CN203159149U - Large-span prestress double-arching-frame hoisting structure - Google Patents
Large-span prestress double-arching-frame hoisting structure Download PDFInfo
- Publication number
- CN203159149U CN203159149U CN 201320192653 CN201320192653U CN203159149U CN 203159149 U CN203159149 U CN 203159149U CN 201320192653 CN201320192653 CN 201320192653 CN 201320192653 U CN201320192653 U CN 201320192653U CN 203159149 U CN203159149 U CN 203159149U
- Authority
- CN
- China
- Prior art keywords
- bow member
- gooseneck
- arching
- screw rod
- steel beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The utility model discloses a large-span prestress double-arching-frame hoisting structure which comprises an operation platform arranged between two load bearing columns arranged abreast. A lower steel beam is arranged on the operation platform, an upper steel beam is arranged above the lower steel beam, a jack is arranged between the lower steel beam and the upper steel beam, the end portions of arching frames are located under the operation platform between the two load bearing columns, the end portions of the arching frames and the upper steel beam are connected through screws, the top ends of the screws penetrate the upper steel beam to be fastened through nuts, and the bottom ends of the screws penetrate the end portions of the arching frames to be fastened through nuts. The screws are utilized as a hoisting tool, the jack is utilized as a power source to hoist the screws, the screws drag the arching frames to the designed elevation, safety and health of constructors in the arching frame hoisting process are ensured, damage to structure quality caused by the hoisting process is avoided, and meanwhile hoisting time is shortened.
Description
Technical field
The utility model relates to large-span prestressed pair of bow member hoisting structure.
Background technology
The two bow member lifting of large span Heavy Weight, the hoisting height height, difficulty of construction is big.
The utility model content
Technical problem to be solved in the utility model just provides a kind of large-span prestressed pair of bow member hoisting structure, guarantee workmen's safety and Health in the bow member hoisting process, guarantee that structure does not take place to destroy because hoisting causes architecture quality, shorten the lifting time simultaneously.
For solving the problems of the technologies described above, the utility model adopts following technical scheme: large-span prestressed pair of bow member hoisting structure, comprise and be located at two service platforms between load-bearing pillar side by side, it is characterized in that: described service platform is provided with down gooseneck, be provided with gooseneck above the gooseneck down, be provided with jack between described gooseneck down and the last gooseneck, the bow member end is below service platform between two load-bearing pillars, be connected by screw rod between described bow member end and the last gooseneck, described screw tip passes gooseneck and fastening by nut, and described screw rod bottom passes bow member end and fastening by nut.
Preferably, described screw rod is provided with four and rectangular distribution.
Preferably, described screw rod is the smart screw-thread steel of pricking, and the diameter of described screw rod is 40mm.
Preferably, described load-bearing pillar is provided with rest hole.
Preferably, described bow member end is provided with the lifting preformed hole that passes for screw rod, is embedded with steel pipe in the described lifting preformed hole and makes sleeve pipe, and the reinforcing bar welding is fixing in steel pipe sleeve pipe and the bow member.
The utility model utilizes screw rod as the lifting instrument, utilize jack as the propulsion source lift-bolt, draw bow member to designed elevation by screw rod, guarantee workmen's safety and Health in the bow member hoisting process, guarantee that structure does not take place to destroy because hoisting causes architecture quality, shortened the lifting time simultaneously.
Description of drawings
Below in conjunction with the drawings and specific embodiments the utility model is further described:
Fig. 1 is large-span prestressed pair of bow member hoisting structure scheme drawing.
The specific embodiment
Specify large-span prestressed pair of bow member hoisting structure below in conjunction with Fig. 1, two 1 of load-bearing pillars side by side are provided with service platform 10, described service platform 10 is provided with down gooseneck 20, be provided with gooseneck 21 above the gooseneck down, be provided with jack 22 between described gooseneck 20 down and the last gooseneck 21, bow member end 3 is below service platform 10 between two load-bearing pillars 1, be connected by screw rod 2 between described bow member end and the last gooseneck, described screw tip passes gooseneck and fastening by nut, and described screw rod bottom passes bow member end and fastening by nut.
Described screw rod is provided with four and rectangular distribution.Described screw rod is the smart screw-thread steel of pricking, and the diameter of described screw rod is 40mm.Described load-bearing pillar is provided with rest hole.Described bow member end is provided with the lifting preformed hole that passes for screw rod, is embedded with steel pipe in the described lifting preformed hole and makes sleeve pipe, and the reinforcing bar welding is fixing in steel pipe sleeve pipe and the bow member.
