CN206800575U - A kind of sewage conduct in piping lane - Google Patents

A kind of sewage conduct in piping lane Download PDF

Info

Publication number
CN206800575U
CN206800575U CN201720669779.5U CN201720669779U CN206800575U CN 206800575 U CN206800575 U CN 206800575U CN 201720669779 U CN201720669779 U CN 201720669779U CN 206800575 U CN206800575 U CN 206800575U
Authority
CN
China
Prior art keywords
piping lane
sewage conduct
sewage
pit shaft
level
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720669779.5U
Other languages
Chinese (zh)
Inventor
李俊涛
李康宁
张睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Lintongyan Liguohao Civil Engineering Consulting Co Ltd
Original Assignee
Shanghai Lintongyan Liguohao Civil Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Lintongyan Liguohao Civil Engineering Consulting Co Ltd filed Critical Shanghai Lintongyan Liguohao Civil Engineering Consulting Co Ltd
Priority to CN201720669779.5U priority Critical patent/CN206800575U/en
Application granted granted Critical
Publication of CN206800575U publication Critical patent/CN206800575U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model belongs to blow-off line technical field, specially a kind of sewage conduct in piping lane.It is that sewage conduct is set in existing piping lane, two sewage conducts are connected by a three-way pipe;Perforate is provided with above piping lane tube wall, and upwardly extends and to form a vertical pipeline as two level pit shaft;3rd mouth of pipe of three-way pipe docks with two level pit shaft straight up.In the utility model, traditional sewage inspection well is replaced using three-way pipe inside piping lane, the basic function of inspection shaft can met, both avoided building brick or concrete inspection well by laying bricks or stones in piping lane, and can enough saves the width of bilge tank, piping lane cross dimensions is reduced, space is saved, effectively reduces piping lane cost.

