CN203188258U - Pole tower foundation bolt screw thread repair device - Google Patents

Pole tower foundation bolt screw thread repair device Download PDF

Info

Publication number
CN203188258U
CN203188258U CN 201320171662 CN201320171662U CN203188258U CN 203188258 U CN203188258 U CN 203188258U CN 201320171662 CN201320171662 CN 201320171662 CN 201320171662 U CN201320171662 U CN 201320171662U CN 203188258 U CN203188258 U CN 203188258U
Authority
CN
China
Prior art keywords
bolt
screw thread
repair device
bolt screw
tower foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320171662
Other languages
Chinese (zh)
Inventor
王利红
李舰雷
郭晓斌
李强
郭浩亮
张新军
李鹏
郝晋刚
王晋强
雷达
明宇
杨建廷
闫鹏峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANXI JINCHENG ELECTRIC POWER SUPPLY Co
State Grid Corp of China SGCC
Original Assignee
SHANXI JINCHENG ELECTRIC POWER SUPPLY Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANXI JINCHENG ELECTRIC POWER SUPPLY Co, State Grid Corp of China SGCC filed Critical SHANXI JINCHENG ELECTRIC POWER SUPPLY Co
Priority to CN 201320171662 priority Critical patent/CN203188258U/en
Application granted granted Critical
Publication of CN203188258U publication Critical patent/CN203188258U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a pole tower foundation bolt screw thread repair device, which belongs to a bolt screw thread repair tool, and substantially aims at the problem that foundation bolt screw threads of an existing transmission tower are difficult to repair, dismount and adjust. The pole tower foundation bolt screw thread repair device substantially comprises a bolt repair device (1), a bolt adjuster (2) and a fixed frame (3), wherein the fixed frame (3) is connected with the bolt adjuster (2) through the bolt repair device (1), and the bolt repair device (1) is connected with the bolt adjuster (2). Compared with the prior art, the pole tower foundation bolt screw thread repair device has the advantages that the pole tower foundation bolt screw thread repair device is simple in structure, easy to carry out and strong in applicability, and can repair the bolt screw thread at any directions, thereby improving work efficiency, reducing labor strength of workers, and enabling adjusting work of a foundation bolt of a tower foundation to be safer and more reliable and the like.

Description

A kind of shaft tower stone bolt screw thread prosthetic device
Technical field
The utility model belongs to a kind of bolt screw thread fix tool, particularly a kind of shaft tower stone bolt screw thread prosthetic device of reparation usefulness of electric power pylon stone bolt screw thread.
Background technology
When being located in the electric power line pole tower ground settlement in goaf, shaft tower backguy displacement deformation, the stressed bending of body of the tower or shaft tower tilt, and cause the electric fixtures safe distance not enough easily, fault trip and the generation of major accidents such as rod disconnection of falling.Prior art is by adjusting iron tower foundation, make four tower leg base surfaces of iron tower return to level, the method can tilt to recover to the goaf iron tower safely and effectively, but and base area qualitative change situation, follow the tracks of adjustment in good time, reach the requirement of transmission line of electricity safe operation, but when adjusting work, four stressed disequilibriums of tower leg stone bolt because iron tower tilts, stressed increase, bolt and nut corrosion are serious.And during the dismantling concrete protective cap, be covered with concrete in the screw thread and when building the concrete protective cap, and owing to smash the rammer machine bolt is smash when ramming, make the distortion of bolt screw thread.Simultaneously, the work plane of stone bolt present position is limited, adds and does not have a special tool, is difficult to nut loosening, has prolonged the working time, has brought very big difficulty for adjustment work.
Summary of the invention
The purpose of this utility model is at above-mentioned prior art the stone bolt screw thread of electric power pylon to be repaired dismounting to adjust difficulty and a kind of shaft tower stone bolt screw thread prosthetic device is provided.
For realizing above-mentioned prior art, the technical scheme that the utility model adopts is: a kind of shaft tower stone bolt screw thread prosthetic device, it comprises bolt obturator 1, bolt adjuster 2, fixed mount 3, described fixed mount 3 is connected with bolt adjuster 2 by bolt obturator 1, and described bolt obturator 1 is connected with bolt adjuster 2.
Compared with prior art, the utlity model has following advantage: 1) simple in structure, easy to implement, applicability is strong, can repair any direction bolt screw thread; 2) improved operating efficiency, alleviated staff's labour intensity, made the stone bolt work of adjusting iron tower foundation more safe and reliable.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is assembly drawing of the present utility model.
The specific embodiment
As shown in Figure 1, a kind of shaft tower stone bolt screw thread prosthetic device, it comprises bolt obturator 1, bolt adjuster 2, fixed mount 3, and described fixed mount 3 is connected with bolt adjuster 2 by bolt obturator 1, and described bolt obturator 1 is connected with bolt adjuster 2.
Because transmission line of electricity tower difference, the stone bolt model that disposes are also different, adjust iron tower stone bolt size as required, according to assembly drawing as shown in Figure 2, can make different size stone bolt screw thread obturator.Form cover volume stone bolt obturator little, in light weight, easy to carry, very convenient the shaft tower stone bolt is repaired.

