CN203113519U - 电厂冷却塔的结构外墙与附墙杆之间的连接结构 - Google Patents

电厂冷却塔的结构外墙与附墙杆之间的连接结构 Download PDF

Info

Publication number
CN203113519U
CN203113519U CN 201320150007 CN201320150007U CN203113519U CN 203113519 U CN203113519 U CN 203113519U CN 201320150007 CN201320150007 CN 201320150007 CN 201320150007 U CN201320150007 U CN 201320150007U CN 203113519 U CN203113519 U CN 203113519U
Authority
CN
China
Prior art keywords
wall
attached wall
iron plate
cooling tower
power plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320150007
Other languages
English (en)
Inventor
陈勇
李�杰
何志佳
盛赛华
方朋幸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUAFENG CONSTRUCTION CO Ltd
Original Assignee
HUAFENG CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUAFENG CONSTRUCTION CO Ltd filed Critical HUAFENG CONSTRUCTION CO Ltd
Priority to CN 201320150007 priority Critical patent/CN203113519U/zh
Application granted granted Critical
Publication of CN203113519U publication Critical patent/CN203113519U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

本实用新型公开了一种电厂冷却塔的结构外墙与附墙杆之间的连接结构,它包括一根附墙杆、一块端板(2)和一块预埋铁板(3),附墙杆的内端与端板(2)焊接,预埋铁板(3)预埋在结构外墙(4)的混凝土中,预埋铁板(3)与端板(2)螺接。该电厂冷却塔的结构外墙与附墙杆之间的连接结构能降低安装和拆卸过程的劳动强度、缩短工期、更安全、且附墙杆拆卸后能再次利用。

