CN203373771U - Split tower crane foundation transforming steel bearing platform - Google Patents

Split tower crane foundation transforming steel bearing platform Download PDF

Info

Publication number
CN203373771U
CN203373771U CN201320448617.0U CN201320448617U CN203373771U CN 203373771 U CN203373771 U CN 203373771U CN 201320448617 U CN201320448617 U CN 201320448617U CN 203373771 U CN203373771 U CN 203373771U
Authority
CN
China
Prior art keywords
tower crane
extension pipe
pile extension
cushion cap
bearing platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320448617.0U
Other languages
Chinese (zh)
Inventor
丁伯生
董善勤
李明
秦鼎
邵仕明
潘长根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HAITONG CONSTRUCTION GROUP Co Ltd
Original Assignee
HAITONG CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HAITONG CONSTRUCTION GROUP Co Ltd filed Critical HAITONG CONSTRUCTION GROUP Co Ltd
Priority to CN201320448617.0U priority Critical patent/CN203373771U/en
Application granted granted Critical
Publication of CN203373771U publication Critical patent/CN203373771U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a split tower crane foundation transforming steel bearing platform which comprises a body, main supporting rods fixed on the body and connected with a tower crane body and pile splicing pipes fixed on the body and connected with latticed columns. The body is of a hollow structure in a shape of a Chinese character 'hui', and the Chinese character 'hui' shaped structure is halved into two symmetrical portions. The two portions can form the whole steel bearing platform after being connected through a flange plate and a bolt pair. By using the split tower crane foundation transforming steel bearing platform, the steel bearing platform body, a foundation and the tower crane body can be conveniently assembled and disassembled. In addition, the steel bearing platform body can be halved into two portions, so that hoisting, transportation and storage of the steel bearing platform are convenient, and manpower and material resources are saved.

