CN109973142A - A kind of pair of underworkings carries out the method and filling system of sold stowing - Google Patents

A kind of pair of underworkings carries out the method and filling system of sold stowing Download PDF

Info

Publication number
CN109973142A
CN109973142A CN201910252294.XA CN201910252294A CN109973142A CN 109973142 A CN109973142 A CN 109973142A CN 201910252294 A CN201910252294 A CN 201910252294A CN 109973142 A CN109973142 A CN 109973142A
Authority
CN
China
Prior art keywords
gangue
underground
filling
slurry
stowboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201910252294.XA
Other languages
Chinese (zh)
Inventor
路彬
耿华锋
刘佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinwen Mining Group Co Ltd
Original Assignee
Xinwen Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinwen Mining Group Co Ltd filed Critical Xinwen Mining Group Co Ltd
Priority to CN201910252294.XA priority Critical patent/CN109973142A/en
Publication of CN109973142A publication Critical patent/CN109973142A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/005Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/06Filling-up mechanically

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses methods and filling system that a kind of pair of underworkings carries out sold stowing, it is mainly on the basis of water rushes spoil wriggling gravity flow stowboard lower part, the top that spoil fills up closely knit tunnel is blown using impact disturbance, emphasis carries out cementing material filling to Delta Region on stowboard, to realize the filling density and crushing resistance in whole tunnel, working face pack effectiveness is improved, enhances gangue sold stowing intensity, particularly suitable for consolidated fill Work places.

