CN203145451U - Retractable steel beam for formwork support - Google Patents

Retractable steel beam for formwork support Download PDF

Info

Publication number
CN203145451U
CN203145451U CN 201320056562 CN201320056562U CN203145451U CN 203145451 U CN203145451 U CN 203145451U CN 201320056562 CN201320056562 CN 201320056562 CN 201320056562 U CN201320056562 U CN 201320056562U CN 203145451 U CN203145451 U CN 203145451U
Authority
CN
China
Prior art keywords
steel
retractable
steel pipe
combined
formwork support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320056562
Other languages
Chinese (zh)
Inventor
杨聪武
冯铭
谭咏梅
丁红力
曹志丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming Iron and Steel Group Co Ltd
Original Assignee
Kunming Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming Iron and Steel Group Co Ltd filed Critical Kunming Iron and Steel Group Co Ltd
Priority to CN 201320056562 priority Critical patent/CN203145451U/en
Application granted granted Critical
Publication of CN203145451U publication Critical patent/CN203145451U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a retractable steel beam for a formwork support. The retractable steel beam for the formwork support is characterized in that a piece of joist steel is inserted into a square steel tube to form a combined steel beam with the length variable within a certain range, a flat steel hanging ring is hung on the combined steel beam, and the combined steel beam is hung at a proper position through the flat steel hanging ring to bear construction load in concrete pouring. The retractable steel beam can meet the requirement of floor slabs with different spans for optional change of the length of a steel formwork support beam, waste of construction circulating materials and increase of corresponding workload due to repeated cutting or spreading of the steel formwork support beam are avoided when the spans of the floor slabs are changed, construction cost is saved, and construction efficiency is improved.

Description

A kind of template supporting retractable steel joist
Technical field
The utility model relates to floorslab concrete in a kind of structural steelwork and builds horizontal supporting equipment with steel form.
Background technology
In structural steelwork, traditional template support pattern has two kinds during concreting, a kind ofly does the template concreting with profiled sheet, and a kind of is to adopt full hall scaffold, laying construction template concreting are set.
Profiled sheet is done the form of construction work of template concreting and is used more in high-rise steel structure, it has construction advantage such as convenient, but no matter adopt open-type profiled sheet composite floor system or closed type, reducing type profiled sheet composite floor system, not only construction cost is higher, and the stiffening rib of profiled sheet influences the configuration of reinforced concrete floor bottom steel bar stress, make the profiled sheet composite floor system have tangible one-way slabs feature, there are adverse effect in the globality of floor and the transmission of floor seismic shear.
Full hall scaffold laying construction template concreting is set in the steel building engineering can better realizes every structural performance of floor, but speed of application is slow, circulation material is more.
The length of the construction brace summer of concreting is generally floor span (and center to center distance of floor two-end structure girder steel) and subtracts 100mm.For example each solitary building of certain residential quarter has 2700 mm, 3300 mm in each layer, each standard width of a room in an old-style house floor span, 3900 mm, and then the length of Dui Ying construction formwork brace summer (as adopting i iron) is respectively 2600 mm, 3200 mm, 3800 mm.
If next engineering part building girder steel spacing is 3000 mm, 3600 mm, 4200 mm, another part building girder steel spacing is 3300 mm, 3900 mm, 4500 mm.If at this moment continue to use original brace summer (i iron), in the time of then and need saw short, the time and need spreading, cause the waste of material and the increase of construction cost.
Summary of the invention
The purpose of this utility model provides a kind of template supporting retractable steel joist, to adapt to the demand that the different spans floor changes arbitrarily steel form supporting beam length, saves construction cost, improves efficiency of construction.
The utility model partly inserts square steel pipe with i iron and forms the combined member that length can freely stretch, cuts off repeatedly when avoiding the floor span variation or spreading steel form supporting beam causes the construct waste of circulation material and the increase of relevant work amount.
The technical solution of the utility model is: template supporting constitutes by being combined into the combined girder steel that a length can change within the specific limits in square steel pipe of an i iron insertion with retractable steel joist, hang the band steel suspension ring in structural steel beam, combined girder steel is hung in position the working load when bearing concreting by the band steel suspension ring.
Lay steel form at combined girder steel, can build reinforced concrete floor on the steel form.Economy provides the vertical support of concreting easily for the floor of different spans.By the free adjustment of combined girder steel length, reduce the quantity of the combined member that needs in the construction project, thereby reducing the construction costs, improve speed of application.
Less than 2600 o'clock, adopt little steel pipe to replace i iron in floor span, big steel pipe replaces square steel pipe, and little steel pipe inserts big steel pipe and forms combined girder steel.
The brace summer of the combined member that the utility model adopts square steel pipe and i iron construction formwork during as concreting.The weight of floorslab concrete is delivered on the girder steel of agent structure by the band steel suspension ring that are suspended on the structural steel beam, has avoided the setting of scaffold, reaches to improve the floorslab concrete speed of perfusion, saves the purpose of construction cost.
The supporting of the utility model template can be implemented in freely stretching in the certain-length scope with retractable steel joist, the needs of when changing to adapt to floor span supporting beam length freely being adjusted.
Description of drawings
Fig. 1 is template supporting retractable steel joist structural representation of the present utility model.
Among the figure: 1, reinforced concrete floor, 2, steel form, 3, i iron, 4, the band steel suspension ring, 5, structural steel beam, 6, square steel pipe, 7, bolt.
The specific embodiment
As shown in Figure 1, template supporting of the present utility model is inserted in the square steel pipe 6 by an i iron 3 with retractable steel joist, be combined into the combined girder steel that a length can change within the specific limits, i iron 3 is fixing with bolt 7 with square steel pipe 6 binding sites, hang band steel suspension ring 4 in structural steel beam 5, combined girder steel is hung in position the working load when bearing concreting by band steel suspension ring 4.Lay steel form 2 at combined girder steel, can build reinforced concrete floor 1 on the steel form 2.
Less than 2600 o'clock, adopt little steel pipe to replace i iron 3 in floor span, big steel pipe replaces square steel pipe 6, and little steel pipe inserts big steel pipe and forms combined girder steel.
Concrete work progress: after the construction of finishing the steel work girder steel, hang and weld the fixed flat steel suspension ring according to designing requirement at girder steel, tighten the bolt of i iron and square steel pipe joint location bottom after the length adjustment of combined girder steel is suitable, two ends ride on the band steel suspension ring.Behind the combined girder steel installation in position, top laying construction template, assembling reinforcement, concreting, concrete are removed combined girder steel and are reused after the maintenance expiration, and the excision of band steel suspension ring exposed parts is reused.
For example: square steel pipe length is 800mm, the minimum lap length of square steel pipe and i iron is 200mm, the length of the i iron that is used therewith has 2600 mm, 3200 mm, 3800 mm, then the length of combined girder steel can freely change between 2600 mm-4400 mm, do not need the short i iron of spreading or saw and can adapt to the needs that span 2700 mm-4500 mm floorslab concrete is built, reach the purpose of saving construction cost, improving speed of application.

