CN203297517U - Annular bolt for fixing aggregate platform of high-rise building - Google Patents

Annular bolt for fixing aggregate platform of high-rise building Download PDF

Info

Publication number
CN203297517U
CN203297517U CN2013203035658U CN201320303565U CN203297517U CN 203297517 U CN203297517 U CN 203297517U CN 2013203035658 U CN2013203035658 U CN 2013203035658U CN 201320303565 U CN201320303565 U CN 201320303565U CN 203297517 U CN203297517 U CN 203297517U
Authority
CN
China
Prior art keywords
bolt
annular
rise building
fixing
aggregate platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013203035658U
Other languages
Chinese (zh)
Inventor
师永生
徐德祥
陈庆梅
朱子燕
徐春明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU HONGSHENG CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
JIANGSU HONGSHENG CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU HONGSHENG CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical JIANGSU HONGSHENG CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN2013203035658U priority Critical patent/CN203297517U/en
Application granted granted Critical
Publication of CN203297517U publication Critical patent/CN203297517U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses an annular bolt for fixing an aggregate platform of a high-rise building, and relates to the technical field of construction tool design, in particular to the annular bolt for fixing the aggregate platform of the high-rise building. The annular bolt for fixing the aggregate platform of the high-rise building comprises a bolt bar with threads, and a bolt head which is arranged at one end of the bolt bar in an integrated mode. The annular bolt for fixing the aggregate platform of the high-rise building further comprises double nuts and a gasket, wherein the bolt bar is sleeved with the gasket, the double nuts are connected to one side, far away from the bolt head, of the gasket and are connected to the bolt bar, and the bolt head is annular. The annular bolt for fixing the aggregate platform of the high-rise building is easy and convenient to operate, and reduces influence of human factors on the degree of fastening of steel wire ropes, and safety is improved.

Description

A kind of tall building platform stationary annular bolt that gathers materials
Technical field
The utility model relates to the construction tool design field, particularly a kind of tall building platform stationary annular bolt that gathers materials.
Background technique
The tall building overhanging type is gathered materials in platform, and wire rope is connected the pre-buried suspension ring of more employing, utilizes preformed hole to penetrate in wire rope several modes such as fixing of surveying with structure.Pre-buried suspension ring have a certain impact to template construction, are unfavorable for constructing operation, and pre-buried ring position, anchorage length need strict control, and operation easier is larger.And adopt wire rope to penetrate exterior wall or side bar preformed hole, and the means of fixation that other steel pipe entangles wire rope in inboard, easily mistake is torn open on the one hand, need retighten wire rope while material discharging platform being installed on the other hand at every turn, complicated operation, and easily cause the fastening degree varies of wire rope, affect wire rope stressed.
The model utility content
The utility model purpose is for above problem, and a kind of tall building that is beneficial to safety, convenient disassembly platform stationary annular bolt that gathers materials is provided.
The utility model comprises that threaded bolt shank and disjunctor are set is arranged on the bolt head of bolt shank one end, the annular bolt also comprises double nut, pad, described pad is set on bolt shank, described Double-nut threaded is connected on the bolt shank of pad away from the first side of bolt, and described bolt head is annular.
The utility model adopts lap welding to make closed annulus the plain bolt termination, and the length of screw rod is determined according to the thickness of member.In construction, by the requirement of the platform that gathers materials, in the position of required fixedly wire rope, use the impact drilling, the slightly large 5mm of aperture ratio bolt left and right, penetrate annular bolt, simultaneously at wall or beam inboard, add pading plate, to strengthen concrete lifting surface area herein, and fastening with double nut.As long as wire rope is fastening putting in place while installing for the first time, and length can determine, fastening steel wire rope again when upwards lifting is had bad luck, only need peace to tear bolt open and get final product, and is easy and simple to handle, also reduced the impact of personal factor on the fastening degree of wire rope, improved Security.
Description of drawings
Fig. 1 is structural representation of the present utility model.
Embodiment
As shown in Figure 1, the utility model comprises the bolt head 3 that the bolt shank 2 that is provided with screw thread 1 and disjunctor are arranged on bolt shank 2 one ends, the annular bolt also comprises double nut 4, pad 5, pad 5 is set on bolt shank 2, double nut 4 is threaded on the bolt shank 2 of pad 5 away from bolt head 3 one sides, and bolt head 3 is annular.

