CN202925552U - Foundation pit steel pipe brace replacing and construction structure for ramp - Google Patents
Foundation pit steel pipe brace replacing and construction structure for ramp Download PDFInfo
- Publication number
- CN202925552U CN202925552U CN 201220677411 CN201220677411U CN202925552U CN 202925552 U CN202925552 U CN 202925552U CN 201220677411 CN201220677411 CN 201220677411 CN 201220677411 U CN201220677411 U CN 201220677411U CN 202925552 U CN202925552 U CN 202925552U
- Authority
- CN
- China
- Prior art keywords
- ramp
- embedded
- wall
- foundation pit
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses a foundation pit steel pipe brace replacing and construction structure for a ramp. The foundation pit steel pipe brace replacing and construction structure comprises a foundation pit dug in the peripheral length direction of the ramp, wherein support piles are piled around the foundation pit; an inner support system is connected inside each support pile; a ramp bottom plate is laid and an inner ramp wall and an outer ramp wall on the two sides of the ramp bottom plate are built inside the foundation pit; a swinging rib is reserved at the top end of each of the inner and outer ramp walls; an edge beam is arranged inside the outer ramp wall along the length direction of the ramp; the inner and outer ramp walls are higher than the standard height of the bottom of the edge beam; a plurality of embedded steel plates are embedded in the edge beam in sequence and at intervals; a plurality of post-thickened embedded part steel plates corresponding to the embedded steel plates one by one are connected inside the inner ramp wall; a steel pipe brace is connected between each embedded steel plate and the post-thickened embedded part steel plate corresponding to the embedded steel plate; and backfilled earth is backfilled and plain concrete conversion plate strips are laid between the support piles and the outer ramp wall. Due to the adoption of the structure, the brace replacing system is stressed uniformly and stably and has enough strength.
Description
Technical field
The utility model relates to a kind of foundation ditch support replacement constructing structure, relates in particular to a kind of ramp foundation ditch steel pipe support support replacement constructing structure.
Background technology
In the Construction of Deep Foundation of highrise building, the foundation pit supporting project construction period is long, and cost is high, is the emphasis stage of whole engineering.The design form of pattern foundation pit supporting structure is more, but is subjected to the restriction of engineering present position and geological conditions, and not only economy but also applicable support form were often few.At present concrete inner support system requires low, easy construction to be applied in more and more in the engineering of deep foundation pit support because of it to surrounding enviroment, but is subjected to the restriction of foundation ditch support system, engineering construction during to certain position the dismounting of inner support be a necessary process.In the construction of basement car ramp, need to carry out special support replacement technology construction to the ramp, just can carry out the foundation ditch inner support and remove, guarantee ramp construction safety when then carrying out the construction of follow-up ramp.
Learn issued patents by retrieval:
1 application number is that the Chinese patent of CN201220017701.2 discloses " bracing of foundation pit fagging structure ", the utility model discloses bracing of foundation pit fagging structure, comprise the concrete slab body, be embedded in respectively the parallel horizontal two groups of reinforcing bars in upper and lower of concrete slab body, and described horizontal two groups of reinforcing bar one ends directly anchor into basement structure, the described horizontal two groups of reinforcing bars that are embedded in the upper and lower of concrete slab body intersected before anchoring into basement structure, and then directly anchored into basement structure.
2 application numbers are that the Chinese patent of CN201020676839.4 discloses that " hole steel sheet piling pit supporting construction in a kind of hole, hole steel sheet piling pit supporting construction in a kind of hole relate to and cheat steel sheet pile supporting and protection structure in a kind of hole, belong to the Geotechnical Engineering field.The utility model comprises hole end absolute altitude in absolute altitude at the bottom of parallel with the earth's surface respectively hollow place, hole, absolute altitude hole end absolute altitude in the hole vertically arranges steel sheet pile at the bottom of the hollow place, the upper end of steel sheet pile connects channel-section steel formation channel-section steel and encloses purlin, and channel-section steel encloses joint steel pipe or shaped steel formation inner support on purlin.
Although the 1st ~ 2 patent has a series of advantage, can not solve in the construction of basement car ramp, the series of problems such as ramp support replacement technology construction are removed thereby carry out the foundation ditch inner support, then carry out the construction of follow-up ramp and guarantee the ramp construction safety.
