CN203347053U - Retaining wall used for planting greenhouse - Google Patents
Retaining wall used for planting greenhouse Download PDFInfo
- Publication number
- CN203347053U CN203347053U CN2013204006239U CN201320400623U CN203347053U CN 203347053 U CN203347053 U CN 203347053U CN 2013204006239 U CN2013204006239 U CN 2013204006239U CN 201320400623 U CN201320400623 U CN 201320400623U CN 203347053 U CN203347053 U CN 203347053U
- Authority
- CN
- China
- Prior art keywords
- wall plate
- plate
- vertical wall
- interior wall
- embedded part
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/24—Structural elements or technologies for improving thermal insulation
- Y02A30/244—Structural elements or technologies for improving thermal insulation using natural or recycled building materials, e.g. straw, wool, clay or used tires
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
The utility model relates to a retaining wall used for a planting greenhouse. The retaining wall comprises an inner vertical wall plate, an outer vertical wall plate, a cover plate covering the top parts of both the inner vertical wall plate and the outer vertical wall plate, and thermal insulation soil filled between the inner vertical wall plate and the outer vertical wall plate, wherein the inner vertical wall plate, the outer vertical wall plate and the cover plate are made of multiple SP pre-stress hollow plates, and the SP pre-stress hollow plates in the inner vertical wall plate and the outer vertical wall plate are installed vertically; a group of first bolting embedded parts are welded at the outer side surfaces of the top ends of both the inner vertical wall plate and the outer vertical wall plate, a group of second bolting embedded parts is arranged at two ends of the bottom of the cover plate respectively, and the first bolting embedded parts and the second bolting embedded parts are connected through angle steel connecting members. With the adoption of the vertically installed SP pre-stress hollow plates, the retaining wall used for the planting greenhouse leaves out steel posts or concrete vertical posts, saves steels, can play the function of the anti-bending intensity of the SP pre-stress hollow plate fully, enables the construction of the retaining wall of the greenhouse to become an assembling work, reduces influence from the construction to the environment, and enables the construction to be faster.
Description
Technical field
The utility model relates to plantation brooder technical field of buildings, particularly relates to a kind of for planting the barricade of brooder.
Background technology
The plantation brooder will effectively utilize the energy at sunshine, makes it temperature of shed and improves, and when in canopy, the axis span is 10 meters, its planting site identity distance brooder pushes up rise from 4 meters left and right.For making in canopy to keep the required temperature of plant growth and height, its barricade thickness to be typically chosen in 0.8 to 1.8 meter and apart between ground level 2.0-3.0, play thermal insulation and heat accumulation function.
The rear barricade of the plantation brooder of current domestic application, most of exterior wall is used brick middle backfill tamper indigenous method.Affect because external wall is subject to backfill pressure and substrate normal reaction, cause the body of wall bending resistance to lose efficacy, produce the body of wall unstability and collapse, barricade easily subsides in chance immersion in rainy season.The domestic way of also advocating to use the horizontal dress side fascia of prestressed slab, because horizontal dress wallboard need connect with steel column or concrete column, execute native Partial Jobs operation more, fails well to bring into play the effect that prestressed slab can replace the part column.In addition, carry out the wet trade on concrete (basis) on plantation ground, produce construction works rubbish, affect the planting soil geological measuring.For this reason, can design a kind of riser assembling kind of canopy barricade, than good utilisation SP prestressed cored slab characteristic, reach above-mentioned requirements.
The utility model content
Technical problem to be solved in the utility model is to provide a kind of for planting the barricade of brooder, the problems such as the prior art wall-retaining structure is safe not for solving, construction complexity, contaminated environment.
