CN203222822U - 组合式检查井 - Google Patents
组合式检查井 Download PDFInfo
- Publication number
- CN203222822U CN203222822U CN 201320267999 CN201320267999U CN203222822U CN 203222822 U CN203222822 U CN 203222822U CN 201320267999 CN201320267999 CN 201320267999 CN 201320267999 U CN201320267999 U CN 201320267999U CN 203222822 U CN203222822 U CN 203222822U
- Authority
- CN
- China
- Prior art keywords
- pipe
- intervalve
- well lid
- base tube
- upper opening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Sewage (AREA)
Abstract
本实用新型公开了一种组合式检查井。这种组合式检查井,检查井由钢筋混凝土制成的底座管、中间管和井盖管依次摞设而成,底座管、中间管和井盖管的上口均呈内环环面低、外环环面凸起的形状,形成纵剖面为L形的支撑台,井盖管的下口外径略小于中间管的上口外环环面的内径,中间管的下口外径略小于底座管的上口外环环面的内径,底座管侧壁上设纵横交叉的管道口,中间管摞设于底座管之上的接合缝、井盖管摞设于中间管之上的接合缝均用水泥砂浆填补密封。优点:运输方便,施工方便快捷,用工少,功效高,造价低,密封性好,坚固耐用,可重复使用。
Description
技术领域
本实用新型涉及一种检查井。
背景技术
现有检查井有两种,一种为砖和水泥砌筑而成固定死的,另一种为数片立式树脂板竖立拼接组合而成的。砖和水泥砌筑而成固定死的检查井,其弊端在于需要将大量砖、水泥、砂子和水运到施工现场,再一块砖、一块砖砌筑,砌完砖后还要抹水泥砂浆,不仅运输工作量大,而且费时费工,劳动强度大,功效低,造价高。数片立式树脂板竖立拼接组合而成的检查井,竖立的接合缝处虽设有密封胶条,但密封性差,遇有雨雪易泄露,最后导致塌井。
发明内容
本实用新型的目的在于提供一种运输方便、施工方便、功效高、造价低、密封性好、坚固耐用的组合式检查井。
本实用新型所采取的技术方案是,这种组合式检查井,检查井由钢筋混凝土制成的底座管、中间管和井盖管依次摞设而成,底座管、中间管和井盖管的上口均呈内环环面低、外环环面凸起的形状,形成纵剖面为L形的支撑台,井盖管的下口外径略小于中间管的上口外环环面的内径,中间管的下口外径略小于底座管的上口外环环面的内径,底座管侧壁上设纵横交叉的管道口,中间管摞设于底座管之上的接合缝、井盖管摞设于中间管之上的接合缝均用水泥砂浆填补密封。
由于采取了上述技术方案,故本实用新型具有以下优点:一是底座管、中间管和井盖管较之砖、水泥、砂子和水不仅占据空间少,而且运输方便。二是施工时,只要将底座管、中间管和井盖管依次摞设起来,然后接合缝用水泥砂浆填补密封即告成功。施工方便、功效高。三是底座管、中间管和井盖管可在预制管厂集中大批量生产,整体造价相应降低;一次运输固体管状物的装运量较之散装砖、水泥、砂子和水的量要大的多,因此运输成本也相应降低;加之施工方便快捷、效率高,用工少,用工成本更会大幅度降低。综上整体成本比砖和水泥砌筑而成的检查井就要低很多。四是由于检查井是由钢筋混凝土制成的底座管、中间管和井盖管依次摞设而成,再加上接合缝用水泥砂浆填补密封,不仅密封性好,坚固耐用,而且可重复使用。
附图说明
下面结合附图和具体实施例对本实用新型作进一步详细说明。
图1为本实用新型外观立体示意图;
图2为本实用新型井盖管的外观立体示意图;
图3为本实用新型中间管的外观立体示意图;
图4为本实用新型底座管的外观立体示意图。
具体实施方式
实施例1,这种组合式检查井,检查井由钢筋混凝土制成的底座管1、中间管2和井盖管3依次摞设而成,底座管1、中间管2和井盖管3的上口均呈内环环面4低、外环环面5凸起的形状,形成纵剖面为L形的支撑台,井盖管3的下口外径略小于中间管2的上口外环环面5的内径,中间管2的下口外径略小于底座管1的上口外环环面5的内径,底座管1侧壁上设纵横交叉的管道口6,中间管2摞设于底座管1之上的接合缝、井盖管3摞设于中间管2之上的接合缝均用水泥砂浆7填补密封。
实施例2,如实施例1所述的组合式检查井,设有两节以上的中间管2,设于底座管1上的中间管2上依次再向上摞设中间管,其接合缝也用水泥砂浆填补密封。
Claims (2)
1.一种组合式检查井,其特征在于:检查井由钢筋混凝土制成的底座管(1)、中间管(2)和井盖管(3)依次摞设而成,底座管(1)、中间管(2)和井盖管(3)的上口均呈内环环面(4)低、外环环面(5)凸起的形状,形成纵剖面为L形的支撑台,井盖管(3)的下口外径略小于中间管(2)的上口外环环面(5)的内径,中间管(2)的下口外径略小于底座管(1)的上口外环环面(5)的内径,底座管(1)侧壁上设纵横交叉的管道口(6),中间管(2)摞设于底座管(1)之上的接合缝、井盖管(3)摞设于中间管(2)之上的接合缝均用水泥砂浆(7)填补密封。
