod of the first blade shell limit air cylinder and the second blade shell limit air cylinder. The first blade material collection groove and the second blade material collection groove are formed in the working table and located in one sides of the blade discharging positions of a blade shell moving track, and the first blade pushing air cylinder and the second blade pushing air cylinder are located in the other side of the blade material collection grooves. The first blade positioning air cylinder and the second blade positioning air cylinder are installed on the back face of the working table and located at screw discharging installation positions. The screw vibration feeding discs are installed on the working table, the screw installation mechanisms are located at the screw discharging installation positions, and the finished production delivery air cylinder is located at the inlet end of the finished product delivery track. Automatic assembling of the double-blade pencil sharpener can be achieved, the efficiency is high, and at least 45 double-blade pencil sharpeners can be assembled per minute.
Description
Technical field
The utility model relates to double-pole pencil sharpener mounting equipment.
Background technology
Pencil sharpener is people's apparatus used in everyday, and it comprises cutter shell, blade and screw, and screw is arranged on blade on the cutter shell.The assembling pencil sharpener is all by manual work at present, and efficiency is low, and human cost is high.
Although the mounting equipment of hilted broadsword pencil sharpener is also arranged at present, the packaging efficiency of the mounting equipment of hilted broadsword pencil sharpener is high, at present also not for assembling the mounting equipment of double-pole pencil sharpener.
In sum, for shortcomings and deficiencies of the prior art, need especially a kind of equipment that can assemble the double-pole pencil sharpener, to address the above problem.
The utility model content
Technical problem to be solved in the utility model is to provide a kind of double-pole pencil sharpener mounting equipment, double-pole pencil sharpener mounting equipment floor space is little, automaticity is high, has greatly improved the efficiency of man-made assembly pencil sharpener, has also filled up the technological deficiency of not assembling the double-pole pencil sharpener at present.
Technical problem to be solved in the utility model can be achieved through the following technical solutions:
Double-pole pencil sharpener mounting equipment comprises:
One workbench supported by device framework;
One cutter shell feeding vibration disk;
It is characterized in that, also comprise:
Be arranged on the cutter shell moving track on described workbench, described cutter shell feeding vibration disk docks with the arrival end of described cutter shell moving track by a cutter shell feeding slideway; Described cutter shell moving track is divided into cutter shell feed station, the first blade blanking station, the first screw blanking installation station, the second blade blanking station, the second screw blanking installation station, the 3rd screw blanking installation station by arrival end successively to port of export direction;
The finished product be arranged on described workbench is sent track, and the arrival end that described finished product is sent track docks with the port of export of described cutter shell moving track;
The cutter shell that is arranged on described workbench and is positioned at described cutter shell moving track arrival end moves cylinder;
Be arranged on the first cutter shell limiting cylinder and the second cutter shell limiting cylinder on the push rod that described cutter shell moves cylinder, be provided with cutter shell limiting plate on the push rod of described the first cutter shell limiting cylinder and the second cutter shell limiting cylinder, be arranged at intervals with some cutter shell holding tanks on described cutter shell limiting plate, cutter shell holding tank on described cutter shell limiting plate is accepted the cutter shell of being brought by cutter shell feeding slideway and accepted cutter shell is moved under cylinder action and is transported to successively forward the first blade blanking station along cutter shell moving track at described cutter shell in cutter shell feed station, the first screw blanking is installed station, the second blade blanking station, the second screw blanking is installed station, the 3rd screw blanking is installed station, and the finished product assembled is sent into to finished product and send track,
Be arranged on described workbench, and lay respectively at the first blade blanking station one side of described cutter shell moving track, the first blade material collecting tank and the second blade material collecting tank of the second blade blanking station one side; Be respectively arranged with first blade outlet and the second blade outlet corresponding with described the first blade blanking station, the second blade blanking station in the bottom of described the first blade material collecting tank and the second blade material collecting tank;
