CN203475810U - Overhanging scaffold bearing structure - Google Patents

Overhanging scaffold bearing structure Download PDF

Info

Publication number
CN203475810U
CN203475810U CN201320625647.4U CN201320625647U CN203475810U CN 203475810 U CN203475810 U CN 203475810U CN 201320625647 U CN201320625647 U CN 201320625647U CN 203475810 U CN203475810 U CN 203475810U
Authority
CN
China
Prior art keywords
positioning screw
screw rod
junction plate
stop nut
positional punch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320625647.4U
Other languages
Chinese (zh)
Inventor
颜有光
杨洪
李林
钟浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Province 4th Construction Engineering Corp
Original Assignee
Sichuan Province 4th Construction Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Province 4th Construction Engineering Corp filed Critical Sichuan Province 4th Construction Engineering Corp
Priority to CN201320625647.4U priority Critical patent/CN203475810U/en
Application granted granted Critical
Publication of CN203475810U publication Critical patent/CN203475810U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an overhanging scaffold bearing structure which comprises a connecting plate, a steel beam, an upper locating lead screw and a lower locating lead screw. One end of the steel beam is connected to the right end face of the connecting plate, the steel beam is perpendicular to the connecting plate, an upper locating penetrating hole penetrating the left end face of the connecting plate and a lower locating penetrating hole penetrating the right end face of the connecting plate are formed in the connecting plate, openings, located in the right end face of the connecting plate, of the upper locating penetrating hole and the lower locating penetrating hole are located above and below the part, connected with the steel beam, of the connecting plate respectively, one end of the upper locating lead screw sequentially penetrates through the upper locating penetrating hole and a shear wall and is embedded into a building structure beam, and one end of the lower locating lead screw penetrates through the lower locating penetrating hole and is embedded into the shear wall. The upper locating lead screw is provided with an inner limiting nut and an outer limiting nut in a sleeved mode, the lower locating lead screw is provided with an inner limiting nut and an outer limiting nut respectively, the inner limiting nuts and the outer limiting nuts are located on the two sides of the connecting plate respectively and the inner limiting nuts are located in the shear wall. When the overhanging scaffold bearing structure is used for bearing a scaffold, a large hole does not need to be reserved, and therefore the influences to the strength of a building structure can be reduced.