The technical scheme that the utility model solves the problems of the technologies described above is as follows: a kind of for planting the barricade of brooder, comprise interior wall plate, outer wall plate, cover the cover plate at interior wall plate and outer wall plate top and be filled in interior wall plate and outer wall plate between heat-preservation;
Described interior wall plate, outer wall plate and cover plate all adopt some SP prestressed cored slabs to make, and the SP prestressed cored slab in described interior wall plate and described outer wall plate all adopts vertical installation;
The top lateral surface of described interior wall plate and described outer wall plate all has one group of first bolt embedded part, the two ends of described cover plate bottom respectively are provided with one group of second bolt embedded part, and the first bolt embedded part on described interior wall plate and described outer wall plate connects part by angle steel respectively and one group of second bolt embedded part carries out bolt.The first bolt embedded part connects part by angle steel respectively and one group of second bolt embedded part carries out bolt, the connection of wall plate, outer wall plate and cover plate in realizing.
The beneficial effects of the utility model are: select vertical SP prestressed cored slab that the interior exterior wall in barricade is installed, the centre mode of banketing, can reach the purpose of thermal insulation, accumulation of heat, and the wall plate of design SP prestressed cored slab has saved steel column or concrete column, save steel, and give full play to the effect of SP prestressed cored slab flexural strength.Add cover plate, the requirement that has both met upper people and placed material, also reinforce wall plate level pulling force, prevents that it from tilting laterally.Simultaneously, adopt the SP prestressed cored slab with the bolt embedded part, make the brooder Retaining wall become assembling work, while reducing because of construction operation, on the impact of plantation Land Environment, and make construction more quick.
On the basis of technique scheme, the utility model can also be done following improvement.
Further, described the second bolt embedded part lower end is connected with girt, and described girt is arranged between described interior wall plate and described outer wall plate.
Adopt the beneficial effect of above-mentioned further scheme to be: to adopt the design of girt, form force system in equilibrium and meet integrally-built stability requirement, and play the effect that increases horizontal pull, contribute to the wall plate to install and the vertical requirement of adjusting.
Further, described barricade also comprises the base plate that adopts the SP prestressed cored slab to make, be provided with one group on described base plate for embedded part on the base plate of welded limiting channel-section steel and scissors supporting, described spacing channel-section steel is for fixing described interior wall plate and outer wall plate, described scissors supporting is located between interior wall plate and outer wall plate, for supporting described interior wall plate and outer wall plate.
Further, in one group of steel clamp plate installing in the plate seam of the SP prestressed cored slab that the seat of honour of described scissors supporting is connected in vertical installation, lower of described scissors supporting is connected to embedded part on described base plate.
Adopt the beneficial effect of above-mentioned further scheme to be: the application base plate, can adapt to the application of the shallow-layer wall base, than single footing depth as shallow, reduce the construction earth volume, and be convenient to mechanical execution.Simultaneously, can first on factory's band stopper slot, embedded part on base plate be set, constructability is installed the operation of centering Foundation Design.Spacing channel-section steel is conducive to inside and outside wall plate centering is installed, and restriction wall plate moves the stability of guaranteeing exterior wall and interior wall.Adopt the design of scissors supporting, contribute to form force system in equilibrium and meet integrally-built stability requirement, can prevent that front and back run-off the straight phenomenon from appearring in the barricade backfill simultaneously.
The accompanying drawing explanation
The structural representation that Fig. 1 is barricade described in the utility model;
Fig. 2 is the use view that the utility model coordinates with brooder.
In accompanying drawing, the list of parts of each label representative is as follows:
1, interior wall plate, 2, outer wall plate, 3, cover plate, 4, heat-preservation, the 5, first bolt embedded part, the 6, second bolt embedded part, 7, angle steel connects part, and 8, girt, 9, base plate, 10, spacing channel-section steel, 11, scissors supporting, 12, embedded part on base plate, 13, steel clamp plate, 14, cushion lime, 15, front barricade, 16, brooder, 17, rear barricade.
The specific embodiment
Below in conjunction with accompanying drawing, principle of the present utility model and feature are described, example, only for explaining the utility model, is not intended to limit scope of the present utility model.
