CN201695682U - Anchorage - Google Patents

Anchorage Download PDF

Info

Publication number
CN201695682U
CN201695682U CN2010202417238U CN201020241723U CN201695682U CN 201695682 U CN201695682 U CN 201695682U CN 2010202417238 U CN2010202417238 U CN 2010202417238U CN 201020241723 U CN201020241723 U CN 201020241723U CN 201695682 U CN201695682 U CN 201695682U
Authority
CN
China
Prior art keywords
bolt
embedded bolt
stressed
ground tackle
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202417238U
Other languages
Chinese (zh)
Inventor
罗维成
应小军
单兰亮
邢军
程剑兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 2 Co Ltd
Original Assignee
Sinohydro Bureau 2 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 2 Co Ltd filed Critical Sinohydro Bureau 2 Co Ltd
Priority to CN2010202417238U priority Critical patent/CN201695682U/en
Application granted granted Critical
Publication of CN201695682U publication Critical patent/CN201695682U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses an anchorage for large cantilever steel formworks of mass concrete walls of hydraulic, industrial and civil architectures. The anchorage mainly comprises an embedded bolt, a climbing cone, a top and a stress bolt, wherein the climbing cone comprises a conical nut, a movable bowl and a washer, the outer wall of the conical unit is provided with a groove, in which the movable bowl and the washer are mounted, the washer is arranged between the movable bowl and the groove, both ends of the conical nut are a bottom opening and an end opening, one end of the embedded bolt is welded with a tail base plate, the other end of the embedded bolt is screwed in the bottom opening, the end opening is screwed on the stress bolt, and the top is sleeved on the stress bolt. The anchorage as the advantages of wide application range, convenient dismounting, safety, firmness, long service life, reusability, cost saving and the like.