Be arranged on described workbench, and the first blade that lays respectively at the first blade blanking station, the second blade blanking station opposite side pushes cylinder and the second blade pushes cylinder, described the first blade pushes cylinder and the second blade propelling movement cylinder is released the blade in the first blade material collecting tank and the second blade material collecting tank to deliver to the first blade blanking station, the second blade blanking station by the first blade outlet and the outlet of the second blade respectively, and falls on the cutter shell that enters the first blade blanking station, the second blade blanking station;
Be arranged on the back side of described workbench, and lay respectively at the first blade positioning cylinder, the second blade positioning cylinder that the first screw blanking is installed station, the second screw blanking installation station, be separately installed with the first blade phase magnet and the second blade phase magnet on the push rod of described the first blade positioning cylinder, the second blade positioning cylinder, described the first blade phase magnet and the second blade phase magnet are had good positioning blade on the cutter shell;
Be arranged on first, second, third screw vibration feeding disc on described workbench and that be arranged side by side along described cutter shell moving track bearing of trend, be provided with screw in the exit of first, second, third screw vibration feeding disc and move cylinder and screw blanking port, all be connected to a screw blanking flexible pipe on first, second, third screw blanking port; The screw of described first, second, third screw vibration feeding disc moves cylinder and respectively the screw of first, second, third screw vibration feeding disc outlet is pushed in the screw blanking port of first, second, third screw vibration feeding disc one by one, and by the screw blanking flexible pipe of first, second, third screw vibration feeding disc, screw is delivered to respectively to first, second, third screw blanking station is installed;
Be arranged on described workbench, and lay respectively at first, second, the 3rd screw blanking is installed first of station, second, the 3rd screw mounting mechanism, each screw mounting mechanism includes a dress screw mechanism be fixed on workbench and moves air cylinder support, be arranged on the dress screw mechanism that described dress screw mechanism moves on air cylinder support and move cylinder, be arranged on the turn of the screw air cylinder support on the push rod that described dress screw mechanism moves cylinder, be arranged on the turn of the screw cylinder on described the turn of the screw air cylinder support, screw detent mechanism and be arranged on the electric screw driver on the push rod of the turn of the screw cylinder, the cutter of each electric screw driver is criticized and is extended in the screw detent mechanism corresponding with it, be provided with screw import and the outlet of screw location on each screw detent mechanism, each screw import and corresponding with it first, second, the screw blanking flexible pipe of the 3rd screw vibration feeding disc connects,
Be arranged on described workbench, and be positioned at described finished product and send the finished product of the arrival end of track and send cylinder, described finished product is sent cylinder and will be entered the finished product that finished product sends in track and send.
The utility model can realize that the double-pole pencil sharpener assembles automatically, and efficiency is high, per minutely at least can assemble 45 double-pole pencil sharpeners, has filled up the technological deficiency of not assembling the double-pole pencil sharpener at present.
The accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, below will the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described, apparently, accompanying drawing in the following describes is only embodiment more of the present utility model, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is structural representation of the present utility model.
The top view that Fig. 2 is Fig. 1.
Fig. 3 is the left view of Fig. 1.
Fig. 4 is the assembling schematic diagram between the utility model screw mounting mechanism, blade material collecting tank, blade propelling movement cylinder, blade positioning cylinder.
Fig. 5 is that the utility model blade pushes the assembling schematic diagram between cylinder and blade material collecting tank.
The structural representation that Fig. 6 is the utility model screw vibration feeding disc and screw mounting mechanism.
The specific embodiment
For technological means, creation characteristic that the utility model is realized, reach purpose and effect is easy to understand, below in conjunction with concrete diagram, further set forth the utility model.
Referring to shown in Fig. 1 to Fig. 6, the double-pole pencil sharpener mounting equipment shown in figure, comprise workbench 120 and a cutter shell feeding vibration disk 200 supported by device framework 110.