Summary of the invention
The purpose of this utility model is to overcome the deficiency of prior art, and a kind of have enough intensity, rigidity are provided, a kind of ramp foundation ditch steel pipe support support replacement constructing structure of sound construction, equalization stable power transmission.
a kind of ramp of the present utility model foundation ditch steel pipe support support replacement constructing structure, it is included in the foundation ditch that ramp periphery length direction digs, set soldier pile on described foundation ditch limit, be connected with interior support system in described soldier pile inboard, be equipped with ramp place's base plate and build in described foundation ditch ramp interior wall and the ramp exterior wall that is positioned at base plate both sides, place, ramp arranged, be reserved with on the top of ramp interior wall and ramp exterior wall and get rid of muscle, be provided with side bar in the ramp inner side of outer wall one along the ramp length direction, the height of described ramp interior wall and ramp exterior wall is higher than the absolute altitude at the bottom of the beam of side bar, the interval is embedded with the polylith pre-embedded steel slab successively on described side bar, interior wall inboard, ramp be connected with the polylith pre-embedded steel slab one by one corresponding arrange after increase the embedded part steel plate, increase after each piece pre-embedded steel slab and setting corresponding to it and be connected with the steel pipe support between embedded part steel plate, backfill has the first floor backfill between soldier pile and described ramp exterior wall, be equipped with plain concrete conversion strip at the top of described first floor backfill, be filled with the second layer backfill last time in described plain concrete conversion strip.
Adopt the beneficial effect of the utility model structure to be: in the construction of basement car ramp, the stressed complexity in place, ramp, need to carry out the construction of support replacement technology to the place, ramp, the foundation ditch inner support could be removed, guarantee ramp construction safety when then carrying out the construction of follow-up ramp.The steel pipe support is installed between the side bar on ramp interior wall and ramp inner side of outer wall, backfill first floor backfill between soldier pile and ramp exterior wall, then lay first floor plain concrete conversion strip at the top of first floor backfill, fill out the second layer backfill last time in first floor plain concrete conversion strip.Wholely like this consisted of take steel pipe support, side bar, backfill, plain concrete conversion strip as main stable support-replacing system.The suffered power of steel pipe support can equalization stable in addition passes to the ramp interior wall, the slab column of passing to agent structure that then can equalization stable.So adopt this structure to make the support-replacing system stress balance stablize, have enough intensity, rigidity, guarantee balanced power transmission and the rigidity stability and safety of the support replacement construction of basement car ramp.
Description of drawings
Fig. 1 is for adopting a kind of ramp of the present utility model foundation ditch steel pipe support support replacement constructing structure mounting plane schematic diagram;
Fig. 2 is for adopting a kind of ramp of the present utility model foundation ditch steel pipe support support replacement constructing structure scheme of installation.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is done to describe in detail.
a kind of ramp of the present utility model foundation ditch steel pipe support support replacement constructing structure as shown in drawings, it is included in the foundation ditch that ramp periphery length direction digs, set soldier pile 6 on described foundation ditch limit, be connected with interior support system 7 in described soldier pile inboard, be equipped with place, ramp base plate 5 and build in described foundation ditch ramp interior wall 4 and the ramp exterior wall 3 that is positioned at base plate both sides, place, ramp arranged, be reserved with on the top of ramp interior wall 4 and ramp exterior wall 3 and get rid of muscle, be provided with side bar 1 in ramp exterior wall 3 inboards one along the ramp length direction, the height of described ramp interior wall 4 and ramp exterior wall 3 is higher than the absolute altitude at the bottom of the beam of side bar 1, the interval is embedded with the polylith pre-embedded steel slab successively on described side bar 1, ramp interior wall 4 inboards be connected with the polylith pre-embedded steel slab one by one corresponding arrange after increase the embedded part steel plate, increase after each piece pre-embedded steel slab and setting corresponding to it and be connected with steel pipe support 2 between embedded part steel plate, backfill has the first floor backfill between soldier pile 6 and described ramp exterior wall, be equipped with plain concrete conversion strip at the top of described first floor backfill, be filled with the second layer backfill last time in described plain concrete conversion strip.