Description

Ground tackle
Technical field
The utility model relates to a kind of ground tackle that is used for the large-scale Steel Cantilever template of massive concrete walls body of water conservancy project, industry and civilian construction.
Background technology
Hydraulic structure such as gravity dam, lead in the construction of wall and gate pier and bridge high pier, the domestic past is mainly adopted combined steel formwork, wooden form or large steel moulding plate are constructed, bear the lateral pressure of concrete with lacing wire or split bolt to template, template is shelved on steel pipe scaffold or the plug-in tripod, steel pipe scaffold or plug-in tripod are usually with L shaped gib headed bolt anchoring on the wall, after the form removal, steel pipe scaffold or plug-in tripod will be hung down one deck or next flowing water section, and of L shaped gib headed bolt is because of exposing concrete surface, need blow method with oxygen-acetylene flame or electric welding and cut off, simultaneously the concrete wall surface also be needed to handle once more.This method is time-consuming, and spillage of material is big, and operation inconvenience is easy to destroy concrete during the cutting exposed steel bar, will have a strong impact on quality of concrete and appearance effect.
In recent years, the cantilever form technology is just applied at home, and conventional cantilever form is mainly solid on the concrete wall of having built by ground tackle.Ground tackle structure in the market comprises pre-embedded bolt, collar nut and stressed bolt, collar nut is similar to the reinforced bar sleeve joint, the one end generally is connected on the pre-embedded bolt, the other end is connected with stressed bolt, behind the concreting, all working load are all passed to collar nut by stressed bolt, pass to pre-embedded bolt by collar nut, are passed in the concrete of having built by pre-embedded bolt again.Finish when dismounting building, collar nut and stressed bolt visual concrete surface can be dismantled, and of pre-embedded bolt still needs to cut off.There is dismounting inconvenience in this ground tackle, stressed bolt poor mechanical property, problem such as ground tackle is short application life, and cantilever form poor stability and construction quality are not high.
The utility model content
The utility model purpose provides a kind of convenient disassembly, and safety is firm, long service life, the ground tackle that is used for large-scale Steel Cantilever template that can recycle.
In order to achieve the above object, technical scheme provided by the utility model is: a kind of ground tackle, it mainly comprises pre-embedded bolt, climb awl, gyro and stressed bolt, climb awl and comprise cone nut, movable button bowl and packing ring, the cone nut outer wall is provided with groove, movable button bowl and gasket sleeve are contained on the groove, and packing ring is arranged between movable button bowl and the groove, the two ends of cone nut are respectively end mouth and port, pre-embedded bolt one end is welded with cascabel plate, the other end and Di Kou are spirally connected, and port and stressed bolt are spirally connected, and gyro is sleeved on the stressed bolt.
Further, gyro is many shoulders cone structure.
Further, cascabel plate is provided with the reinforcing rib that is resisted against pre-embedded bolt.
Further, the mouth interior diameter is less than the port interior diameter at the end.
The beneficial effect of the utility model ground tackle is: the ground tackle that the utility model obtains has applied range, convenient disassembly, and safety is firm, and long service life can be used repeatedly, saves advantages such as cost and raising construction quality.
Description of drawings
Fig. 1 is the structural representation of ground tackle;
Fig. 2 is the structural representation of climbing awl;
Fig. 3 is the right view of Fig. 2;
Wherein: 1 pre-embedded bolt, 2 climb awl, 3 gyros, 4 stressed bolts, 11 cascabel plates, 12 reinforcing ribs, 21 cone nuts, 22 movable button bowls, 23 packing rings, 24 grooves, 25 end mouths, 26 ports.
The specific embodiment
Below in conjunction with the description of drawings specific embodiment of the present utility model.
As Fig. 1, Fig. 2 and shown in Figure 3, a kind of ground tackle, it mainly comprises pre-embedded bolt 1, climbs awl 2, gyro 3 and stressed bolt 4, climbs awl 2 and comprises cone nut 21, movable button bowl 22 and packing ring 23.Cone nut 21 profiles are taper, its two ends are respectively end mouth 25 and port 26, and the interior diameter of end mouth 25 is less than the interior diameter of port 26, and mouth 25 profiles in the end are taper, port 26 profiles are hexagon, and the interior hexagonal socket wrench of standard easy to use will be climbed awl 2 and be taken out in concrete.Cone nut 21 outer walls are provided with groove 24, movable button bowl 22 and packing ring 23 are sleeved on the groove 24, and packing ring 23 is arranged between movable button bowl 22 and the groove 24, guarantee can relatively rotate between cone nut 21 and the movable button bowl 22, simultaneously, prevent that movable button bowl 22 from coming off from cone nut 21.Pre-embedded bolt 1 one ends welding cascabel plate 11, cascabel plate 11 is provided with the reinforcing rib 12 that is resisted against pre-embedded bolt 1, and pre-embedded bolt 1 other end and end mouth 25 are spirally connected.Gyro 3 is sleeved on the stressed bolt 4, and stressed bolt 4 is spirally connected with port 26.
During construction, at first will climb awl 2 and be installed on the pre-embedded bolt 1, with connecting bolt they will be connected preposition on the template together then, and make and climb awl 2 port 26 and the rim of a bowl of movable button bowl 22 is close to form surfacing, after having built concrete, dismantle earlier connecting bolt, stripping again.After the form removable, the port 26 of climbing awl 2 is loaded onto stressed bolt 4 and gyro 3, then cantilever form is hung on gyro 3 with hanging device, calibration template is finished template and is installed, and the anchoring piece of one deck template down is installed, concreting enters next layer concrete template erection procedure.When cantilever form is removed, the stressed bolt 4 of outwarding winding, dismounting stressed bolt 4 and gyro 3, be locked with hexagonal socket wrench and climb awl 2 port, be rotated counterclockwise cone nut 21 rotations, movable button bowl 22 because and between the cone nut 21 space is arranged and keeps motionless, reduced and climbed the resistance that awl 2 takes out, climbed awl 2 and take out smoothly, and can use repeatedly.Stressed bolt 4, gyro 3 and climb after awl 2 removes are filled processing to the pit that metope forms with microdilatancy mortar or dry mortar.
The utility model ground tackle awl 2 of climbing of ground tackle in work progress is installed and removed conveniently with gyro 3, not being only applicable to vertical formwork installs, also be applicable to inclination template installation (as dam back side template and bracket soffit formwork), reduce a large amount of attached support systems, template can be in place rapidly, the efficiency of construction height, and concrete quality is unaffected, outward appearance is clean and tidy, effective, and concrete surface need not to do antirust and preservative treatment, and construction quality is improved.
When the utility model ground tackle is used for concrete cantilever template, its structure power transmission process is: working load is passed to gyro 3 by the cantilever shelf of cantilever form, pass to stressed bolt 4 by gyro 3, by stressed bolt 4 pass to climb the awl 2, pass to pre-embedded bolt 1 by climbing awl 2, pass in the concrete of having built by pre-embedded bolt 1 again.
Stressed bolt 4 bears flexural stress simultaneously, shear stress and tensile stress, also have high-frequency excitation power and impact force, it is the critical component that bears the whole loads of cantilever large steel moulding plate, whether the cantilever large steel moulding plate safety, the mechanical property that depends on stressed bolt 4 to a great extent, the stressed bolt 4 of the utility model ground tackle adopts the 40Cr steel to make, heat with salt bath when modified, cool off in oil, carry out high tempering then, the metallographic microstructure that obtains is a tempered sorbite, hardness 30~35HRC, after heat treatment is intact, carry out ultrasonic testing/ ultrasonic examination again, the mechanical property of stressed screw rod 4 improves.
Gyro 3 is the accurate cast steel part of shoulder vertebral body structure more than; the hypotenuse draw-in groove of its excircle is convenient to the suspension that cantilever form is quit; improved the reliability of its suspension; simultaneously; the screw thread of 3 pairs of stressed bolts 4 of gyro has played protective effect; having reduced cantilever form quits when hanging to the impact stress and the shear stress of stressed bolt 4, the safety that improved cantilever form.
The stressed character and stressed the varying in size of pre-embedded bolt 1 and stressed bolt 4,1 effect that is subjected to tensile stress of pre-embedded bolt, so pre-embedded bolt 1 is different with the specification of stressed bolt 4, the nominal diameter of stressed bolt 4 is greater than pre-embedded bolt 1, and mouth 25 interior diameters in the end are less than port 26 interior diameters, can link together pre-embedded bolt 1 and stressed bolt 4 well, thereby the consumption of saving the precious metal material reduces construction cost.
The design of cascabel plate 11 and reinforcing rib 12 can be passed in the concrete climbing awl 2 suffered pulling force, has improved the anchored force of concrete to pre-embedded bolt 1.
But the utility model ground tackle maximum bearing load is 45t, and monolithic cantilever form size can reach 3000mm * 3300mm (wide * height), satisfies the requirement of large volume concrete structural quick template supporting fully.

