CN203146013U - Material slurry filling multipoint lime feeding device - Google Patents

Material slurry filling multipoint lime feeding device Download PDF

Info

Publication number
CN203146013U
CN203146013U CN 201320118809 CN201320118809U CN203146013U CN 203146013 U CN203146013 U CN 203146013U CN 201320118809 CN201320118809 CN 201320118809 CN 201320118809 U CN201320118809 U CN 201320118809U CN 203146013 U CN203146013 U CN 203146013U
Authority
CN
China
Prior art keywords
filling
pipe
filling pipe
pipes
lime feeding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320118809
Other languages
Chinese (zh)
Inventor
陈永强
刘玉强
张明军
龙卫国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinchuan Group Co Ltd
Original Assignee
Jinchuan Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinchuan Group Co Ltd filed Critical Jinchuan Group Co Ltd
Priority to CN 201320118809 priority Critical patent/CN203146013U/en
Application granted granted Critical
Publication of CN203146013U publication Critical patent/CN203146013U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a material slurry filling multipoint lime feeding device which comprises filling pipes arranged in a stope filling admission passage and a stope filling small well. The tail ends of the filling pipes are provided with lime feeding ports. The filling pipes comprises a first filling pipe, a second filling pipe, a third filling pipe and a fourth filling pipe, wherein the first filling pipe, the second filling pipe, the third filling pipe and the fourth filling pipe are different in pipe diameter and connected through reducer pipes. The tail end of the second filling pipe and the tail end of the third filling pipe are respectively provided with a lime feeding port. According to the material slurry filling multipoint lime feeding device, due to the fact that i the filling pipes in the different pipe diameters are installed and the lime feeding ports are additionally formed in the filling pipes in the different pipe diameters, filling can be achieved without interruption, the phenomena of dissociation and layering can be prevented from being generated in the filling process of slurry, a delaminating phenomenon of filling slurry is free of being generated, and generated drainage water and generated rinsing water are little. One-time lime feeding is achieved in the filling admission passage, one-time filling close to back is achieved, a smooth filling body is achieved, filling barricades are reduced, production efficiency is improved, waste stone generated by collapse of the filling body is eliminated, and dilution of ores is reduced.