Claims (1)

1. tall building platform stationary annular bolt that gathers materials, comprise that threaded bolt shank and disjunctor are set is arranged on the bolt head of bolt shank one end, it is characterized in that: annular bolt also comprises double nut, pad, described pad is set on bolt shank, described Double-nut threaded is connected on the bolt shank of pad away from the first side of bolt, and described bolt head is annular.
CN2013203035658U 2013-05-30 2013-05-30 Annular bolt for fixing aggregate platform of high-rise building Expired - Fee Related CN203297517U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203035658U CN203297517U (en) 2013-05-30 2013-05-30 Annular bolt for fixing aggregate platform of high-rise building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203035658U CN203297517U (en) 2013-05-30 2013-05-30 Annular bolt for fixing aggregate platform of high-rise building

Publications (1)

Publication Number Publication Date
CN203297517U true CN203297517U (en) 2013-11-20

Family

ID=49573525

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203035658U Expired - Fee Related CN203297517U (en) 2013-05-30 2013-05-30 Annular bolt for fixing aggregate platform of high-rise building

Country Status (1)

Country Link
CN (1) CN203297517U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103994179A (en) * 2014-05-26 2014-08-20 武汉菲舍控制技术有限公司 Rope fixing device
CN106088357A (en) * 2016-08-04 2016-11-09 聂益胜 The building pre-buried anchoring bolt of infilled wall tie bar

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103994179A (en) * 2014-05-26 2014-08-20 武汉菲舍控制技术有限公司 Rope fixing device
CN106088357A (en) * 2016-08-04 2016-11-09 聂益胜 The building pre-buried anchoring bolt of infilled wall tie bar

Similar Documents

Publication Publication Date Title
CN201722929U (en) Embedded part anchoring device of building template
CN203297517U (en) Annular bolt for fixing aggregate platform of high-rise building
CN204081445U (en) To encorbelment i iron anchor device
CN201695682U (en) Anchorage
CN208309396U (en) A kind of bridge pier column overturn-preventing operation platform
CN204002882U (en) A kind of Multifunctional anchor rod
CN205348724U (en) Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting
CN205530246U (en) Shape pawl formula of preapring for an unfavorable turn of events soil bolt
CN201671232U (en) Large-diameter steel strand anchoring device
CN201539476U (en) Dynamic load sizing chemical high-strength anchor bolt
CN201760828U (en) Non-standard bolt and nut fastening tool
CN202073897U (en) Steel structure bolt for megawatt unit boiler
CN211949650U (en) Concrete direction formula stick that vibrates
CN205529842U (en) Steel pipe concrete arch foot
CN204326498U (en) Screw outrigger oblique pull wire rope fixing device
CN203097291U (en) Reinforcing and counter-pulling device of building construction formwork
CN104100038A (en) Girder
CN207469244U (en) A kind of precast pile monkey of pile driver
CN203938311U (en) Construction elevator wall-attaching equipment
CN203807008U (en) High-strength bolt anchorage structure for attachment of tower crane in high-rise building construction
CN201176856Y (en) Rope torquemoment releaser
CN203769311U (en) Self-drilling dismountable stress bolt assembly
CN207658986U (en) A kind of quick loosening device of vertical shaft hoisting head rope suspension wedge rope_ring and its loosen structure
CN205709591U (en) The novel flexible attachment device of derrick crane
CN205259181U (en) Wind rope earth anchor device is pulled to derrick

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131120

Termination date: 20150530

EXPY Termination of patent right or utility model