Claims (4)

1. ground tackle, it mainly comprises pre-embedded bolt (1), climb awl (2), gyro (3) and stressed bolt (4), it is characterized in that: the described awl (2) of climbing comprises cone nut (21), movable button bowl (22) and packing ring (23), described cone nut (21) outer wall is provided with groove (24), described movable button bowl (22) and packing ring (23) are sleeved on the groove (24), and packing ring (23) is arranged between movable button bowl (22) and the groove (24), the two ends of cone nut (21) are respectively end mouth (25) and port (26), described pre-embedded bolt (1) one end is welded with cascabel plate (11), the other end and Di Kou (25) are spirally connected, described port (26) is spirally connected with stressed bolt (4), and described gyro (3) is sleeved on the stressed bolt (4).
2. ground tackle according to claim 1 is characterized in that: described gyro (3) is many shoulders cone structure.
3. ground tackle according to claim 1 is characterized in that: described cascabel plate (11) is provided with the reinforcing rib (12) that is resisted against pre-embedded bolt (1).
4. ground tackle according to claim 1 is characterized in that: mouth of the described end (25) interior diameter is less than port (26) interior diameter.
CN2010202417238U 2010-06-23 2010-06-23 Anchorage Expired - Fee Related CN201695682U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202417238U CN201695682U (en) 2010-06-23 2010-06-23 Anchorage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202417238U CN201695682U (en) 2010-06-23 2010-06-23 Anchorage

