CN106088357A - The building pre-buried anchoring bolt of infilled wall tie bar - Google Patents

The building pre-buried anchoring bolt of infilled wall tie bar Download PDF

Info

Publication number
CN106088357A
CN106088357A CN201610633688.6A CN201610633688A CN106088357A CN 106088357 A CN106088357 A CN 106088357A CN 201610633688 A CN201610633688 A CN 201610633688A CN 106088357 A CN106088357 A CN 106088357A
Authority
CN
China
Prior art keywords
buried
tie bar
wall tie
infilled wall
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610633688.6A
Other languages
Chinese (zh)
Inventor
聂益胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610633688.6A priority Critical patent/CN106088357A/en
Publication of CN106088357A publication Critical patent/CN106088357A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4157Longitudinally-externally threaded elements extending from the concrete or masonry, e.g. anchoring bolt with embedded head
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4178Masonry wall ties

Abstract

The invention provides the building pre-buried anchoring bolt of infilled wall tie bar.The described pre-buried anchoring bolt of building infilled wall tie bar includes that pre-buried bolt and pin, described pre-buried bolt include embedded section and the section of stretching out connected, described in the section of stretching out include keyhole, described pin and described keyhole size are mutually matched and described pin is inserted in described keyhole.The pre-buried anchoring bolt of building infilled wall tie bar that the present invention provides can be imbedded in concrete, again can form removal smoothly, thereafter filling wall construction can be carried out at any time, technique is simple, low cost, can be simple and easy to do in construction with mass production, and intensity high-durability is good, construction is without dust noise pollution, and from construction quality, cost, effect several respects, being better than chemically-planted steel bar construction method can widely popularize with nationwide.

