CN106194252A - A kind of coal mining totipotency end pipeline conveying Paste-filling System and method - Google Patents

A kind of coal mining totipotency end pipeline conveying Paste-filling System and method Download PDF

Info

Publication number
CN106194252A
CN106194252A CN201610871763.2A CN201610871763A CN106194252A CN 106194252 A CN106194252 A CN 106194252A CN 201610871763 A CN201610871763 A CN 201610871763A CN 106194252 A CN106194252 A CN 106194252A
Authority
CN
China
Prior art keywords
spoil
filling
totipotency
coal mining
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610871763.2A
Other languages
Chinese (zh)
Other versions
CN106194252B (en
Inventor
路彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610871763.2A priority Critical patent/CN106194252B/en
Publication of CN106194252A publication Critical patent/CN106194252A/en
Application granted granted Critical
Publication of CN106194252B publication Critical patent/CN106194252B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/06Filling-up mechanically

Abstract

The invention provides a kind of coal mining totipotency end pipeline conveying Paste-filling System and method, this system includes: pulping equipment, spoil supply arrangement, fluid-conveying pipe (21) and filling pipe (25), and slurry and spoil can be mixed in this filling pipe (25) and guide to offset to be filled (27) by filling pipe (25).This coal mining totipotency end pipeline conveying Paste-filling System and method take full advantage of the filler of the wide material sources such as spoil, cement and flyash, are using pipeline pack near work surface position, and to condition strong adaptability, efficiency is high.This coal mining totipotency end pipeline conveying Paste-filling System and method utilize the ability that nature potential energy produces, and decrease energy produced by investment goods, filling cost is greatly reduced.

