CN202925552U - Foundation pit steel pipe brace replacing and construction structure for ramp - Google Patents

Foundation pit steel pipe brace replacing and construction structure for ramp Download PDF

Info

Publication number
CN202925552U
CN202925552U CN 201220677411 CN201220677411U CN202925552U CN 202925552 U CN202925552 U CN 202925552U CN 201220677411 CN201220677411 CN 201220677411 CN 201220677411 U CN201220677411 U CN 201220677411U CN 202925552 U CN202925552 U CN 202925552U
Authority
CN
China
Prior art keywords
ramp
embedded
wall
foundation pit
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220677411
Other languages
Chinese (zh)
Inventor
刁晓翔
王辉
郭君
刁宁
王端阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd
Original Assignee
TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd filed Critical TIANJIN HOUSING GROUP CONSTRUCTION ENGINEERING CONTRACTION Co Ltd
Priority to CN 201220677411 priority Critical patent/CN202925552U/en
Application granted granted Critical
Publication of CN202925552U publication Critical patent/CN202925552U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a foundation pit steel pipe brace replacing and construction structure for a ramp. The foundation pit steel pipe brace replacing and construction structure comprises a foundation pit dug in the peripheral length direction of the ramp, wherein support piles are piled around the foundation pit; an inner support system is connected inside each support pile; a ramp bottom plate is laid and an inner ramp wall and an outer ramp wall on the two sides of the ramp bottom plate are built inside the foundation pit; a swinging rib is reserved at the top end of each of the inner and outer ramp walls; an edge beam is arranged inside the outer ramp wall along the length direction of the ramp; the inner and outer ramp walls are higher than the standard height of the bottom of the edge beam; a plurality of embedded steel plates are embedded in the edge beam in sequence and at intervals; a plurality of post-thickened embedded part steel plates corresponding to the embedded steel plates one by one are connected inside the inner ramp wall; a steel pipe brace is connected between each embedded steel plate and the post-thickened embedded part steel plate corresponding to the embedded steel plate; and backfilled earth is backfilled and plain concrete conversion plate strips are laid between the support piles and the outer ramp wall. Due to the adoption of the structure, the brace replacing system is stressed uniformly and stably and has enough strength.

