CN203330645U - 吊车走行电机更换架 - Google Patents

吊车走行电机更换架 Download PDF

Info

Publication number
CN203330645U
CN203330645U CN2013203360300U CN201320336030U CN203330645U CN 203330645 U CN203330645 U CN 203330645U CN 2013203360300 U CN2013203360300 U CN 2013203360300U CN 201320336030 U CN201320336030 U CN 201320336030U CN 203330645 U CN203330645 U CN 203330645U
Authority
CN
China
Prior art keywords
crane
welded
pillar
guide chain
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013203360300U
Other languages
English (en)
Inventor
韩志勇
鲁海涛
杜威
全维生
王荣鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Steel Co Ltd
Original Assignee
Angang Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Steel Co Ltd filed Critical Angang Steel Co Ltd
Priority to CN2013203360300U priority Critical patent/CN203330645U/zh
Application granted granted Critical
Publication of CN203330645U publication Critical patent/CN203330645U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

本实用新型提供一种吊车走行电机更换架,由工字梁及支柱组成;工字梁一端焊接一带有导链孔的吊挂板,另一端的两侧各焊有一块连接板,在工字梁中部焊有一个连接柱,连接板、连接柱及支柱上端均设有螺栓孔,支柱通过螺栓固定在连接柱上。将支柱下端固定在吊车主横行栏杆上,再将工字梁连接板固定在主卷制动器上,并将支柱上端与工字梁连接柱用螺栓锁紧,然后将导链挂到吊挂板导链孔内,即可通过主横车配合完成吊车走行电机的快速更换。更换时间由原来的5h缩短至1.5h,极大提高作业效率,减轻劳动强度,减少设备处理时间,有利于提高设备的作业率。

Description

吊车走行电机更换架
技术领域
本实用新型属于吊装器具领域,尤其涉及一种快速更换吊车走行电机的专用更换架。
背景技术
150t铸造吊车是炼钢生产的关键设备,承担三座转炉的炼钢生产,每台吊车设置四台走行电动机,吊车走行电动机分设于东西各两台,而转炉跨厂房的唯一吊具—单轨吊则设在厂房中间部位,且为南北走向。所以单轨吊不能直接吊到走行电动机。以前更换走行电动机时,需要将吊车停止在固定位置上(不能串车)然后甩麻绳上房架将钢绳扣引上锁紧,留一套挂手拉葫芦,用手拉葫芦将旧电机吊到走行平台上,再由人力推移至单轨吊下面,然后用单轨吊把旧电机吊至地面。新电机的安装亦重复上述作业。用这种方法更换电机既费时、又费力,且危险程度高。常规更换需要5小时,且完全停车才能更换完,从而严重影响和制约生产的顺利进行。
发明内容
本实用新型旨在提供一种能快速更换吊车走行电机的更换架,从而缩短更换时间,提高作业效率和设备作业率,减轻劳动强度。
为此,本实用新型采取的技术方案如下:
一种吊车走行电机更换架,由工字梁及支柱组成;工字梁一端焊接一带有导链孔的吊挂板,另一端的两侧各焊有一块连接板,在工字梁中部焊有一个连接柱,连接板、连接柱及支柱上端均设有螺栓孔,支柱通过螺栓固定在连接柱上。
所述工字梁、支柱和吊挂板均采用工字钢截取而成。
本实用新型的使用方法及有益效果为:
更换走行电机前,先将支柱下端固定在吊车主横行栏杆上,再将工字梁的连接板固定在主卷制动器上,并将支柱上端与工字梁连接柱用螺栓锁紧,然后将导链挂到吊挂板导链孔内,即可通过主横车配合完成吊车走行电机的快速更换。从而使更换时间由原来的5h缩短至1.5h,极大提高了作业效率,减轻劳动强度,减少设备处理时间,有利于提高设备的作业率和生产能力。
附图说明
图1是吊车走行电机更换架示意图。
图中:连接板1、工字梁2、连接柱3、吊挂板4、导链孔5、螺栓6、支柱7。
具体实施方式
由图1可见,本实用新型吊车走行电机更换架主要是由工字梁2及支柱7所组成。在工字梁2的一端焊接一段工字钢制成的带有导链孔5的吊挂板4,另一端的前后两侧分别焊接一块带螺栓孔的连接板1,在工字梁2中部略偏于吊挂板4一侧适当位置上焊接一个工字钢连接柱3,连接柱3及支柱7的上端对应位置上分别加工有4个螺栓孔,支柱7通过4个螺栓6固定在连接柱3上。