The cutter shell moving track 121 and the finished product that on workbench 120, are equipped with are each other in the same way sent track 122, the port of export vertical butt joint of the arrival end of cutter shell moving track 121 and cutter shell feeding slideway 210, the port of export of cutter shell moving track 121 is sent track 122 arrival ends with finished product and is docked.The arrival end of cutter shell feeding slideway 210 is connected to cutter shell feeding vibration disk 200 exit positions, and cutter shell feeding vibration disk 200 just can be sent into cutter shell moving track 121 by cutter shell feeding slideway 210 one by one by the cutter shell like this.
Cutter shell moving track 121 is divided into cutter shell feed station 121a, the first blade blanking station 121b, the first screw blanking installation station 121c, the second blade blanking station 121d, the second screw blanking installation station 121e, the 3rd screw blanking installation station 121f by arrival end successively to port of export direction.
One cutter shell is installed on workbench 120 and moves cylinder 310, the cutter shell moves cylinder 310 and is positioned at cutter shell moving track 121 arrival ends; Move at the cutter shell on the push rod of cylinder 310 the first cutter shell limiting cylinder 320a and the second cutter shell limiting cylinder 320b that is parallel to each other and is arranged side by side is installed, on the push rod of the first cutter shell limiting cylinder 320a and the second cutter shell limiting cylinder 320b, be provided with cutter shell limiting plate 330.
The length of cutter shell limiting plate 330 equals cutter shell feed station 121a substantially, the first blade blanking station 121b, the first screw blanking is installed station 121c, the second blade blanking station 121d, the second screw blanking is installed station 121e, five length sums, cutter shell limiting plate 330 moves at the cutter shell under the driving of cylinder 310 at cutter shell feed station 121a like this, the first blade blanking station 121b, the first screw blanking is installed station 121c, the second blade blanking station 121d, the second screw blanking is installed station 121e, the 3rd screw blanking is installed between station 121f and is moved back and forth.Be arranged at intervals with six cutter shell holding tanks 331,332,333,334,335,336 on cutter shell limiting plate 330.
When assembling starts, cutter shell holding tank 331, 332 are in cutter shell feed station 121a, and cutter shell holding tank 333, 334, 335, 336 successively facing to the first blade blanking station 121b, the first screw blanking is installed station 121c, the second blade blanking station 121d, the second screw blanking is installed station 121e, at this moment the push rod of cutter shell limiting cylinder 320 stretches out, cutter shell holding tank 331 will be sent into first cutter shell in cutter shell moving track 121 by cutter shell feeding slideway 210 and can block, the push rod that then the cutter shell moves cylinder 310 pushes forward a position, make first cutter shell move forward a position along cutter shell moving track 121, then the push rod of the first cutter shell limiting cylinder 320a and the second cutter shell limiting cylinder 320b bounces back, cutter shell holding tank 331 exits first cutter shell, then the cutter shell moves the push rod retraction of cylinder 310, make cutter shell limiting plate 330 get back to original position, then the push rod of the first cutter shell limiting cylinder 320a and the second cutter shell limiting cylinder 320b stretches out again, cutter shell holding tank 331 will be sent into interior second the cutter shell of cutter shell moving track 121 by cutter shell feeding slideway 210 and can block, cutter shell holding tank 332 blocks first cutter shell in cutter shell moving track 121, the push rod that then the cutter shell moves cylinder 310 pushes forward again a position, make first cutter shell move again forward a position along cutter shell moving track 121, second cutter shell moves forward to along cutter shell moving track 121 position that original first cutter shell occupies, then the push rod of the first cutter shell limiting cylinder 320a and the second cutter shell limiting cylinder 320b bounces back again, cutter shell holding tank 