Description

A kind of ramp foundation ditch steel pipe support support replacement constructing structure
Technical field
The utility model relates to a kind of foundation ditch support replacement constructing structure, relates in particular to a kind of ramp foundation ditch steel pipe support support replacement constructing structure.
Background technology
In the Construction of Deep Foundation of highrise building, the foundation pit supporting project construction period is long, and cost is high, is the emphasis stage of whole engineering.The design form of pattern foundation pit supporting structure is more, but is subjected to the restriction of engineering present position and geological conditions, and not only economy but also applicable support form were often few.At present concrete inner support system requires low, easy construction to be applied in more and more in the engineering of deep foundation pit support because of it to surrounding enviroment, but is subjected to the restriction of foundation ditch support system, engineering construction during to certain position the dismounting of inner support be a necessary process.In the construction of basement car ramp, need to carry out special support replacement technology construction to the ramp, just can carry out the foundation ditch inner support and remove, guarantee ramp construction safety when then carrying out the construction of follow-up ramp.
Learn issued patents by retrieval:
1 application number is that the Chinese patent of CN201220017701.2 discloses " bracing of foundation pit fagging structure ", the utility model discloses bracing of foundation pit fagging structure, comprise the concrete slab body, be embedded in respectively the parallel horizontal two groups of reinforcing bars in upper and lower of concrete slab body, and described horizontal two groups of reinforcing bar one ends directly anchor into basement structure, the described horizontal two groups of reinforcing bars that are embedded in the upper and lower of concrete slab body intersected before anchoring into basement structure, and then directly anchored into basement structure.
2 application numbers are that the Chinese patent of CN201020676839.4 discloses that " hole steel sheet piling pit supporting construction in a kind of hole, hole steel sheet piling pit supporting construction in a kind of hole relate to and cheat steel sheet pile supporting and protection structure in a kind of hole, belong to the Geotechnical Engineering field.The utility model comprises hole end absolute altitude in absolute altitude at the bottom of parallel with the earth's surface respectively hollow place, hole, absolute altitude hole end absolute altitude in the hole vertically arranges steel sheet pile at the bottom of the hollow place, the upper end of steel sheet pile connects channel-section steel formation channel-section steel and encloses purlin, and channel-section steel encloses joint steel pipe or shaped steel formation inner support on purlin.
Although the 1st ~ 2 patent has a series of advantage, can not solve in the construction of basement car ramp, the series of problems such as ramp support replacement technology construction are removed thereby carry out the foundation ditch inner support, then carry out the construction of follow-up ramp and guarantee the ramp construction safety.
Summary of the invention
The purpose of this utility model is to overcome the deficiency of prior art, and a kind of have enough intensity, rigidity are provided, a kind of ramp foundation ditch steel pipe support support replacement constructing structure of sound construction, equalization stable power transmission.
a kind of ramp of the present utility model foundation ditch steel pipe support support replacement constructing structure, it is included in the foundation ditch that ramp periphery length direction digs, set soldier pile on described foundation ditch limit, be connected with interior support system in described soldier pile inboard, be equipped with ramp place's base plate and build in described foundation ditch ramp interior wall and the ramp exterior wall that is positioned at base plate both sides, place, ramp arranged, be reserved with on the top of ramp interior wall and ramp exterior wall and get rid of muscle, be provided with side bar in the ramp inner side of outer wall one along the ramp length direction, the height of described ramp interior wall and ramp exterior wall is higher than the absolute altitude at the bottom of the beam of side bar, the interval is embedded with the polylith pre-embedded steel slab successively on described side bar, interior wall inboard, ramp be connected with the polylith pre-embedded steel slab one by one corresponding arrange after increase the embedded part steel plate, increase after each piece pre-embedded steel slab and setting corresponding to it and be connected with the steel pipe support between embedded part steel plate, backfill has the first floor backfill between soldier pile and described ramp exterior wall, be equipped with plain concrete conversion strip at the top of described first floor backfill, be filled with the second layer backfill last time in described plain concrete conversion strip.
Adopt the beneficial effect of the utility model structure to be: in the construction of basement car ramp, the stressed complexity in place, ramp, need to carry out the construction of support replacement technology to the place, ramp, the foundation ditch inner support could be removed, guarantee ramp construction safety when then carrying out the construction of follow-up ramp.The steel pipe support is installed between the side bar on ramp interior wall and ramp inner side of outer wall, backfill first floor backfill between soldier pile and ramp exterior wall, then lay first floor plain concrete conversion strip at the top of first floor backfill, fill out the second layer backfill last time in first floor plain concrete conversion strip.Wholely like this consisted of take steel pipe support, side bar, backfill, plain concrete conversion strip as main stable support-replacing system.The suffered power of steel pipe support can equalization stable in addition passes to the ramp interior wall, the slab column of passing to agent structure that then can equalization stable.So adopt this structure to make the support-replacing system stress balance stablize, have enough intensity, rigidity, guarantee balanced power transmission and the rigidity stability and safety of the support replacement construction of basement car ramp.
Description of drawings
Fig. 1 is for adopting a kind of ramp of the present utility model foundation ditch steel pipe support support replacement constructing structure mounting plane schematic diagram;
Fig. 2 is for adopting a kind of ramp of the present utility model foundation ditch steel pipe support support replacement constructing structure scheme of installation.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is done to describe in detail.
a kind of ramp of the present utility model foundation ditch steel pipe support support replacement constructing structure as shown in drawings, it is included in the foundation ditch that ramp periphery length direction digs, set soldier pile 6 on described foundation ditch limit, be connected with interior support system 7 in described soldier pile inboard, be equipped with place, ramp base plate 5 and build in described foundation ditch ramp interior wall 4 and the ramp exterior wall 3 that is positioned at base plate both sides, place, ramp arranged, be reserved with on the top of ramp interior wall 4 and ramp exterior wall 3 and get rid of muscle, be provided with side bar 1 in ramp exterior wall 3 inboards one along the ramp length direction, the height of described ramp interior wall 4 and ramp exterior wall 3 is higher than the absolute altitude at the bottom of the beam of side bar 1, the interval is embedded with the polylith pre-embedded steel slab successively on described side bar 1, ramp interior wall 4 inboards be connected with the polylith pre-embedded steel slab one by one corresponding arrange after increase the embedded part steel plate, increase after each piece pre-embedded steel slab and setting corresponding to it and be connected with steel pipe support 2 between embedded part steel plate, backfill has the first floor backfill between soldier pile 6 and described ramp exterior wall, be equipped with plain concrete conversion strip at the top of described first floor backfill, be filled with the second layer backfill last time in described plain concrete conversion strip.