Description

A kind of coal mining totipotency end pipeline conveying Paste-filling System and method
Technical field
The present invention relates to mining technology field, particularly a kind of coal mining totipotency end pipeline conveying paste body filling System, or a kind of coal mining totipotency end pipeline conveying paste body filling method.
Background technology
The mine of domestic application placement method exploitation at present, according to coal winning technology, work surface stowage unit and filling place Deng, fully-mechanized mining working spoil solid sold stowing, conventional face can be divided into throw cash machine spoil solid sold stowing, working face Face (seemingly) paste body filling or (surpassing) high*.water packing, conventional face (seemingly) paste body filling or (surpassing) high*.water packing, coal road crawler belt are certainly Line throws the multiple filling forms such as cash machine sold stowing.
Filling mining is mainly restricted by 3 conditions, i.e. filler, pack effectiveness and filling cost.
Summary of the invention
In order to solve the problem that existing filling mining is mainly restricted by filler, pack effectiveness and filling cost, this The bright one coal mining totipotency end pipeline that provides carries Paste-filling System and method, this coal mining totipotency end Pipeline conveying Paste-filling System and method take full advantage of the filler of the wide material sources such as spoil, cement and flyash, Use pipeline pack near work surface position, to condition strong adaptability, efficiency is high.This coal mining totipotency end pipeline carries Paste-filling System and method utilize the ability that nature potential energy produces, and decrease energy produced by investment goods, greatly Reduce filling cost.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of coal mining totipotency end pipeline conveying Paste-filling System, it is characterised in that the full gesture of this coal mining Can include by end pipeline conveying Paste-filling System:
Pulping equipment, for by cement, coal ash for manufacturing form slurry;
Spoil supply arrangement, it is possible to carry spoil to underground;
Fluid-conveying pipe, for carrying described slurry to underground;
Filling pipe, is connected with described spoil supply arrangement and fluid-conveying pipe, and filling pipe can be by described slurry and spoil Mixing in this filling pipe and guide to offset to be filled, filling pipe is arranged at underground.
A kind of coal mining totipotency end pipeline conveying paste body filling method, this coal mining totipotency end pipeline is defeated Sending paste body filling method to have employed above-mentioned coal mining totipotency end pipeline conveying Paste-filling System, this coal mining is complete Potential energy end pipeline conveying paste body filling method comprises the following steps:
Step 1, the lower end making filling pipe are corresponding with offset to be filled;When the inclination angle, tunnel of this offset to be filled is more than or equal to 8 ° Time, first by tight for the lower outlet closure of offset to be filled, then directly irrigate described slurry with filling pipe at the upper outlet of offset to be filled Material and the mixture of spoil, until this solid top board of mixture filling;When this is less than 8 ° wait the inclination angle, tunnel filling offset, First by tight for the lower outlet closure of this offset to be filled, make the lower end of filling pipe stretch to the lower outlet of this offset to be filled, then adopt In offset to be filled, the mixture of described slurry and spoil is irrigated, until this mixture is fills up to wait to fill prop up by the mode of retrusive Lane upper outlet, tighter to the closure of this upper outlet;
Step 2, making the lower end offset to be filled of the next one laterally of filling pipe move, repeating step 1, until completing to be needed Fill the filling of offset.
The invention has the beneficial effects as follows:
1, work surface air return way uses pipeline to replace spoil rubber conveyer, improves pack effectiveness, decreases equipment Input and the use of personnel, eliminate equipment power consumption, eliminate a series of unsafe act that the unsafe condition of thing brings.
2, use pipeline high position filling, solve the problem that offset upper end filling connects real top board difficulty.
As long as 3 discrepancy in elevation ensureing pipeline import and export, nearly horizontal operation face can be solved and use the filling of nature potential energy Problem.
Accompanying drawing explanation
The Figure of description of the part constituting the application is used for providing a further understanding of the present invention, and the present invention shows Meaning property embodiment and explanation thereof are used for explaining the present invention, are not intended that inappropriate limitation of the present invention.
Fig. 1 is the general illustration of this coal mining totipotency end pipeline conveying Paste-filling System.
Fig. 2 is the structural representation of pulping equipment.
Fig. 3 is the structural representation of spoil supply arrangement.
Fig. 4 is the schematic diagram of packing job.