As shown in Figure 1, embodiment mono-has provided a kind of for planting the barricade of brooder, comprise interior wall plate 1, outer wall plate 2, cover the cover plate 3 at interior wall plate 1 and outer wall plate 2 tops and be filled in interior wall plate 1 and outer wall plate 2 between heat-preservation 4;
Described interior wall plate 1, outer wall plate 2 and cover plate 3 all adopt some SP prestressed cored slabs to make, and the SP prestressed cored slab in described interior wall plate 1 and described outer wall plate 2 all adopts vertical installation;
The top lateral surface of described interior wall plate 1 and described outer wall plate 2 all has one group of first bolt embedded part 5, the two ends of described cover plate 3 bottoms respectively are provided with one group of second bolt embedded part 6, and the first bolt embedded part 5 on described interior wall plate 1 and described outer wall plate 2 connects part 7 by angle steel respectively and one group of second bolt embedded part 6 carries out bolt.
In addition, described the second bolt embedded part lower end is connected with girt 8, and described girt 8 is arranged between described interior wall plate 1 and described outer wall plate 2.
Described barricade also comprises the base plate 9 that adopts the SP prestressed cored slab to make, be provided with one group on described base plate 9 for embedded part 12 on the base plate of welded limiting channel-section steel 10 and scissors supporting 11, described spacing channel-section steel 10 is for fixing described interior wall plate 1 and outer wall plate 2, described scissors supporting 11 is located between interior wall plate 1 and outer wall plate 2, for supporting described interior wall plate 1 and outer wall plate 2.In one group of steel clamp plate 13 installing in the plate seam of the SP prestressed cored slab that the seat of honour of described scissors supporting 11 is connected in vertical installation, lower of described scissors supporting 11 is connected to embedded part 12 on described base plate, and described base plate is placed on cushion lime 14.
Wall-retaining structure based on above-mentioned, the example by a reality builds approximately 2.8 meters high barricades, and its concrete implementation step is as follows:
(1) slab foundation
Levelling after the compacting of barricade cushion lime, can highly set level base plate in distance ground-0.320 meter.Base plate adopts the SP12 plate to make, embedded part welded limiting channel-section steel on factory process is placed.
(2) wall plate and girt
This is the key component of the present embodiment, and inside and outside wall plate is also to make of the SP prestressed cored slab with the bolt embedded part, is about to the vertical installation of SP prestressed cored slab.After lifting wall plate is in place, with the bearing diagonal with balancing weight, connect the wall plate.After lifting opposite side wall plate, then connect and adjust the installation verticality of wall plate with girt.
Prefabricated two bolt embedded parts in the upper end of wall plate, factory is by bolt embedded part button anchoring steel strand (SP prestressed cored slab master muscle).The wall plate is being lowered to seat board channel-section steel location, upper part water horizontal drawing bar bolt connects.
(3) scissors supporting
For preventing that phenomenon from appearring tilting forward and back in rear barricade backfill, approximately after 6 meters spacings, at the plate seam, 1 group of steel clamp plate is being installed at interval of 5 risers, between base plate and wall plate, with the scissors supporting, be connected.
(4) cover plate
Cover plate need go up the people and stack heat insulating material formed, therefore also make of the SP12 plate.Still place one group of bolt embedded part at the bottom of plate, and be connected with the wall plate by angle steel.Form square bearer with the cross section of wall plate and base plate after the cover plate bolt.Simultaneously, because banketing, cause wall plate horizontal force laterally larger, cover plate also plays the effect of enhanced level pulling force.
As shown in Figure 2, embodiment bis-is that the wall-retaining structure that embodiment mono-is proposed is applied in plantation brooder system, and this system comprises front barricade 15, brooder 16 and rear barricade 17, and the wall-retaining structure that adopts embodiment mono-to construct is as the rear barricade of this system.
The foregoing is only preferred embodiment of the present utility model, not in order to limit the utility model, all within spirit of the present utility model and principle, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection domain of the present utility model.
Claims (4)
1. one kind for planting the barricade of brooder, it is characterized in that, comprise interior wall plate, outer wall plate, cover the cover plate at interior wall plate and outer wall plate top and be filled in interior wall plate and outer wall plate between heat-preservation;
Described interior wall plate, outer wall plate and cover plate all adopt some SP prestressed cored slabs to make, and the SP prestressed cored slab in described interior wall plate and described outer wall plate all adopts vertical installation;
The top lateral surface of described interior wall plate and described outer wall plate all has one group of first bolt embedded part, the two ends of described cover plate bottom respectively are provided with one group of second bolt embedded part, and the first bolt embedded part on described interior wall plate and described outer wall plate connects part by angle steel respectively and one group of second bolt embedded part carries out bolt.
