CN203238511U - Porous brick ground structure - Google Patents

Porous brick ground structure Download PDF

Info

Publication number
CN203238511U
CN203238511U CN 201320166790 CN201320166790U CN203238511U CN 203238511 U CN203238511 U CN 203238511U CN 201320166790 CN201320166790 CN 201320166790 CN 201320166790 U CN201320166790 U CN 201320166790U CN 203238511 U CN203238511 U CN 203238511U
Authority
CN
China
Prior art keywords
porous brick
hole
blinding
brick
porous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320166790
Other languages
Chinese (zh)
Inventor
任荣
任俏俏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201320166790 priority Critical patent/CN203238511U/en
Application granted granted Critical
Publication of CN203238511U publication Critical patent/CN203238511U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a porous brick ground structure, comprising a foundation, wherein a blinding cushion is paved on the foundation; rectangular porous bricks are fixedly arranged on the blinding cushion; more than one hole is formed in each rectangular porous brick; the hole runs through the entire brick body up and down; sand is filled inside the hole. The porous brick ground structure has the beneficial effects that a sidewalk and a plaza formed by large-area rectangular round porous bricks can achieve the effect of collecting and storing water; the pressure on flood drainage caused by rapid concentration of rainfall runoff is alleviated.

Description

A kind of porous brick earth construction
Technical field
The utility model belongs to urban road and square building material technical field, relates to a kind of porous brick earth construction.
Background technology
At present, the footway brick, the square brick that use in urban road and the square building mostly adopt the not strong material of water permeability.Meet the upper weather of moderate rain, because the excessive city flood discharge channel that easily causes of rainwater central flow stops up flood in the excessive formation city, a large amount of rainwater run off, and surface water can not get replenishing, and is unfavorable for the growth of flowers, plants and trees in the city, causes the decline of groundwater table in the city.
The utility model content
The purpose of this utility model is providing a kind of porous brick earth construction, has solved existing earth's surface face brick layer water permeability not strong, and ponding can not leak into by the brick layer shortcoming on earth's surface.
The technical scheme that the utility model adopts is to comprise ground, the ground top is covered with the blinding bed course, and blinding bed course top fixed placement has the rectangle porous brick, and every rectangle porous brick body is provided with more than one hole, up/down perforation whole brick body in hole is filled with sand in the hole.
Characteristics of the present utility model also are to fix with the cement paste jointing between blinding bed course and the rectangle porous brick.
The beneficial effects of the utility model are sidewalk and squares that large tracts of land square type circular hole porous brick forms, and can play the effect of receiving the water retaining, alleviate rainfall runoff and concentrate to the pressure that drains off floodwaters and bring fast.
Description of drawings
Fig. 1 is the structural representation of a kind of porous brick earth construction of the utility model.
Among the figure, 1. rectangle porous brick, 2. hole, 3. sand, 4. blinding bed course, 5. ground.
The specific embodiment
Below in conjunction with the drawings and specific embodiments the utility model is elaborated.
The utility model comprises ground 5 as shown in Figure 1, ground 5 tops are covered with blinding bed course 4, and blinding bed course 4 top fixed placement have rectangle porous brick 1, and every rectangle porous brick 1 body is provided with more than one hole 2,2 up/down perforations whole brick body in hole is filled with sand 3 in the hole 2.Fix with the cement paste jointing between blinding bed course 4 and the rectangle porous brick 1.
In the situation that area definition is laid on sidewalk and square, according to what of rectangle circular hole porous brick consumption, the smooth compacting foundation 5 of elder generation, lay certain thickness blinding bed course 4 at ground 5, lay square type circular hole porous brick 1 at blinding bed course 4, connect with the cement paste jointing between the square type circular hole porous brick 1, after has laid on sidewalk and square, with the sand of certain granules degree, till the passage 2 up and down of the circular hole on the square type circular hole porous brick is full of.After sand 3 fillings, because sand 3 has the space, dust and earth will can not accumulate into and then circular hole be blocked.The sidewalk that lays and can using after square maintenance a period of time.When rainy, rainwater sand in the lower channel 3 on via hole 2 enters blinding bed course 4 rapidly, and rainwater slowly penetrates in the ground 5 more quickly.
The effect of receiving the water retaining also can be played in sidewalk and square that large tracts of land square type circular hole porous brick forms.Alleviating rainfall runoff concentrates fast to the pressure that drains off floodwaters and bring.But recharge of groundwater source is also avoided water to amass on the brick layer and is evaporated simultaneously, forms the surface water benign cycle.

Claims (2)

1. porous brick earth construction, it is characterized in that: comprise ground (5), ground (5) top is covered with blinding bed course (4), blinding bed course (4) top fixed placement has rectangle porous brick (1), every rectangle porous brick (1) body is provided with more than one hole (2), up/down perforation whole brick body in hole (2) is filled with sand (3) in hole (2).
2. according to the described a kind of porous brick earth construction of claim 1, it is characterized in that: fix with the cement paste jointing between described blinding bed course (4) and the rectangle porous brick (1).
CN 201320166790 2013-04-07 2013-04-07 Porous brick ground structure Expired - Fee Related CN203238511U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320166790 CN203238511U (en) 2013-04-07 2013-04-07 Porous brick ground structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320166790 CN203238511U (en) 2013-04-07 2013-04-07 Porous brick ground structure

Publications (1)

Publication Number Publication Date
CN203238511U true CN203238511U (en) 2013-10-16

Family

ID=49315826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320166790 Expired - Fee Related CN203238511U (en) 2013-04-07 2013-04-07 Porous brick ground structure

Country Status (1)

Country Link
CN (1) CN203238511U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114592396A (en) * 2022-03-14 2022-06-07 济南四建集团建材有限责任公司 Rapid permeable pavement

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114592396A (en) * 2022-03-14 2022-06-07 济南四建集团建材有限责任公司 Rapid permeable pavement

Similar Documents

Publication Publication Date Title
CN206352331U (en) The concave herbaceous field structure of sponge the idea of the city
CN102150596B (en) Method for constructing water saving type landscape plant community
CN110130466A (en) Sponge urban ecology town road
CN207130570U (en) A kind of urban landscape pavement based on sponge the idea of the city
CN204676385U (en) A kind of high durable environmental and ecological water-permeable brick
CN201678926U (en) Novel combined type water-permeable sidewalk
CN205591075U (en) Ecology structure of mating formation
CN202359477U (en) Internal drainage ground structure
CN201080590Y (en) Water seepage floor tile
CN206245443U (en) A kind of novel grass-planting trench system
CN205063000U (en) Novel inlet for stom water reposition of redundant personnel funnel
CN203238511U (en) Porous brick ground structure
CN104652595B (en) Half support water storage type greenery patches structure of a kind of urban flood defence and utilization of flood resources
CN104145673B (en) Based on water drainage and the integrated form greenbelt system of water conservation and water drainage and water-retaining method
CN207469190U (en) A kind of infitration galleries structure of efficient draining
CN206721596U (en) A kind of pavement structure of permeable road
CN105484125A (en) Step capable of collecting and utilizing rainwater
CN206090204U (en) Height ecological road surface structure of permeating water
CN202220356U (en) Water collection canopy
CN204849516U (en) Resistant lawn of trampleing on
CN211848696U (en) Type bituminous paving structure permeates water
CN207828733U (en) A kind of novel water permeable concrete road
CN207295362U (en) A kind of novel water permeable water storage grass planting ecological brick
CN202416116U (en) Road surface rain water collecting and utilizing system
CN207802890U (en) The ecology tree pond of purifying rainwater

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131016

Termination date: 20150407

EXPY Termination of patent right or utility model