332 exits first cutter shell, cutter shell holding tank 331 exits second cutter shell, and then the cutter shell moves the push rod retraction of cylinder 310, makes cutter shell limiting plate 330 get back to original position.Then the push rod of the first cutter shell limiting cylinder 320a and the second cutter shell limiting cylinder 320b stretches out again, cutter shell holding tank 331 will be sent into the 3rd cutter shell in cutter shell moving track 121 by cutter shell feeding slideway 210 and can block, cutter shell holding tank 332 blocks interior second the cutter shell of cutter shell moving track 121, cutter shell holding tank 333 blocks first cutter shell in cutter shell moving track 121, the push rod that then the cutter shell moves cylinder 310 pushes forward again a position, make first cutter shell move forward to the first blade blanking station 121b along cutter shell moving track 121, second cutter shell moves forward to along cutter shell moving track 121 position that original first cutter shell occupies, the 3rd cutter shell moves forward to original second position that the cutter shell occupies along cutter shell moving track 121, move the combination action of cylinder 310 and the first cutter shell limiting cylinder 320a and the second cutter shell limiting cylinder 320b by above-mentioned cutter shell and just can will be sent into the 4th in cutter shell moving track 121 by cutter shell feeding slideway 210, the 5th, the 6th ... the cutter shell is transported to forward the first blade blanking station 121b one by one successively, the first screw blanking is installed station 121c, the second blade blanking station 121d, the second screw blanking is installed station 121e, the 3rd screw blanking is installed station 11f, and the finished product assembled is sent into to finished product and send track 122.
On workbench 120, lay respectively at the first blade blanking station 121b mono-side of cutter shell moving track 121, the position of the second blade blanking station 121d mono-side is equipped with the first blade material collecting tank 410a and the second blade material collecting tank 410b, manually blade is piled up in the first blade material collecting tank 410a and the second blade material collecting tank 410b, blade can fall vertically downward gradually along the first blade material collecting tank 410a and the second blade material collecting tank 410b.Be provided with corresponding with the first blade blanking station 121b, the second blade blanking station 121d respectively blade outlet (not shown) in the bottom of the first blade material collecting tank 410a and the second blade material collecting tank 410b.
On workbench 120, lay respectively on the position of opposite side of the first blade blanking station 121b, the second blade blanking station and be equipped with that the first blade pushes cylinder 420a and the second blade pushes cylinder 420b, the first blade pushes cylinder 420a and the every reciprocating motion of the second blade propelling movement cylinder 420b once just can be released a slice blade from the blade outlet of the first blade material collecting tank 410a and the second blade material collecting tank 410b, and the blade of release is released respectively on the cutter shell of delivering to the first blade blanking station 121b, the second blade blanking station 121d;
The first, second, third screw vibration feeding disc 610a, 610b, the 610c that on workbench 120, along cutter shell moving track 121 bearing of trends, install side by side, be respectively arranged with screw in the exit of first, second, third screw vibration feeding disc 610a, 610b, 610c and move cylinder 620a, 620b, 620c and screw blanking port 630a, 630b, 630c, be connected to respectively a screw blanking flexible pipe 640a, 640b, 640c on first, second, third screw blanking port 630a, 630b, 630c; Screw moves the screw that cylinder 620a, 620b, the every action of 620c once just can export out by first, second, third screw vibration feeding disc 610a, 610b, 610c respectively and is pushed in screw blanking port 630a, 630b, 630c like this, and delivers to respectively the first screw blanking by screw blanking flexible pipe 640a, 640b, 640c and install that station 121c, the second screw blanking install station 121e, the 3rd screw blanking is installed station 121f.