Description

Builder's jack supporting framework
Technical field
The utility model relates to the realm of building construction, specifically the supporting framework of builder's jack.
Background technology
Along with the develop rapidly of urban construction, being on the increase of high level and super high rise building, construction environment heals and becomes complicated, and in order to meet the needs of structure construction and outer decoration construction, people generally adopt cantilever steel girder to support scaffold.Existing cantilever steel girder needs to stay large hole while passing concrete building structures in building structure, can subdue the intensity of building structure on horizontal section.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, and a kind of supporting framework that can reduce the builder's jack of Building Structure Strength impact is provided.
The purpose of this utility model is achieved through the following technical solutions: builder's jack supporting framework, comprise junction plate, girder steel, upper positioning screw rod and lower positioning screw rod, described girder steel one end is connected on junction plate right side and is vertical with junction plate, described junction plate forms upper positional punch and the lower positional punch that runs through its left and right end face, upper positional punch lays respectively at the opening of lower positional punch in junction plate right side the upper and lower that junction plate is connected girder steel position, upper positioning screw rod one end is successively through upper positional punch, shear wall also embeds in architecture beam, lower positioning screw rod one end is passed lower positional punch and is embedded in shear wall, on described upper positioning screw rod and lower positioning screw rod, be all arranged with interior stop nut and outer stop nut, described interior stop nut and outer stop nut lay respectively at junction plate both sides, and interior stop nut is positioned at shear wall.The utility model is when specifically arranging, before disturbing concrete on positioning screw rod, lower positioning screw rod and interior stop nut carry out pre-buried, upper positioning screw rod of the present utility model is not limited to through on shear wall built-in beam, also can embed in floor, lower positioning screw rod of the present utility model is not limited to and embeds in shear wall, also can embed in concrete structure column.During the utility model application, by rotating outer stop nut, make junction plate left side be close to shear wall wall face.
Further, on described upper positioning screw rod and lower positioning screw rod, be all arranged with flat bolster and spring shim, described flat bolster and spring shim are all between junction plate and outer stop nut, and flat bolster contacts with junction plate, and spring shim both ends of the surface contact with outer stop nut with flat bolster respectively.The utility model is separated outer stop nut and junction plate by flat bolster, compare with the irregular outer stop nut of end face, wearing and tearing to junction plate when flat bolster being set separating outer stop nut and junction plate and can reduce fastening connecting plate, and spring shim is set, can avoid the rigid friction between flat bolster and outer stop nut, make junction plate fixing more firm.
Further, the quantity of the sheathed outer stop nut of described upper positioning screw rod and lower positioning screw rod is two.Loosening and the potential safety hazard that exists of junction plate in the time of further avoiding the utility model stressed is being set outside two after stop nut.
Further, convenient in order to draw materials, described junction plate adopts steel plate.
Further, in order to save girder steel cost, described girder steel adopts welding H-bar.
In order to make the utility model when application junction plate fixing more firm, the quantity of described upper positional punch and lower positional punch is two, identical and settings that keep at a certain distance away in the vertical of two upper positional punch level heights, two lower positional punch level heights are identical and lay respectively at two and go up under positional punches; The quantity of described upper positioning screw rod and lower positioning screw rod is two, and two upper positioning screw rods are respectively through two upper positional punches, and two lower positioning screw rods are respectively through two lower positional punches.
Further, on described girder steel, be provided with two positioning tubes that keep at a certain distance away in the horizontal and arrange.While setting up scaffold on the utility model, ricker lower end is set on positioning tube or embeds in positioning tube, so, can avoid scaffold displacement.
