CN203159149U - Large-span prestress double-arching-frame hoisting structure - Google Patents

Large-span prestress double-arching-frame hoisting structure Download PDF

Info

Publication number
CN203159149U
CN203159149U CN 201320192653 CN201320192653U CN203159149U CN 203159149 U CN203159149 U CN 203159149U CN 201320192653 CN201320192653 CN 201320192653 CN 201320192653 U CN201320192653 U CN 201320192653U CN 203159149 U CN203159149 U CN 203159149U
Authority
CN
China
Prior art keywords
bow member
gooseneck
arching
screw rod
steel beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320192653
Other languages
Chinese (zh)
Inventor
虞功平
徐建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN 201320192653 priority Critical patent/CN203159149U/en
Application granted granted Critical
Publication of CN203159149U publication Critical patent/CN203159149U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses a large-span prestress double-arching-frame hoisting structure which comprises an operation platform arranged between two load bearing columns arranged abreast. A lower steel beam is arranged on the operation platform, an upper steel beam is arranged above the lower steel beam, a jack is arranged between the lower steel beam and the upper steel beam, the end portions of arching frames are located under the operation platform between the two load bearing columns, the end portions of the arching frames and the upper steel beam are connected through screws, the top ends of the screws penetrate the upper steel beam to be fastened through nuts, and the bottom ends of the screws penetrate the end portions of the arching frames to be fastened through nuts. The screws are utilized as a hoisting tool, the jack is utilized as a power source to hoist the screws, the screws drag the arching frames to the designed elevation, safety and health of constructors in the arching frame hoisting process are ensured, damage to structure quality caused by the hoisting process is avoided, and meanwhile hoisting time is shortened.

Description

Large-span prestressed pair of bow member hoisting structure
Technical field
The utility model relates to large-span prestressed pair of bow member hoisting structure.
Background technology
The two bow member lifting of large span Heavy Weight, the hoisting height height, difficulty of construction is big.
The utility model content
Technical problem to be solved in the utility model just provides a kind of large-span prestressed pair of bow member hoisting structure, guarantee workmen's safety and Health in the bow member hoisting process, guarantee that structure does not take place to destroy because hoisting causes architecture quality, shorten the lifting time simultaneously.
For solving the problems of the technologies described above, the utility model adopts following technical scheme: large-span prestressed pair of bow member hoisting structure, comprise and be located at two service platforms between load-bearing pillar side by side, it is characterized in that: described service platform is provided with down gooseneck, be provided with gooseneck above the gooseneck down, be provided with jack between described gooseneck down and the last gooseneck, the bow member end is below service platform between two load-bearing pillars, be connected by screw rod between described bow member end and the last gooseneck, described screw tip passes gooseneck and fastening by nut, and described screw rod bottom passes bow member end and fastening by nut.
Preferably, described screw rod is provided with four and rectangular distribution.
Preferably, described screw rod is the smart screw-thread steel of pricking, and the diameter of described screw rod is 40mm.
Preferably, described load-bearing pillar is provided with rest hole.
Preferably, described bow member end is provided with the lifting preformed hole that passes for screw rod, is embedded with steel pipe in the described lifting preformed hole and makes sleeve pipe, and the reinforcing bar welding is fixing in steel pipe sleeve pipe and the bow member.
The utility model utilizes screw rod as the lifting instrument, utilize jack as the propulsion source lift-bolt, draw bow member to designed elevation by screw rod, guarantee workmen's safety and Health in the bow member hoisting process, guarantee that structure does not take place to destroy because hoisting causes architecture quality, shortened the lifting time simultaneously.
Description of drawings
Below in conjunction with the drawings and specific embodiments the utility model is further described:
Fig. 1 is large-span prestressed pair of bow member hoisting structure scheme drawing.
The specific embodiment
Specify large-span prestressed pair of bow member hoisting structure below in conjunction with Fig. 1, two 1 of load-bearing pillars side by side are provided with service platform 10, described service platform 10 is provided with down gooseneck 20, be provided with gooseneck 21 above the gooseneck down, be provided with jack 22 between described gooseneck 20 down and the last gooseneck 21, bow member end 3 is below service platform 10 between two load-bearing pillars 1, be connected by screw rod 2 between described bow member end and the last gooseneck, described screw tip passes gooseneck and fastening by nut, and described screw rod bottom passes bow member end and fastening by nut.
Described screw rod is provided with four and rectangular distribution.Described screw rod is the smart screw-thread steel of pricking, and the diameter of described screw rod is 40mm.Described load-bearing pillar is provided with rest hole.Described bow member end is provided with the lifting preformed hole that passes for screw rod, is embedded with steel pipe in the described lifting preformed hole and makes sleeve pipe, and the reinforcing bar welding is fixing in steel pipe sleeve pipe and the bow member.