Publications (1)

Publication Number Publication Date
CN201695682U true CN201695682U (en) 2011-01-05

Family

ID=43396921

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202417238U Expired - Fee Related CN201695682U (en) 2010-06-23 2010-06-23 Anchorage

Country Status (1)

Country Link
CN (1) CN201695682U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912118A (en) * 2013-01-05 2014-07-09 青岛两仪环保工程有限公司 Novel outer wall joint straightness ensuring device and use method thereof
CN102677595B (en) * 2012-05-31 2015-10-21 北京市建筑工程研究院有限责任公司 A kind of multifunctional platform being applicable to Character of Cable Force of Cable stayed Bridge construction
CN105544404A (en) * 2016-01-21 2016-05-04 中国建筑第六工程局有限公司 Supporting and fixing device used for installing high pier and U-type abutment formwork
CN109025013A (en) * 2012-12-07 2018-12-18 伊利诺斯工具制品有限公司 Curtain wall panel bracket leveling system
CN110374110A (en) * 2019-07-20 2019-10-25 东莞市建安桩基础工程有限公司 A kind of foundation pit supporting construction and its construction method
CN115012636A (en) * 2022-07-14 2022-09-06 中建三局第一建设工程有限责任公司 Bracket supporting and jacking formwork system and method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102677595B (en) * 2012-05-31 2015-10-21 北京市建筑工程研究院有限责任公司 A kind of multifunctional platform being applicable to Character of Cable Force of Cable stayed Bridge construction
CN109025013A (en) * 2012-12-07 2018-12-18 伊利诺斯工具制品有限公司 Curtain wall panel bracket leveling system
CN103912118A (en) * 2013-01-05 2014-07-09 青岛两仪环保工程有限公司 Novel outer wall joint straightness ensuring device and use method thereof
CN105544404A (en) * 2016-01-21 2016-05-04 中国建筑第六工程局有限公司 Supporting and fixing device used for installing high pier and U-type abutment formwork
CN110374110A (en) * 2019-07-20 2019-10-25 东莞市建安桩基础工程有限公司 A kind of foundation pit supporting construction and its construction method
CN115012636A (en) * 2022-07-14 2022-09-06 中建三局第一建设工程有限责任公司 Bracket supporting and jacking formwork system and method

Similar Documents

Publication Publication Date Title
CN201695682U (en) Anchorage
CN201695681U (en) Integral self-elevating type elevator hoistway tube mold
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN211114418U (en) Main material damage-free detachable steel-concrete combined beam
CN205935621U (en) Simple and easy outer scaffold frame and shear force wall connecting device
CN110593485A (en) Main material damage-free detachable steel-concrete combined beam
CN207110468U (en) A kind of shear wall joint part template reinforcing device
CN203531365U (en) Bolt anchor stiffness wall connecting piece
CN110863644A (en) Novel turnover tool type beam side connecting wall piece fixing device and method
CN107762135A (en) The construction method of skin scaffold wall connecting piece
CN105696796A (en) Cantilever scaffold steel girder anchoring method
CN205348724U (en) Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting
CN107476443A (en) Cast-in-place concrete floor hanging built-in fitting and technique
CN204343642U (en) Builder's jack corner support frame
CN207063177U (en) Cast-in-place concrete floor hanging built-in fitting
CN106320687A (en) Detachable wall connecting component for scaffold
CN107504036B (en) Internal support device for casing and construction method thereof
CN206800981U (en) A kind of detachable builder's jack retainer ring
CN205400025U (en) Detachable even wall spare of scaffold
CN210421889U (en) Wall-attached support mounting structure of attached lifting scaffold
CN103938845A (en) Anchor device for cantilever beam of cantilever scaffold and construction method
CN204343647U (en) A kind of the shaped steel suspension scaffolding bracing frame
CN211945954U (en) Detachable hanging ring structure
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN204435835U (en) Scaffold wall connecting piece

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110105

Termination date: 20160623

CF01 Termination of patent right due to non-payment of annual fee