Description

The building pre-buried anchoring bolt of infilled wall tie bar
[technical field]
The present invention relates to building engineering field, be specifically related to a kind of building pre-buried anchoring bolt of infilled wall tie bar.
[background technology]
National regulation specify fill wall tension rib should be in structural frames trestle, pre-buried φ 6 reinforcing bar, expose the lap of splice= 400mm.When building filling wall, the tension rib built in wall overlaps with embedded bar colligation.
But being difficult to by the requirement pre-buried tie bar of this specification in reality is constructed, reason is that on frame column pre-buried tie bar is relatively Many, after casting concrete, the extremely difficult dismounting of template is filled the tension rib of wall the most at present and is generally adopted with concrete column, wall, beam, plate Connect by the method for chemically-planted steel bar, the method specification is allow, but intensity inspection must be carried out according to related specifications after bar planting Survey (pull-out test).The operation of bar planting and being affected by the condition such as concrete curing, degree of drying, holes during construction, aperture blowing is formed Dust pollution, noise pollution serious.The quality requirement to be reached of bar planting, construction manager, management need to strengthen monitoring power Degree checks concrete degree of drying, drilling depth, glue cases at any time.Because floor volume very much not Qualification happens occasionally, and The quantity of detection is only 3 ‰, has underproof bar planting to cause hidden danger of quality unavoidably.The quality of rebar-planting quality directly affect body of wall with The reliability of the connection of agent structure, and then affect the anti-seismic performance of house wall.
Therefore, it is necessary to provide the one building pre-buried anchoring bolt of infilled wall tie bar.
[summary of the invention]
It is an object of the invention to provide a kind of building pre-buried anchoring bolt of infilled wall tie bar.
Technical scheme is as follows: a kind of building pre-buried anchoring bolt of infilled wall tie bar, including pre-buried bolt and pin, Described pre-buried bolt includes embedded section and the section of stretching out connected, described in the section of stretching out include keyhole, described pin and described keyhole size It is mutually matched and described pin is inserted in described keyhole.
Preferably, the section of stretching out described in includes extending, from described embedded section, the extension formed and prolonging from the bending of described extension Stretching the kink of formation, described keyhole is enclosed formed by described extension and described kink.
Preferably, the internal diameter of described keyhole is 8mm, and described pin is 6-10mm reducing plug-in unit, and described pin includes end Round handle and be located at the eyelet in round handle, described eyelet is used for being screwed into screw, fixing described pin, and the diameter of described pin is from tool One end of described round handle is gradually reduced to the other end.
Preferably, described embedded section is inserted in the pattern hole of concrete component template, and the length etc. of described pattern hole External diameter in described keyhole.
Preferably, described embedded section has L-type bending structure away from one end of the described section of stretching out.
Preferably, described pre-buried bolt uses the reinforcing bar of φ 8.
Preferably, a length of 280mm of described embedded section, described in a length of 24-30mm of the section of stretching out.
Preferably, a length of 60-70mm of described pin.
Preferably, a length of 24mm of described pattern hole, width is 8mm.
The beneficial effects of the present invention is: the pre-buried anchoring bolt of building infilled wall tie bar that the present invention provides can imbed concrete In, again can form removal smoothly, filling wall construction thereafter can be carried out at any time, and technique is simple, low cost, can be big with batch production Batch production, simple and easy to do in construction, and intensity high-durability is good, construct without dust noise pollution, from construction quality, cost, Effect several respects, being better than chemically-planted steel bar construction method can widely popularize with nationwide.
[accompanying drawing explanation]
Fig. 1 is the part-structure figure of the building pre-buried anchoring bolt of infilled wall tie bar of the present invention;
Fig. 2 is the sectional view of the building pre-buried anchoring bolt of infilled wall tie bar of the present invention;
Fig. 3 is that the present invention dismantles the design sketch of concrete component template;
Fig. 4 is the structural map that the application present invention builds a wall.
[detailed description of the invention]
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
Please refer to Fig. 1 to Fig. 3, the described pre-buried anchoring bolt of building infilled wall tie bar, including pre-buried bolt 1 and pin 2, Described pre-buried bolt 1 includes embedded section 11 and the section of stretching out 12 connected, described in the section of stretching out 12 include keyhole 121, described pin 2 and institute State keyhole 121 size to be mutually matched and described pin 2 is inserted in described keyhole 121.
The described section of stretching out 12 includes extending, from described embedded section 1, the extension 122 formed and bending from described extension 122 Extending the kink 123 formed, described keyhole 121 is enclosed formed by described extension 122 and described kink 123.
The internal diameter of described keyhole 121 is 8mm, and described pin 2 is 6-10mm reducing plug-in unit, and described pin 2 includes end Justifying handle 21 and be located at the eyelet 22 in round handle 21, described eyelet 22 is used for installing tapping screw 5, fixing described pin 2, described pin The diameter of nail 2 is gradually reduced to the other end from the one end having described round handle 21, and this ensure that its closely connecting with described keyhole 121 Connect.
Described embedded section 11 is inserted in the pattern hole 31 of concrete component template 3, and the length etc. of described pattern hole 31 External diameter in described keyhole 121.
Described embedded section 11 has L-type bending structure away from one end of the described section of stretching out 12.
Described pre-buried bolt 1 uses the reinforcing bar of φ 8.
The a length of 280mm of described embedded section 11, described in a length of 24-30mm of the section of stretching out 12.
The a length of 60-70mm of described pin 2.
The installation method of the described pre-buried anchor of building infilled wall tie bar is: after good for described concrete component model sheetinstallat, Described concrete component template draws perforated lines molding plate hole by spacing dimension, a length of 24mm of described pattern hole, Width is 8mm.
Described pre-buried bolt is inserted in pattern hole, described pin is penetrated described keyhole simultaneously, treat that described pre-buried bolt is complete After inserting post mould, described pin is close to described concrete component template, uses tapping screw 5 to load described eyelet 22, by institute State pin and described concrete component template is tightened fixing.
Incorporated by reference to refering to Fig. 4, when building filling wall 6, tension rib 7 is through keyhole 121, and colligation is firm;When tension rib 7 blanking Time should be plus the bending length of 180 °.
Above-described is only embodiments of the present invention, it should be noted here that for those of ordinary skill in the art For, without departing from the concept of the premise of the invention, it is also possible to make improvement, but these belong to the protection model of the present invention Enclose.

