CN201695682U - Anchorage - Google Patents
Anchorage Download PDFInfo
- Publication number
- CN201695682U CN201695682U CN2010202417238U CN201020241723U CN201695682U CN 201695682 U CN201695682 U CN 201695682U CN 2010202417238 U CN2010202417238 U CN 2010202417238U CN 201020241723 U CN201020241723 U CN 201020241723U CN 201695682 U CN201695682 U CN 201695682U
- Authority
- CN
- China
- Prior art keywords
- bolt
- embedded bolt
- stressed
- ground tackle
- groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses an anchorage for large cantilever steel formworks of mass concrete walls of hydraulic, industrial and civil architectures. The anchorage mainly comprises an embedded bolt, a climbing cone, a top and a stress bolt, wherein the climbing cone comprises a conical nut, a movable bowl and a washer, the outer wall of the conical unit is provided with a groove, in which the movable bowl and the washer are mounted, the washer is arranged between the movable bowl and the groove, both ends of the conical nut are a bottom opening and an end opening, one end of the embedded bolt is welded with a tail base plate, the other end of the embedded bolt is screwed in the bottom opening, the end opening is screwed on the stress bolt, and the top is sleeved on the stress bolt. The anchorage as the advantages of wide application range, convenient dismounting, safety, firmness, long service life, reusability, cost saving and the like.
Description
Technical field
The utility model relates to a kind of ground tackle that is used for the large-scale Steel Cantilever template of massive concrete walls body of water conservancy project, industry and civilian construction.
Background technology
Hydraulic structure such as gravity dam, lead in the construction of wall and gate pier and bridge high pier, the domestic past is mainly adopted combined steel formwork, wooden form or large steel moulding plate are constructed, bear the lateral pressure of concrete with lacing wire or split bolt to template, template is shelved on steel pipe scaffold or the plug-in tripod, steel pipe scaffold or plug-in tripod are usually with L shaped gib headed bolt anchoring on the wall, after the form removal, steel pipe scaffold or plug-in tripod will be hung down one deck or next flowing water section, and of L shaped gib headed bolt is because of exposing concrete surface, need blow method with oxygen-acetylene flame or electric welding and cut off, simultaneously the concrete wall surface also be needed to handle once more.This method is time-consuming, and spillage of material is big, and operation inconvenience is easy to destroy concrete during the cutting exposed steel bar, will have a strong impact on quality of concrete and appearance effect.
In recent years, the cantilever form technology is just applied at home, and conventional cantilever form is mainly solid on the concrete wall of having built by ground tackle.Ground tackle structure in the market comprises pre-embedded bolt, collar nut and stressed bolt, collar nut is similar to the reinforced bar sleeve joint, the one end generally is connected on the pre-embedded bolt, the other end is connected with stressed bolt, behind the concreting, all working load are all passed to collar nut by stressed bolt, pass to pre-embedded bolt by collar nut, are passed in the concrete of having built by pre-embedded bolt again.Finish when dismounting building, collar nut and stressed bolt visual concrete surface can be dismantled, and of pre-embedded bolt still needs to cut off.There is dismounting inconvenience in this ground tackle, stressed bolt poor mechanical property, problem such as ground tackle is short application life, and cantilever form poor stability and construction quality are not high.
The utility model content
The utility model purpose provides a kind of convenient disassembly, and safety is firm, long service life, the ground tackle that is used for large-scale Steel Cantilever template that can recycle.
In order to achieve the above object, technical scheme provided by the utility model is: a kind of ground tackle, it mainly comprises pre-embedded bolt, climb awl, gyro and stressed bolt, climb awl and comprise cone nut, movable button bowl and packing ring, the cone nut outer wall is provided with groove, movable button bowl and gasket sleeve are contained on the groove, and packing ring is arranged between movable button bowl and the groove, the two ends of cone nut are respectively end mouth and port, pre-embedded bolt one end is welded with cascabel plate, the other end and Di Kou are spirally connected, and port and stressed bolt are spirally connected, and gyro is sleeved on the stressed bolt.