Description

Apparatus for ash under the filling slurry multiple spot
Technical field
The utility model relates to apparatus for ash under a kind of filling slurry, relates in particular to apparatus for ash under a kind of filling slurry multiple spot.
Background technology
At present, known following pipeline in cemented filling method stope filling route is along the straight laying of filling top board, and solid with the firm colligation of muscle at the bottom of anchor pole or the upper strata, and the tube head position is positioned at apart from 5~8 meters on face, and is fixed on the peak place.Filling route surpassing 40m is subjected to the restriction of filling slurry hydraulic gradient, and the filling slurry is easy to emanate, and requires shutoff filling counterfort in the middle of route, divides primary filling to be beneficial to filling and connects the top.This placement method because stowing operation interrupts, is prone to obturation segregation, layering, begins and the drainage water when finishing filling and rinse Guan Shui and infiltrate stope by board wall or protolith at every turn, causes clay mineral, the grade reduction; Stope mining during to lower leaf the top board obturation be easy to take place delamination because of segregation, layering.
The utility model content
The purpose of this utility model is to provide a kind of can effectively solve apparatus for ash under the filling slurry can not primary filling connects the top because of the factor of hydraulic gradient the filling slurry multiple spot.
For achieving the above object, the technical scheme taked of the utility model is:
Apparatus for ash under a kind of filling slurry multiple spot, comprise the filling pipe that is arranged in stope filling route and the stope filling The Small Well, the end of filling pipe is dust inlet, described filling pipe comprises first filling pipe, second filling pipe, the 3rd filling pipe and the 4th filling pipe of different tube diameters, be connected by reducer pipe between each filling pipe, described second filling pipe end and the 3rd filling pipe end are respectively equipped with dust inlet.
Described second filling pipe lengthens pipeline by joint.
Described the 3rd filling pipe lengthens pipeline by joint.
Described first filling pipe, second filling pipe, the 3rd filling pipe and the 4th filling pipe are PE pipe or steel pipe.
Apparatus for ash under the filling slurry multiple spot that employing the utility model provides, because the filling pipe of different tube diameters has been installed, filling pipe at different tube diameters has been set up dust inlet, do not interrupt during filling, can guarantee that slurry is not emanated, stratification in stowing operation, delamination does not take place in obturation, the drainage water of generation and rinse the pipe water less.Following ash once in the filling route realizes that primary filling connects the top, has formed smooth obturation, has reduced filling counterfort, has improved production efficiency, has eliminated because of the obturation barren rock that produces that falls that collapses, the dilution of reduction ore.
Description of drawings
Fig. 1 is structural representation of the present utility model.
Among the figure, 1-stope filling The Small Well, 2-first filling pipe, 3-stope filling route, 4-second filling pipe, 5-dust inlet, 6-reducer pipe, 7-joint, 8-the 3rd filling pipe, 9-the 4th filling pipe.
The specific embodiment
Below in conjunction with specific embodiment and accompanying drawing thereof, the utility model is described in further detail, but embodiment of the present utility model is not limited thereto.
As shown in Figure 1, apparatus for ash under the filling slurry multiple spot that the utility model provides comprises the filling pipe that is laid in stope filling route 3 and the stope filling The Small Well 1, and the end of filling pipe is dust inlet, and the firm colligation of muscle is solid at the bottom of filling pipe and anchor pole or the upper strata.Filling pipe comprises first filling pipe 2, second filling pipe 4, the 3rd filling pipe 8 and the 4th filling pipe 9 of different tube diameters, connects by reducer pipe 6 between each filling pipe, is respectively equipped with dust inlet 5 at second filling pipe end and the 3rd filling pipe end.According to actual needs, second filling pipe 4 and the 3rd filling pipe 8 can lengthen pipeline by joint 7.Each filling pipe can be PE pipe or steel pipe.
First filling pipe 2 is the PE filling pipe of ф 86mm, and second filling pipe 4 is the PE filling pipe of ф 100mm, and the 3rd filling pipe 8 is the PE filling pipe of ф 90mm, and the 4th filling pipe 9 is the PE filling pipe of ф 60mm.Connect by reducer pipe 6 between the filling pipe.Terminal and the 3rd filling pipe 8 ends offer the dust inlet 5 of ф 30mm respectively at second filling pipe 4.
During filling, filling slurry once flows into stope filling route 3 by dust inlet 5 and the 4th filling pipe 9 end outlets of second filling pipe, 4 ends and the 3rd filling pipe 8 ends.
Apparatus for ash under the filling slurry multiple spot that the utility model provides, employing be that primary filling connects the top technology owing to adopted the filling pipe of different tube diameters, offer a plurality of dust inlets, simultaneously route is carried out filling, filling slurry forms smooth obturation after the sand off.Overcome the phenomenon that the filling route primary filling that surpasses 40m does not connect the top, this technology can not cause the obturation segregation, the drainage water that produces and to rinse pipe water less surpasses 40m at route and does not build filling counterfort, and is easy to solve the delamination that the top board obturation causes because of segregation, layering.
Above-described only is preferred embodiment of the present utility model, does not limit to the utility model.Should be understood that for the person of ordinary skill of the art, under technology enlightenment provided by the utility model, can also make other equivalent modifications and improvement, all can realize the purpose of this utility model, all should be considered as protection domain of the present utility model.

Claims (4)

1. apparatus for ash under the filling slurry multiple spot, comprise the filling pipe that is arranged in stope filling route (3) and the stope filling The Small Well (1), the end of filling pipe is dust inlet, it is characterized in that, described filling pipe comprises first filling pipe (2), second filling pipe (4), the 3rd filling pipe (8) and the 4th filling pipe (9) of different tube diameters, be connected by reducer pipe (6) between each filling pipe, described second filling pipe end and the 3rd filling pipe end are respectively equipped with dust inlet (5).
2. apparatus for ash under the filling slurry multiple spot according to claim 1 is characterized in that, described second filling pipe (4) lengthens pipeline by joint (7).
3. apparatus for ash under the filling slurry multiple spot according to claim 1 is characterized in that, described the 3rd filling pipe (8) lengthens pipeline by joint (7).
4. apparatus for ash under the filling slurry multiple spot according to claim 1 is characterized in that, described first filling pipe (2), second filling pipe (4), the 3rd filling pipe (8) and the 4th filling pipe (9) are PE pipe or steel pipe.
CN 201320118809 2013-03-15 2013-03-15 Material slurry filling multipoint lime feeding device Expired - Fee Related CN203146013U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320118809 CN203146013U (en) 2013-03-15 2013-03-15 Material slurry filling multipoint lime feeding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320118809 CN203146013U (en) 2013-03-15 2013-03-15 Material slurry filling multipoint lime feeding device

Publications (1)

Publication Number Publication Date
CN203146013U true CN203146013U (en) 2013-08-21

