CN203113369U - Rapid-formed 10KV steel pipe rod metal foundation - Google Patents
Rapid-formed 10KV steel pipe rod metal foundation Download PDFInfo
- Publication number
- CN203113369U CN203113369U CN 201320113247 CN201320113247U CN203113369U CN 203113369 U CN203113369 U CN 203113369U CN 201320113247 CN201320113247 CN 201320113247 CN 201320113247 U CN201320113247 U CN 201320113247U CN 203113369 U CN203113369 U CN 203113369U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- positioning disk
- main pipe
- positioning plate
- base plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 17
- 239000010959 steel Substances 0.000 title claims abstract description 17
- 239000002184 metal Substances 0.000 title claims abstract description 15
- 238000007493 shaping process Methods 0.000 claims description 11
- 230000003014 reinforcing effect Effects 0.000 claims description 10
- 238000003466 welding Methods 0.000 claims description 10
- 238000009826 distribution Methods 0.000 abstract description 13
- 239000004568 cement Substances 0.000 abstract description 4
- 230000005611 electricity Effects 0.000 abstract description 3
- 230000005540 biological transmission Effects 0.000 abstract description 2
- 238000012423 maintenance Methods 0.000 abstract 3
- 230000000694 effects Effects 0.000 description 2
- 238000005773 Enders reaction Methods 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Investigating Or Analyzing Materials By The Use Of Electric Means (AREA)
Abstract
The utility model relates to a rapid-formed 10KV steel pipe rod metal foundation which is used for fast repairing a power distribution network, and belongs to the technical field of high-voltage electricity transmission. The rapid-formed 10KV steel pipe rod metal foundation comprises an upper positioning plate and a lower positioning plate. The upper ends of a plurality of bases are connected with a base plate through bolts and are fixed through nuts on the bases. A main pipe body is welded in the center of the base plate, connecting plates are welded on two sides of the main pipe body, and the lower ends of the connecting plates are welded on the base plate. The upper positioning plate and the lower positioning plate are connected at the upper end and the middle of the main pipe body respectively. A plurality of double-head screw rods are connected between the upper positioning plate and the lower positioning plate. The rapid-formed 10KV steel pipe rod metal foundation is simple, compact and reasonable in structure, the requirement for laying out wires in short time can be met, related emergency maintenance engineering and engineering in special time are not affected by a cement curing period, emergency maintenance is accelerated, electricity can be transmitted in advance, the reliability of operating of the distribution network is improved, and emergency maintenance cost is effectively reduced.
Description
Technical field
The utility model relates to a kind of rapid shaping 10kV steel pipe pole metal basis, is used for repairing electric distribution network fast specifically, belongs to the high-tension electricity transmission technique field.
Background technology
Along with the high speed development of national economy, power delivery networks enlarges rapidly, and power department is more and more higher to the management expectancy of electrical network, and the loss that power failure causes more and more becomes and is difficult to bear.Therefore for guaranteeing to realize the power supply reliability target, improve client's satisfaction rate, must realize that electric distribution network rushes to repair fast.
Electric distribution network is the important component part of power system, and it is the important step that directly links to each other with the user and distribute electric energy to the user, and its security reliability directly affects the national economic development and living standards of the people.According to incompletely statistics, China user have a power failure in the fault 80% since distribution network failure cause.Therefore, how to improve electric distribution network power supply reliability level and just have very important practical significance.The reliability level of electric distribution network is reflected by frequency of power cut and each power off time, therefore improves repairing quality and the efficient of distribution operation, shortens the repairing time to greatest extent, has very important meaning for promoting power supply reliability with service high-quality level.
According to power distribution rush-repair situation analysis in the past, when repairing work includes steel pipe pole, double ender, owing to can come into operation after the service time that all must reach certain is built on the basis of shaft tower, can only water by the time that underpin satisfies curing time after (being generally 28 days) could the vertical rod stringing, finishes repairing work.Basis defects liability period time length is just given our repairing work and is had the engineering of special time requirement to bring very big inconvenience, has also influenced power supply reliability.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned weak point, thereby provide a kind of rapid shaping 10kV steel pipe pole metal basis, can satisfy the requirement of finishing stringing work in the short time, make the engineering of relevant salvaging and special time requirement not be subjected to the influence of cement conservation phase, electric power feeding time improves the distribution reliability of operation ahead of time.