Further, gyro is many shoulders cone structure.
Further, cascabel plate is provided with the reinforcing rib that is resisted against pre-embedded bolt.
Further, the mouth interior diameter is less than the port interior diameter at the end.
The beneficial effect of the utility model ground tackle is: the ground tackle that the utility model obtains has applied range, convenient disassembly, and safety is firm, and long service life can be used repeatedly, saves advantages such as cost and raising construction quality.
Description of drawings
Fig. 1 is the structural representation of ground tackle;
Fig. 2 is the structural representation of climbing awl;
Fig. 3 is the right view of Fig. 2;
Wherein: 1 pre-embedded bolt, 2 climb awl, 3 gyros, 4 stressed bolts, 11 cascabel plates, 12 reinforcing ribs, 21 cone nuts, 22 movable button bowls, 23 packing rings, 24 grooves, 25 end mouths, 26 ports.
The specific embodiment
Below in conjunction with the description of drawings specific embodiment of the present utility model.
As Fig. 1, Fig. 2 and shown in Figure 3, a kind of ground tackle, it mainly comprises pre-embedded bolt 1, climbs awl 2, gyro 3 and stressed bolt 4, climbs awl 2 and comprises cone nut 21, movable button bowl 22 and packing ring 23.Cone nut 21 profiles are taper, its two ends are respectively end mouth 25 and port 26, and the interior diameter of end mouth 25 is less than the interior diameter of port 26, and mouth 25 profiles in the end are taper, port 26 profiles are hexagon, and the interior hexagonal socket wrench of standard easy to use will be climbed awl 2 and be taken out in concrete.Cone nut 21 outer walls are provided with groove 24, movable button bowl 22 and packing ring 23 are sleeved on the groove 24, and packing ring 23 is arranged between movable button bowl 22 and the groove 24, guarantee can relatively rotate between cone nut 21 and the movable button bowl 22, simultaneously, prevent that movable button bowl 22 from coming off from cone nut 21.Pre-embedded bolt 1 one ends welding cascabel plate 11, cascabel plate 11 is provided with the reinforcing rib 12 that is resisted against pre-embedded bolt 1, and pre-embedded bolt 1 other end and end mouth 25 are spirally connected.Gyro 3 is sleeved on the stressed bolt 4, and stressed bolt 4 is spirally connected with port 26.
During construction, at first will climb awl 2 and be installed on the pre-embedded bolt 1, with connecting bolt they will be connected preposition on the template together then, and make and climb awl 2 port 26 and the rim of a bowl of movable button bowl 22 is close to form surfacing, after having built concrete, dismantle earlier connecting bolt, stripping again.After the form removable, the port 26 of climbing awl 2 is loaded onto stressed bolt 4 and gyro 3, then cantilever form is hung on gyro 3 with hanging device, calibration template is finished template and is installed, and the anchoring piece of one deck template down is installed, concreting enters next layer concrete template erection procedure.When cantilever form is removed, the stressed bolt 4 of outwarding winding, dismounting stressed bolt 4 and gyro 3, be locked with hexagonal socket wrench and climb awl 2 port, be rotated counterclockwise cone nut 21 rotations, movable button bowl 22 because and between the cone nut 21 space is arranged and keeps motionless, reduced and climbed the resistance that awl 2 takes out, climbed awl 2 and take out smoothly, and can use repeatedly.Stressed bolt 4, gyro 3 and climb after awl 2 removes are filled processing to the pit that metope forms with microdilatancy mortar or dry mortar.
The utility model ground tackle awl 2 of climbing of ground tackle in work progress is installed and removed conveniently with gyro 3, not being only applicable to vertical formwork installs, also be applicable to inclination template installation (as dam back side template and bracket soffit formwork), reduce a large amount of attached support systems, template can be in place rapidly, the efficiency of construction height, and concrete quality is unaffected, outward appearance is clean and tidy, effective, and concrete surface need not to do antirust and preservative treatment, and construction quality is improved.