2.根据权利要求1所述的组合式检查井,其特征在于:设有两节以上的中间管(2),设于底座管(1)上的中间管(2)上依次再向上摞设中间管,其接合缝也用水泥砂浆填补密封。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320267999 CN203222822U (zh) | 2013-05-03 | 2013-05-03 | 组合式检查井 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320267999 CN203222822U (zh) | 2013-05-03 | 2013-05-03 | 组合式检查井 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203222822U true CN203222822U (zh) | 2013-10-02 |
Family
ID=49249829
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320267999 Expired - Lifetime CN203222822U (zh) | 2013-05-03 | 2013-05-03 | 组合式检查井 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203222822U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103806470A (zh) * | 2014-03-14 | 2014-05-21 | 江苏华光双顺机械制造有限公司 | 钢筋混凝土检查井生产安装方法 |
-
2013
- 2013-05-03 CN CN 201320267999 patent/CN203222822U/zh not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103806470A (zh) * | 2014-03-14 | 2014-05-21 | 江苏华光双顺机械制造有限公司 | 钢筋混凝土检查井生产安装方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204531066U (zh) | 装配式钢管混凝土剪力墙拆分拼装连接结构 | |
CN106149489B (zh) | 基于3d打印砌体形成的3d打印配筋砌体剪力墙 | |
CN104727467A (zh) | 装配式钢管混凝土剪力墙拆分拼装连接结构和拼装连接方法 | |
CN203755352U (zh) | 一种用于地下室沉降后浇带封闭的预制板 | |
CN103243860A (zh) | 多室式钢管混凝土组合l形柱 | |
CN204225133U (zh) | 一种人工挖桩用预制护壁 | |
CN203229972U (zh) | 一种地下室外墙后浇带预制封堵挂板 | |
CN202482889U (zh) | 一种连锁预制桩地下连续墙 | |
CN203222822U (zh) | 组合式检查井 | |
CN104786368A (zh) | 一种钢筋成型技术 | |
CN213418236U (zh) | 一种预制装配式frp管-混凝土-钢管双壁空心柱 | |
CN203821381U (zh) | 矩形预应力灌注桩 | |
CN103147438A (zh) | 基于现场浇筑后张法工字型支护桩及支护桩的制作方法 | |
CN110552378A (zh) | 地下空间顶板沉降后浇带提前封闭结构 | |
CN104294962A (zh) | 一种预置再生骨料灌浆混凝土节能保温砌块的制作方法及墙体系统 | |
CN103161181A (zh) | 一种地下外墙施工缝止水结构及其施工方法 | |
KR100735681B1 (ko) | 트러스덱을 영구거푸집으로 겸용하는 두꺼운 벽 공법 | |
CN203066063U (zh) | 塑料套管与钢管组合现浇混凝土空心管桩 | |
RU161210U1 (ru) | Блок несъёмной опалубки | |
CN102561315B (zh) | 一种连锁预制桩地下连续墙 | |
CN206052957U (zh) | 注浆连接钢管装置结构 | |
CN103924614B (zh) | 一种杆塔分体筏基快装基础 | |
CN204060731U (zh) | 隧道纵向中埋式钢边止水带夹具 | |
CN207828734U (zh) | 预制拼装式道路边坡排水槽 | |
CN207526119U (zh) | 一种定型化外墙模板的加固工具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20131002 |
|
CX01 | Expiry of patent term |