CN203180464U - Cable pipe laying system with monitoring function - Google Patents

Cable pipe laying system with monitoring function Download PDF

Info

Publication number
CN203180464U
CN203180464U CN 201320167560 CN201320167560U CN203180464U CN 203180464 U CN203180464 U CN 203180464U CN 201320167560 CN201320167560 CN 201320167560 CN 201320167560 U CN201320167560 U CN 201320167560U CN 203180464 U CN203180464 U CN 203180464U
Authority
CN
China
Prior art keywords
cable
hoist engine
conduit
monitoring function
laying system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320167560
Other languages
Chinese (zh)
Inventor
周韫捷
杨小静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Shanghai Municipal Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN 201320167560 priority Critical patent/CN203180464U/en
Application granted granted Critical
Publication of CN203180464U publication Critical patent/CN203180464U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model relates to a cable pipe laying system with a monitoring function. The system comprises a cable reel, a cable bracket, a rolling wheel, a conduit and a winch. The cable reel is installed on the ground and is coiled with the cable for laying. The cable bracket is installed on one side of the cable reel. The rolling wheel is installed on the cable bracket. The cable passes through the conduit and then is connected with the winch. The system also comprises a network camera and a winch control device. The network camera is installed on one end of the conduit and is connected with the winch control device via the network. The winch control device is connected with the winch. Compared with the prior art, the cable pipe laying system with the monitoring function has advantages of being flexible in construction, has less effect on road traffic and can solve problems in time.