The technical scheme that provides according to the utility model, rapid shaping 10kV steel pipe pole metal basis comprises a plurality of bases that are arranged side by side, it is characterized in that: also comprise positioning disk and following positioning disk, a plurality of bases upper end connects base plate by bolt, and fastening by the base nut.Base plate center welding main pipe, the main pipe both sides are welded to connect plate, and the junction plate lower end is welded on the base plate.Last positioning disk and following positioning disk are connected to main pipe upper end and middle, connect a plurality of double threaded screws between last positioning disk and the following positioning disk.
Further, a plurality of floors of welding between junction plate and the base plate.
Further, the double threaded screw upper end is fastening by top nut, and the double threaded screw lower end is fastening by lower nut.
Further, weld upper reinforcing plate between last positioning disk and the main pipe.
Further, weld lower reinforcing plate between following positioning disk and the main pipe.
Further, a plurality of double threaded screws are parallel to each other.
Further, a plurality of stirrups of welding between a plurality of double threaded screws.
Compared with the prior art the utility model has the following advantages:
The utility model is simple in structure, compact, reasonable; Can satisfy the requirement of finishing stringing work in the short time, make the engineering of relevant salvaging and special time requirement not be subjected to the influence of cement conservation phase, improve repairing speed, electric power feeding time improves the distribution reliability of operation ahead of time; Effectively reduce emergency repair cost.
Description of drawings
Fig. 1 is the utility model front view.
Fig. 2 is the utility model lateral view.
Fig. 3 is the utility model vertical view.
Positioning disk, 5-main pipe, 6-base plate, 7-floor, 8-base, 9-bolt, 10-upper reinforcing plate, 11-lower reinforcing plate, 12-top nut, 13-lower nut, 14-base nut, 15-junction plate under the last positioning disk of description of reference numerals: 1-, 2-double threaded screw, 3-stirrup, the 4-.
The specific embodiment
Embodiment during following the utility model is incited somebody to action by reference to the accompanying drawings is further described:
Shown in Fig. 1 ~ 3, the utility model mainly comprises a plurality of bases 8 that are arranged side by side, and base 8 adopts concreting, and a plurality of bases 8 upper ends connect base plate 6 by bolt 9, and fastening by base nut 14.
The utility model also comprises positioning disk 1 and following positioning disk 4, and last positioning disk 1 and following positioning disk 4 are connected to main pipe 5 upper ends and centre.Described going up connects a plurality of double threaded screws 2 between positioning disk 1 and the following positioning disk 4, double threaded screw 2 upper ends are fastening by top nut 12, and double threaded screw 2 lower ends are fastening by lower nut 13.
Described going up welded upper reinforcing plate 10 between positioning disk 1 and the main pipe 5, welding lower reinforcing plate 11 between following positioning disk 4 and the main pipe 5, and upper reinforcing plate 10 and lower reinforcing plate 11 play the effect of strengthening intensity.
Described a plurality of double threaded screw 2 is parallel to each other, and a plurality of stirrups 3 of welding between a plurality of double threaded screws 2 are further strengthened the intensity that connect by stirrup 3.
The utility model is simple in structure, convenient in enormous quantities the manufacturing, in use, only it need be embedded in the heatable adobe sleeping platform, positioning disk 1 is connected and fixed steel pipe pole on the upper end, can construct fast, can satisfy the requirement of finishing stringing work in the short time, make the engineering of relevant salvaging and special time requirement not be subjected to the influence of cement conservation phase, improve repairing speed, electric power feeding time improves the distribution reliability of operation ahead of time; Effectively reduce emergency repair cost.
Claims (7)
1. rapid shaping 10kV steel pipe pole metal basis, comprise a plurality of bases (8) that are arranged side by side, it is characterized in that: also comprise positioning disk (1) and following positioning disk (4), a plurality of bases (8) upper end connects base plate (6) by bolt (9), and fastening by base nut (14); Base plate (6) center welding main pipe (5), main pipe (5) both sides are welded to connect plate (15), and junction plate (15) lower end is welded on the base plate (6); Last positioning disk (1) and following positioning disk (4) are connected to main pipe (5) upper end and middle, connect a plurality of double threaded screws (2) between last positioning disk (1) and the following positioning disk (4).