Description

A kind of pair of underworkings carries out the method and filling system of sold stowing
Technical field
The invention belongs to coal mine filling production technique fields, and it is cementing closely knit to be particularly suitable for a kind of underworkings gangue The method of filling.
Background technique
China is in coal industry great development period, and coal mine filling production technique makes rapid progress, according to filling material used Material is different with mode of movement, and the filling process of China's application mainly has dry stowing, slush, consolidated fill, filling-up pneumatically Deng especially consolidated fill is widely applied in underground mine, nonferrous metal mine.
The filling method is to mix cementitious material with solid materials such as gangue, flyash, improves consolidating for obturation Change intensity, when filling, rushes object gravity flow filling process using water and mixture slurry is flow to goaf, the glue in controllable time Knot, cohesion, reach filling design strength, to realize bashing deformation controlling for rock surrounding gateways, avoid surface subsidence.Because filling is starched Body rushes the gravity flow of object fluid by water and is fills up to the realization sold stowing of excavating lane lower part, but goaf upper space exists Gap and uncompacted problem especially cannot achieve sold stowing in the upper Delta Region in nearly horizontal filling face, cause to fill Triangle cannot sufficiently connect top and the low problem of pack effectiveness on lane.
Summary of the invention
In order to solve the problems, such as goaf upper space, there are gaps and uncompacted, especially solve in nearly horizontal filling The upper Delta Region in face cannot achieve sold stowing, cause triangle on filling lane that cannot sufficiently connect top and the low difficulty of pack effectiveness Topic, the present invention provide the method that a kind of pair of underworkings carries out sold stowing.
In order to adapt to the above method, present invention simultaneously provides a set of filling systems.
In order to achieve the above objectives, the technical solution adopted by the present invention is that:
The method that a kind of pair of underworkings carries out sold stowing, it is characterised in that: including following measures:
First: the gangue behind ground and underground coal-gangue separation being delivered to filling after two-stage crushing, sorting in advance The gangue surge bunker of working face;
Second: the slurry can on ground is temporarily stored in after filler is uniformly mixed into slurry by ground slurry preparing station in proportion;
Third: filling goaf tunnel, specific placement method are as follows:
1. the first block pulp wall is arranged in underground goaf stowboard lower port first, and sealing and reinforcing is handled;
2. the mixed slurry of slurry can is transported to filling operation face using static pressure, it is delivered to the mixing in filling operation face Slurry proportionally discharges with the gangue for being stored in gangue surge bunker, is being self-possessed under the double action with water flow, along coal seam Inclination angle is mixed in flowing, is ultimately formed using spoil as aggregate, cement and is fills up to goaf for the mixture gravity flow of cementing material Stowboard stops filling when can not form wriggling gravity flow close to level angle until being fills up to tunnel top half, at this moment exists Gravity flow fill area is formed in goaf filling tunnel;
3. the second block pulp wall is arranged in stowboard upper port in underground goaf;
4. by the gangue of gangue surge bunker using wind model to the second block pulp wall upper port, in the second block pulp wall Upper port gangue merges formation filling mixture with the mixed slurry spray from slurry can, is fills up to stowboard More than the upper triangle portion of level angle, to be carried out to the upper Delta Region that goaf filling tunnel is more than level angle close Real filling.
In order to implement the above method, the present invention provides a kind of filling system, specifically includes: on well and the two large divisions of underground, Wherein:
Well-surface part includes multiple batch cans, pond, blender, slurry can, spoil heap storage on well;
Underground part include gangue surge bunker, coal-gangue separation spoil surge bunker, underground blender, wind model system, Water pump, the first block pulp wall for being located at stowboard lower port and the second block pulp wall for being located at stowboard upper port;The well Apparatus for lower wind transportation system includes blastower and wind conducting pipe;
It is moved towards according to slurry and spoil, the above-mentioned connection relationship respectively formed is:
Batch can discharge port passes through pipeline with the water outlet in pond respectively and communicates with stirring machine inlet on well, stirs on well Machine discharge port is communicated with slurry can, and slurry can discharge port divides two-way by grout pipe line, leads to second gear slurry wall upper port all the way It is connected with wind model pipeline end, wind model pipeline enters filling operation face by the upper end of the second block pulp wall 15;It is another Underground stirring machine inlet is led on road, and underground blender discharge port is by pipeline and pump tube side by side together from stowboard Upper port is passed through goaf;
Spoil heap storage passes through pipeline and underground gangue surge bunker phase with underground coal-gangue separation spoil surge bunker respectively on well It is logical;Underground gangue surge bunker discharge port divides two-way, communicates all the way with underground filling-up pneumatically machine inlet, blastower goes out Material mouth leads to the second block pulp wall upper port by wind conducting pipe, and another way is communicated with underground stirring machine inlet.
Each composition that filling system of the present invention uses is commercial product, and what the present invention protected is not the tool of each composition Body structure, protection be each composition arrangement relation and mutual positional relationship.In addition, blastower of the present invention Connection relationship and working method with wind conducting pipe are the prior art, and this will not be detailed here.