Description

A kind of cable duct bank laying system with monitoring function
Technical field
The utility model relates to a kind of be used to the equipment that lays underground cable, especially relates to a kind of cable duct bank laying system with monitoring function.
Background technology
Along with the expansion of city size and the continuous improvement of urban environment, the influence that overhead transmission line causes for urban look and space is also more and more obvious.In order to make the reasonable utilization of the attractive in appearance and city space of urban environment, simultaneously also for guaranteeing the needs of all kinds of installation securitys and personal safety, transmission line adopts the cable buried-pipe laying to become wherein a very important measures.
What for a long time, cable laying was mainly taked is modes such as direct-burried, comb, cable trough and electric power tunnel.Directly buried installation: without any need for external world protection structures, cable directly is embedded in the underground soil, is applicable to that same path passage pipeline is less, often excavation, underground nothing produce etching condition and do not have external force damage location.Comb lays: be that an excavated pavement is with regard to pre-buried enough cable duct banks; avoided between the cable influence each other and underground other pipelines to the influence of cable itself; have completeness and reliability preferably; cable has been played the better protect effect; the construction operation area is little, and the duration is shorter, and is convenient and easy; simultaneously can also shift to an earlier date pre-buried comb with the current period engineering, for getting ready with the no longer broken road of final cable laying construction.Cable trough lays: construct cast in place reinforced bar at the path of cable laying passage and mix Tu Gou, mounting and fixing bracket is convenient to payout on the interior two side of ditch.Its unfavorable factor is that in the future each cable laying all needs to break again the road.Electric power tunnel lays: utilize once excavation, construct the armored concrete tunnel as the public utility of how tame units such as municipal administration, coal gas, running water, electric power and telecommunications, it is many to involve unit, and investment is big, and is long in time limit, sees that from present case the enforcement difficulty is very big.Therefore the comb laying method has obtained application more and more widely.
Summary of the invention
The purpose of this utility model be exactly provide a kind of in order to overcome the defective that above-mentioned prior art exists and construct flexibly, to the less cable duct bank laying system with monitoring function of road traffic influence.
The purpose of this utility model can be achieved through the following technical solutions:
A kind of cable duct bank laying system with monitoring function, comprise cable hank, cable bearer, roller, conduit and hoist engine, described cable hank is located on the ground, coiling is useful on the cable that lays on the cable hank, described cable bearer is located at a side of cable hank, described roller is located on the cable bearer, described cable is connected with hoist engine after passing conduit, also comprise IP Camera and hoist engine control appliance, described IP Camera is located at an end of conduit, and be connected with the hoist engine control appliance by network, described hoist engine control appliance is connected with hoist engine.
Described IP Camera comprises camera lens and support, and described camera lens is located on the support movably, and described support is connected with conduit.
Described hoist engine control appliance comprises monitor and the controller that is connected, and described monitor is connected with IP Camera by network, and described controller is connected with hoist engine.
Described hoist engine is connected with cable by steel wire rope.
Described conduit is located in the subterranean tunnel.
Compared with prior art, the utility model is by arranging the condition of construction of IP Camera monitoring underground cable, in time from monitor, pinpoint the problems and solve a problem promptly, and size and direction by controller control hoist engine tractive effort, do not need personnel at underground construction, have construction flexibly, to advantages such as the road traffic influence are less, convenient and easy.
Description of drawings
Fig. 1 is structural representation of the present utility model.
Embodiment
Below in conjunction with the drawings and specific embodiments the utility model is elaborated.Present embodiment is that prerequisite is implemented with technical solutions of the utility model, provided detailed execution mode and concrete operating process, but protection range of the present utility model is not limited to following embodiment.
As shown in Figure 1, a kind of cable duct bank laying system with monitoring function, comprise cable hank 1, cable bearer 2, roller 3, conduit 4 and hoist engine 5, described cable hank 1 is located on the ground, coiling is useful on the cable 9 that lays on the cable hank 1, described cable bearer 2 is located at a side of cable hank 1, described roller 3 is located on the cable bearer 2, described conduit 4 is located in the subterranean tunnel, described cable 9 passes conduit 4 backs and is connected with hoist engine 5 by steel wire rope, also comprise IP Camera 6 and hoist engine control appliance, described IP Camera 6 is located at an end of conduit 4, and be connected with the hoist engine control appliance by network, described hoist engine control appliance is connected with hoist engine 5.
Described IP Camera 6 comprises camera lens and support, and described camera lens is located on the support movably, and described support is connected with conduit.Described hoist engine control appliance comprises monitor 7 and the controller 8 that is connected, and described monitor 7 is connected with IP Camera 6 by network, and described controller 8 is connected with hoist engine 5.
When adopting above-mentioned cable duct bank laying system with monitoring function to carry out the cable laying construction, IP Camera 6 is taken the actual conditions that the subterranean tunnel inner cable lays, and be transferred to monitor 7 by network, monitor 7 shows present case, then warning or transmission instruction are to controller 8 if pinpoint the problems, tractive effort size or the direction of controller 8 control hoist engine outputs are in time to fix a breakdown.

Claims (5)

1. cable duct bank laying system with monitoring function, comprise cable hank, cable bearer, roller, conduit and hoist engine, described cable hank is located on the ground, coiling is useful on the cable that lays on the cable hank, described cable bearer is located at a side of cable hank, described roller is located on the cable bearer, described cable is connected with hoist engine after passing conduit, it is characterized in that, also comprise IP Camera and hoist engine control appliance, described IP Camera is located at an end of conduit, and is connected with the hoist engine control appliance by network, and described hoist engine control appliance is connected with hoist engine.
2. a kind of cable duct bank laying system with monitoring function according to claim 1 is characterized in that described IP Camera comprises camera lens and support, and described camera lens is located on the support movably, and described support is connected with conduit.
3. a kind of cable duct bank laying system with monitoring function according to claim 1, it is characterized in that, described hoist engine control appliance comprises monitor and the controller that is connected, and described monitor is connected with IP Camera by network, and described controller is connected with hoist engine.
4. a kind of cable duct bank laying system with monitoring function according to claim 1 is characterized in that described hoist engine is connected with cable by steel wire rope.
5. a kind of cable duct bank laying system with monitoring function according to claim 1 is characterized in that described conduit is located in the subterranean tunnel.
CN 201320167560 2013-04-07 2013-04-07 Cable pipe laying system with monitoring function Expired - Lifetime CN203180464U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320167560 CN203180464U (en) 2013-04-07 2013-04-07 Cable pipe laying system with monitoring function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320167560 CN203180464U (en) 2013-04-07 2013-04-07 Cable pipe laying system with monitoring function

