CN103924614B - 一种杆塔分体筏基快装基础 - Google Patents

一种杆塔分体筏基快装基础 Download PDF

Info

Publication number
CN103924614B
CN103924614B CN201410135158.XA CN201410135158A CN103924614B CN 103924614 B CN103924614 B CN 103924614B CN 201410135158 A CN201410135158 A CN 201410135158A CN 103924614 B CN103924614 B CN 103924614B
Authority
CN
China
Prior art keywords
raft foundation
concrete
semicolumn
shaft tower
fast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410135158.XA
Other languages
English (en)
Other versions
CN103924614A (zh
Inventor
郭志涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Zhong Neng Shaft Tower Co Ltd
Original Assignee
Shandong Zhong Neng Shaft Tower Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Zhong Neng Shaft Tower Co Ltd filed Critical Shandong Zhong Neng Shaft Tower Co Ltd
Priority to CN201410135158.XA priority Critical patent/CN103924614B/zh
Publication of CN103924614A publication Critical patent/CN103924614A/zh
Application granted granted Critical
Publication of CN103924614B publication Critical patent/CN103924614B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

本发明公开了一种杆塔分体筏基快装基础,包括筏基,其特征在于:所述筏基由筏基Ⅰ和筏基Ⅱ组成,所述筏基Ⅰ和筏基Ⅱ分别由混凝土矩形底座和位于其上端一体的混凝土半圆柱组成,并在所述筏基Ⅰ和筏基Ⅱ里设置钢筋,在所述混凝土半圆柱中设置地脚螺栓,在所述混凝土半圆柱表面设置抱箍。本发明的有益效果是:1.分体筏基快装基础属于预制产品,工厂化标准模具加工成型,蒸汽养护,强度高,通用性好。加工质量能得到保证;2.现场施工快,可实现当天挖坑、当天组杆、当天完工;3.对于需要转移的杆塔和移动基站可二次吊运,重复利用,降低了成本。