The invention has the advantages that the present invention utilizes impact on the basis of water rushes spoil wriggling gravity flow stowboard lower part Disturbance blows the top that spoil fills up closely knit tunnel, and emphasis carries out cementing material filling to Delta Region on stowboard, thus The filling density and crushing resistance for realizing whole tunnel, improve working face pack effectiveness, enhance gangue sold stowing intensity, Particularly suitable for consolidated fill Work places.
Detailed description of the invention
Fig. 1 is filling system embodiment arrangement schematic diagram of the present invention.
In figure: 1- cementing tank, 2- flyash silo, the pond 3-, blender on 4- well, 5- slurry can, 6- grout pipe line, 7- Spoil heap storage, 8- coal-gangue separation spoil surge bunker, 9- gangue surge bunker, the underground 10- blender, 11- water pump, 12- gravity flow Fill area, 13- blastower, 14- wind model pipeline, 15- the second block pulp wall, the upper triangle obturation of 16-, 17- first Block pulp wall.
Specific embodiment
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will to embodiment or Attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only Some embodiments of the present invention, for those of ordinary skill in the art, without creative efforts, also Other drawings may be obtained according to these drawings without any creative labor.
Such as Fig. 1, filling system of the present invention includes underground part and underground two large divisions, in which:
Well-surface part includes cementing tank 1, flyash silo 2, pond 3, blender 4, slurry can 5 and spoil heap storage 7 on well;
Underground part includes grout pipe line 6, and the coal-gangue separation spoil surge bunker 8 of coal working face is arranged in, and setting is being filled Gangue surge bunker 9, underground blender 10, blastower 13, wind model pipeline 14 and the water pump 13 of working face are filled out, The the first block pulp wall 17 for being located at stowboard lower port and the second block pulp wall 15 for being located at stowboard upper port.
Move towards to describe the connection relationship of each composition below according to slurry and spoil.
The water outlet in the discharge port of cementing tank 1 and flyash silo 2 and pond 3 pass through on pipeline and well respectively blender 4 into Material mouth communicates, and 4 discharge port of blender is communicated with slurry can 5 on well, and 5 discharge port of slurry can divides two-way by grout pipe line 6, and one Road leads to 15 upper port of the second block pulp wall and is connected with 14 end of wind model pipeline, and wind model pipeline 14 passes through the second block pulp The upper end of wall 15 enters filling operation face, and another way leads to underground blender 10, and underground blender 10 leads to stowboard upper end Mouthful;
Spoil heap storage 7 is given with coal-gangue separation spoil surge bunker 8 through pipeline and 9 phase of underground gangue surge bunker on well It is logical;Gangue surge bunker 9 discharge port in underground divides two-way, communicates all the way with 13 feed inlet of underground blastower, blastower 13 discharge ports lead to 15 upper port of the second block pulp wall, another way and 10 feed inlet of underground blender by wind model pipeline 14 It communicates, underground blender 10 leads to stowboard upper port.
The method that sold stowing is carried out to underworkings using above-mentioned filling system are as follows:
First: the spoil of ground spoil heap storage 7 being vertically put into underground transportation lane by defeated cash hole in advance, together with underground After the spoil of coal-gangue separation spoil surge bunker 8 is crushed respectively, sorted machine sub-elects the spoil that partial size is 20~25mm and passes through band Formula conveyer, elevating conveyor reach the gangue surge bunker 9 in filling operation face;
Second: carrying out rational proportion by the water of cementing tank 1, flyash silo 2 and pond 3, (slurrying proportion is cement 15%, flyash 25%, water 50%), it is sufficiently stirred after entering back into blender 4, filling mining is made and is sent with mixed slurry to storage Tank 5 is starched, mixed slurry is delivered to underground filling work face by grout pipe line 6 using static pressure;
Third: filling goaf filling tunnel, specific placement method are as follows:
3.1st: the first block pulp wall 17 being set in underground goaf tunnel lower port first, and sealing and reinforcing is handled;
3.2nd: the mixed slurry of slurry can 5 being transported to filling operation face using static pressure, is delivered to filling operation face Mixed slurry and the gangue proportionally 1:2 discharging for being stored in gangue surge bunker 9, in 11 water pipe of Gravitative Loads and water pump Under road is washed away, by seam inclination, the mixing of the side Bian Liudong, it is cementing for ultimately forming by aggregate, cement of the spoil of certain partial size The mixture gravity flow of material is fills up to goaf filling tunnel, gravity flow fill area 12 is formed, until being fills up to tunnel upper half Part stops filling when can not form wriggling gravity flow close to level angle;
3.3rd: while water rushes logistics gravity flow bashing stowboard lower part, in goaf filling tunnel The first block pulp wall 15, sealing, consolidation process is arranged in upper port;
3.4th: the gangue of the gangue surge bunker 9 in filling operation face is utilized into blastower 13, it is defeated by wind-force Send in pipeline 14 and be delivered to filling operation face, the first block pulp wall 15 upper port by the spoil of wind model pipeline 14, with it is defeated Mixed slurry in slurry pipeline 6 carries out spray fusion, and be allowed to form certain partial size is as aggregate, with mixture slurry using spoil The mixture of binder is fills up to the upper triangle portion that stowboard is more than level angle, forms closely knit upper triangle filling Body 16.
Present invention design combines gravity flow and wind-power to fill advantage, can be right in the operation of gravity flow filling operation face The mined out region of triangle carries out sold stowing on stowboard top, improves pack effectiveness, solving Delta Region can not be close The problem of real filling, realizes that obturation substantially 100% connects top, is particularly suitable for gravity flow Lian Cailian and fills Work places.
More than, only a specific embodiment of the invention, but scope of protection of the present invention is not limited thereto, it is any not The change or replacement expected by creative work, should be covered by the protection scope of the present invention.Therefore, of the invention Protection scope should be determined by the scope of protection defined in the claims.