Publications (1)

Publication Number Publication Date
CN203180464U true CN203180464U (en) 2013-09-04

Family

ID=49077124

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320167560 Expired - Lifetime CN203180464U (en) 2013-04-07 2013-04-07 Cable pipe laying system with monitoring function

Country Status (1)

Country Link
CN (1) CN203180464U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106054370A (en) * 2016-06-27 2016-10-26 清华大学合肥公共安全研究院 Pipeline internal inspection device
CN109386741A (en) * 2018-11-28 2019-02-26 湖南普奇地质勘探设备研究院(普通合伙) Pipe leakage detection device and method
CN110112682A (en) * 2019-05-30 2019-08-09 国网河南省电力公司内乡县供电公司 A kind of non-excavation type crosses over the track laying device of road
CN111711122A (en) * 2020-06-04 2020-09-25 国网山东省电力公司德州供电公司 Laying device for underground cable line
CN114172086A (en) * 2021-12-15 2022-03-11 江阴市源达电工材料有限公司 Power supply pipeline cable width identification platform

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106054370A (en) * 2016-06-27 2016-10-26 清华大学合肥公共安全研究院 Pipeline internal inspection device
CN106054370B (en) * 2016-06-27 2018-09-28 清华大学合肥公共安全研究院 A kind of pipe endoscopic detection device
CN109386741A (en) * 2018-11-28 2019-02-26 湖南普奇地质勘探设备研究院(普通合伙) Pipe leakage detection device and method
CN110112682A (en) * 2019-05-30 2019-08-09 国网河南省电力公司内乡县供电公司 A kind of non-excavation type crosses over the track laying device of road
CN111711122A (en) * 2020-06-04 2020-09-25 国网山东省电力公司德州供电公司 Laying device for underground cable line
CN114172086A (en) * 2021-12-15 2022-03-11 江阴市源达电工材料有限公司 Power supply pipeline cable width identification platform

Similar Documents

Publication Publication Date Title
CN203180464U (en) Cable pipe laying system with monitoring function
KR101275117B1 (en) Remote monitoring devices exploration pipeline for drain water pipe
CN203233131U (en) Cable protection sleeve
RU2616681C1 (en) Method for production of encased pipe with conduit
CN103697334B (en) A kind of bushing type underground installation automatic early-warning system
WO2010029365A3 (en) Laying network cables in water supply pipes
CN210201333U (en) Underground cable laying structure
CN107008710A (en) A kind of cable pipeline dredging device
CN111894115A (en) Sewage pipeline dredging device for municipal engineering and implementation method thereof
CN207117111U (en) Anti-theft device for cable
CN103603376A (en) Concrete box culvert deformation joint waterproof structure and manufacturing technology thereof
KR101352128B1 (en) Unbinding apparatus of spiral pipe
CN205791250U (en) A kind of network service cable construction system
KR101016055B1 (en) Undergrond railway laying system for cable
CN211701429U (en) Small-caliber horizontal pipe jacking device suitable for distribution network cable channel
CN202501104U (en) Culvert cable bracket
CN103235380A (en) Method for long-distance coal conveying pipeline and communication cable to pass through underground engineering pipeline
JPH03270613A (en) Method for underground wiring of communication wire by using fluid transport pipe
CN112727499B (en) Protection device for underground pipeline in rectangular pipe jacking construction
CN104297882A (en) Transformer substation leading-down cable fault prevention measures
KR100753970B1 (en) Supporting apparatus using pc wire for box in weakness ground
CN219606226U (en) Temporary pipeline support for pipe jacking construction
CN103938596A (en) Water conveyance tunnel line system crossing active fault
CN221525837U (en) Reinforcing apparatus that piping connection used
KR101218061B1 (en) Winch for laying electric wire in pipe mountable on excavator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20130904