Description

Split type tower crane conversion steel cushion cap
Technical field
The utility model relates to a kind of building machinery, especially a kind of tower crane conversion steel cushion cap, a kind of split type tower crane conversion steel cushion cap specifically.
Background technology
At present, when tower crane is installed, is mostly first the basis of tower crane conversion steel cushion cap to be installed on the concrete lattice column of castable, and then the tower crane tower body is installed on basis conversion steel cushion cap.The basis conversion steel cushion cap of current use is all integral type, bulky and heavy, all very inconvenient when installing, dismantle, transporting and storing.
Summary of the invention
The purpose of this utility model is to provide a kind of tower crane conversion steel cushion cap that can split, and has solved the problem that integral type basis conversion steel cushion cap is not easy to installation, dismounting, transportation and stores in the past.
The technical solution of the utility model is a kind of split type tower crane conversion steel cushion cap, comprise body, be fixed on body and the main zeugopodium be connected with the tower crane tower body be fixed on body on and the pile extension pipe that is connected with the lattice column of stake.Wherein, body is three-back-shaped hollow structure, formed by peripheral board, interior coaming plate, panel and base plate, and be separated into symmetrical two parts from three-back-shaped centre, these two parts by flanged plate with can form a complete basis conversion steel cushion cap after bolt pair is connected.
Above-mentioned main zeugopodium is four, and the junction of every main zeugopodium and panel is welded with at least one main zeugopodium floor, and is equipped with bolt sleeve on every main zeugopodium, in order to connect main zeugopodium and tower crane tower body by bolt pair.
Described pile extension Guan Weisi root, be equipped with flange on the connecting end surface of every pile extension pipe, can with lattice column, be connected by bolt pair.The junction of every pile extension pipe and base plate all is welded with at least one pile extension pipe floor.
Also comprise some contact floors and deep floor in described body.Above-mentioned main zeugopodium and pile extension Guan Jun penetrate in body.The two ends of described contact floor are welded on respectively on adjacent pile extension pipe and main zeugopodium.The two ends of described deep floor are welded on respectively on pile extension pipe and interior coaming plate.
The beneficial effects of the utility model: the utility model is rational in infrastructure, easy accessibility, only need remove bolt pair on the flange at steel cushion cap body two parts connecting end surface place, the steel cushion cap just can be decomposed into the member of two symmetries, be convenient to lifting, transportation and storage, thereby save a large amount of man power and materials.
The accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is top view of the present utility model.
Fig. 3 is upward view of the present utility model.
Fig. 4 is that A-A is to sectional view.
Fig. 5 is that B-B is to sectional view.
The specific embodiment
Below in conjunction with drawings and Examples, the utility model is further described.
As shown in Figure 1, the utility model comprises body 18, and is welded with respectively the main zeugopodium 4 that is connected tower crane tower body main body and the pile extension pipe 10 that is connected lattice column with below above it.Main zeugopodium 4 and pile extension pipe 10 respectively have four.Be equipped with bolt sleeve 5 on every main zeugopodium 4, can connect main zeugopodium 4 and tower crane tower body 17 by bolt pair.Be provided with a main zeugopodium stiffener 12 in every main zeugopodium 4, be provided with a main zeugopodium floor 3 on every side, be welded on the junction of main zeugopodium and panel in the mode perpendicular to panel, to strengthen the intensity of main zeugopodium 4.On the joint face of every pile extension pipe 10 and corresponding lattice column 16, be equipped with flange 9, can connect pile extension pipe 10 and lattice column 16 by bolt pair.Be provided with four pile extension pipe floors 8 around every pile extension pipe 10, be welded on the junction of pile extension pipe and base plate with the direction of vertical base plate, to strengthen the intensity of pile extension pipe 10.
As shown in Fig. 2 to Fig. 5, steel cushion cap body 18 is three-back-shaped hollow structures, peripheral board 1, interior coaming plate 14, panel 2 and base plate 11, consists of.Body 18 is separated into the part of two symmetries from three-back-shaped centre.These two parts can be connected as a whole with bolt pair 7 by flanged plate 6.Above-mentioned main zeugopodium 4 and pile extension pipe 10 all penetrate steel cushion cap body 18, and also are provided with four contact floors 13 and eight deep floors 15 in body 18.Wherein the two ends of every contact floor 13 are welded on respectively on adjacent main zeugopodium 4 and pile extension pipe 10.The two ends of every deep floor are welded on respectively on pile extension pipe 10 and interior coaming plate 14.All deep floor is symmetrical in twos.
When needs dismountings tower crane, by removing the connecting bolt pair between main zeugopodium 4 and body of tower hoist 17 on this steel cushion cap body 18, body of tower hoist 17 is removed.Simultaneously, can, by removing the bolt pair on pile extension pipe 10 and 16 flange 9 of lattice column, body 18 and lattice column 16 be broken away from.Then, by the bolt pair on the flanged plate 6 between two parts of removing body 18, two parts of this steel cushion cap body 18 are separated, thereby make lifting, transportation and the storage etc. of steel cushion cap more convenient.
The utility model does not relate to partly all prior aries that maybe can adopt same as the prior art to be realized.

Claims (6)