Claims (1)
1. a ramp foundation ditch steel pipe supports the support replacement constructing structure, it is characterized in that: it is included in the foundation ditch that ramp periphery length direction digs, set soldier pile on described foundation ditch limit, be connected with interior support system in described soldier pile inboard, be equipped with ramp place's base plate and build in described foundation ditch ramp interior wall and the ramp exterior wall that is positioned at base plate both sides, place, ramp arranged, be reserved with on the top of ramp interior wall and ramp exterior wall and get rid of muscle, be provided with side bar in the ramp inner side of outer wall one along the ramp length direction, the height of described ramp interior wall and ramp exterior wall is higher than the absolute altitude at the bottom of the beam of side bar, the interval is embedded with the polylith pre-embedded steel slab successively on described side bar, interior wall inboard, ramp be connected with the polylith pre-embedded steel slab one by one corresponding arrange after increase the embedded part steel plate, increase after each piece pre-embedded steel slab and setting corresponding to it and be connected with the steel pipe support between embedded part steel plate, backfill has the first floor backfill between soldier pile and described ramp exterior wall, be equipped with plain concrete conversion strip at the top of described first floor backfill, be filled with the second layer backfill last time in described plain concrete conversion strip.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220677411 CN202925552U (en) | 2012-12-07 | 2012-12-07 | Foundation pit steel pipe brace replacing and construction structure for ramp |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201220677411 CN202925552U (en) | 2012-12-07 | 2012-12-07 | Foundation pit steel pipe brace replacing and construction structure for ramp |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202925552U true CN202925552U (en) | 2013-05-08 |
Family
ID=48215528
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201220677411 Expired - Fee Related CN202925552U (en) | 2012-12-07 | 2012-12-07 | Foundation pit steel pipe brace replacing and construction structure for ramp |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202925552U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104863163A (en) * | 2015-04-28 | 2015-08-26 | 成都迅德科技有限公司 | Profile steel slope protection structure |
CN110629779A (en) * | 2019-10-10 | 2019-12-31 | 中国建筑第八工程局有限公司 | Connection structure for constructing unequal-height bottom plates in stages and construction method thereof |
CN111456025A (en) * | 2020-04-09 | 2020-07-28 | 中建八局天津建设工程有限公司 | Combined support replacing and dismantling construction method for ultra-deep foundation pit |
-
2012
- 2012-12-07 CN CN 201220677411 patent/CN202925552U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104863163A (en) * | 2015-04-28 | 2015-08-26 | 成都迅德科技有限公司 | Profile steel slope protection structure |
CN110629779A (en) * | 2019-10-10 | 2019-12-31 | 中国建筑第八工程局有限公司 | Connection structure for constructing unequal-height bottom plates in stages and construction method thereof |
CN111456025A (en) * | 2020-04-09 | 2020-07-28 | 中建八局天津建设工程有限公司 | Combined support replacing and dismantling construction method for ultra-deep foundation pit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101914925B (en) | Basement by using optimized composite prefabricated arch wall as external wall | |
CN103437567B (en) | Method for supporting existing building underground added storey through original pile foundations | |
CN103321231B (en) | Base pit stand construction | |
CN205776347U (en) | Novel cover for subway station digs against making structural system | |
CN104878835B (en) | Strip footing increases basement structure behind house | |
CN101418569B (en) | Optimization complex arch wall combining prefabricated arch leaf, support and major structure | |
CN102953385B (en) | Construction method for changing support of foundation pit at irregular place of rampway | |
CN103938634B (en) | A kind of deep foundation pit supporting structure and construction method | |
CN103015432B (en) | Construction method for changing steel pipe supports of ramp foundation pit | |
CN201296994Y (en) | Multifunctional precast arch piece | |
CN105240018A (en) | Vertical shaft construction device and method | |
CN202925552U (en) | Foundation pit steel pipe brace replacing and construction structure for ramp | |
CN104532856A (en) | Fabricated lattice unit for foundation pit supporting and installation method | |
CN110158602B (en) | Soft soil geological deep foundation pit supporting excavation construction structure and construction method | |
CN203977432U (en) | Multistage H type soil blocking pile | |
CN105421477A (en) | Construction method for tower crane foundation | |
CN202925551U (en) | Foundation pit brace replacing and construction structure at irregular place of ramp | |
CN210684718U (en) | Combined foundation pit supporting structure | |
CN204715364U (en) | A kind of foundation pit support device | |
CN203639929U (en) | Split open caisson and pile composite anchor foundation | |
CN202577316U (en) | Structure of miniature piles in combination with composite soil nailing wall | |
CN211143118U (en) | Assembled steel construction box utility tunnel underground structure | |
CN201169781Y (en) | Cap digging pit structure | |
CN101408024A (en) | Undercrossing subway tunnel pit supporting and protecting structure of high-rise building or super high-rise building | |
JP3132876U (en) | Reinforcement foundation structure of building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130508 Termination date: 20161207 |