Description

一种杆塔分体筏基快装基础
技术领域
本发明属于电力通信输送设备技术领域,尤其涉及一种杆塔分体筏基快装基础。
背景技术
随着国民经济的迅速发展,现代化电力、通信技术的不断发展,需要建设大量的输电线路和移动通信基站来满足要求。故不同强度、不同弯矩、不同长度的杆塔使用广泛,杆塔基础施工甚为关键。根据线路和基站杆位地质条件,现有的输电线路杆塔和移动通信杆塔的基础方式有以下几种:钢管桩基础、灌注桩基础、筏基基础。三种基础里面,只有筏基基础满足各种地质条件。筏基基础施工时,首先在定位好的杆位上进行开挖,其次现场基础钢筋骨架焊接成型,最后支模板浇捣混凝土,待混凝土达到养护周期并满足设计强度后,再将杆塔运往施工现场进行组塔安装。在基础地质条件差的情况下主要采用筏基基础来作为杆塔基础,虽然是杆塔现阶段基础施工地质条件通用的一种方式,但是施工周期特别长,现场混凝土浇捣量非常大,传统现浇筏基基础,基坑开挖后要组立模板,现场进行钢筋焊接和绑扎,偏远地区还要现场配制混凝土,需搅拌机、电源、振动棒、运输工具等辅助设备,现场浇注的混凝土质量受气候、环境、施工人员技术水平等影响,很难达到设计的混凝土强度。曾有施工队把C30混凝土做成C10强度,质量较难控制,特别是冬季施工,质量、工期更难保证,且周期长,带来的社会工作量大。现浇混凝土筏基基础只能一次使用,不能二次利用。由于现场拌制混凝土所产生湿作业,对周边环境产生了污染。这是现有技术的不足之处。
发明内容
本发明的目的在于,克服现有技术的不足,提供了一种解决输电线路杆塔和通信杆塔基础抗弯、抗倾覆、缩短施工周期、快速安装、及节约资源、低碳环保等问题的一种杆塔分体筏基快装基础。
为解决上述技术问题,本发明的技术方案为:一种杆塔分体筏基快装基础,包括筏基,其特征在于:所述筏基由筏基Ⅰ和筏基Ⅱ组成,所述筏基Ⅰ和筏基Ⅱ分别由混凝土矩形底座和位于其上端一体的混凝土半圆柱组成,并在所述筏基Ⅰ和筏基Ⅱ里设置钢筋,在所述混凝土半圆柱中设置地脚螺栓,在所述混凝土半圆柱表面设置抱箍。该结构通信杆塔基础抗弯、抗倾覆、缩短了施工周期。
本发明的进一步改进有,所述筏基Ⅰ和筏基Ⅱ的混凝土半圆柱接触面相啮合。通过两个混凝土半圆柱接触面的啮合,增加了基础的稳固性。
本发明的进一步改进还有,所述混凝土半圆柱中的钢筋由垂直的主筋和螺旋缠绕主筋的螺旋筋、连接主筋的内钩筋组成。内钩筋设置成网格状,可以设置成两层以上,起到了固定主筋的作用。
本发明的进一步改进还有,在所述混凝土半圆柱中设置连接短筋,与所述地脚螺栓和所述主筋相连。起到了固定地脚螺栓的作用。
本发明的进一步改进还有,所述混凝土矩形底座中的钢筋由主配筋和与之连接的马蹄筋组成,所述主配筋与所述混凝土半圆柱中的主筋连接。主配筋设置成网格状,可以设置成两层以上。
本发明的进一步改进还有,在所混凝土矩形底座上设置吊环。便于运输。
本发明的进一步改进还有,所述筏基Ⅰ和筏基Ⅱ混凝土半圆柱上设置铆杆。通过铆杆的固定,使筏基Ⅰ和筏基Ⅱ连接更牢固。
说明书中没有描述的结构属于现有技术。
本方案的有益效果可根据对上述方案的叙述得知,一种杆塔分体筏基快装基础,包括筏基,其特征在于:所述筏基由筏基Ⅰ和筏基Ⅱ组成,所述筏基Ⅰ和筏基Ⅱ分别由混凝土矩形底座和位于其上端一体的混凝土半圆柱组成,并在所述筏基里设置钢筋,在所述混凝土半圆柱中设置地脚螺栓,在所述混凝土半圆柱表面设置抱箍。本发明的有益效果是:1.分体筏基快装基础属于预制产品,工厂化标准模具加工成型,蒸汽养护,强度高,通用性好。加工质量能得到保证。2.现场施工快,可实现当天挖坑、当天组杆、当天完工。3.对于需要转移的杆塔和移动基站可二次吊运,重复利用,降低了成本。
工作时,先将主配筋4双向均布焊接成三层网格状,通过马蹬筋5将主筋1均布的分列在混凝土半圆柱中,并焊接在主配筋4上。螺旋筋2上下均布缠绕在主筋1外围并焊接,然后将内钩筋3焊接在主筋1上,最后将地脚螺栓8放入柱混凝土半圆柱内,调整好后用连接短筋6将主筋1与地脚螺栓8进行焊接。骨架完成后放入模具内加入混凝土成型。基础施工完成后用锚杆7、抱箍9将分体基础连接。
附图说明
图1为本发明的结构示意图,图2是图1的A-A剖视结构示意图,图3是混凝土半圆柱配筋图。图1中:1是主筋,2是螺旋筋,3是内钩筋,4是主配筋,5是马蹄筋,6是连接短筋,7是铆杆,8是地脚螺栓,9是抱箍,10是筏基Ⅰ,11是筏基Ⅱ,12是吊环。
具体实施方式
下面结合附图和具体实施方式对本发明作进一步详细说明,通过附图可以看出,本方案的一种杆塔分体筏基快装基础,包括筏基,其特征在于:所述筏基由筏基Ⅰ10和筏基Ⅱ11组成,所述筏基Ⅰ10和筏基Ⅱ11分别由混凝土矩形底座和位于其上端一体的混凝土半圆柱组成,并在所述筏基Ⅰ10和筏基Ⅱ11里设置钢筋,在所述混凝土半圆柱中设置地脚螺栓8,在所述混凝土半圆柱表面设置抱箍9。所述筏基Ⅰ10和筏基Ⅱ11的混凝土半圆柱接触面相啮合。所述混凝土半圆柱中的钢筋由垂直的主筋1和螺旋缠绕主筋的螺旋筋2、连接主筋的内钩筋3组成。在所述混凝土半圆柱中设置连接短筋6,与所述地脚螺栓8和所述主筋1相连。所述混凝土矩形底座中的钢筋由主配筋4和与之连接的马蹄筋5组成,所述主配筋4与所述混凝土半圆柱中的主筋1连接。在所混凝土矩形底座上设置吊环12。所述筏基Ⅰ10和筏基Ⅱ11混凝土半圆柱上设置铆杆7。
当然,上述说明并非对本发明的限制,本发明也不仅限于上述举例,本技术领域的普通技术人员在本发明的实质范围内所做出的变化、改型、添加或替换,也属于本发明的保护范围。