1. a split type tower crane is changed the steel cushion cap, include body (18), be fixed on the upper and main zeugopodium (4) that is connected with body of tower hoist of body (18), be fixed on the pile extension pipe (10) that body (18) is gone up and is connected with lattice column, it is characterized in that described body (18) is Back Word type hollow structure, formed by peripheral board (1), interior coaming plate (14), panel (2) and base plate (11), and be divided into symmetrical two parts from three-back-shaped centre.
2. split type tower crane conversion steel cushion cap according to claim 1, is characterized in that being respectively equipped with flanged plate (6) on the connecting end surface of two parts of body (18), can couple together by bolt pair (7).
3. split type tower crane conversion steel cushion cap according to claim 1, is characterized in that at described main zeugopodium (4) be four, and every main zeugopodium (4) all is welded with at least one main zeugopodium floor (3) with the junction of panel (2).
4. according to the described split type tower crane conversion steel cushion cap of claim 1 or 3, it is characterized in that being equipped with bolt sleeve (5) on described every main zeugopodium (4), and be connected with the tower body of tower crane by bolt pair (7).
5. split type tower crane conversion steel cushion cap according to claim 1, is characterized in that described pile extension pipe (10) is four; Be equipped with flange (9) on the connecting end surface of every pile extension pipe (10), can be connected with the lattice column (16) of stake by bolt pair; Every pile extension pipe (10) all is welded with at least one pile extension pipe floor (8) with the junction of base plate (11).
6. split type tower crane conversion steel cushion cap according to claim 1, is characterized in that in body (18) also comprising some contact floors (13) and deep floor (15); Above-mentioned main zeugopodium (4) and pile extension pipe (10) all penetrate in body (18); The two ends of described contact floor (13) are welded on respectively on adjacent pile extension pipe (10) and main zeugopodium (4); The two ends of described deep floor (15) are welded on respectively on pile extension pipe (10) and interior coaming plate (14).
CN201320448617.0U 2013-07-26 2013-07-26 Split tower crane foundation transforming steel bearing platform Expired - Lifetime CN203373771U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320448617.0U CN203373771U (en) 2013-07-26 2013-07-26 Split tower crane foundation transforming steel bearing platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320448617.0U CN203373771U (en) 2013-07-26 2013-07-26 Split tower crane foundation transforming steel bearing platform

Publications (1)

Publication Number Publication Date
CN203373771U true CN203373771U (en) 2014-01-01

Family

ID=49836316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320448617.0U Expired - Lifetime CN203373771U (en) 2013-07-26 2013-07-26 Split tower crane foundation transforming steel bearing platform

Country Status (1)

Country Link
CN (1) CN203373771U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109750687A (en) * 2019-01-27 2019-05-14 浙江大学城市学院 The steel construction tower crane foundation platform of adjustable dimension
CN109930623A (en) * 2017-12-19 2019-06-25 广东庞源工程机械有限公司 A kind of foundation for tower crane transformational structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109930623A (en) * 2017-12-19 2019-06-25 广东庞源工程机械有限公司 A kind of foundation for tower crane transformational structure
CN109750687A (en) * 2019-01-27 2019-05-14 浙江大学城市学院 The steel construction tower crane foundation platform of adjustable dimension

Similar Documents

Publication Publication Date Title
CN109184189B (en) Construction method for conical shell silo top structure of large-diameter silo
CN103243961B (en) Titanium plate steel inner tank reversed construction device for chimney of thermal power station
CN201999656U (en) Detachable combined tower crane base
CN203373771U (en) Split tower crane foundation transforming steel bearing platform
CN203247868U (en) Large-span steel structure construction temporary supporting frame
CN204163095U (en) A kind of foundation structure of building and combined member thereof
CN202785387U (en) Indoor cantilever crane
CN203878563U (en) Suspended single-row scaffold
CN202466841U (en) Through type connection node for connecting steel tube column and steel beam partition plate
CN201198659Y (en) Formwork support system of prilling tower hanging structure
CN203666706U (en) Simple two-wheel lever transportation tool
CN103981881B (en) A kind of foundation structure of building and construction method thereof
CN204456164U (en) A kind of spliced pedestal of communication tower
CN203096729U (en) Storage tank pile cap assembling type pouring platform
CN204282920U (en) A kind of communication tower being furnished with spliced pedestal
CN202611250U (en) Concreting platform for concrete filled steel tube column
CN202359826U (en) Structure for fixing stiff steel columns temporarily
CN204039923U (en) For the assembled lifting gear of steel cofferdam coxopodite in deep-water bridge foundation construction
CN203174494U (en) Space radioactive concrete-filled steel tube pier of bridge
CN204212274U (en) A kind of building frame construction
CN201857234U (en) Simple lifting device
CN202000494U (en) Spliced enhancing structure for steel structure
CN213233138U (en) Jacking operation platform
CN209835356U (en) Aerial conversion platform of construction elevator
CN203213121U (en) Steel support structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20140101

CX01 Expiry of patent term