On workbench 120, lay respectively at that first, second, third screw blanking is installed station 121c, 121e, the 121f position is equipped with first, second, third screw mounting mechanism 700a, 700b, 700c.Each screw mounting mechanism includes a dress screw mechanism be fixed on workbench 120 and moves air cylinder support 710, be arranged on the dress screw mechanism that moves on air cylinder support 710 of dress screw mechanism and move cylinder 720, be arranged on the dress screw mechanism and move the turn of the screw air cylinder support 730 on the push rod of cylinder 720, be arranged on the turn of the screw cylinder 740 on the turn of the screw air cylinder support 730, screw detent mechanism 750, be arranged on the electric screw driver 760 on the push rod of the turn of the screw cylinder 740, the cutter of each electric screw driver 760 is criticized and is extended in the screw detent mechanism 750 corresponding with it, be provided with screw import 751 and screw location outlet 752 on each screw detent mechanism 750, each screw import 752 and corresponding with it first, second, the 3rd screw vibration feeding disc 610a, 610b, the screw blanking flexible pipe 640a of 610c, 640b, 640c connects.By screw blanking flexible pipe 640a, 640b, the screw one by one that 640c brings can enter into screw detent mechanism 750 by screw import 752, when a screw blanking is wherein installed in station while having a cutter shell that blade is housed, the dress screw mechanism moves a position of push rod decline of cylinder 720, the push rod that the dress screw mechanism moves cylinder 720 drives the turn of the screw cylinder 740 and the synchronous position that descends of screw detent mechanism 750 by the turn of the screw air cylinder support 730, at this moment screw detent mechanism 750 drops to the cutter shell top that blade is housed, 740 actions of the cylinder of the turn of the screw simultaneously, drive electric screw driver 760 to descend simultaneously, electric screw driver 760 impact that is stressed, automatically start, a screw in screw detent mechanism 750 is sent by screw import 751, and be screwed in the screw hole on the cutter shell, blade is fixed on the cutter shell.
At the back side of workbench 120, corresponding to the first screw blanking station 121c is installed, the second screw blanking is installed station 121e position and is separately installed with the first blade positioning cylinder 510a, the second blade positioning cylinder 510b, is separately installed with the first blade phase magnet 520a and the second blade phase magnet 520b on the push rod of the first blade positioning cylinder 510a, the second blade positioning cylinder 510b.Before the dress screw, when the first blade positioning cylinder 510a, the second blade positioning cylinder 510b stretch out, its push rod will promote the first blade phase magnet 520a and the second blade phase magnet 520b bottom surface close to the cutter shell, attract blade to be positioned in the cutter groove of cutter shell.
After screw installs, the dress screw mechanism moves the push rod of cylinder 720 and gets back to original position wait action next time, and the push rod of the cylinder of the turn of the screw simultaneously 740 also bounces back and gets back to original position wait action next time, and electric screw driver 760 quits work.At this moment the push rod of blade positioning cylinder 510 is got back to original position, and the first blade phase magnet 520a and the second blade phase magnet 520b, away from the cutter shell, lose the blade attraction.
On workbench 120, be positioned at finished product and send the arrival end of track 122 and a finished product is installed sends cylinder 810, this finished product is sent cylinder 810 and will be entered the finished products that finished product sends in track 122 and send.
Above demonstration and described basic principle of the present utility model and principal character and advantage of the present utility model.The technical staff of the industry should understand; the utility model is not restricted to the described embodiments; that in above-described embodiment and specification, describes just illustrates principle of the present utility model; under the prerequisite that does not break away from the utility model spirit and scope; the utility model also has various changes and modifications, and these changes and improvements all fall in claimed the utility model scope.The claimed scope of the utility model is defined by appending claims and equivalent thereof.