Claims (7)

1.一种杆塔分体筏基快装基础,包括筏基,其特征在于:所述筏基由筏基Ⅰ和筏基Ⅱ组成,所述筏基Ⅰ和筏基Ⅱ分别由混凝土矩形底座和位于其上端一体的混凝土半圆柱组成,并在所述筏基Ⅰ和筏基Ⅱ里设置钢筋,在所述混凝土半圆柱中设置地脚螺栓,在所述混凝土半圆柱表面设置抱箍。
2.根据权利要求1所述的一种杆塔分体筏基快装基础,其特征在于:所述筏基Ⅰ和筏基Ⅱ的混凝土半圆柱接触面相啮合。
3.根据权利要求1或2所述的一种杆塔分体筏基快装基础,其特征在于:所述混凝土半圆柱中的钢筋由垂直的主筋和螺旋缠绕主筋的螺旋筋、连接主筋的内钩筋组成。
4.根据权利要求3所述的一种杆塔分体筏基快装基础,其特征在于:在所述混凝土半圆柱中设置连接短筋,与所述地脚螺栓和所述主筋相连。
5.根据权利要求3所述的一种杆塔分体筏基快装基础,其特征在于:所述混凝土矩形底座中的钢筋由主配筋和与之连接的马蹄筋组成,所述主配筋与所述混凝土半圆柱中的主筋连接。
6.根据权利要求1所述的一种杆塔分体筏基快装基础,其特征在于:在所述混凝土矩形底座上设置吊环。
7.根据权利要求1所述的一种杆塔分体筏基快装基础,其特征在于:所述筏基Ⅰ和筏基Ⅱ混凝土半圆柱上设置铆杆。
CN201410135158.XA 2014-04-04 2014-04-04 一种杆塔分体筏基快装基础 Active CN103924614B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410135158.XA CN103924614B (zh) 2014-04-04 2014-04-04 一种杆塔分体筏基快装基础

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410135158.XA CN103924614B (zh) 2014-04-04 2014-04-04 一种杆塔分体筏基快装基础

Publications (2)

Publication Number Publication Date
CN103924614A CN103924614A (zh) 2014-07-16
CN103924614B true CN103924614B (zh) 2015-11-18

Family

ID=51142994

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410135158.XA Active CN103924614B (zh) 2014-04-04 2014-04-04 一种杆塔分体筏基快装基础

Country Status (1)

Country Link
CN (1) CN103924614B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111485573A (zh) * 2020-03-19 2020-08-04 衡水衡源电力建设有限责任公司 一种输电工程预制基础安装、铁塔组立连贯施工方法
CN111395382A (zh) * 2020-03-19 2020-07-10 衡水衡源电力建设有限责任公司 一种用于输电工程的预制基础

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1135852A1 (ru) * 1983-08-12 1985-01-23 Украинский Филиал Государственного Проектно-Изыскательского И Научно-Исследовательского Института "Аэропроект" Сборный блок железобетонного ростверка свайного фундамента и способ возведени свайного фундамента с железобетонным ростверком из сборных блоков
CN201420268Y (zh) * 2009-05-22 2010-03-10 国网直流工程建设有限公司四川工程建设部 预制装配式基础
CN201695406U (zh) * 2010-05-10 2011-01-05 电联工程技术有限公司 预制构件的拼装基础
CN203129166U (zh) * 2013-04-12 2013-08-14 肥城鲁泰科技有限公司 大弯矩底部法兰盘电杆预制基础
CN203188228U (zh) * 2013-02-06 2013-09-11 刘泽华 一种拼接式组合基础及其端件连接结构
CN203729318U (zh) * 2014-04-04 2014-07-23 山东中能杆塔有限公司 一种杆塔分体筏基快装基础