Claims (2)

1.一种吊车走行电机更换架,其特征在于,由工字梁及支柱组成;工字梁一端焊接一带有导链孔的吊挂板,另一端的两侧各焊有一块连接板,在工字梁中部焊有一个连接柱,连接板、连接柱及支柱上端均设有螺栓孔,支柱通过螺栓固定在连接柱上。
2.根据权利要求1所述的吊车走行电机更换架,其特征在于,所述工字梁、支柱和吊挂板均采用工字钢截取而成。
CN2013203360300U 2013-06-12 2013-06-12 吊车走行电机更换架 Expired - Fee Related CN203330645U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203360300U CN203330645U (zh) 2013-06-12 2013-06-12 吊车走行电机更换架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203360300U CN203330645U (zh) 2013-06-12 2013-06-12 吊车走行电机更换架

Publications (1)

Publication Number Publication Date
CN203330645U true CN203330645U (zh) 2013-12-11

Family

ID=49699344

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203360300U Expired - Fee Related CN203330645U (zh) 2013-06-12 2013-06-12 吊车走行电机更换架

Country Status (1)

Country Link
CN (1) CN203330645U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112607582A (zh) * 2020-12-15 2021-04-06 上海宝冶集团有限公司 一种轴头更换吊具和方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112607582A (zh) * 2020-12-15 2021-04-06 上海宝冶集团有限公司 一种轴头更换吊具和方法

Similar Documents

Publication Publication Date Title
CN103790114A (zh) 液压牵引与滚轮行走结合的缆载吊机及其行走方法
CN203979647U (zh) 一种可拆卸重复利用导轨穿管器
CN211034929U (zh) 一种双梁桥式起重机
CN201634332U (zh) 重型门式提梁机
CN205400756U (zh) 可变断面台车
CN201883104U (zh) 炼钢转炉托圈、炉壳安装用台车装置
CN110759232A (zh) 一种四辊式轧机下支撑辊阶梯板吊装工装及吊装方法
CN103669882A (zh) 工业厂房内利用钢丝绳做轨道进行构件安装的方法
CN203330645U (zh) 吊车走行电机更换架
CN203428766U (zh) 一种电动葫芦
CN202936087U (zh) 可调式吊装用钢管平衡梁
CN201817208U (zh) 一种简易吊装机
CN204173795U (zh) 一种电动葫芦桥式起重机
CN203094107U (zh) 安装工程施工中构件的简易移动就位装置
CN103434967B (zh) 蓄能电站拦污栅检修起吊装置
CN202279833U (zh) 一种简易转炉烟道横移车
CN105984821A (zh) 一种按需使用的风电机组舱内起吊装置
CN210973590U (zh) 一种四辊式轧机下支撑辊阶梯板吊装工装
CN202542732U (zh) 四梁四轨双小车桥式起重机副起升钢丝绳更换机构
CN202688892U (zh) 一种用于架设水利渡槽的专用架槽机
CN207645656U (zh) 一种重型架桥机
CN206707719U (zh) 一种隧道施工辅助tbm后配套台车平移的托架
CN203373673U (zh) 一种贝雷梁拆卸拖运车
CN106185597A (zh) 一种大型解析塔分节吊装专用吊具及吊装方法
CN207332897U (zh) 隧道水沟电缆槽液压式整体台车

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131211

Termination date: 20190612

CF01 Termination of patent right due to non-payment of annual fee