Claims (1)
1. double-pole pencil sharpener mounting equipment comprises:
One workbench supported by device framework;
One cutter shell feeding vibration disk;
It is characterized in that, also comprise:
Be arranged on the cutter shell moving track on described workbench, described cutter shell feeding vibration disk docks with the arrival end of described cutter shell moving track by a cutter shell feeding slideway; Described cutter shell moving track is divided into cutter shell feed station, the first blade blanking station, the first screw blanking installation station, the second blade blanking station, the second screw blanking installation station, the 3rd screw blanking installation station by arrival end successively to port of export direction;
The finished product be arranged on described workbench is sent track, and the arrival end that described finished product is sent track docks with the port of export of described cutter shell moving track;
The cutter shell that is arranged on described workbench and is positioned at described cutter shell moving track arrival end moves cylinder;
Be arranged on the first cutter shell limiting cylinder and the second cutter shell limiting cylinder on the push rod that described cutter shell moves cylinder, be provided with cutter shell limiting plate on the push rod of described the first cutter shell limiting cylinder and the second cutter shell limiting cylinder, be arranged at intervals with some cutter shell holding tanks on described cutter shell limiting plate, cutter shell holding tank on described cutter shell limiting plate is accepted the cutter shell of being brought by cutter shell feeding slideway and accepted cutter shell is moved under cylinder action and is transported to successively forward the first blade blanking station along cutter shell moving track at described cutter shell in cutter shell feed station, the first screw blanking is installed station, the second blade blanking station, the second screw blanking is installed station, the 3rd screw blanking is installed station, and the finished product assembled is sent into to finished product and send track,
Be arranged on described workbench, and lay respectively at the first blade blanking station one side of described cutter shell moving track, the first blade material collecting tank and the second blade material collecting tank of the second blade blanking station one side; Be respectively arranged with first blade outlet and the second blade outlet corresponding with described the first blade blanking station, the second blade blanking station in the bottom of described the first blade material collecting tank and the second blade material collecting tank;
Be arranged on described workbench, and the first blade that lays respectively at the first blade blanking station, the second blade blanking station opposite side pushes cylinder and the second blade pushes cylinder, described the first blade pushes cylinder and the second blade propelling movement cylinder is released the blade in the first blade material collecting tank and the second blade material collecting tank to deliver to the first blade blanking station, the second blade blanking station by the first blade outlet and the outlet of the second blade respectively, and falls on the cutter shell that enters the first blade blanking station, the second blade blanking station;
Be arranged on the back side of described workbench, and lay respectively at the first blade positioning cylinder, the second blade positioning cylinder that the first screw blanking is installed station, the second screw blanking installation station, be separately installed with the first blade phase magnet and the second blade phase magnet on the push rod of described the first blade positioning cylinder, the second blade positioning cylinder, described the first blade phase magnet and the second blade phase magnet are had good positioning blade on the cutter shell;
Be arranged on first, second, third screw vibration feeding disc on described workbench and that be arranged side by side along described cutter shell moving track bearing of trend, be provided with screw in the exit of first, second, third screw vibration feeding disc and move cylinder and screw blanking port, all be connected to a screw blanking flexible pipe on first, second, third screw blanking port; The screw of described first, second, third screw vibration feeding disc moves cylinder and respectively the screw of first, second, third screw vibration feeding disc outlet is pushed in the screw blanking port of first, second, third screw vibration feeding disc one by one, and by the screw blanking flexible pipe of first, second, third screw vibration feeding disc, screw is delivered to respectively to first, second, third screw blanking station is installed;
