CN203769311U - Self-drilling dismountable stress bolt assembly - Google Patents

Self-drilling dismountable stress bolt assembly Download PDF

Info

Publication number
CN203769311U
CN203769311U CN201420068759.9U CN201420068759U CN203769311U CN 203769311 U CN203769311 U CN 203769311U CN 201420068759 U CN201420068759 U CN 201420068759U CN 203769311 U CN203769311 U CN 203769311U
Authority
CN
China
Prior art keywords
bolt
bolt head
dismountable
screw
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420068759.9U
Other languages
Chinese (zh)
Inventor
赵礼江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201420068759.9U priority Critical patent/CN203769311U/en
Application granted granted Critical
Publication of CN203769311U publication Critical patent/CN203769311U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a self-drilling dismountable stress bolt assembly. The self-drilling dismountable stress bolt assembly mainly comprises a bolt and a ring buckle (50), wherein the bolt comprises a bolt head (40) and a threaded rod (30), and the upper part of the bolt head (40) is a hexagon;as the cross section of a sleeve pipe of an electrically-driven drill is also a hexagon,the threaded rod (30) is a self drilling screw actually, the threaded rod (30) comprises a screw rod (31) and a screw tail (32), and the screw tail (32) takes a drilling tail shape. The self-drilling dismountable stress bolt assembly has the advantages as follows: through the adoption of the bolt assembly, the template loss can be reduced greatly, the construction progress can be accelerated, the mounting cost can be reduced, and the construction safety can be guaranteed.