Claims (3)

1. retractable steel joist use in template supporting, it is characterized in that: the template supporting constitutes by being combined into the combined girder steel that a length can change within the specific limits in square steel pipe of an i iron insertion with retractable steel joist; Hang the band steel suspension ring in structural steel beam, combined girder steel is hung in position by the band steel suspension ring, the working load when bearing concreting.
2. retractable steel joist use in template according to claim 1 supporting, it is characterized in that: during less than 2600mm, replace i iron with little steel pipe in floor span, big steel pipe replaces square steel pipe, little steel pipe insertion big steel pipe formation combined girder steel.
3. retractable steel joist is used in template supporting according to claim 1, it is characterized in that described i iron and square steel pipe binding site bolt.
CN 201320056562 2013-02-01 2013-02-01 Retractable steel beam for formwork support Expired - Fee Related CN203145451U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320056562 CN203145451U (en) 2013-02-01 2013-02-01 Retractable steel beam for formwork support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320056562 CN203145451U (en) 2013-02-01 2013-02-01 Retractable steel beam for formwork support

Publications (1)

Publication Number Publication Date
CN203145451U true CN203145451U (en) 2013-08-21

Family

ID=48972990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320056562 Expired - Fee Related CN203145451U (en) 2013-02-01 2013-02-01 Retractable steel beam for formwork support

Country Status (1)

Country Link
CN (1) CN203145451U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103883121A (en) * 2014-02-21 2014-06-25 金天德 Extensible steel-truss-type formwork support

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103883121A (en) * 2014-02-21 2014-06-25 金天德 Extensible steel-truss-type formwork support

Similar Documents

Publication Publication Date Title
CN202338110U (en) Supporting structure of truss
CN103089004B (en) Combination frame module, component frame module and tool set structure and installing and dismantling method thereof
CN104612241A (en) Civil building prefabricated member set and assembly method thereof
CN102080384B (en) Construction method for mounting lifter on top plate of underground parking garage
CN202324606U (en) U-shaped force bearing seat
CN203022222U (en) Wholly-cast ring beam of brick-concrete building support
CN204098314U (en) Steel plate combination floor
CN203755678U (en) Upper suspension hoisting type hoisting device for reinforced concrete floor construction
CN203145451U (en) Retractable steel beam for formwork support
CN204715764U (en) The structure that a kind of constructional column and agent structure are constructed simultaneously
CN203334679U (en) Steel reinforced concrete beam suspending and supporting structure
CN103015713B (en) High-altitude-spanned steel reinforced concrete truss template
CN109518861A (en) A kind of steel bar truss floor support plate being applied in combination with cast-in-situ wall
CN102787717B (en) Self-supporting combined steel template construction method
CN202284359U (en) Steel structure concrete support beam
CN202273341U (en) Prefabricated prestressed plate with reinforced-truss flange plate
CN205591579U (en) Adopt girder steel to consolidate aerated concrete roof boarding structure
CN204960324U (en) Suspension type floor formwork support device
CN201915629U (en) Novel quick detaching template for cast-in-situ concrete floor of steel structure building
CN204662739U (en) A kind of steel bar truss floor support plate and light-steel light-concrete combining structure
CN204212302U (en) A kind of hollowcore slab light pipe float Structure
CN103216085A (en) Detachable self-supporting type steel bar truss formwork
CN203905181U (en) Shear wallboard with supporting frames and connection structure of shear wallboard and composite floor slabs
CN207646979U (en) A kind of composite floor structure
CN202338108U (en) Steel-wood support rigid supporting structure fixed on lower wing plates of steel beams of floor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: KUNMING STEEL GROUP DESIGN INSTITUTE Co.,Ltd.

Assignor: KUNMING IRON & STEEL GROUP Co.,Ltd.

Contract record no.: 2014530000075

Denomination of utility model: Retractable steel beam for formwork support

Granted publication date: 20130821

License type: Exclusive License

Record date: 20140609

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130821

Termination date: 20220201

CF01 Termination of patent right due to non-payment of annual fee