1, cementing tank;2, flyash silo;3, exhaustor;4, exhaustor;5, bucket;6, conveying worm;7, helical feed Machine;8, pond;9, pond water yield weighing system;10, high-speed rotational pulper;11, accumulative weighing system;12, low speed slurry storing tank; 13, probe level controller;14, low-speed mixer;15, tank car;16, Chu Gan factory;17, the first spoil feed belt;18, vapour Car;19, coal washery;20, spoil defeated cash passage;21, fluid-conveying pipe;22, spoil surge bunker;23, the second spoil feed belt; 24, taper batch mixing funnel;25, filling pipe;26, the air return way of work surface;27, offset to be filled;28, filling operation face.
Detailed description of the invention
It should be noted that in the case of not conflicting, the embodiment in the application and the feature in embodiment can phases Combination mutually.Describe the present invention below with reference to the accompanying drawings and in conjunction with the embodiments in detail.
A kind of coal mining totipotency end pipeline conveying Paste-filling System, including:
Pulping equipment, makes slurry after cement and flyash being added water, and this slurry can also include except cement and powder Other materials that coal is thought;
Spoil supply arrangement, it is possible to carry spoil to underground;
Fluid-conveying pipe 21, for carrying described slurry to underground;
Filling pipe 25, is connected with described spoil supply arrangement and fluid-conveying pipe 21, and filling pipe 25 can be by described slurry Mixing in this filling pipe 25 with spoil and guide to offset 27 to be filled, filling pipe 25 is arranged at underground, as shown in Figures 1 to 4.
Pulping equipment is made slurry and is entered filling pipe 25, the spoil of spoil supply arrangement conveying after fluid-conveying pipe 21 Also into filling pipe 25, pulping equipment is made slurry and spoil and is tentatively mixed in filling pipe 25, and filling pipe 25 is discharged The mixture of slurry and spoil mixes after entering tunnel again, it is possible to increase the quality of mixture casting resin, makes to fill Fill out body solidification cycle and shorten 2 days-3 days.
In the present embodiment, described pulping equipment is positioned at ground, described pulping equipment contain cementing tank 1, flyash silo 2, Pond 8 and high-speed rotational pulper 10, in the described cement in cementing tank 1, the described flyash in flyash silo 2 and pond 8 Water can enter mix and blend in high-speed rotational pulper 10, high-speed rotational pulper 10 is conducive to cement and flyash stirring Uniformly.
In the present embodiment, cementing tank 1 and flyash silo 2 are respectively connected with exhaustor, have exhaustor 3 as cementing tank 1 connects, Flyash silo 2 connects exhaustor 4, and the lower end of exhaustor 3 and exhaustor 4 is inserted in bucket 5, to prevent dust dirt in air Dye diffusion, cementing tank 1 is connected with high-speed rotational pulper 10 by conveying worm 6, and flyash silo 2 is by conveying worm 7 Being connected with high-speed rotational pulper 10, high-speed rotational pulper 10 is also associated with for measuring the accumulative of described cement and flyash The accumulative weighing system 11 of weight, pond 8 connects the pond water yield weighing system 9 for measuring the weight of water in pond 8.Logical Cross accumulative weighing system 11 and pond water yield weighing system 9 can be accurately controlled the ratio of cement, flyash and water.
In the present embodiment, cement and flyash can be transported to this pulping equipment by tank car 15, and this pulping equipment is also Containing low speed slurry storing tank 12, high-speed rotational pulper 10, low speed slurry storing tank 12 and fluid-conveying pipe 21 are sequentially connected with, low speed storage slurry Bucket 12 is provided with probe level controller 13 and low-speed mixer 14.The slurry mixed is entered low by high-speed rotational pulper 10 Speed blender 14 carries out further mix and blend.Such as, according to set mass ratio, by pond water yield weighing system 9 to Give the water of set amount in high-speed rotational pulper 10, then given cement and the fine coal of certain mass by accumulative weighing system 11 Ash, mixture is sufficiently mixed in high-speed rotational pulper 10, stores in entering low speed slurry storing tank 12 after mix homogeneously.
In the present embodiment, described spoil supply arrangement contains the first spoil feed belt 17, spoil defeated cash passage 20, cash Stone surge bunker 22 and the second spoil feed belt 23, the first spoil feed belt 17 is positioned at ground, spoil defeated cash passage 20, spoil Surge bunker 22 and the second spoil feed belt 23 are respectively positioned on underground, and spoil can sequentially pass through the first spoil feed belt 17, cash Filling pipe 25 is entered, as shown in Figure 3 after stone defeated cash passage 20, spoil surge bunker 22 and the second spoil feed belt 23.Spoil is defeated Cash passage 20 is vertical state, and spoil surge bunker 22 is positioned at the underface of spoil defeated cash passage 20, spoil defeated cash passage 20 interior Footpath is 500mm, and the inwall of spoil defeated cash passage 20 is provided with ceramic wear-resisting pipe, and the bottom in spoil surge bunker 22 is provided with crushing rod, This crushing rod can make described spoil in spoil defeated cash passage 20 after free-falling with this crushing rod collision crashing.