Compared with prior art, the utlity model has following beneficial effect: the utility model comprises junction plate, girder steel, upper positioning screw rod and lower positioning screw rod, wherein, girder steel is connected with junction plate, upper positioning screw rod one end is successively through upper positional punch, shear wall also embeds in architecture beam, lower positioning screw rod one end is passed lower positional punch and is embedded in shear wall, on upper positioning screw rod and lower positioning screw rod, be all arranged with interior stop nut and outer stop nut, the utility model overall structure is simple, be convenient to realize, cost is low, during the utility model application, only has upper positioning screw rod, lower positioning screw rod and interior stop nut embed in concrete building structures, when specifically arranging, before disturbing concrete on positioning screw rod, lower positioning screw rod and interior stop nut carry out pre-buried, do not need reserving hole, after the utility model should be finished by upper positioning screw rod, lower positioning screw rod and interior stop nut are stayed in building structure, so, can reduce the impact on Building Structure Strength.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structure for amplifying schematic diagram at A place in Fig. 1.
In accompanying drawing, the corresponding name of Reference numeral is called: 1, junction plate, 2, girder steel, 3, upper positioning screw rod, 4, lower positioning screw rod, 5, interior stop nut, 6, outer stop nut, 7, flat bolster, 8, spring shim, 9, positioning tube.
The specific embodiment
Below in conjunction with embodiment and accompanying drawing, the utility model is described in further detail, but embodiment of the present utility model is not limited to this.
Embodiment 1
As shown in Figures 1 and 2, builder's jack supporting framework, comprises junction plate 1, girder steel 2, upper positioning screw rod 3 and lower positioning screw rod 4, and wherein, junction plate 1 preferably adopts steel plate, and girder steel 2 preferably adopts welding H-bar.Girder steel 2 one end are connected on junction plate 1 right side and are vertical with junction plate 1, junction plate 1 forms upper positional punch and the lower positional punch that runs through its left and right end face, and upper positional punch lays respectively at the opening of lower positional punch in junction plate 1 right side the upper and lower that junction plate 1 is connected girder steel 2 positions.Upper positioning screw rod 3 one end are passed successively upper positional punch, shear wall and are embedded in architecture beam, and lower positioning screw rod 4 one end are passed lower positional punch and embedded in shear wall.In the present embodiment, the quantity of upper positional punch and lower positional punch is two, identical and the setting that keeps at a certain distance away in the vertical of two upper positional punch level heights, two lower positional punch level heights are identical and lay respectively under two upper positional punches, the quantity of upper positioning screw rod 3 and lower positioning screw rod 4 is two, two upper positioning screw rods 3 are respectively through two upper positional punches, and two lower positioning screw rods 5 are respectively through two lower positional punches.
In the present embodiment, on every upper positioning screw rod 3 and every lower positioning screw rod 4, be all arranged with interior stop nut 5 and outer stop nut 6, interior stop nut 5 and outer stop nut 6 lay respectively at junction plate 1 both sides, and interior stop nut 5 is positioned at shear wall.Wherein, the quantity of every upper positioning screw rod 3 and the every upper outside stop nut 6 of lower positioning screw rod 4 is all preferably two, an outer stop nut 6 is for suppressing junction plate 1 displacement, and another outer stop nut 6 is again to resisting 6 resistancing actions of outer stop nut of junction plate 1.
In the present embodiment when application,, the quantity that the builder's jack supporting framework of the present embodiment is set in the building structure of same level height is a plurality of, and a plurality of supporting frameworks are spaced set in the vertical, and scaffold building, on girder steel 2, and is supported by girder steel 2.
Embodiment 2
The present embodiment has been made following improvement on the basis of embodiment 1: in the present embodiment, on upper positioning screw rod 3 and lower positioning screw rod 4, be all arranged with flat bolster 7 and spring shim 8, wherein, flat bolster 7 and spring shim 8 are all between junction plate 1 and outer stop nut 5, flat bolster 7 contacts with junction plate 1, and spring shim 8 both ends of the surface contact with outer stop nut 5 with flat bolster 7 respectively.
Embodiment 3
The present embodiment has carried out following improvement on the basis of embodiment 1 or 2: on the girder steel 2 of the present embodiment, be provided with two positioning tubes 9 that keep at a certain distance away in the horizontal and arrange, so, while setting up scaffold on the present embodiment, the vertical rod of scaffold can embed in positioning tube 9 or be enclosed within on positioning tube 9, and then can avoid scaffold displacement.
Above content is the further description of the utility model being done in conjunction with concrete preferred embodiment, can not assert that the specific embodiment of the present utility model is confined to these explanations.For the utility model person of an ordinary skill in the technical field, not departing from other embodiments that draw under the technical solution of the utility model, all should be included in protection domain of the present utility model.