Description

A kind of sewage conduct in piping lane
Technical field
The utility model belongs to blow-off line technical field, and in particular to a kind of sewage conduct in piping lane.
Background technology
State Council's hair in 2013《On strengthening the opinion of urban infrastructure construction》, clearly carry out Urban Underground integrated pipe Corridor pilot work.On August 3rd, 2015, State Council prints and distributes《On promoting the instruction of Urban Underground pipe gallery construction》. House town and country construction portion has issued the notice on promoting underground pipe gallery construction, and " built city is proposed in the notice The primary and secondary main line of underground pipe gallery, planning pipeline must enter corridor, must not again excavate and lay the line ".Refer in above-mentioned national policy Lead down, sewage conduct will be accomplished under the conditions of possible, be laid in as far as possible in pipe gallery.After sewage conduct enters corridor, one As can utilize pipe gallery itself 3 to 4 meters of clear height, meet sewage conduct the gradient laying requirement.But in synthesis In piping lane, the connection gesture necessary choice more reasonably mode of sewage conduct and inspection shaft.
And the premise of the connected mode of existing sewage conduct and sewage inspection well is sewage conduct is laid in soil layer, sewage The size of inspection shaft is relevant with access tube caliber, generally between Φ 1000 ~ 4000 × 2900.When sewage conduct applies in piping lane If when, corresponding sewage inspection well then has that space is big, and it is hidden to have certain safety without support for the clear height of 3 to 4 meters of longitudinal direction Suffer from.
If sewage conduct is laid in pipe gallery, the new structural form of sewage inspection well can avoid tradition Brick or reinforced concrete structure account for the shortcomings that piping lane space is larger, and key dimension is big, effectively save pipe gallery space, Reduce investment outlay, and be avoided that the situation that pipeline occurs seeping water with traditional inspection shaft interface imprecision occurs.
The content of the invention
The purpose of this utility model is that providing one kind occupies little space, and is easy to the sewage pipe being used in piping lane safeguarded Road.
Sewage conduct provided by the utility model in piping lane, it is the setting sewage conduct 2 in existing piping lane 1, The junction of two sewage conducts 2, connected by a three-way pipe 3;
Perforate is provided with above the tube wall of piping lane 1, and upwardly extends and to form a vertical pipeline as two level pit shaft 4, directly To ground;Opening of the two level pit shaft 4 on ground sets inspection well cover;
Described 3 or so two mouths of pipe of three-way pipe dock two sewage conducts 2 respectively, its 3rd mouth of pipe straight up, together Two level well casing 5 connects, and two level well casing 5 extends two level pit shaft 4 upwards, and is docked with two level pit shaft 4;The diameter of two level well casing 5 is the same as two The level inner diameter of pit shaft 4 matches.
In the utility model, the sewage conduct 2 is provided with cleanout 6 close to the interface of three-way pipe 3.
In the utility model, the bottom of the three-way pipe 3 is provided with support pier 7, the support as the part;When sewage from During upper and lower entrance downstream line, cushioning effect is played.
In the utility model, traditional sewage inspection well is replaced using three-way pipe inside piping lane, inspection shaft can met Basic function, both avoided building brick or concrete inspection well by laying bricks or stones in piping lane, and can enough saves the width of bilge tank, reduce Piping lane cross dimensions, space is saved, effectively reduces piping lane cost.Cleanout is set on sewage conduct, is easy to attendant to exist In piping lane, by opening the dirt in cleanout cleaning sewage conduct.Three-way pipe convenient disassembly, it is easy to maintenance to change pipeline group Part.In piping lane between up to pavement of road, using routine inspection well masonry way, branch pipe can be accessed on pit shaft.Threeway Bottom sets support pier to support, and protects main sewage conduct to reduce external force vibration influence.
Brief description of the drawings
Fig. 1 is the utility model structural diagrams.
Label in figure:1 is piping lane, and 2 be sewage conduct, and 3 be three-way pipe, and 4 be two level pit shaft, and 5 be two level well casing, and 6 be clear Mouth is swept, 7 be support pier.
Embodiment
The utility model sets sewage conduct 2 in existing piping lane 1, the junction of two sewage conducts 2, passes through one three Siphunculus 3 connects, and is connected again with ground by three-way pipe 3;
The piping lane 1 is built into using concrete, and perforate is provided with above tube wall, perforate size with top borehole size, and to Upper extension forms a vertical pipeline as two level pit shaft 4, until ground, two level pit shaft 4 is built into using brick or concrete; Opening of the two level pit shaft 4 on ground sets inspection well cover;
Described 3 or so two mouths of pipe of three-way pipe dock two sewage conducts 2 respectively, its 3rd mouth of pipe straight up, together Two level well casing 5 connects, and two level well casing 5 extends pushed up outside piping lane upwards, and carries out and be connected with piping lane top two level pit shaft 4;Two level well The diameter of pipe 5 matches with the inner diameter of two level pit shaft 4.As shown in Figure 1.
The sewage conduct 2 is provided with cleanout 6 close to the interface of three-way pipe 3.
The bottom of the three-way pipe 3 is provided with support pier 7, as the support of the part, under sewage enters from top to bottom During play pipe road, cushioning effect is played.
In work progress, sewage conduct 2, threeway 3 and other accessories enter piping lane by hoisting port, with reference to specification and branch Pipe access requires, sets three-way inspection well at a certain distance.Between each tube coupling of sewage conduct and sewage conduct and threeway, threeway It can be connected between two level well casing 5 using hot melting way, convenient and quick construction.Pit shaft 4 is brick or concrete structure, can be with Build by laying bricks or stones with reference to piping lane construction synchronous construction or individually.
In the utility model, traditional sewage inspection well is replaced using three-way pipe inside piping lane, inspection shaft can met Basic function on the premise of, both avoided building brick or concrete inspection well by laying bricks or stones in piping lane, and can enough saves bilge tank Width, piping lane cross dimensions is reduced, save space, effectively reduce piping lane cost.Cleanout is set on sewage conduct, is easy to tie up The dirt that shield personnel are cleared up in sewage conduct in piping lane, by opening cleanout.Three-way pipe convenient disassembly, it is easy to maintenance to change Conduit assembly.In piping lane between up to pavement of road, using routine inspection well masonry way, branch can be accessed on pit shaft Pipe.Threeway bottom sets support pier to support, and protects main sewage conduct to reduce external force vibration influence.