Claims (9)

1. the building pre-buried anchoring bolt of infilled wall tie bar, it is characterised in that include pre-buried bolt and pin, described pre-buried bolt bag Include the embedded section of connection and the section of stretching out, described in the section of stretching out include that keyhole, described pin and described keyhole size are mutually matched and institute State pin to be inserted in described keyhole.
The pre-buried anchoring bolt of building infilled wall tie bar the most according to claim 1, it is characterised in that described in:, the section of stretching out includes Extending, from described embedded section, the extension formed and extend, from the bending of described extension, the kink formed, described keyhole is by described Extension and described kink enclose formation.
The pre-buried anchoring bolt of building infilled wall tie bar the most according to claim 2, it is characterised in that: the internal diameter of described keyhole For 8mm, described pin is 6-10mm reducing plug-in unit, and described pin includes the round handle of end and is located at the eyelet in round handle, described Eyelet is used for being screwed into screw, fixing described pin, and the diameter of described pin gradually subtracts to the other end from the one end having described round handle Little.
The pre-buried anchoring bolt of building infilled wall tie bar the most according to claim 1, it is characterised in that: described embedded section inserts In the pattern hole of concrete component template, and the length of described pattern hole is equal to the external diameter of described keyhole.
The pre-buried anchoring bolt of building infilled wall tie bar the most according to claim 1, it is characterised in that: described embedded section away from One end of the described section of stretching out has L-type bending structure.
The pre-buried anchoring bolt of building infilled wall tie bar the most according to claim 1, it is characterised in that: described pre-buried bolt uses The reinforcing bar of φ 8.
The pre-buried anchoring bolt of building infilled wall tie bar the most according to claim 1, it is characterised in that: the length of described embedded section Degree for 280mm, described in a length of 24-30mm of the section of stretching out.
The pre-buried anchoring bolt of building infilled wall tie bar the most according to claim 1, it is characterised in that: the length of described pin For 60-70mm.
The pre-buried anchoring bolt of building infilled wall tie bar the most according to claim 4, it is characterised in that: the length of described pattern hole Degree is 24mm, and width is 8mm.
CN201610633688.6A 2016-08-04 2016-08-04 The building pre-buried anchoring bolt of infilled wall tie bar Pending CN106088357A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610633688.6A CN106088357A (en) 2016-08-04 2016-08-04 The building pre-buried anchoring bolt of infilled wall tie bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610633688.6A CN106088357A (en) 2016-08-04 2016-08-04 The building pre-buried anchoring bolt of infilled wall tie bar

Publications (1)

Publication Number Publication Date
CN106088357A true CN106088357A (en) 2016-11-09

Family

ID=57454968

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610633688.6A Pending CN106088357A (en) 2016-08-04 2016-08-04 The building pre-buried anchoring bolt of infilled wall tie bar

Country Status (1)

Country Link
CN (1) CN106088357A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109137988A (en) * 2018-10-23 2019-01-04 苏州同尚工程设计咨询有限公司 A kind of inspection shaft and its implementation method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3599379A (en) * 1969-01-21 1971-08-17 Spanel Abram Nathaniel Bolt-anchoring devices for concrete
CN203297517U (en) * 2013-05-30 2013-11-20 江苏弘盛建设工程集团有限公司 Annular bolt for fixing aggregate platform of high-rise building
CN203531361U (en) * 2013-10-14 2014-04-09 中国十七冶集团有限公司 Embedded type lifting ring bolt for being connected with scaffold
CN204645268U (en) * 2015-05-25 2015-09-16 山东平安建设集团有限公司 A kind of infilled wall tie bar built-in fitting
US20160032582A1 (en) * 2014-08-01 2016-02-04 Columbia Insurance Company Thermally-isolated anchoring systems with split tail veneer tie for cavity walls
CN205314534U (en) * 2016-01-29 2016-06-15 湖州职业技术学院 Frame post can't harm drawknot steel form structure
CN105780964A (en) * 2016-03-09 2016-07-20 盐城工学院 Connection structure and construction process for lightweight wall block filler wall and frame structure
CN205975992U (en) * 2016-08-04 2017-02-22 聂益胜 Pre -buried anchor of building infilled wall drawknot muscle is tied