When the utility model ground tackle is used for concrete cantilever template, its structure power transmission process is: working load is passed to gyro 3 by the cantilever shelf of cantilever form, pass to stressed bolt 4 by gyro 3, by stressed bolt 4 pass to climb the awl 2, pass to pre-embedded bolt 1 by climbing awl 2, pass in the concrete of having built by pre-embedded bolt 1 again.
Stressed bolt 4 bears flexural stress simultaneously, shear stress and tensile stress, also have high-frequency excitation power and impact force, it is the critical component that bears the whole loads of cantilever large steel moulding plate, whether the cantilever large steel moulding plate safety, the mechanical property that depends on stressed bolt 4 to a great extent, the stressed bolt 4 of the utility model ground tackle adopts the 40Cr steel to make, heat with salt bath when modified, cool off in oil, carry out high tempering then, the metallographic microstructure that obtains is a tempered sorbite, hardness 30~35HRC, after heat treatment is intact, carry out ultrasonic testing/ ultrasonic examination again, the mechanical property of stressed screw rod 4 improves.
Gyro 3 is the accurate cast steel part of shoulder vertebral body structure more than; the hypotenuse draw-in groove of its excircle is convenient to the suspension that cantilever form is quit; improved the reliability of its suspension; simultaneously; the screw thread of 3 pairs of stressed bolts 4 of gyro has played protective effect; having reduced cantilever form quits when hanging to the impact stress and the shear stress of stressed bolt 4, the safety that improved cantilever form.
The stressed character and stressed the varying in size of pre-embedded bolt 1 and stressed bolt 4,1 effect that is subjected to tensile stress of pre-embedded bolt, so pre-embedded bolt 1 is different with the specification of stressed bolt 4, the nominal diameter of stressed bolt 4 is greater than pre-embedded bolt 1, and mouth 25 interior diameters in the end are less than port 26 interior diameters, can link together pre-embedded bolt 1 and stressed bolt 4 well, thereby the consumption of saving the precious metal material reduces construction cost.
The design of cascabel plate 11 and reinforcing rib 12 can be passed in the concrete climbing awl 2 suffered pulling force, has improved the anchored force of concrete to pre-embedded bolt 1.
But the utility model ground tackle maximum bearing load is 45t, and monolithic cantilever form size can reach 3000mm * 3300mm (wide * height), satisfies the requirement of large volume concrete structural quick template supporting fully.
Claims (4)
1. ground tackle, it mainly comprises pre-embedded bolt (1), climb awl (2), gyro (3) and stressed bolt (4), it is characterized in that: the described awl (2) of climbing comprises cone nut (21), movable button bowl (22) and packing ring (23), described cone nut (21) outer wall is provided with groove (24), described movable button bowl (22) and packing ring (23) are sleeved on the groove (24), and packing ring (23) is arranged between movable button bowl (22) and the groove (24), the two ends of cone nut (21) are respectively end mouth (25) and port (26), described pre-embedded bolt (1) one end is welded with cascabel plate (11), the other end and Di Kou (25) are spirally connected, described port (26) is spirally connected with stressed bolt (4), and described gyro (3) is sleeved on the stressed bolt (4).
2. ground tackle according to claim 1 is characterized in that: described gyro (3) is many shoulders cone structure.
3. ground tackle according to claim 1 is characterized in that: described cascabel plate (11) is provided with the reinforcing rib (12) that is resisted against pre-embedded bolt (1).
