CN203307813U - Geotextile laying device for shallow area of beach - Google Patents

Geotextile laying device for shallow area of beach Download PDF

Info

Publication number
CN203307813U
CN203307813U CN2013203340275U CN201320334027U CN203307813U CN 203307813 U CN203307813 U CN 203307813U CN 2013203340275 U CN2013203340275 U CN 2013203340275U CN 201320334027 U CN201320334027 U CN 201320334027U CN 203307813 U CN203307813 U CN 203307813U
Authority
CN
China
Prior art keywords
beach
geotextile
job platform
geotextile laying
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2013203340275U
Other languages
Chinese (zh)
Inventor
李国义
王庆水
王延军
刘成锋
钟国林
王庆霞
厉明松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Oilfield Service Corp
Original Assignee
Shengli Engineering Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shengli Engineering Construction Group Co Ltd filed Critical Shengli Engineering Construction Group Co Ltd
Priority to CN2013203340275U priority Critical patent/CN203307813U/en
Application granted granted Critical
Publication of CN203307813U publication Critical patent/CN203307813U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins

Landscapes

  • Position Fixing By Use Of Radio Waves (AREA)

Abstract

The utility model discloses a geotextile laying device for a shallow area of a beach, which is capable of performing geotextile laying construction in areas such as tidal, neritic sea, lakes, rivers, marshes and paddy fields where large ships cannot arrive. The device comprises a work platform, a power plant and an anchor gear, wherein the power plant is arranged on one side of the work platform; the anchor gear is fixed on the work platform; floating fillers are fixed at the bottom of the work platform; a satellite positioning device is fixed on the work surface of the work platform. The power plant is a marine power plant, and the satellite positioning device is adopted to perform positioned laying on the geotextile through base station signals and aquatic free walker engineering software. The geotextile laying device for a shallow area of a beach disclosed by the utility model is easy to machine and manufacture and low in input cost, is a special geotextile laying device for the shallow area of a beach, and solves the problem of incapability of work and sailing of construction ships in shallow areas of beaches. The device can greatly improve construction progress and ensure construction quality and safety.