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3599379A (en) * 1969-01-21 1971-08-17 Spanel Abram Nathaniel Bolt-anchoring devices for concrete
CN203297517U (en) * 2013-05-30 2013-11-20 江苏弘盛建设工程集团有限公司 Annular bolt for fixing aggregate platform of high-rise building
CN203531361U (en) * 2013-10-14 2014-04-09 中国十七冶集团有限公司 Embedded type lifting ring bolt for being connected with scaffold
US20160032582A1 (en) * 2014-08-01 2016-02-04 Columbia Insurance Company Thermally-isolated anchoring systems with split tail veneer tie for cavity walls
CN204645268U (en) * 2015-05-25 2015-09-16 山东平安建设集团有限公司 A kind of infilled wall tie bar built-in fitting
CN205314534U (en) * 2016-01-29 2016-06-15 湖州职业技术学院 Frame post can't harm drawknot steel form structure
CN105780964A (en) * 2016-03-09 2016-07-20 盐城工学院 Connection structure and construction process for lightweight wall block filler wall and frame structure
CN205975992U (en) * 2016-08-04 2017-02-22 聂益胜 Pre -buried anchor of building infilled wall drawknot muscle is tied

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109137988A (en) * 2018-10-23 2019-01-04 苏州同尚工程设计咨询有限公司 A kind of inspection shaft and its implementation method

Similar Documents

Publication Publication Date Title
CN201722929U (en) Embedded part anchoring device of building template
US6796745B2 (en) Soil nailing system
CN106088357A (en) The building pre-buried anchoring bolt of infilled wall tie bar
CN204727362U (en) Control setup draw-in box
CN205975992U (en) Pre -buried anchor of building infilled wall drawknot muscle is tied
CN209244225U (en) A kind of hound of adjustable length
KR100881863B1 (en) Concrete supporting pole for mounting anchor bolt and manufacturing method thereof
CN204327134U (en) A kind of prestressing force balance anchor cable
CN203499017U (en) Wall tie bar pre-embedded positioning device
CN211973866U (en) Concrete PC vertical wall plate prefabricated part
CN209945978U (en) Splicing steel die for testing bonding strength of sprayed concrete and rock on site
CN216664971U (en) Large formwork assembling structure and formwork of high-rise shear wall
KR101424347B1 (en) Shear anchor for joing new and old concrete and method for joining new and old concrete
KR101916628B1 (en) Prefabricated Wall Assembly
CN205804922U (en) A kind of novel embedded tool formula scaffold wall connecting piece
CN206190698U (en) Panel connecting screw
CN219491507U (en) Sealing device for airtight treatment of grain bungalow house roof board seam
CN214423989U (en) Building plank sheathing coupling mechanism
CN215749903U (en) Shield constructs section of jurisdiction grout pipe installation device
CN202882114U (en) Cast-in-place concrete prearranged pull connection piece
CN212508905U (en) Novel fan foundation
CN215631080U (en) Fixed end anchorage device for building prestressed concrete
CN216475613U (en) Prefabricated spliced bearing beam structure for house construction
CN220644119U (en) Sluice gate slot connecting device of river sluice
CN220521940U (en) Building scaffold wall connecting mechanism

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161109

RJ01 Rejection of invention patent application after publication