Claims (5)

1. large-span prestressed pair of bow member hoisting structure, comprise and be located at two service platforms (10) between load-bearing pillar (1) side by side, it is characterized in that: described service platform (10) is provided with down gooseneck (20), be provided with gooseneck (21) above the gooseneck down, be provided with jack (22) between described gooseneck down and the last gooseneck, bow member end (3) is below service platform between two load-bearing pillars, be connected by screw rod (2) between described bow member end and the last gooseneck, described screw tip passes gooseneck and fastening by nut, and described screw rod bottom passes bow member end and fastening by nut.
2. large-span prestressed pair of bow member hoisting structure according to claim 1 is characterized in that: described screw rod is provided with four and rectangular distributions.
3. large-span prestressed pair of bow member hoisting structure according to claim 2 is characterized in that: described screw rod is the smart screw-thread steel of pricking, and the diameter of described screw rod is 40mm.
4. large-span prestressed pair of bow member hoisting structure according to claim 1, it is characterized in that: described load-bearing pillar is provided with rest hole.
5. large-span prestressed pair of bow member hoisting structure according to claim 1, it is characterized in that: described bow member end is provided with the lifting preformed hole that passes for screw rod, be embedded with steel pipe in the described lifting preformed hole and make sleeve pipe, the reinforcing bar welding is fixing in steel pipe sleeve pipe and the bow member.
CN 201320192653 2013-04-16 2013-04-16 Large-span prestress double-arching-frame hoisting structure Expired - Fee Related CN203159149U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320192653 CN203159149U (en) 2013-04-16 2013-04-16 Large-span prestress double-arching-frame hoisting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320192653 CN203159149U (en) 2013-04-16 2013-04-16 Large-span prestress double-arching-frame hoisting structure

Publications (1)

Publication Number Publication Date
CN203159149U true CN203159149U (en) 2013-08-28

Family

ID=49020352

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320192653 Expired - Fee Related CN203159149U (en) 2013-04-16 2013-04-16 Large-span prestress double-arching-frame hoisting structure

Country Status (1)

Country Link
CN (1) CN203159149U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103264977A (en) * 2013-04-16 2013-08-28 中天建设集团有限公司 Large-span prestress double-arch-frame hoisting structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103264977A (en) * 2013-04-16 2013-08-28 中天建设集团有限公司 Large-span prestress double-arch-frame hoisting structure

Similar Documents

Publication Publication Date Title
CN106436557B (en) Method for improving anti-overturning performance of single-pier bridge
CN201567146U (en) Suspender for eccentric component
CN203973750U (en) Integral prefabricated T girder tensioning protection canopy
CN204455842U (en) Bridge precast beam plate plays roof beam structure
CN203159149U (en) Large-span prestress double-arching-frame hoisting structure
CN202079565U (en) Auxiliary tool for installing steel arch center
CN103266777A (en) Large-span prestress double-arch frame hoisting process
CN204823738U (en) Two roof beam electric hoist formula hoist girder orthotic devices
CN202124920U (en) Steel column mechanism for steel structure
CN204023414U (en) The few fulcrum support entirety of a kind of novel large falls rack device
CN203559314U (en) Track fixing device of thickener
CN203701878U (en) Split-type bearing connection mechanism for vertical columns of platform screen door
CN204850482U (en) Anti - stretch -draw pre -compaction instrument of jack
CN103264977A (en) Large-span prestress double-arch-frame hoisting structure
CN203306639U (en) Installing guide rail mechanism for diesel engine set
CN203129624U (en) Prestress carbon fiber cloth tensioning device for strengthening oblique section of reinforced concrete beam
CN203602189U (en) Car frame structure of car elevator
CN203321544U (en) Hydraulic support
CN203794571U (en) Adjustable rope lifting device for maintaining cableway supporting roller
CN202194073U (en) Large-volume long-cantilever capping beam construction device
CN201424347Y (en) Assistant lifting device for hosting bridge tower arch ribs
CN202865750U (en) Load-bearing device of concrete bent cap
CN203475810U (en) Overhanging scaffold bearing structure
CN203130123U (en) Snapping-preventive device for two-frame-in-on-group type face end support
CN203684111U (en) Self-jacking cable hoisting system tower top door frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130828

Termination date: 20140416