Concrete, spoil defeated cash passage 20 is to set up diameter 500mm's between the spoil surge bunker 22 on ground to down-hole Spoil defeated cash duct, and spoil defeated cash passage 20 inwall is provided with ceramic-lined wear-resistant pipe, builds bottom spoil defeated cash passage 20 There is the spoil surge bunker 22 of certain capacity;It is transported to store up cash field 16 by automobile 18 by the spoil of coal washery, ground 19 output, when Uniformly spoil is transferred in spoil defeated cash passage 20 by the first spoil feed belt 17 on ground when needing to carry out filling, Spoil in spoil defeated cash passage 20 after free-falling with spoil surge bunker 22 bottom crushing rod collision crashing, make more than 40% Spoil be broken into powder, and be stored in spoil surge bunker 22, spoil surge bunker 22 is funnel structure.Second spoil transmission The spoil that spoil surge bunker 22 is discharged is delivered in taper batch mixing funnel 24 by belt 23 again, as shown in Figure 3.
In the present embodiment, as shown in Figure 1 and Figure 4, filling pipe 25 is containing the vertical section being sequentially connected with and tilting section, and this erects The upper end of straight section is provided with taper batch mixing funnel 24, and the described slurry that pulping equipment can be made by fluid-conveying pipe 21 is delivered to cone In shape batch mixing funnel 24, the described spoil in storage cash field 16 can be delivered to taper batch mixing funnel 24 by this spoil supply arrangement In.Further preferably fluid-conveying pipe 21 is upright and in the vertical in colliery, falls cash point at the Duan Xuanyi of going down the hill in lane, ore deposit, and this point is to work Make face all go down the hill, without turning back inclination angle.Taper batch mixing funnel 24 is positioned at cash point, and the tilting section of filling pipe 25 is along the section of going down the hill cloth It is placed in the air return way 26 of work surface.
Concrete, filling pipe 25 is the DN315*1.6Mpa super abrasive multiple tube that can bend, and filling pipe 25 can utilize The mixture of spoil and slurry is delivered to filling offset 27, casting resin (cash by the feature of high speed slurry low-resistance high-speed in the duct Stone and the mixture of slurry) after preliminary mix and blend, mix again after entering tunnel, improve in filling pipe 25 The quality of casting resin, makes obturator solidification cycle shorten 2 days-3 days.
A kind of coal mining totipotency end pipeline conveying paste body filling method, this coal mining totipotency end pipeline is defeated Sending paste body filling method to have employed above-mentioned coal mining totipotency end pipeline conveying Paste-filling System, this coal mining is complete Potential energy end pipeline conveying paste body filling method comprises the following steps:
Step 1, the lower end making filling pipe 25 are corresponding with an offset 27 to be filled;Inclination angle, tunnel when this offset 27 to be filled During more than or equal to 8 °, first by tight for the lower outlet closure of offset 27 to be filled, then go out on offset 27 to be filled with filling pipe 25 Mouth directly irrigates described slurry and the mixture of spoil, until this solid top board of mixture filling, i.e. this mixture filling Solid after and the upper surface contact in tunnel;When this is less than 8 ° wait the inclination angle, tunnel filling offset 27, first by this offset 27 to be filled Lower outlet closure is tight, makes the lower end of filling pipe 25 stretch to the lower outlet of this offset 27 to be filled, then uses the side of retrusive Formula (also being understood as moving up the mode of the lower end of filling pipe 25) irrigates the mixed of described slurry and spoil in offset 27 to be filled Compound, until this mixture is fills up to the upper outlet of offset 27 to be filled then tight to the closure of this upper outlet, i.e. fill at this mixture It is filled to reduce the ratio of spoil in time filling offset 27 upper outlet, improves the mobility of mixture, select pipeline high position filling method (i.e. The upper outlet that the lower end of filling pipe 25 is placed in offset 27 to be filled carries out filling) make the top rate that connects in tunnel reach 100%, tunnel Full Ratio reaches more than 95%.
Step 2, making the lower end offset to be filled of the next one laterally 27 of filling pipe 25 move, repeating step 1, until completing institute Need to be filled the filling of offset 27, the most as shown in Figure 4, filling offset to be filled 27 the most one by one, until completing to own The filling of offset 27 to be filled.
By above-mentioned introduction, work surface air return way uses pipeline to replace spoil rubber conveyer, improves filling Efficiency, decreases the input of equipment and the use of personnel, eliminates equipment power consumption, eliminate that the unsafe condition of thing brings one Series unsafe act.Use pipeline high position filling, solve the problem that offset upper end filling connects real top board difficulty.As long as ensureing The discrepancy in elevation of pipeline import and export, can solve nearly horizontal operation face and use the filling problem of nature potential energy.
The above, the only specific embodiment of the present invention, it is impossible to limit the scope that invention is implemented with it, so its equivalent The displacement of assembly, or the equivalent variations made according to scope of patent protection of the present invention and modification, all should still fall within what this patent was contained Category.It addition, between technical characteristic and technical characteristic in the present invention, between technical characteristic and technical scheme, technical scheme with All can use with independent assortment between technical scheme.