2. barricade according to claim 1, is characterized in that, described the second bolt embedded part lower end is connected with girt, and described girt is arranged between described interior wall plate and described outer wall plate.
3. barricade according to claim 1, it is characterized in that, described barricade also comprises the base plate that adopts the SP prestressed cored slab to make, be provided with one group on described base plate for embedded part on the base plate of welded limiting channel-section steel and scissors supporting, described spacing channel-section steel is for fixing described interior wall plate and outer wall plate, described scissors supporting is located between interior wall plate and outer wall plate, for supporting described interior wall plate and outer wall plate.
4. barricade according to claim 3, is characterized in that, in one group of steel clamp plate installing in the plate seam of the SP prestressed cored slab that the seat of honour of described scissors supporting is connected in vertical installation, lower of described scissors supporting is connected to embedded part on described base plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013204006239U CN203347053U (en) | 2013-07-05 | 2013-07-05 | Retaining wall used for planting greenhouse |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013204006239U CN203347053U (en) | 2013-07-05 | 2013-07-05 | Retaining wall used for planting greenhouse |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203347053U true CN203347053U (en) | 2013-12-18 |
Family
ID=49746969
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013204006239U Expired - Fee Related CN203347053U (en) | 2013-07-05 | 2013-07-05 | Retaining wall used for planting greenhouse |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203347053U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107806200A (en) * | 2017-10-13 | 2018-03-16 | 广州康纳天花有限公司 | A kind of novel sound insulating wall and its installation method |
-
2013
- 2013-07-05 CN CN2013204006239U patent/CN203347053U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107806200A (en) * | 2017-10-13 | 2018-03-16 | 广州康纳天花有限公司 | A kind of novel sound insulating wall and its installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101935986B (en) | Overwater large-span steel tube pile cast-in-situ trestle and building method thereof | |
CN205205635U (en) | Stride footpath bailey frame steel suspension bridge structure greatly | |
CN203174619U (en) | Reverse raft concrete terrace | |
CN104652475B (en) | A kind of truss-like retaining wall | |
CN103046644B (en) | Cold-formed thin-walled steel column and beam structural system for multistoried building | |
CN109183838B (en) | A kind of high anti-floating cracking resistance basement floor constructions and its design method | |
CN201785940U (en) | Reinforced concrete prefabricated beam | |
CN206768861U (en) | A kind of reinforcement ring retaining wall | |
CN205894089U (en) | Native supporting construction of environmental fender of prefabricated assembled | |
CN101967832B (en) | Method for treating bottom structure of building in substation | |
CN103967332B (en) | The construction method of a kind of building site enclosing | |
CN203347053U (en) | Retaining wall used for planting greenhouse | |
CN105756377A (en) | Swimming pool and construction method thereof | |
CN202989868U (en) | Earthquake region high earth and rockfill dam earthquake resistance structure | |
CN204715364U (en) | A kind of foundation pit support device | |
CN203821399U (en) | Deep foundation pit supporting structure | |
CN216615958U (en) | Assembled reinforced concrete retaining wall configured with greening planting wall surface | |
CN202925552U (en) | Foundation pit steel pipe brace replacing and construction structure for ramp | |
CN211714007U (en) | Construction elevator foundation structure | |
CN201671103U (en) | Integral construction forming platform of underwater pier cap drilled pile | |
CN209323553U (en) | A kind of steady type house foundation | |
CN201512803U (en) | Structural layer used for preventing building from sinking and bottom layer structure in transformer substation | |
CN102704592B (en) | Damping control method for existing frame structure | |
CN208309616U (en) | A kind of assembled prefabricated house prefabricated foundation that piece is staggered | |
CN207268110U (en) | One kind tree pond Fence structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131218 Termination date: 20150705 |
|
EXPY | Termination of patent right or utility model |