Description

Shallow water territory, beach geotextile laying apparatus
Technical field
The utility model relates to the laying equipment of shallow water territory, beach geotextile, beach shallow water territory geotextile laying apparatus particularly, this device can enter the laying construction that geotextile is carried out in the unapproachable zones of large ship such as Tan Hai, shallow sea, lake, river, marsh, paddy field.
Background technology
At present the geotextiles such as geotextiles, geo-grid are widely used in highway, harbour, navigation channel, mole, reservoir, sea-going road, Hai Youlu and adopt the engineering construction fields such as platform, to controlling soil erosion, keep the foundation globality, reduce the soft foundation differential settlement and play a key effect.In ground engineering construction, geotextile is to adopt artificial the laying, easy to operate.Domestic mainly concentrating in the hydraulic architectures such as Yangtze River waterway construction project and Bohai Sea Gulf production platform laid at the bottom of geotextile at present, adopts professional Working Ships, and professional Working Ships draft is in 2.0-3.5 rice left and right.And the waters of depth of water 1.0-2.0 rice can not be laid by artificial, can't adopt again the darker Working Ships operation of drinking water, in current this waters, also there is no the special-purpose installation apparatus of geotextile.For quality, reduction of erection time, the reduction engineering cost that improves geotextile laying construction in this waters, need the installation apparatus of development shallow water territory, beach geotextile to construct.
Summary of the invention
The purpose of this utility model is to provide shallow water territory, beach geotextile laying apparatus, solve the present situation that shallow water territory, current beach does not have special-purpose geotextile installation apparatus, this device can enter the laying construction that geotextile is carried out in shallow water territory, beach, and accelerating construction progress and construction quality guarantee construction safety.
The utility model is achieved in that shallow water territory, beach geotextile laying apparatus comprises job platform, power-equipment and windlass, power-equipment is arranged on a side of job platform, windlass is fixed on job platform, at the fixing floating filler in job platform bottom, satellite positioning device is fixed on the scope of operation of job platform.Power-equipment uses ship power equipment, uses satellite positioning device, by base station signal and free walker engineering software waterborne, geotextile is positioned to laying.
Compared with prior art, remarkable advantage of the present utility model is: the utility model is easily processed and is manufactured, input cost is low, and for shallow water territory, beach provides special-purpose geotextile installation apparatus, solving beach shallow water area construction ship can't operation, the predicament of navigation.This device can be widely used in paddy field, marsh, river, lake, neritic province domain engineering construction field construction of soft soil treatment, can significantly improve construction speed, guarantees construction quality and construction safety.After the frame welding of the utility model job platform completes, utilize anti-corrosive steel tube to be encrypted welding as reinforcing rib, truss net sheet form, firm safety are adopted in welding.The job platform bottom is filled by the assembled foam-plastic blocks of plug-in type, and fixation, has strengthened the buoyancy of this device.The job platform surrounding arranges guardrail, is equipped with lifesaving appliance, easy to operate, can greatly raise labour efficiency, and the constructability operation, have obvious economic benefit.
The accompanying drawing explanation
Fig. 1 is the top view of the utility model structural representation.
Fig. 2 is the top view of the utility model job platform end welding steel pre-structure schematic diagram.
Fig. 3 is the lateral view of the utility model job platform structural representation.
The specific embodiment
Below in conjunction with accompanying drawing in detail the utility model is described in detail, referring to Fig. 1, shallow water territory, beach geotextile laying apparatus comprises job platform, power-equipment 7 and windlass 5, power-equipment 7 is arranged on a side of job platform, windlass 5 is fixed on job platform, at the fixing floating filler 3 in job platform bottom, satellite positioning device 6 is fixed on the scope of operation of job platform.Power-equipment 7 uses ship power equipment, uses satellite positioning device 6, by base station signal and free walker engineering software waterborne, geotextile is positioned to laying.Windlass 5 is by diesel engine, to be driven the boats and ships fastening devices of ground tackle, and ground tackle, satellite positioning device 6 and free walker engineering software waterborne by windlass 5, can make the utility model be accurately positioned in precalculated position.Referring to Fig. 2 and Fig. 3, job platform comprises the scope of operation, skeleton 1, reinforcing rib 2 and guardrail 4, the periphery of the scope of operation and lower end surrounding welded framework 1, and at the interior welding reinforcing rib 2 of skeleton 1, the upper surface of the scope of operation is welding steel again, is provided with guardrail 4 in its surrounding.Skeleton 1 is channel-section steel, and reinforcing rib 2 is welded as to net sheet or truss net sheet, and the reinforcing rib 2 shown in Fig. 2 and Fig. 3 is truss net sheet.Windlass 5 is fixed on the middle part of job platform and four jiaos, symmetrical, adopts 12 diesel engines as power.Floating filler 3 comprises foam-plastic blocks and air bag, is fixed in the skeleton 1 of job platform lower end surrounding.What the utility model was used is foam-plastic blocks, and foam-plastic blocks used is assembled of plug-in type, uses assembled of plug-in type easy for installation.
Concrete using method is as follows:
1, at first utilize satellite positioning device 6, also claim GPS, use power-equipment 7 that the utility model is navigated by water to construction area.
2, under construction area is thrown the ground tackle of six windlass 5 successively, according to the live signal of satellite positioning device 6, by windlass 5 and ground tackle, the utility model is accurately navigated to precalculated position.
3, in the geotextile process of deployment, the windlass 5 by both sides moves forward and backward the utility model; Windlass 5 by middle part makes the utility model realize moving left and right, and completes the laying construction of geotextile.

Claims (6)

1. beach shallow water territory geotextile laying apparatus, it is characterized in that, comprise job platform, power-equipment and windlass, power-equipment is arranged on a side of job platform, windlass is fixed on job platform, at the fixing floating filler in job platform bottom, satellite positioning device is fixed on the scope of operation of job platform.
2. shallow water territory, beach according to claim 1 geotextile laying apparatus, it is characterized in that, described job platform comprises the scope of operation, skeleton, reinforcing rib and guardrail, the periphery of the scope of operation and lower end surrounding welded framework, in skeleton, weld reinforcing rib, the upper surface of the scope of operation is welding steel again, is provided with guardrail in its surrounding.
3. shallow water territory, beach according to claim 2 geotextile laying apparatus, is characterized in that, described skeleton is channel-section steel, and reinforcing rib is welded as to net sheet or truss net sheet.
4. shallow water territory, beach according to claim 1 geotextile laying apparatus, is characterized in that, described windlass is fixed on the middle part of job platform and four jiaos, symmetrical.
5. shallow water territory, beach according to claim 1 geotextile laying apparatus, is characterized in that, described floating filler comprises foam-plastic blocks and air bag, is fixed in the skeleton of job platform lower end surrounding.
6. shallow water territory, beach according to claim 5 geotextile laying apparatus, is characterized in that, described foam-plastic blocks is assembled of plug-in type.
CN2013203340275U 2013-06-09 2013-06-09 Geotextile laying device for shallow area of beach Expired - Lifetime CN203307813U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203340275U CN203307813U (en) 2013-06-09 2013-06-09 Geotextile laying device for shallow area of beach