Description

电厂冷却塔的结构外墙与附墙杆之间的连接结构
技术领域
本实用新型涉及土木工程的电厂构筑物领域,具体讲是一种电厂的冷却塔的高耸结构外墙与附墙杆之间的连接结构。 
背景技术
电厂的冷却塔的塔身为高耸的双曲线型结构,其高度一般在100~200m之间。施工时,人员及部分材料及配件是依靠曲线施工电梯来运输的,曲线施工电梯是指电梯运行的轨道为与塔身双曲线吻合的曲线,曲线施工电梯包括吊笼和导轨架,导轨架和冷却塔的结构外墙经附墙架连接。而附墙架由多层附墙杆组成,每层包括4根附墙杆,每根附墙杆的外端与电梯的导轨架连接,每根附墙杆的内端与冷却塔的结构外墙连接。 
现有技术的电厂冷却塔的结构外墙与附墙杆之间的连接结构,它包括预埋铁板、端板和附墙杆,附墙杆的内端与端板焊接固定,预埋铁板内表面焊接固定有三根钩筋,每根钩筋内端与结构外墙的钢筋骨架焊接固定,钩筋和预埋铁板均锚固在结构外墙的混凝土中,端板与预埋铁板焊接固定。其中,附墙杆与端板、预埋铁板与钩筋都是在高空作业施工前就在地面焊接固定好的,而预埋铁板与端板则需要高空施工焊接。而现场高空焊接作业、劳动强度大、施工时间长而且焊接质量无法保证,而且高空作业存在安全隐患,在拆卸时,需要高空气割附墙杆,故拆卸过程也同样劳动强度大、施工时间长、存在安全隐患,况且,气割后的附墙杆被破坏,无法再利用。 
发明内容
本实用新型要解决的技术问题是,提供一种能降低安装和拆卸过程的劳动强度、缩短工期、更安全、且附墙杆拆卸后能再次利用的电厂冷却塔的结构外墙与附墙杆之间的连接结构。 
本实用新型的技术解决方案是,提供一种具有以下结构的电厂冷却塔的结构外墙与附墙杆之间的连接结构,它包括一根附墙杆、一块端板和一块预埋铁板,附墙杆的内端与端板焊接,预埋铁板预埋在结构外墙的混凝土中,预埋铁板与端板螺接。 
采用以上结构后,本实用新型电厂冷却塔的结构外墙与附墙杆之间的连接结构与现有技术相比,具有以下优点: 
附墙杆内端与端板是在高空作业前就在地面焊接固定好的,而预埋铁板也锚固在结构外墙中,这样,高空作业的过程只需要在现场将端板螺接到预埋铁板上即可,这就大幅度降低了高空作业的工作量和操作难度,缩短了工时,更加安全,而且,螺接相对于高空焊接其固定效果更有保障;而在拆卸过程中,只需要将螺钉旋出,同样降低了高空作业的工作量和操作难度,缩短了工时,更加安全,而且拆卸后的附墙杆没被破坏,仍然能再次利用。
作为改进,预埋铁板的内端焊接固定有两个内螺纹套管,两个内螺纹套管的内端焊接有一块锚板,锚板的内表面焊接有一根钩筋,内螺纹套管与锚板之间设有加固锚筋,这样,预埋铁板与结构外墙固定效果牢固,而且施工过程也方便。 
附图说明
图1是本实用新型的电厂冷却塔的结构外墙与附墙杆之间的连接结构安装在电梯与结构外墙之间的使用状态参考图。 
图2是本实用新型的电厂冷却塔的结构外墙与附墙杆之间的连接结构的正视结构示意图。 
图3是本实用新型的电厂冷却塔的结构外墙与附墙杆之间的连接结构的侧剖视结构示意图。 
图4是本实用新型的电厂冷却塔的结构外墙与附墙杆之间的连接结构与电梯的导轨架固定后的俯视结构示意图。 
图中所示    1、附墙杆,2、端板,3、预埋铁板,4、结构外墙,5、内螺纹套管,6、锚板,7、钩筋,8、加固锚筋,9、螺钉。 
具体实施方式
下面结合附图和具体实施例对本实用新型作进一步说明。 
如图1、图2、图3、图4所示本实用新型的电厂冷却塔的结构外墙与附墙杆之间的连接结构,它包括一根附墙杆1、一块端板2和一块预埋铁板3。附墙杆1的内端与端板2焊接。预埋铁板3预埋在结构外墙4的混凝土中,预埋铁板3的内端焊接固定有两个内螺纹套管5,两个内螺纹套管5的内端焊接有一块锚板6,即两个内螺纹套管5的内端均与一块锚板6焊接。锚板6的内表面焊接有一根钩筋7,钩筋7的内端与结构外墙4的钢筋骨架焊接固定,内螺纹套管5与锚板6之间设有加固锚筋8。 
预埋铁板3与端板2螺接。具体的说,端板2和预埋铁板3上分别设有两个通孔,两个螺钉9分别经端板2的两个通孔、预埋铁板3的两个通孔旋入两个内螺纹套管5内。 

Claims (2)

1.一种电厂冷却塔的结构外墙与附墙杆之间的连接结构,它包括一根附墙杆(1)、一块端板(2)和一块预埋铁板(3),附墙杆(1)的内端与端板(2)焊接,预埋铁板(3)预埋在结构外墙(4)的混凝土中,其特征在于:预埋铁板(3)与端板(2)螺接。
2.根据权利要求1所述的电厂冷却塔的结构外墙与附墙杆之间的连接结构,其特征在于:预埋铁板(3)的内端焊接固定有两个内螺纹套管(5),两个内螺纹套管(5)的内端焊接有一块锚板(6),锚板(6)的内表面焊接有一根钩筋(7),内螺纹套管(5)与锚板(6)之间设有加固锚筋(8)。
CN 201320150007 2013-03-29 2013-03-29 电厂冷却塔的结构外墙与附墙杆之间的连接结构 Expired - Fee Related CN203113519U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320150007 CN203113519U (zh) 2013-03-29 2013-03-29 电厂冷却塔的结构外墙与附墙杆之间的连接结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320150007 CN203113519U (zh) 2013-03-29 2013-03-29 电厂冷却塔的结构外墙与附墙杆之间的连接结构