Claims (2)

1. the method that a kind of pair of underworkings carries out sold stowing, which is characterized in that including following measures:
First: the gangue behind ground and underground coal-gangue separation being delivered to filling operation after two-stage crushing, sorting in advance The gangue surge bunker in face;
Second: the slurry can on ground is temporarily stored in after filler is uniformly mixed into slurry by ground slurry preparing station in proportion;
Third: filling goaf tunnel, specific placement method are as follows:
3.1: the first block pulp wall being set in underground goaf stowboard lower port first, and sealing and reinforcing is handled;
3.2: the mixed slurry of slurry being transported to filling operation face using static pressure, is delivered to the mixed slurry in filling operation face It proportionally discharges, is being self-possessed under the double action with water flow, along seam inclination with the gangue for being stored in gangue surge bunker It is mixed in flowing, ultimately forms using spoil as aggregate, cement and be fills up to goaf filling for the mixture gravity flow of cementing material Tunnel stops filling when can not form wriggling gravity flow close to level angle until being fills up to tunnel top half, at this moment mined out Gravity flow fill area is formed in area's stowboard;
3.3: in underground goaf, the second block pulp wall is arranged in stowboard upper port;
3.4: by the gangue of gangue surge bunker using wind model to the second block pulp wall upper port, in the second block pulp wall upper end Mouth gangue merges formation filling mixture with the mixed slurry spray from slurry can, and being fills up to stowboard is more than water The upper triangle portion of straight angle degree, to carry out sold stowing to the upper Delta Region that goaf filling tunnel is more than level angle.
2. a kind of filling system for implementing the method described in claim 1 for carrying out sold stowing to underworkings, feature exist In specifically including on well and underground two large divisions, in which:
Well-surface part includes multiple batch cans, pond, blender, slurry can, spoil heap storage on well;
Underground part include gangue surge bunker, coal-gangue separation spoil surge bunker, underground blender, wind model system, water pump, It is located at the first block pulp wall of stowboard lower port and is located at the second block pulp wall of stowboard upper port;The underground wind-force Transportation system includes blastower and wind conducting pipe;
It is moved towards according to slurry and spoil, the above-mentioned connection relationship respectively formed is:
Batch can discharge port passes through pipeline with the water outlet in pond respectively and communicates with stirring machine inlet on well, and blender discharges on well Mouth is communicated with slurry can, and slurry can discharge port divides two-way by grout pipe line, leads to second gear slurry wall upper port and wind-force all the way Transfer pipeline end is connected, and wind model pipeline enters filling operation face by the upper end of the second block pulp wall 15;Another way is led to Machine inlet is stirred in underground, and underground blender discharge port is logical from stowboard upper port together side by side by pipeline and pump tube Enter goaf;
Spoil heap storage passes through pipeline with underground coal-gangue separation spoil surge bunker respectively and communicates with underground gangue surge bunker on well;Well Lower gangue buffering bin discharge port external divides two-way, communicates all the way with underground filling-up pneumatically machine inlet, blastower discharge port is logical It crosses wind conducting pipe and leads to the second block pulp wall upper port, another way is communicated with underground stirring machine inlet.
CN201910252294.XA 2019-03-29 2019-03-29 A kind of pair of underworkings carries out the method and filling system of sold stowing Withdrawn CN109973142A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910252294.XA CN109973142A (en) 2019-03-29 2019-03-29 A kind of pair of underworkings carries out the method and filling system of sold stowing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910252294.XA CN109973142A (en) 2019-03-29 2019-03-29 A kind of pair of underworkings carries out the method and filling system of sold stowing

Publications (1)

Publication Number Publication Date
CN109973142A true CN109973142A (en) 2019-07-05

Family

ID=67081832

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910252294.XA Withdrawn CN109973142A (en) 2019-03-29 2019-03-29 A kind of pair of underworkings carries out the method and filling system of sold stowing

Country Status (1)

Country Link
CN (1) CN109973142A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111807061A (en) * 2020-09-09 2020-10-23 天津美腾科技股份有限公司 Dual-power wind conveying system and underground gangue conveying line
CN114370301A (en) * 2022-01-12 2022-04-19 内蒙古鄂托克旗昊源煤焦化有限责任公司 Energy-saving grouting mining system based on automatic detection of coal seam inclination
CN116877187A (en) * 2023-05-18 2023-10-13 赤峰荣邦矿业有限责任公司 Automatic tailing filling device and filling method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101701527A (en) * 2009-11-05 2010-05-05 冀中能源邯郸矿业集团有限公司 Goaf open-type packing method
CN102418555A (en) * 2011-08-11 2012-04-18 安徽大昌矿业集团有限公司 Method for filling mine goaf by utilizing high-concentration all tailing cement
RU2471069C1 (en) * 2011-04-20 2012-12-27 Учреждение Российской академии наук Институт проблем комплексного освоения недр Российской академии наук (УРАН ИПКОН РАН) Method for underground mining of sloping and inclined ore bodies in cryolite zone
CN203146013U (en) * 2013-03-15 2013-08-21 金川集团股份有限公司 Material slurry filling multipoint lime feeding device
CN106194252A (en) * 2016-09-29 2016-12-07 路彬 A kind of coal mining totipotency end pipeline conveying Paste-filling System and method
CN108442930A (en) * 2018-03-15 2018-08-24 中南大学 A kind of Medium Thickness And Medium Slope Angle metal ore mining methods