Description

A kind of from boring dismountable stress bolt composite member
Technical field
The utility model relates in construction work for fixing accessory, especially a kind of from boring dismountable stress bolt composite member, this composite member mainly comprises bolt and clasp, this utility model is fixed on the steel mesh reinforcement in construction work in template, prevent steel mesh reinforcement drift floating in the time of concreting, simultaneously all right accelerating construction progress, saves installation cost, ensures construction safety.
Background technology
At present, in construction work, steel mesh reinforcement is fixed in template and mostly adopts iron wire to fix, there are following several defects for this form of construction work: first, because iron wire will be fixed reinforcing bar, also to fix reinforcing bar and template simultaneously, and iron wire pulling force is limited, in the time that stretch amplitude is large, iron wire easily ruptures, will increase like this loss, affect construction speed, and to there will be empty button phenomenon (be that surface looks solid that but tying causes half breaking state because of coiling overexertion, when grouting because of concrete buoyancy, can make filling member unbalance, impact construction), its two, iron wire is thinner, pulling force is crossed conference and is penetrated in filling member and damage it, gets loose phenomenon, reduces anti-floating power, its three, in the time of stripping, to cut at twice iron wire---first before stripping, cut once, expose outside also will cutting at the bottom of cement board after stripping screw---the progress of construction is slow like this, paying of increasing manpower, has increased cost of labor, its four, because such construction is no less than two people operations, be subject to the restriction of many factors, can not be control construction speed, its five, due to iron wire construction location disunity, often to reserve longer iron wire, thereby strengthen loss, increase cost, finally, iron wire exists potential safety hazard easily to scratch health and face in the time of construction.
Therefore, for above-mentioned many disadvantages, in order to adapt to the development trend in market, meet people's demand, be badly in need of a kind of new product and occur.
Summary of the invention
For above-mentioned prior art, the technical problems to be solved in the utility model is to provide a kind of from boring dismountable stress bolt composite member, this utility model can make steel mesh reinforcement well be fixed in template, make it not drift about, can not float, but also can accelerating construction progress, save installation cost, ensure construction safety.
In order to solve the problems of the technologies described above, it is a kind of from boring dismountable stress bolt composite member that the utility model provides, and mainly comprises bolt and latch closure.Wherein, bolt comprises bolt head and screw rod, and bolt head and screw rod are not one, but be threaded connection, that is to say that they can separate, bolt head is made up of three parts, be top, the protuberance of bolt head and the bottom of bolt head of bolt head, the top of bolt head is hexagon, because the cross section of the sleeve of electric drill is also hexagonal, can use like this Electric portable drill to operate bolt; What be connected with the top of bolt head is the protuberance of bolt head, and it can prevent that bolt from coming off from clasp; What be connected with the protuberance of bolt head is the bottom of bolt head, it is a cylinder, there is an an end opening and threaded hole in cylindrical inside, be screw hole and screw-socket, because the screw thread on screw rod is corresponding with the screw thread of screw hole, can facilitate like this bolt head and screw rod to be threaded connection; Screw rod is actually a kind of Self Drilling Screws, formed by screw mandrel and silk tail, silk tail present brill shape of tail, again owing to being bolted to after template, silk a tail can expose template a little, in the time of dismounting template, can on electric drill, load onto socket wrench specially adapted for it like this, to start in the other direction, can easily unload screw, template just can intactly unload, can not damage template, the screw disassembling can be reused; For clasp, it is made up of pulling force hook and ring portion, and wherein the effect of pulling force hook is for hooking reinforcing bar, and ring portion is for blocking bolt, preventing bolt falling.
Concrete operations flow process of the present utility model is as follows:
First reinforcing bar is placed in template, be net structure, one time punching molded hex bolts head and screw combinations, coordinate the clasp of the buckle of high strength elastic force finally to consist of " certainly boring dismountable stress bolt composite member ", according to mechanics principle, the pulling force fastener of clasp in reinforcing bar, utilize electric drill to be enclosed within bolt head, reinforcing bar and template are fixed together, finally reach required pulling force, play anti-floating effect, in the time of dismounting template, unload screw in template bottom with instruments such as electric drills, template just can easily come off, and can not damage template.
Need to illustrate, this bolt combination part is generally taking every square metre three cover or three covers are above is uniformly distributed as benchmark, and reinforcing bar and template are fixed together.
Advantage of the present utility model:
Use this bolt combination part, can reduce template loss largelyr, accelerating construction progress, saves installation cost, ensures construction safety.
Brief description of the drawings
Fig. 1 is from boring dismountable stress bolt composite member by the structure chart after constructing;
Fig. 2 is from the structure chart that bores dismountable stress bolt composite member;
Fig. 3 is the amplification assumption diagram of screw rod;
Fig. 4 is the structural representation of clasp;
Fig. 5 is the structural representation of bolt head.
Description of reference numerals: 11, reinforcing bar 12, template 30, screw rod 31, screw mandrel 32, silk tail 40, bolt head 41, the top 42 of bolt head, the protuberance 43 of bolt head, the bottom 44 of bolt head, screw hole 45, screw-socket 50, clasp 51, pulling force hook 52, ring portion.
Detailed description of the invention
Below in conjunction with drawings and the specific embodiments, the utility model is described in further detail.
As shown in Figure 2, it is a kind of from boring dismountable stress bolt composite member that the utility model provides, and mainly comprises bolt and latch closure 50.Wherein, as shown in Figures 3 and 5, bolt comprises bolt head 40 and screw rod 30, and bolt head 40 and screw rod 30 are not one, but be threaded connection, that is to say that they can separate, as shown in Figure 5, bolt head 40 is made up of three parts, be top 41, the protuberance 42 of bolt head and the bottom 43 of bolt head of bolt head, the top 41 of bolt head is hexagon, because the cross section of the sleeve of electric drill is also hexagonal, can use like this Electric portable drill to operate bolt; What be connected with the top 41 of bolt head is the protuberance 42 of bolt head, and it can prevent that bolt from coming off from clasp 50; What be connected with the protuberance 42 of bolt head is the bottom 43 of bolt head, it is a cylinder, there is an an end opening and threaded hole in cylindrical inside, be screw hole 44 and screw-socket 45, because the screw thread on screw rod 30 is corresponding with the screw thread in screw hole 44, can make like this bolt head 40 and screw rod 30 be threaded connection; Shown in Fig. 3, screw rod 30 is actually a kind of Self Drilling Screws, is made up of screw mandrel 31 and silk tail 32, and silk tail 32 presents brill shape of tail, again owing to being bolted to after template 12, silk tail 32 can expose template a little, can on electric drill, load onto socket wrench specially adapted for it in dismounting when template 12 like this, to start in the other direction, can easily unload screw, template 12 just can intactly unload, and can not damage template 12, and the screw disassembling can be reused; As shown in Figure 4, for clasp 50, it is made up of pulling force hook 51 and ring portion 52, and wherein pulling force hook 51 has elastic force, and its effect is for hooking reinforcing bar 11, and ring portion 52 is for blocking bolt, preventing bolt falling.
Concrete operations flow process of the present utility model is as follows:
As shown in Figure 1, first reinforcing bar 11 is placed in template 12, be net structure, one time punching molded hex bolts head 40 and screw rod 30 are combined, coordinate the clasp 50 of high strength elastic force finally to consist of " certainly boring dismountable stress bolt composite member ", according to mechanics principle, the pulling force hook 51 of clasp 50 is buckled in to reinforcing bar 11, utilize electric drill to be enclosed within bolt head 40, reinforcing bar 11 and template 12 are fixed together, finally reach required pulling force, play anti-floating effect, in the time of dismounting template 12, unload screw in template 12 bottoms with instruments such as electric drills, template 12 just can easily come off, and can not damage template.
Need to illustrate, this bolt combination part is generally anchored on template 12 taking every square metre three cover as benchmark is uniformly distributed, and fixes reinforcing bar 11 simultaneously.
Advantage of the present utility model:
Use this bolt combination part, can reduce template loss largelyr, accelerating construction progress, saves installation cost, ensures construction safety.
In sum; content described in the utility model and detailed description of the invention thereof; only essence and the intension in order clearly to illustrate that by way of example this practicality is new; not be limited on the variation pattern on the utility model design basis in the mode of limitation; those skilled in the art can be on design of the present utility model basis; arbitrarily change, but as its based on invention thinking common practise and the customary means in conjunction with this area, within still belonging to protection domain of the present utility model.