Claims (1)

1. shaft tower stone bolt screw thread prosthetic device, it is characterized in that: comprise bolt obturator (1), bolt adjuster (2), fixed mount (3), described fixed mount (3) is connected with bolt adjuster (2) by bolt obturator (1), and described bolt obturator (1) is connected with bolt adjuster (2).
CN 201320171662 2013-04-09 2013-04-09 Pole tower foundation bolt screw thread repair device Expired - Lifetime CN203188258U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320171662 CN203188258U (en) 2013-04-09 2013-04-09 Pole tower foundation bolt screw thread repair device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320171662 CN203188258U (en) 2013-04-09 2013-04-09 Pole tower foundation bolt screw thread repair device

Publications (1)

Publication Number Publication Date
CN203188258U true CN203188258U (en) 2013-09-11

Family

ID=49105127

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320171662 Expired - Lifetime CN203188258U (en) 2013-04-09 2013-04-09 Pole tower foundation bolt screw thread repair device

Country Status (1)

Country Link
CN (1) CN203188258U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174177A (en) * 2013-04-09 2013-06-26 山西省电力公司晋城供电分公司 Pole tower foundation bolt screw thread repair device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174177A (en) * 2013-04-09 2013-06-26 山西省电力公司晋城供电分公司 Pole tower foundation bolt screw thread repair device

Similar Documents

Publication Publication Date Title
CN202324808U (en) Guard fence rest used for power construction
CN203188258U (en) Pole tower foundation bolt screw thread repair device
CN204343771U (en) A kind of convenient line bar
CN103343551A (en) Goaf transmission tower foundation adjusting device
CN203188230U (en) Pole tower foundation bolt protective cap
CN102761077A (en) Insulating hoisting bracket for strain insulator string of 1000kV extra-high alternating current line
CN202298645U (en) Installation support device for megawatt fan base ring
CN203960920U (en) Colliery minery electric power pylon inclination adjusting device
CN202689029U (en) Anchor rod foundation of photovoltaic module support
CN103174177A (en) Pole tower foundation bolt screw thread repair device
CN205189743U (en) Insulating hard terraced afterbody mounting fixture
CN203161459U (en) Fixing device used for fixing wind power generator tower barrel with platform
CN104500512A (en) Cluster line squaring collector and electric pole fixing structure
CN202467221U (en) Power plant main workshop steel roof truss hoisting lifting device
CN203208568U (en) Safety belt hanger
CN202840363U (en) Insulated lifting bracket for tension insulator chain of 1000-kV extra-high voltage alternating current circuit
CN203871758U (en) Angle iron pile equipped with spiral pulling device
CN204311465U (en) Electric hoist is slagged tap support
CN203377549U (en) Small holding pole attached to tower
CN202668419U (en) Iron tower foundation bolt disassembling device
CN203547215U (en) Telegraph pole straightener
CN204023546U (en) A kind of ground works rammer compacter
CN204304356U (en) A kind of frock of flexible bus assembling
CN204538475U (en) Hanging line lever switch support
CN204633685U (en) A kind of photovoltaic panel suspension arrangement

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20130911

CX01 Expiry of patent term