Claims (5)
1. large-span prestressed pair of bow member hoisting structure, comprise and be located at two service platforms (10) between load-bearing pillar (1) side by side, it is characterized in that: described service platform (10) is provided with down gooseneck (20), be provided with gooseneck (21) above the gooseneck down, be provided with jack (22) between described gooseneck down and the last gooseneck, bow member end (3) is below service platform between two load-bearing pillars, be connected by screw rod (2) between described bow member end and the last gooseneck, described screw tip passes gooseneck and fastening by nut, and described screw rod bottom passes bow member end and fastening by nut.
2. large-span prestressed pair of bow member hoisting structure according to claim 1 is characterized in that: described screw rod is provided with four and rectangular distributions.
3. large-span prestressed pair of bow member hoisting structure according to claim 2 is characterized in that: described screw rod is the smart screw-thread steel of pricking, and the diameter of described screw rod is 40mm.
4. large-span prestressed pair of bow member hoisting structure according to claim 1, it is characterized in that: described load-bearing pillar is provided with rest hole.
5. large-span prestressed pair of bow member hoisting structure according to claim 1, it is characterized in that: described bow member end is provided with the lifting preformed hole that passes for screw rod, be embedded with steel pipe in the described lifting preformed hole and make sleeve pipe, the reinforcing bar welding is fixing in steel pipe sleeve pipe and the bow member.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320192653 CN203159149U (en) | 2013-04-16 | 2013-04-16 | Large-span prestress double-arching-frame hoisting structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320192653 CN203159149U (en) | 2013-04-16 | 2013-04-16 | Large-span prestress double-arching-frame hoisting structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203159149U true CN203159149U (en) | 2013-08-28 |
Family
ID=49020352
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320192653 Expired - Fee Related CN203159149U (en) | 2013-04-16 | 2013-04-16 | Large-span prestress double-arching-frame hoisting structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203159149U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103264977A (en) * | 2013-04-16 | 2013-08-28 | 中天建设集团有限公司 | Large-span prestress double-arch-frame hoisting structure |
-
2013
- 2013-04-16 CN CN 201320192653 patent/CN203159149U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103264977A (en) * | 2013-04-16 | 2013-08-28 | 中天建设集团有限公司 | Large-span prestress double-arch-frame hoisting structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106436557B (en) | Method for improving anti-overturning performance of single-pier bridge | |
CN201567146U (en) | Suspender for eccentric component | |
CN203973750U (en) | Integral prefabricated T girder tensioning protection canopy | |
CN204455842U (en) | Bridge precast beam plate plays roof beam structure | |
CN203159149U (en) | Large-span prestress double-arching-frame hoisting structure | |
CN202079565U (en) | Auxiliary tool for installing steel arch center | |
CN103266777A (en) | Large-span prestress double-arch frame hoisting process | |
CN204823738U (en) | Two roof beam electric hoist formula hoist girder orthotic devices | |
CN202124920U (en) | Steel column mechanism for steel structure | |
CN204023414U (en) | The few fulcrum support entirety of a kind of novel large falls rack device | |
CN203559314U (en) | Track fixing device of thickener | |
CN203701878U (en) | Split-type bearing connection mechanism for vertical columns of platform screen door | |
CN204850482U (en) | Anti - stretch -draw pre -compaction instrument of jack | |
CN103264977A (en) | Large-span prestress double-arch-frame hoisting structure | |
CN203306639U (en) | Installing guide rail mechanism for diesel engine set | |
CN203129624U (en) | Prestress carbon fiber cloth tensioning device for strengthening oblique section of reinforced concrete beam | |
CN203602189U (en) | Car frame structure of car elevator | |
CN203321544U (en) | Hydraulic support | |
CN203794571U (en) | Adjustable rope lifting device for maintaining cableway supporting roller | |
CN202194073U (en) | Large-volume long-cantilever capping beam construction device | |
CN201424347Y (en) | Assistant lifting device for hosting bridge tower arch ribs | |
CN202865750U (en) | Load-bearing device of concrete bent cap | |
CN203475810U (en) | Overhanging scaffold bearing structure | |
CN203130123U (en) | Snapping-preventive device for two-frame-in-on-group type face end support | |
CN203684111U (en) | Self-jacking cable hoisting system tower top door frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130828 Termination date: 20140416 |