Claims (3)

1. one kind is bored dismountable stress bolt composite member certainly, it is characterized in that: mainly comprise bolt and latch closure (50), wherein, bolt comprises bolt head (40) and screw rod (30), and bolt head (40) and screw rod (30) are to be threaded connection, bolt head (40) is made up of three parts, i.e. the protuberance (42) of the top of bolt head (41), bolt head and the bottom (43) of bolt head, and what be connected with the top (41) of bolt head is the protuberance (42) of bolt head; What be connected with the protuberance (42) of bolt head is the bottom (43) of bolt head, it is a cylinder, there is an an end opening and threaded hole in cylindrical inside, i.e. screw hole (44) and screw-socket (45), screw rod (30) is a kind of Self Drilling Screws; For clasp (50), it is made up of pulling force hook (51) and ring portion (52).
2. certainly bore dismountable stress bolt composite member according to one claimed in claim 1, it is characterized in that: described screw rod (30) is made up of screw mandrel (31) and a silk tail (32), and a silk tail (32) presents brill shape of tail.
3. certainly bore dismountable stress bolt composite member according to one claimed in claim 1, it is characterized in that: the top (41) of described bolt head is hexagon, pentagon or quadrangle.
CN201420068759.9U 2014-02-18 2014-02-18 Self-drilling dismountable stress bolt assembly Expired - Fee Related CN203769311U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420068759.9U CN203769311U (en) 2014-02-18 2014-02-18 Self-drilling dismountable stress bolt assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420068759.9U CN203769311U (en) 2014-02-18 2014-02-18 Self-drilling dismountable stress bolt assembly

Publications (1)

Publication Number Publication Date
CN203769311U true CN203769311U (en) 2014-08-13

Family

ID=51286515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420068759.9U Expired - Fee Related CN203769311U (en) 2014-02-18 2014-02-18 Self-drilling dismountable stress bolt assembly

Country Status (1)

Country Link
CN (1) CN203769311U (en)

Similar Documents

Publication Publication Date Title
CN205117377U (en) Gob entry driving fender is consolidated and is used slip casting anchor rope
CN203742194U (en) Prestressed steel wire rope encircling reinforcing device of concrete beam
CN203066474U (en) Disposable wallboard pulling piece for building aluminum formwork
CN204081445U (en) To encorbelment i iron anchor device
CN204225471U (en) A kind of cantilever steel girder structure through walls
CN203769311U (en) Self-drilling dismountable stress bolt assembly
CN204000863U (en) A kind of recoverable anchor rod that can form enlarged footing
CN201362956Y (en) Novel wall connector
CN205530246U (en) Shape pawl formula of preapring for an unfavorable turn of events soil bolt
CN208966008U (en) A kind of reusable exterior wall steel pipe scaffold wall-connecting piece device
CN203097291U (en) Reinforcing and counter-pulling device of building construction formwork
CN202644967U (en) Scaffold tool type wall connecting piece
CN201459718U (en) Flexible pull rod for construction bearing platform
CN207310223U (en) A kind of detachable end to end anchorage of electric pole reinforcement frame
CN203297517U (en) Annular bolt for fixing aggregate platform of high-rise building
CN203960860U (en) A kind of detachable anchoring piece
CN204475816U (en) A kind of novel long cantilever construction construction support
CN204941579U (en) The pre-buried orifice tube of a kind of pit shaft borehole wall grouting
CN203393904U (en) Reinforcement fabric hoop
CN203769312U (en) Novel bolt assembly for fixing mesh reinforcement
CN205709591U (en) The novel flexible attachment device of derrick crane
CN203096731U (en) Pre-stressed hollow square pile assembly without end plate at one end
CN208184760U (en) A kind of coal mine anchor rod protective case
CN203213362U (en) Construction anti-floating positioning anchoring part
CN206571799U (en) A kind of hollow bolt

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140813

Termination date: 20180218

CF01 Termination of patent right due to non-payment of annual fee