Claims (1)

1. a ramp foundation ditch steel pipe supports the support replacement constructing structure, it is characterized in that: it is included in the foundation ditch that ramp periphery length direction digs, set soldier pile on described foundation ditch limit, be connected with interior support system in described soldier pile inboard, be equipped with ramp place's base plate and build in described foundation ditch ramp interior wall and the ramp exterior wall that is positioned at base plate both sides, place, ramp arranged, be reserved with on the top of ramp interior wall and ramp exterior wall and get rid of muscle, be provided with side bar in the ramp inner side of outer wall one along the ramp length direction, the height of described ramp interior wall and ramp exterior wall is higher than the absolute altitude at the bottom of the beam of side bar, the interval is embedded with the polylith pre-embedded steel slab successively on described side bar, interior wall inboard, ramp be connected with the polylith pre-embedded steel slab one by one corresponding arrange after increase the embedded part steel plate, increase after each piece pre-embedded steel slab and setting corresponding to it and be connected with the steel pipe support between embedded part steel plate, backfill has the first floor backfill between soldier pile and described ramp exterior wall, be equipped with plain concrete conversion strip at the top of described first floor backfill, be filled with the second layer backfill last time in described plain concrete conversion strip.
CN 201220677411 2012-12-07 2012-12-07 Foundation pit steel pipe brace replacing and construction structure for ramp Expired - Fee Related CN202925552U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220677411 CN202925552U (en) 2012-12-07 2012-12-07 Foundation pit steel pipe brace replacing and construction structure for ramp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220677411 CN202925552U (en) 2012-12-07 2012-12-07 Foundation pit steel pipe brace replacing and construction structure for ramp

Publications (1)

Publication Number Publication Date
CN202925552U true CN202925552U (en) 2013-05-08

Family

ID=48215528

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220677411 Expired - Fee Related CN202925552U (en) 2012-12-07 2012-12-07 Foundation pit steel pipe brace replacing and construction structure for ramp

Country Status (1)

Country Link
CN (1) CN202925552U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104863163A (en) * 2015-04-28 2015-08-26 成都迅德科技有限公司 Profile steel slope protection structure
CN110629779A (en) * 2019-10-10 2019-12-31 中国建筑第八工程局有限公司 Connection structure for constructing unequal-height bottom plates in stages and construction method thereof
CN111456025A (en) * 2020-04-09 2020-07-28 中建八局天津建设工程有限公司 Combined support replacing and dismantling construction method for ultra-deep foundation pit

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104863163A (en) * 2015-04-28 2015-08-26 成都迅德科技有限公司 Profile steel slope protection structure
CN110629779A (en) * 2019-10-10 2019-12-31 中国建筑第八工程局有限公司 Connection structure for constructing unequal-height bottom plates in stages and construction method thereof
CN111456025A (en) * 2020-04-09 2020-07-28 中建八局天津建设工程有限公司 Combined support replacing and dismantling construction method for ultra-deep foundation pit

Similar Documents

Publication Publication Date Title
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN103437567B (en) Method for supporting existing building underground added storey through original pile foundations
CN103321231B (en) Base pit stand construction
CN205776347U (en) Novel cover for subway station digs against making structural system
CN104878835B (en) Strip footing increases basement structure behind house
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN102953385B (en) Construction method for changing support of foundation pit at irregular place of rampway
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN103015432B (en) Construction method for changing steel pipe supports of ramp foundation pit
CN201296994Y (en) Multifunctional precast arch piece
CN105240018A (en) Vertical shaft construction device and method
CN202925552U (en) Foundation pit steel pipe brace replacing and construction structure for ramp
CN104532856A (en) Fabricated lattice unit for foundation pit supporting and installation method
CN110158602B (en) Soft soil geological deep foundation pit supporting excavation construction structure and construction method
CN203977432U (en) Multistage H type soil blocking pile
CN105421477A (en) Construction method for tower crane foundation
CN202925551U (en) Foundation pit brace replacing and construction structure at irregular place of ramp
CN210684718U (en) Combined foundation pit supporting structure
CN204715364U (en) A kind of foundation pit support device
CN203639929U (en) Split open caisson and pile composite anchor foundation
CN202577316U (en) Structure of miniature piles in combination with composite soil nailing wall
CN211143118U (en) Assembled steel construction box utility tunnel underground structure
CN201169781Y (en) Cap digging pit structure
CN101408024A (en) Undercrossing subway tunnel pit supporting and protecting structure of high-rise building or super high-rise building
JP3132876U (en) Reinforcement foundation structure of building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130508

Termination date: 20161207