Be arranged on described workbench, and lay respectively at first, second, the 3rd screw blanking is installed first of station, second, the 3rd screw mounting mechanism, each screw mounting mechanism includes a dress screw mechanism be fixed on workbench and moves air cylinder support, be arranged on the dress screw mechanism that described dress screw mechanism moves on air cylinder support and move cylinder, be arranged on the turn of the screw air cylinder support on the push rod that described dress screw mechanism moves cylinder, be arranged on the turn of the screw cylinder on described the turn of the screw air cylinder support, screw detent mechanism and be arranged on the electric screw driver on the push rod of the turn of the screw cylinder, the cutter of each electric screw driver is criticized and is extended in the screw detent mechanism corresponding with it, be provided with screw import and the outlet of screw location on each screw detent mechanism, each screw import and corresponding with it first, second, the screw blanking flexible pipe of the 3rd screw vibration feeding disc connects,
Be arranged on described workbench, and be positioned at described finished product and send the finished product of the arrival end of track and send cylinder, described finished product is sent cylinder and will be entered the finished product that finished product sends in track and send.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320471842.6U CN203380596U (en) | 2013-08-02 | 2013-08-02 | Double-blade pencil sharpener assembling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320471842.6U CN203380596U (en) | 2013-08-02 | 2013-08-02 | Double-blade pencil sharpener assembling device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203380596U true CN203380596U (en) | 2014-01-08 |
Family
ID=49869122
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320471842.6U Expired - Fee Related CN203380596U (en) | 2013-08-02 | 2013-08-02 | Double-blade pencil sharpener assembling device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203380596U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104162779A (en) * | 2014-07-25 | 2014-11-26 | 浙江爱易特智能技术有限公司 | Fully-automatic pencil sharpener assembly machine |
CN108058013A (en) * | 2017-12-16 | 2018-05-22 | 无锡昌至盛机械制造有限公司 | A kind of feedway of pencil sharpener blade |
CN115464364A (en) * | 2022-10-31 | 2022-12-13 | 常州三协电机股份有限公司 | Automatic assembling equipment for stepping motor |
-
2013
- 2013-08-02 CN CN201320471842.6U patent/CN203380596U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104162779A (en) * | 2014-07-25 | 2014-11-26 | 浙江爱易特智能技术有限公司 | Fully-automatic pencil sharpener assembly machine |
CN104162779B (en) * | 2014-07-25 | 2016-04-13 | 浙江爱易特智能技术有限公司 | Full-automatic pencil sharpener assembly machine |
CN108058013A (en) * | 2017-12-16 | 2018-05-22 | 无锡昌至盛机械制造有限公司 | A kind of feedway of pencil sharpener blade |
CN115464364A (en) * | 2022-10-31 | 2022-12-13 | 常州三协电机股份有限公司 | Automatic assembling equipment for stepping motor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202539920U (en) | Single-core pencil sharpener assembling equipment | |
CN101764250B (en) | Automatic rubberizing equipment of battery | |
CN203409499U (en) | Water meter mounting equipment | |
CN203380596U (en) | Double-blade pencil sharpener assembling device | |
CN103264275A (en) | Automatic assembling device for universal casters | |
CN103878584B (en) | The PTC heat generating core Automated assembly device of heater | |
CN106553036B (en) | Full-automatic steel disc make-up machine | |
CN201587043U (en) | Stone cutter | |
CN103878585B (en) | The PTC heat generating core automatic assembling apparatus of heater | |
CN203238480U (en) | Curtain cutting machine | |
CN103879828B (en) | The insulation film band hitch structure of PTC heat generating core automatic assembling apparatus | |
CN203779095U (en) | Automatic assembly device for PTC heating core of heater | |
CN208020311U (en) | The semi-automatic waste discharge apparatus of paper drop | |
CN207861406U (en) | Cpu fan pedestal automatic feeding system | |
CN202668621U (en) | Cutting device | |
CN205394636U (en) | ACFLLLW cutting device | |
CN103878586A (en) | Electrode slice supplying mechanism for automatic PTC heating core assembling machine | |
CN105013663B (en) | Point gum machine | |
CN108147070A (en) | The draw point collator installed on coronule | |
CN205237172U (en) | Automatic guillootine with iron sheet cuts function | |
CN204341470U (en) | The pressing of a kind of super sonic automatic ultrasonic, pad pasting, film cutting apparatus | |
CN103878559B (en) | The PTC heat generating core automatic assembling apparatus of heater send band structure | |
CN207668362U (en) | A kind of steel disc autoloader | |
CN206425885U (en) | One kind saw material feeding clamping device | |
CN207643209U (en) | A kind of casting films cutting edge material apparatus for crushing and treating |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140108 Termination date: 20150802 |
|
EXPY | Termination of patent right or utility model |