Publications (1)

Publication Number Publication Date
CN203113519U true CN203113519U (zh) 2013-08-07

Family

ID=48893882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320150007 Expired - Fee Related CN203113519U (zh) 2013-03-29 2013-03-29 电厂冷却塔的结构外墙与附墙杆之间的连接结构

Country Status (1)

Country Link
CN (1) CN203113519U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105236318A (zh) * 2015-10-22 2016-01-13 浙江省电力建设有限公司 用于涂刷双曲线型冷却塔内壁的吊篮导向装置和涂刷方法
CN107859244A (zh) * 2017-10-12 2018-03-30 天津塔尔森科技发展有限公司 一种混凝土钢结构立柱
CN108466439A (zh) * 2018-01-31 2018-08-31 倪惠芳 一种航空航天复合材料模具的定位预埋件

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105236318A (zh) * 2015-10-22 2016-01-13 浙江省电力建设有限公司 用于涂刷双曲线型冷却塔内壁的吊篮导向装置和涂刷方法
CN107859244A (zh) * 2017-10-12 2018-03-30 天津塔尔森科技发展有限公司 一种混凝土钢结构立柱
CN108466439A (zh) * 2018-01-31 2018-08-31 倪惠芳 一种航空航天复合材料模具的定位预埋件
CN108466439B (zh) * 2018-01-31 2021-02-19 倪惠芳 一种航空航天复合材料模具的定位预埋件

Similar Documents

Publication Publication Date Title
CN103422674B (zh) 装配式混凝土结构现浇段混凝土施工方法
CN208702140U (zh) 一种剪力墙接茬处模板加固结构
CN103206089A (zh) 装配式铝合金模板体系施工方法
CN203808484U (zh) 一种整体悬挑附着式外脚手架
CN202937005U (zh) 现浇混凝土梁侧模板加固装置
CN203113519U (zh) 电厂冷却塔的结构外墙与附墙杆之间的连接结构
CN104295109B (zh) 老旧小区不入户阳台快速加固结构及其施工方法
CN205935621U (zh) 一种简易外脚手架与剪力墙连接装置
CN103015735A (zh) 预埋套筒组件后植墙拉筋施工方法
CN107191006B (zh) 一种导流槽耐火混凝土层拆除修复方法
CN104612697A (zh) 一种应用于地铁车站轨顶风道的施工方法
CN203247842U (zh) 混凝土结构伸缩缝模板的加固装置
CN203222994U (zh) 一种外墙模板用可拆卸预埋件
CN202990111U (zh) 一种预埋套筒组件
CN206815804U (zh) 一种新型悬挑脚手架钢梁预埋件
CN202611223U (zh) 可循环使用的螺栓式脚手架连墙件
CN206245709U (zh) 一种外架连墙件
CN205244621U (zh) 一种管道附墙固定装置
CN203716477U (zh) 一种建筑外墙脚手架连墙件
CN204876566U (zh) 一种简易的爪式连墙件
CN203603490U (zh) 一种预制梁上用于架设支模桁架的支撑结构
CN207827724U (zh) 一种用于内爬式塔吊的钢牛腿结构
CN202108244U (zh) 拉结固定件
CN208294057U (zh) 一种脚手架连墙件及其安装结构
CN203022346U (zh) 三节头式止水螺杆

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20140219

Granted publication date: 20130807

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20140310

Granted publication date: 20130807

RINS Preservation of patent right or utility model and its discharge
PP01 Preservation of patent right

Effective date of registration: 20150511

Granted publication date: 20130807

RINS Preservation of patent right or utility model and its discharge
PD01 Discharge of preservation of patent

Date of cancellation: 20151111

Granted publication date: 20130807

RINS Preservation of patent right or utility model and its discharge
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130807

Termination date: 20150329

EXPY Termination of patent right or utility model