Family

ID=48973549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320118809 Expired - Fee Related CN203146013U (en) 2013-03-15 2013-03-15 Material slurry filling multipoint lime feeding device

Country Status (1)

Country Link
CN (1) CN203146013U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103615285A (en) * 2013-12-04 2014-03-05 南京银茂铅锌矿业有限公司 Stope route arrangement mode and method beneficial to roof-contacted filling
CN103939707A (en) * 2014-03-21 2014-07-23 淄博矿业集团有限责任公司许厂煤矿 Flowing-speed-limiting device for coal mine high-pressure filling pipeline
CN109882173A (en) * 2019-04-30 2019-06-14 长沙有色冶金设计研究院有限公司 Big thick ore body vertically Two step mining stope filling system and placement method
CN109973142A (en) * 2019-03-29 2019-07-05 新汶矿业集团有限责任公司 A kind of pair of underworkings carries out the method and filling system of sold stowing
CN116498322A (en) * 2023-06-26 2023-07-28 长春黄金研究院有限公司 Filling mining method for improving filling roof-grafting rate of approach mining

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103615285A (en) * 2013-12-04 2014-03-05 南京银茂铅锌矿业有限公司 Stope route arrangement mode and method beneficial to roof-contacted filling
CN103615285B (en) * 2013-12-04 2015-11-04 南京银茂铅锌矿业有限公司 A kind of stope route arrangement and method being beneficial to Tight filling
CN103939707A (en) * 2014-03-21 2014-07-23 淄博矿业集团有限责任公司许厂煤矿 Flowing-speed-limiting device for coal mine high-pressure filling pipeline
CN103939707B (en) * 2014-03-21 2016-01-27 淄博矿业集团有限责任公司许厂煤矿 Colliery high pressure packing pipeline current-limiting apparatus
CN109973142A (en) * 2019-03-29 2019-07-05 新汶矿业集团有限责任公司 A kind of pair of underworkings carries out the method and filling system of sold stowing
CN109882173A (en) * 2019-04-30 2019-06-14 长沙有色冶金设计研究院有限公司 Big thick ore body vertically Two step mining stope filling system and placement method
CN116498322A (en) * 2023-06-26 2023-07-28 长春黄金研究院有限公司 Filling mining method for improving filling roof-grafting rate of approach mining

Similar Documents

Publication Publication Date Title
CN203146013U (en) Material slurry filling multipoint lime feeding device
CN107218738B (en) Mineral deposit cooperates with exploitation stope filling heat sink and method with underground heat
CN106120801B (en) Pipeline crosses the construction method at foundation ditch in water-rich sand layer
CN102287207B (en) Assembling jacking method in relation to serious collapse of small-section tunnel
CN108547659A (en) Tailing slurry filling system and technique
CN105862990A (en) Prefabricated assembly well wall structure and construction method thereof
CN101793154A (en) Method for grouting for stopping up water by using geological parameters of tunnel surrounding rocks and setting relief holes
CN206360705U (en) The major diameter New pipe curtain supporting construction constructed for underground digging in subway station
CN103953359B (en) The assembled concrete prefabricated square culvert of Tunnel Boring
CN203757176U (en) Non-excavation-type pipeline replacement device
CN106677806A (en) Pipe type shed frame supporting structure used for down-hole roadway and tunnel
CN206800575U (en) A kind of sewage conduct in piping lane
CN203891831U (en) Double-pipe aggregate pouring device with orifice
CN110700264A (en) Fishbone string barrel suitable for deep foundation pit concrete warehousing pouring
CN203022808U (en) Roof-contacted filling flow guide device
CN203741790U (en) Anti-scour apron structure for river bed covering layer
CN205954632U (en) Pipeline crosses supporting construction of foundation ditch department in rich water sand layer
CN102268992A (en) Sand sampling method and sand sampling device of tailing pond
CN108930323A (en) A kind of pipe jacking construction method
CN205154250U (en) Pipeline suitable for admission passage fills multiple spot unloading
CN202040464U (en) Quick switching device with materials of slurry conveying pipeline of filling mining method
CN209211289U (en) Continuous beam cantilever casting two sides Hanging Basket concrete synchronous pours separation feeding mechanism
CN203768858U (en) Water-taking sand-preventing guiding wall system
CN105780805A (en) Tower foundation treatment structure in multi-purpose tunnel bank-tower water inlet combined arrangement
CN206090447U (en) Water conservancy pre buried pipeline prevents stifled device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130821

Termination date: 20190315