Claims (10)

1. a coal mining totipotency end pipeline conveying Paste-filling System, it is characterised in that this coal mining totipotency End pipeline conveying Paste-filling System includes:
Pulping equipment, for by cement, coal ash for manufacturing form slurry;
Spoil supply arrangement, it is possible to carry spoil to underground;
Fluid-conveying pipe (21), for carrying described slurry to underground;
Filling pipe (25), is connected with described spoil supply arrangement and fluid-conveying pipe (21), and filling pipe (25) can be by described slurry Material and spoil mix in this filling pipe (25) and guide to offset to be filled (27), and filling pipe (25) is arranged at underground.
Coal mining totipotency end pipeline the most according to claim 1 conveying Paste-filling System, it is characterised in that institute State pulping equipment and contain cementing tank (1), flyash silo (2), pond (8) and high-speed rotational pulper (10), in cementing tank (1) Described flyash in described cement, flyash silo (2) and the water in pond (8) can enter in high-speed rotational pulper (10) Mix and blend, described pulping equipment is positioned at ground.
Coal mining totipotency end pipeline the most according to claim 2 conveying Paste-filling System, it is characterised in that water Mud tank (1) and flyash silo (2) are respectively connected with exhaustor, cementing tank (1) and flyash silo (2) all by conveying worm and height Speed eddy flow pulper (10) connects, and high-speed rotational pulper (10) is also associated with for measuring the accumulative of described cement and flyash The accumulative weighing system (11) of weight, pond (8) connect to have for measuring the pond water yield of the weight of water in pond (8) and weigh and are System (9).
Coal mining totipotency end pipeline the most according to claim 2 conveying Paste-filling System, it is characterised in that should Pulping equipment is possibly together with low speed slurry storing tank (12), high-speed rotational pulper (10), low speed slurry storing tank (12) and fluid-conveying pipe (21) being sequentially connected with, low speed slurry storing tank (12) is provided with probe level controller (13) and low-speed mixer (14).
Coal mining totipotency end pipeline the most according to claim 1 conveying Paste-filling System, it is characterised in that institute State spoil supply arrangement and contain the first spoil feed belt (17), spoil defeated cash passage (20), spoil surge bunker (22) and second Spoil feed belt (23), the first spoil feed belt (17) is positioned at ground, spoil defeated cash passage (20), spoil surge bunker (22) Being respectively positioned on underground with the second spoil feed belt (23), it is defeated that spoil can sequentially pass through the first spoil feed belt (17), spoil Cash passage (20), spoil surge bunker (22) and the second spoil feed belt (23) enter filling pipe (25) afterwards.
Coal mining totipotency end pipeline the most according to claim 5 conveying Paste-filling System, it is characterised in that cash Stone defeated cash passage (20) is vertical state, and spoil surge bunker (22) is positioned at the underface of spoil defeated cash passage (20), the defeated cash of spoil The internal diameter of passage (20) is 500mm, and the inwall of spoil defeated cash passage (20) is provided with ceramic wear-resisting pipe, in spoil surge bunker (22) Bottom be provided with crushing rod, this crushing rod can make described spoil in spoil defeated cash passage (20) after free-falling with this crushing rod Collision crashing.
Coal mining totipotency end pipeline the most according to claim 1 conveying Paste-filling System, it is characterised in that fill Filling out pipe (25) and contain the vertical section and tilting section being sequentially connected with, the upper end of this vertical section is provided with taper batch mixing funnel (24), slurry Described slurry can be delivered in taper batch mixing funnel (24) by conveying pipe (21), and this spoil supply arrangement can be by described spoil It is delivered in taper batch mixing funnel (24).
Coal mining totipotency end pipeline the most according to claim 7 conveying Paste-filling System, it is characterised in that fill The tilting section filling out pipe (25) is arranged in the air return way (26) of work surface along the section of going down the hill.
Coal mining totipotency end pipeline the most according to claim 1 conveying Paste-filling System, it is characterised in that fill Filling out pipe (25) is the wear-resistant composite tubes that can bend.
10. a coal mining totipotency end pipeline conveying paste body filling method, it is characterised in that this coal mining totipotency The coal mining totipotency end pipeline conveying mastic that end pipeline conveying paste body filling method have employed described in claim 1 fills Filling out system, this coal mining totipotency end pipeline conveying paste body filling method comprises the following steps:
Step 1, the lower end making filling pipe (25) are corresponding with offset to be filled (27);When the inclination angle, tunnel of this offset to be filled (27) is big When equal to 8 °, first the lower of offset to be filled (27) is exported closure tightly, then with filling pipe (25) at offset to be filled (27) Upper outlet directly irrigates the mixture of described slurry and spoil, until this solid top board of mixture filling;Prop up when this waits to fill When the inclination angle, tunnel in lane (27) is less than 8 °, first by tight for the lower outlet closure of this offset to be filled (27), make under filling pipe (25) End stretches to the lower outlet of this offset to be filled (27), then uses the mode of retrusive to irrigate described slurry in offset to be filled (27) Material and the mixture of spoil are until this mixture is fills up to offset to be filled (27) upper outlet tighter to the closure of this upper outlet;
Step 2, the lower end next one laterally offset to be filled (27) making filling pipe (25) are mobile, repeat step 1, until completing institute Need to be filled the filling of offset (27).
CN201610871763.2A 2016-09-29 2016-09-29 A kind of coal mining totipotency end pipeline Paste-filling System and method Expired - Fee Related CN106194252B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610871763.2A CN106194252B (en) 2016-09-29 2016-09-29 A kind of coal mining totipotency end pipeline Paste-filling System and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610871763.2A CN106194252B (en) 2016-09-29 2016-09-29 A kind of coal mining totipotency end pipeline Paste-filling System and method