4. ground tackle according to claim 1 is characterized in that: mouth of the described end (25) interior diameter is less than port (26) interior diameter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202417238U CN201695682U (en) | 2010-06-23 | 2010-06-23 | Anchorage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202417238U CN201695682U (en) | 2010-06-23 | 2010-06-23 | Anchorage |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201695682U true CN201695682U (en) | 2011-01-05 |
Family
ID=43396921
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202417238U Expired - Fee Related CN201695682U (en) | 2010-06-23 | 2010-06-23 | Anchorage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201695682U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103912118A (en) * | 2013-01-05 | 2014-07-09 | 青岛两仪环保工程有限公司 | Novel outer wall joint straightness ensuring device and use method thereof |
CN102677595B (en) * | 2012-05-31 | 2015-10-21 | 北京市建筑工程研究院有限责任公司 | A kind of multifunctional platform being applicable to Character of Cable Force of Cable stayed Bridge construction |
CN105544404A (en) * | 2016-01-21 | 2016-05-04 | 中国建筑第六工程局有限公司 | Supporting and fixing device used for installing high pier and U-type abutment formwork |
CN109025013A (en) * | 2012-12-07 | 2018-12-18 | 伊利诺斯工具制品有限公司 | Curtain wall panel bracket leveling system |
CN110374110A (en) * | 2019-07-20 | 2019-10-25 | 东莞市建安桩基础工程有限公司 | A kind of foundation pit supporting construction and its construction method |
CN115012636A (en) * | 2022-07-14 | 2022-09-06 | 中建三局第一建设工程有限责任公司 | Bracket supporting and jacking formwork system and method |
-
2010
- 2010-06-23 CN CN2010202417238U patent/CN201695682U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102677595B (en) * | 2012-05-31 | 2015-10-21 | 北京市建筑工程研究院有限责任公司 | A kind of multifunctional platform being applicable to Character of Cable Force of Cable stayed Bridge construction |
CN109025013A (en) * | 2012-12-07 | 2018-12-18 | 伊利诺斯工具制品有限公司 | Curtain wall panel bracket leveling system |
CN103912118A (en) * | 2013-01-05 | 2014-07-09 | 青岛两仪环保工程有限公司 | Novel outer wall joint straightness ensuring device and use method thereof |
CN105544404A (en) * | 2016-01-21 | 2016-05-04 | 中国建筑第六工程局有限公司 | Supporting and fixing device used for installing high pier and U-type abutment formwork |
CN110374110A (en) * | 2019-07-20 | 2019-10-25 | 东莞市建安桩基础工程有限公司 | A kind of foundation pit supporting construction and its construction method |
CN115012636A (en) * | 2022-07-14 | 2022-09-06 | 中建三局第一建设工程有限责任公司 | Bracket supporting and jacking formwork system and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201695682U (en) | Anchorage | |
CN201695681U (en) | Integral self-elevating type elevator hoistway tube mold | |
CN203808484U (en) | Integrated cantilevered and attached external scaffolding | |
CN211114418U (en) | Main material damage-free detachable steel-concrete combined beam | |
CN205935621U (en) | Simple and easy outer scaffold frame and shear force wall connecting device | |
CN110593485A (en) | Main material damage-free detachable steel-concrete combined beam | |
CN207110468U (en) | A kind of shear wall joint part template reinforcing device | |
CN203531365U (en) | Bolt anchor stiffness wall connecting piece | |
CN110863644A (en) | Novel turnover tool type beam side connecting wall piece fixing device and method | |
CN107762135A (en) | The construction method of skin scaffold wall connecting piece | |
CN105696796A (en) | Cantilever scaffold steel girder anchoring method | |
CN205348724U (en) | Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting | |
CN107476443A (en) | Cast-in-place concrete floor hanging built-in fitting and technique | |
CN204343642U (en) | Builder's jack corner support frame | |
CN207063177U (en) | Cast-in-place concrete floor hanging built-in fitting | |
CN106320687A (en) | Detachable wall connecting component for scaffold | |
CN107504036B (en) | Internal support device for casing and construction method thereof | |
CN206800981U (en) | A kind of detachable builder's jack retainer ring | |
CN205400025U (en) | Detachable even wall spare of scaffold | |
CN210421889U (en) | Wall-attached support mounting structure of attached lifting scaffold | |
CN103938845A (en) | Anchor device for cantilever beam of cantilever scaffold and construction method | |
CN204343647U (en) | A kind of the shaped steel suspension scaffolding bracing frame | |
CN211945954U (en) | Detachable hanging ring structure | |
CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
CN204435835U (en) | Scaffold wall connecting piece |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110105 Termination date: 20160623 |
|