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203340275U CN203307813U (en) 2013-06-09 2013-06-09 Geotextile laying device for shallow area of beach

Publications (1)

Publication Number Publication Date
CN203307813U true CN203307813U (en) 2013-11-27

Family

ID=49614031

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203340275U Expired - Lifetime CN203307813U (en) 2013-06-09 2013-06-09 Geotextile laying device for shallow area of beach

Country Status (1)

Country Link
CN (1) CN203307813U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114561965A (en) * 2022-03-04 2022-05-31 广东东升实业集团有限公司 Construction method for suspended net foreign soil spray mixed planting

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114561965A (en) * 2022-03-04 2022-05-31 广东东升实业集团有限公司 Construction method for suspended net foreign soil spray mixed planting
CN114561965B (en) * 2022-03-04 2024-01-09 广东东升实业集团有限公司 Construction method for spraying, mixing and planting off-grid soil

Similar Documents

Publication Publication Date Title
CN102839666B (en) Bottom-supported floating pile-driving platform
CN1837512B (en) Combined cofferdam of steel slab pile and steel pipe pile an method for manufacturing the same
CN103225304B (en) A kind of marine foundation supporting structure and construction method thereof
CN102677592B (en) Method for erecting deepwater steel trestle and platform on exposed bedrock in shallow sea
CN102926350B (en) A kind of can the construction method of dock module of transportation by driving towage
CN102322069A (en) Underwater combination base of open caisson and steel pipe piles and construction method
CN103015367A (en) High-efficiency economical construction method for revetment
CN105730165A (en) Spiral roller walking device
CN204112298U (en) Combined type artificial island, Diarrhea lake region
CN201980397U (en) Underwater slipway for ship berth
CN203307813U (en) Geotextile laying device for shallow area of beach
CN2581502Y (en) On water piling platform device with cylindrical foundation
CN101892650B (en) Combined type seawall and construction method thereof
CN106088155A (en) Box hat immersed tube tunnel tube coupling prefabricated transportation by driving fitting-out technique
CN105480386A (en) Overwater operation platform
CN202170512U (en) Underwater combined base for open caisson and steel pipe piles
CN216041278U (en) Novel pile foundation scour prevention structure
CN106836115A (en) One kind broken end creek separate system
Nichols et al. Evolution of an urban estuarine harbor: Norfolk, Virginia
CN204080736U (en) Bimodulus bag green vegetation concrete bank protection
CN205975551U (en) A construction platform for construction of aquatic steel sheet pile
CN214657199U (en) Super hectometer deep water is striden sea bridge caisson foundation structure
CN210827305U (en) Diversion breakwater based on pile foundation structure
CN202705883U (en) Deepwater steel trestle and platform built on shallow sea bare bedrock
CN202466518U (en) Back pressure structure of soft soil foundation dam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SINOPEC OILFIELD SERVICE CORPORATION

Free format text: FORMER OWNER: SHENGLI ENGINEERING CONSTRUCTION (GROUP) CORPORATION LTD. OF SHENGLI OIL FIELD

Effective date: 20150129

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 257000 DONGYING, SHANDONG PROVINCE TO: 100029 CHAOYANG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20150129

Address after: 100029 Beijing City, Chaoyang District Hui Street No. six twelfth floor

Patentee after: SINOPEC OILFIELD SERVICE Corp.

Address before: 257000 No. two, 755 North Road, Dongying District, Shandong, Dongying

Patentee before: Shengli Oilfield Shengli Engineering Construction (Group) Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20131127