Publications (2)

Publication Number Publication Date
CN106194252A true CN106194252A (en) 2016-12-07
CN106194252B CN106194252B (en) 2018-09-21

Family

ID=57521157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610871763.2A Expired - Fee Related CN106194252B (en) 2016-09-29 2016-09-29 A kind of coal mining totipotency end pipeline Paste-filling System and method

Country Status (1)

Country Link
CN (1) CN106194252B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387158A (en) * 2017-09-12 2017-11-24 中煤能源研究院有限责任公司 A kind of coal mine down-hole splited formula lotion prepares and conveying device
CN107738927A (en) * 2017-10-27 2018-02-27 北京艾可马恩矿业科技有限公司 Adding set for the curing agent of gangue in coal mine
CN109973142A (en) * 2019-03-29 2019-07-05 新汶矿业集团有限责任公司 A kind of pair of underworkings carries out the method and filling system of sold stowing
CN110043311A (en) * 2019-03-29 2019-07-23 新汶矿业集团有限责任公司 A kind of goaf grouting filling process for being suitble to stay lane
CN113638768A (en) * 2021-08-25 2021-11-12 中煤能源研究院有限责任公司 Underground gangue powder transportation system with caching device and using method
CN113756861A (en) * 2021-08-20 2021-12-07 鄂尔多斯市绿矿技术服务有限公司 973 filling method based on near-horizontal roadway
CN116241319A (en) * 2023-01-03 2023-06-09 通用技术集团工程设计有限公司 Paste filling system and dual-mode joint arrangement method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3129090A1 (en) * 1981-07-23 1983-03-03 Ruhrkohle Ag, 4300 Essen Method for the hydromechanical conveying of filling materials for filling mining cavities and apparatus for carrying out the method
CN101008315A (en) * 2007-02-07 2007-08-01 邸建友 Paste-like backfill technology used in coal cutting area and the paste-like thereof
CN203891926U (en) * 2014-05-10 2014-10-22 河北充填采矿技术有限公司 Concrete type grouting workstation
CN104775817A (en) * 2015-03-05 2015-07-15 内蒙古裕兴矿业有限公司 All-negative pressure continuous-mining continuous-filling step-by-step replacement mining method for coal underneath cities and towns, industrial buildings, railways and other buildings
CN105781612A (en) * 2016-03-28 2016-07-20 北京中岩大地科技股份有限公司 Method and system for filling mine goaf

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3129090A1 (en) * 1981-07-23 1983-03-03 Ruhrkohle Ag, 4300 Essen Method for the hydromechanical conveying of filling materials for filling mining cavities and apparatus for carrying out the method
CN101008315A (en) * 2007-02-07 2007-08-01 邸建友 Paste-like backfill technology used in coal cutting area and the paste-like thereof
CN203891926U (en) * 2014-05-10 2014-10-22 河北充填采矿技术有限公司 Concrete type grouting workstation
CN104775817A (en) * 2015-03-05 2015-07-15 内蒙古裕兴矿业有限公司 All-negative pressure continuous-mining continuous-filling step-by-step replacement mining method for coal underneath cities and towns, industrial buildings, railways and other buildings
CN105781612A (en) * 2016-03-28 2016-07-20 北京中岩大地科技股份有限公司 Method and system for filling mine goaf