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1135852A1 (ru) * 1983-08-12 1985-01-23 Украинский Филиал Государственного Проектно-Изыскательского И Научно-Исследовательского Института "Аэропроект" Сборный блок железобетонного ростверка свайного фундамента и способ возведени свайного фундамента с железобетонным ростверком из сборных блоков
CN201420268Y (zh) * 2009-05-22 2010-03-10 国网直流工程建设有限公司四川工程建设部 预制装配式基础
CN201695406U (zh) * 2010-05-10 2011-01-05 电联工程技术有限公司 预制构件的拼装基础
CN203188228U (zh) * 2013-02-06 2013-09-11 刘泽华 一种拼接式组合基础及其端件连接结构
CN203129166U (zh) * 2013-04-12 2013-08-14 肥城鲁泰科技有限公司 大弯矩底部法兰盘电杆预制基础
CN203729318U (zh) * 2014-04-04 2014-07-23 山东中能杆塔有限公司 一种杆塔分体筏基快装基础

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
混凝土预制装配式扩展基础抗拔试验;鲁先龙等;《工程力学》;20130131;第215-220页 *

Also Published As

Publication number Publication date
CN103924614A (zh) 2014-07-16

Similar Documents

Publication Publication Date Title
CN205171535U (zh) 输电线路预制组装式杆塔基础
CN104410030A (zh) 一种轻质砼叠合板装配式电缆沟及制作方法
CN201443072U (zh) 可拆卸式组合塔吊基础
CN102912808A (zh) 螺旋cfg桩结合水泥搅拌桩复合地基施工方法
CN103343547B (zh) 集装箱式活动房装配式型钢混凝土四柱基础及施工方法
CN104005407A (zh) 一种部分预应力混凝土结构基础桩
CN103924614B (zh) 一种杆塔分体筏基快装基础
CN203229972U (zh) 一种地下室外墙后浇带预制封堵挂板
CN204418510U (zh) 楼承板钢筋桁架结构
CN204243699U (zh) 一种轻质砼叠合板装配式电缆沟
CN205296197U (zh) 抗腐蚀工业厂房混凝土杯口式预制承台
CN204753783U (zh) 预制砼雨污水检查井装置
CN204590782U (zh) 一种工业化预制装配式围墙
CN203729318U (zh) 一种杆塔分体筏基快装基础
CN204475536U (zh) 带有刚性节点连接的钢筋混凝土预制构件
CN206428805U (zh) 一种装配式钢‑混凝土预制阳台
CN206034475U (zh) 通信塔埋地式预制基础
CN205046569U (zh) 基于双波纹钢筒成型的环形风电基础结构
CN204418559U (zh) 一种用于连接楼梯上端的插销式连接结构
CN204753639U (zh) 工厂化模块式混凝土挤压预制的水井
CN203669198U (zh) 活动房用楼层板
CN104652426B (zh) 一种盐渍土地区水玻璃防腐桩基础施工方法
CN203531004U (zh) 一种电抗器基础
CN203145011U (zh) 具有抗浮能力的锚杆结构
CN203429656U (zh) 集装箱式活动房装配式型钢混凝土四柱组合基础

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A pole tower split raft foundation quick installation foundation

Effective date of registration: 20210926

Granted publication date: 20151118

Pledgee: Liaocheng branch of Rizhao Bank Co.,Ltd.

Pledgor: SHANDONG ZHONGNENG TOWER Co.,Ltd.

Registration number: Y2021980009907

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20221018

Granted publication date: 20151118

Pledgee: Liaocheng branch of Rizhao Bank Co.,Ltd.

Pledgor: Shandong Zhongneng Tower Co.,Ltd.

Registration number: Y2021980009907

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A kind of pole tower split raft foundation quick installation foundation

Effective date of registration: 20221020

Granted publication date: 20151118

Pledgee: Rizhao Bank Co.,Ltd. Liaocheng Shenxian Sub branch

Pledgor: Shandong Zhongneng Tower Co.,Ltd.

Registration number: Y2022980019138

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20151118

Pledgee: Rizhao Bank Co.,Ltd. Liaocheng Shenxian Sub branch

Pledgor: Shandong Zhongneng Tower Co.,Ltd.

Registration number: Y2022980019138

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A quick installation foundation for a split raft foundation of a tower

Granted publication date: 20151118

Pledgee: Rizhao Bank Co.,Ltd. Liaocheng Shenxian Sub branch

Pledgor: Shandong Zhongneng Tower Co.,Ltd.

Registration number: Y2024980007831