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101701527A (en) * 2009-11-05 2010-05-05 冀中能源邯郸矿业集团有限公司 Goaf open-type packing method
RU2471069C1 (en) * 2011-04-20 2012-12-27 Учреждение Российской академии наук Институт проблем комплексного освоения недр Российской академии наук (УРАН ИПКОН РАН) Method for underground mining of sloping and inclined ore bodies in cryolite zone
CN102418555A (en) * 2011-08-11 2012-04-18 安徽大昌矿业集团有限公司 Method for filling mine goaf by utilizing high-concentration all tailing cement
CN203146013U (en) * 2013-03-15 2013-08-21 金川集团股份有限公司 Material slurry filling multipoint lime feeding device
CN106194252A (en) * 2016-09-29 2016-12-07 路彬 A kind of coal mining totipotency end pipeline conveying Paste-filling System and method
CN108442930A (en) * 2018-03-15 2018-08-24 中南大学 A kind of Medium Thickness And Medium Slope Angle metal ore mining methods

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111807061A (en) * 2020-09-09 2020-10-23 天津美腾科技股份有限公司 Dual-power wind conveying system and underground gangue conveying line
CN114370301A (en) * 2022-01-12 2022-04-19 内蒙古鄂托克旗昊源煤焦化有限责任公司 Energy-saving grouting mining system based on automatic detection of coal seam inclination
CN116877187A (en) * 2023-05-18 2023-10-13 赤峰荣邦矿业有限责任公司 Automatic tailing filling device and filling method

Similar Documents

Publication Publication Date Title
CN107246279B (en) Underground, which picks up sieve and mixes, fills the cementing construction filling system of integrated spoil and method
CN102865101B (en) Filling method and system of coal mine goaf
CN112814732B (en) Waste stone and tailing mixed slurry preparation and pumping filling device
CN203035256U (en) Waste rock bashing device capable of preventing waste rock from being lifted to ground from well
CN109973142A (en) A kind of pair of underworkings carries out the method and filling system of sold stowing
WO2018176892A1 (en) Network integrated and coordinated control system and method for thin coal seam comprehensive mining and gas control
CN102493839B (en) Method for filling gob
CN106194252A (en) A kind of coal mining totipotency end pipeline conveying Paste-filling System and method
CN101215976B (en) Down-hole gangue pump packing system and method
CN203925502U (en) The system that a kind of hydraulic coal mining and filling are synchronously carried out
CN110030031A (en) The method that coal column is left in a kind of longwell recycling house column type goaf
CN112343651A (en) Process and equipment for filling mining by using coal gangue
CN109209491A (en) A kind of waste filling method
CN103590851A (en) Underground waste-rock concrete preparation, pumping and filling system and method
Krupnik et al. Backfilling technology in Kazakhstan mines
CN111365067A (en) Paste filling mining method
CN103133033A (en) Mine phosphogypsum cemented fill slurrying process
CN106050300A (en) Filling roof connecting method used for upward drift ultrahigh undersampling
CN201982137U (en) Underground preparation device taking waste rock as aggregate concrete filling material
CN106194249A (en) A kind of coal mine gob totipotency Paste-filling System and method
CN210343417U (en) Realize closely knit filling system that full roof was met in collecting space area filling tunnel in pit
CN112796829A (en) Underground original gangue filling system and method for caving area of fully mechanized caving face
Liu Technologies and practices of mechanized backfill mining for water protection with aeolian sand paste-like
CN209990500U (en) Grouting filling system
CN102661170A (en) Process and device for continuously stirring and filling paste-like body for mine manufactured by use of building waste

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190705