Claims (7)

1. builder's jack supports framework, it is characterized in that: comprise junction plate (1), girder steel (2), upper positioning screw rod (3) and lower positioning screw rod (4), described girder steel (2) one end is connected on junction plate (1) right side and is vertical with junction plate (1), described junction plate (1) forms upper positional punch and the lower positional punch that runs through its left and right end face, upper positional punch lays respectively at the opening of lower positional punch in junction plate (1) right side the upper and lower that junction plate (1) is connected girder steel (2) position, upper positioning screw rod (3) one end is successively through upper positional punch, shear wall also embeds in architecture beam, lower positioning screw rod (4) one end is passed lower positional punch and is embedded in shear wall, on described upper positioning screw rod (3) and lower positioning screw rod (4), be all arranged with interior stop nut (5) and outer stop nut (6), described interior stop nut (5) and outer stop nut (6) lay respectively at junction plate (1) both sides, and interior stop nut (5) is positioned at shear wall.
2. builder's jack according to claim 1 supports framework, it is characterized in that: on described upper positioning screw rod (3) and lower positioning screw rod (4), be all arranged with flat bolster (7) and spring shim (8), described flat bolster (7) and spring shim (8) are all positioned between junction plate (1) and outer stop nut (5), flat bolster (7) contacts with junction plate (1), and spring shim (8) both ends of the surface contact with outer stop nut (5) with flat bolster (7) respectively.
3. builder's jack supporting framework according to claim 1, is characterized in that: both quantity of sheathed outer stop nut (5) of described upper positioning screw rod (3) and lower positioning screw rod (4) are two.
4. builder's jack supporting framework according to claim 1, is characterized in that: described junction plate (1) adopts steel plate.
5. builder's jack supporting framework according to claim 1, is characterized in that: described girder steel (2) adopts welding H-bar.
6. builder's jack according to claim 1 supports framework, it is characterized in that: the quantity of described upper positional punch and lower positional punch is two, identical and settings that keep at a certain distance away in the vertical of two upper positional punch level heights, two lower positional punch level heights are identical and lay respectively at two and go up under positional punches; The quantity of described upper positioning screw rod (3) and lower positioning screw rod (4) is two, and two upper positioning screw rods (3) are respectively through two upper positional punches, and two lower positioning screw rods (5) are respectively through two lower positional punches.
7. according to the builder's jack supporting framework described in any one in claim 1~6, it is characterized in that: on described girder steel (2), be provided with two positioning tubes (9) that keep at a certain distance away in the horizontal and arrange.
CN201320625647.4U 2013-10-11 2013-10-11 Overhanging scaffold bearing structure Expired - Lifetime CN203475810U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320625647.4U CN203475810U (en) 2013-10-11 2013-10-11 Overhanging scaffold bearing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320625647.4U CN203475810U (en) 2013-10-11 2013-10-11 Overhanging scaffold bearing structure

Publications (1)

Publication Number Publication Date
CN203475810U true CN203475810U (en) 2014-03-12

Family

ID=50224164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320625647.4U Expired - Lifetime CN203475810U (en) 2013-10-11 2013-10-11 Overhanging scaffold bearing structure

Country Status (1)

Country Link
CN (1) CN203475810U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113775A (en) * 2015-09-18 2015-12-02 中建七局(上海)有限公司 Basic structure of cantilever scaffold

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113775A (en) * 2015-09-18 2015-12-02 中建七局(上海)有限公司 Basic structure of cantilever scaffold

Similar Documents

Publication Publication Date Title
CN204492134U (en) Be convenient to the height scaffolding installed
CN103061514B (en) Long-span steel structure corridor construction method
CN203475809U (en) Scaffold supporting structure convenient to mount and dismount
CN204552087U (en) A kind of steel column foot concrete blinding construction equipment
CN203475808U (en) Framework for supporting scaffold
CN204343642U (en) Builder's jack corner support frame
CN204212385U (en) Scaffold strengthened by truss
CN206467579U (en) A kind of support meanss of bridge coping
CN201915632U (en) Adjustable supporting structure of beam template
CN204624885U (en) A kind of standard knot support chassis of elevator
CN203499235U (en) Structure for locating scaffold
CN201747052U (en) Novel nondestructive tight bind type attachment device of creeping climbing formwork and climbing frame
CN203475807U (en) Bearing base of overhanging scaffold
CN203257080U (en) Adjustable overhang supporting device for building construction
CN209779639U (en) A Supporting Structure Applied to Foundation Pit with Internal Facade Support
CN201649616U (en) Rigid connecting tube of scaffold and building
CN202544875U (en) Front canopy type temporary supporting suspension device for anchor pole supporting tunnel construction
CN205242988U (en) Cantilever type steel with inclined support at bottom
CN202658868U (en) Operating platform for super-high elevator shaft
CN202299365U (en) Vertical main framework structure of attached elevating scaffold
CN203080923U (en) Formwork support diagonal bracing system for construction of cast-in-situ concrete large cross-sectional beams
CN105649317A (en) Fixing mechanism for cantilever I-beam
CN202164832U (en) Inner telescopic jacket steel pipe and supporting device for cast-in-place floor slab and supporting formwork
CN203080922U (en) Supporting formwork system used for cast-in-place concrete large-cross-section beam construction
CN203866962U (en) Profile steel lifting and supporting system of super high-rise steel structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140312