Claims (3)

1. a kind of sewage conduct in piping lane, it is characterised in that be in existing piping lane(1)Middle setting sewage conduct(2), two Root sewage conduct(2)Junction, pass through a three-way pipe(3)Connection;
The piping lane(1)Perforate is provided with above tube wall, and upwardly extends and to form a vertical pipeline as two level pit shaft(4), directly To ground;Two level pit shaft(4)Opening on ground sets inspection well cover;
The three-way pipe(3)The mouth of pipe of left and right two docks two sewage conducts respectively(2), its 3rd mouth of pipe straight up, together Two level well casing(5)Connection, two level well casing(5)Extend two level pit shaft upwards(4), and with two level pit shaft(4)Docking;Two level well casing (5)Diameter is the same as two level pit shaft(4)Inner diameter matches.
2. sewage conduct as claimed in claim 1, it is characterised in that the sewage conduct(2)Close to three-way pipe(3)Interface Provided with cleanout(6).
3. sewage conduct as claimed in claim 1, it is characterised in that the three-way pipe(3)Bottom be provided with support pier (7), the support as the part.
CN201720669779.5U 2017-06-10 2017-06-10 A kind of sewage conduct in piping lane Expired - Fee Related CN206800575U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720669779.5U CN206800575U (en) 2017-06-10 2017-06-10 A kind of sewage conduct in piping lane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720669779.5U CN206800575U (en) 2017-06-10 2017-06-10 A kind of sewage conduct in piping lane

Publications (1)

Publication Number Publication Date
CN206800575U true CN206800575U (en) 2017-12-26

Family

ID=60745805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720669779.5U Expired - Fee Related CN206800575U (en) 2017-06-10 2017-06-10 A kind of sewage conduct in piping lane

Country Status (1)

Country Link
CN (1) CN206800575U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111173032A (en) * 2020-02-18 2020-05-19 重庆市市政设计研究院 Assembled grid energy absorber and drainage energy dissipation system suitable for municipal drainage gets into utility tunnel
CN111456199A (en) * 2020-04-16 2020-07-28 山盛源建设有限公司 Underground rainwater drainage pipeline

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111173032A (en) * 2020-02-18 2020-05-19 重庆市市政设计研究院 Assembled grid energy absorber and drainage energy dissipation system suitable for municipal drainage gets into utility tunnel
CN111456199A (en) * 2020-04-16 2020-07-28 山盛源建设有限公司 Underground rainwater drainage pipeline

Similar Documents

Publication Publication Date Title
CN103205979B (en) Method for constructing large raft foundation under high temperature
CN102561402B (en) Treatment method for construction joint between top plate and wall of individual underground civil air defense project constructed by covered top-down excavation method
CN206800575U (en) A kind of sewage conduct in piping lane
CN100587211C (en) Method for implementing hot rolling swirl pool constructional engineering by top-down method
CN115182737A (en) Vertical orthogonal ejection type air duct structure of deep-buried subway station and construction method
CN203389471U (en) Ceramic water film dust collector
CN102619521B (en) Construction method for vertical shaft bedrock section wall structure
CN204825993U (en) Underground continuous wall stagnant water, lap guard stream joint design
CN204326100U (en) The Preserved node of covered back-digging side wall bar splice
CN207553133U (en) A kind of underground pipe gallery structure
CN206090617U (en) Novel assembled piping lane
CN204040021U (en) Large diameter pile construction equipment system in city underground engineering tunneling pilot tunnel
CN105041348A (en) Underground space subsurface excavation construction method adopting combined roof
CN105065040A (en) Top-plate-prefabricated underground space underground excavation building method
CN205894103U (en) Prefabricated parabola type utility tunnel
CN208136954U (en) Precast splice type Pipe rack
CN207405616U (en) A kind of assembled energy diaphram wall package assembly
CN108930323A (en) A kind of pipe jacking construction method
CN202416156U (en) Concrete external-mounted cantilever type parterre of flyover
CN206396794U (en) A kind of assembled piping lane
CN109469099A (en) Assembled underground pipe gallery
CN209509022U (en) A kind of pipe gallery space releasing system improving space utilization rate
CN105908778A (en) Comprehensive pipe rack for corrugated spiral pipe structure
CN204941552U (en) A kind of subway station of parallel shield method enlarging construction
CN204401651U (en) Abnormity resistance to compression longitudinal prestressing pin-connected panel underground pipe gallery

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171226