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
路彬: "巷式淋浆连采连充关键工艺与技术", 《万方学位论文数据库》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107387158A (en) * 2017-09-12 2017-11-24 中煤能源研究院有限责任公司 A kind of coal mine down-hole splited formula lotion prepares and conveying device
CN107387158B (en) * 2017-09-12 2023-02-28 中煤能源研究院有限责任公司 Coal mine underground split paste preparation and conveying device
CN107738927A (en) * 2017-10-27 2018-02-27 北京艾可马恩矿业科技有限公司 Adding set for the curing agent of gangue in coal mine
CN109973142A (en) * 2019-03-29 2019-07-05 新汶矿业集团有限责任公司 A kind of pair of underworkings carries out the method and filling system of sold stowing
CN110043311A (en) * 2019-03-29 2019-07-23 新汶矿业集团有限责任公司 A kind of goaf grouting filling process for being suitble to stay lane
CN113756861A (en) * 2021-08-20 2021-12-07 鄂尔多斯市绿矿技术服务有限公司 973 filling method based on near-horizontal roadway
CN113756861B (en) * 2021-08-20 2022-08-05 鄂尔多斯市绿矿技术服务有限公司 973 filling method based on near-horizontal roadway
CN113638768A (en) * 2021-08-25 2021-11-12 中煤能源研究院有限责任公司 Underground gangue powder transportation system with caching device and using method
CN113638768B (en) * 2021-08-25 2024-01-26 中煤能源研究院有限责任公司 Underground gangue powder transportation system with buffer device and use method
CN116241319A (en) * 2023-01-03 2023-06-09 通用技术集团工程设计有限公司 Paste filling system and dual-mode joint arrangement method thereof
CN116241319B (en) * 2023-01-03 2023-10-24 通用技术集团工程设计有限公司 Paste filling system and dual-mode joint arrangement method thereof

Also Published As

Publication number Publication date
CN106194252B (en) 2018-09-21

Similar Documents

Publication Publication Date Title
CN106194252A (en) A kind of coal mining totipotency end pipeline conveying Paste-filling System and method
CN203035256U (en) Waste rock bashing device capable of preventing waste rock from being lifted to ground from well
CN112814732A (en) Preparation of mixed ground paste of barren rock and tailings and pump sending filling device
CN102581954B (en) Underground concrete mixer for coal mine
CN106194249B (en) A kind of coal mine gob totipotency Paste-filling System and method
CN110282894A (en) A kind of coal gangue haydite and preparation method thereof
CN201361943Y (en) Mining filling-slurry preparing system
CN106426566B (en) A kind of mine down-hole wet shotcreting mixing plant pulping device and method
CN106939796A (en) The method and system that filling slurry fills underground goaf are prepared using efflorescent sand
CN101749047B (en) Paste filling simulation test system
CN208100770U (en) A kind of filling slurry preparation facilities
CN113339056A (en) Fluidized gangue layer surface subsequent filling system and method
CN108825299A (en) A kind of movable type filling pipeline device and construction method
CN206071641U (en) A kind of coal mine gob totipotency Paste-filling System
CN103196337B (en) A kind of Multifunctional heavy ANFO mixing loading truck
CN106626060A (en) Coal mine anti-explosion traveling bogie
CN202412466U (en) Integrated motor vehicle capable of taking, conveying and stirring materials
CN201587031U (en) Automatic mixing device for ointment filling system
CN206765104U (en) Sunk type sandstone blending station
CN109973142A (en) A kind of pair of underworkings carries out the method and filling system of sold stowing
CN204036658U (en) A kind of mine concrete stirring transportation tank vehicle
CN210343417U (en) Realize closely knit filling system that full roof was met in collecting space area filling tunnel in pit
CN207740012U (en) A kind of synchronous grouting mortar vehicle for shield-tunneling construction
CN111420590A (en) Mine fills multiaxis combined type mixer
CN208858400U (en) A kind of Mine Tailings filling system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180921