2. rapid shaping 10kV steel pipe pole metal as claimed in claim 1 basis is characterized in that: welding a plurality of floors (7) between described junction plate (15) and the base plate (6).
3. rapid shaping 10kV steel pipe pole metal as claimed in claim 1 basis, it is characterized in that: described double threaded screw (2) upper end is fastening by top nut (12), and it is fastening that lower nut (13) is passed through in double threaded screw (2) lower end.
4. rapid shaping 10kV steel pipe pole metal as claimed in claim 1 basis, it is characterized in that: described going up between positioning disk (1) and the main pipe (5) welded upper reinforcing plate (10).
5. rapid shaping 10kV steel pipe pole metal as claimed in claim 1 basis is characterized in that: weld lower reinforcing plate (11) between described positioning disk (4) down and the main pipe (5).
6. rapid shaping 10kV steel pipe pole metal as claimed in claim 1 basis, it is characterized in that: described a plurality of double threaded screws (2) are parallel to each other.
7. rapid shaping 10kV steel pipe pole metal as claimed in claim 1 basis is characterized in that: welding a plurality of stirrups (3) between described a plurality of double threaded screws (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320113247 CN203113369U (en) | 2013-03-13 | 2013-03-13 | Rapid-formed 10KV steel pipe rod metal foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320113247 CN203113369U (en) | 2013-03-13 | 2013-03-13 | Rapid-formed 10KV steel pipe rod metal foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203113369U true CN203113369U (en) | 2013-08-07 |
Family
ID=48893732
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320113247 Expired - Fee Related CN203113369U (en) | 2013-03-13 | 2013-03-13 | Rapid-formed 10KV steel pipe rod metal foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203113369U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103147459A (en) * | 2013-03-13 | 2013-06-12 | 江苏省电力公司宜兴市供电公司 | Rapidly formed 10kV steel pipe pole metal foundation |
-
2013
- 2013-03-13 CN CN 201320113247 patent/CN203113369U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103147459A (en) * | 2013-03-13 | 2013-06-12 | 江苏省电力公司宜兴市供电公司 | Rapidly formed 10kV steel pipe pole metal foundation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203674624U (en) | Sleeve-type combination tool for live-line jumper clamp fastening | |
CN203113369U (en) | Rapid-formed 10KV steel pipe rod metal foundation | |
CN203800477U (en) | Clamping tool used for electriferous replacement of first insulator of power transmission line tension single chain at wire side | |
CN204258155U (en) | Electric transmission line hot-line adds split pin, closed pin specific purpose tool | |
CN203871745U (en) | Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line | |
CN201570808U (en) | Device for simultaneously replacing two strings of strain insulators | |
CN202764001U (en) | Annular concrete pole prestress inward-tension device | |
CN209277668U (en) | A kind of reinforced electric wire cross-arm | |
CN203113874U (en) | Rapid-formed 10KV steel pipe rod metal foundation base | |
CN201438617U (en) | Electric lifting tool for linear insulator string on ZM tower | |
CN203859448U (en) | Special tool for righting two-gang board during live working on double bundle conductor | |
CN103147459A (en) | Rapidly formed 10kV steel pipe pole metal foundation | |
CN203119391U (en) | Rapid prototype 10kV steel pipe pole metal based positioning plate | |
CN102683915A (en) | Quick joint for high-tension cables | |
CN201857793U (en) | Iron tower provided with bird repeller | |
CN204230763U (en) | A kind of 10kV overhead distribution electrical verification operation insulating bar | |
CN207553725U (en) | A kind of longitudinal steel bracket for being suitable for high altitude localities power transmission tower composite conductor cross-arm | |
CN103573005B (en) | Composite material pole tower reinforcement device and reinforcement method thereof | |
CN202658866U (en) | High altitude gate type rack maintenance platform | |
CN202925981U (en) | 750kV composite material cross arm | |
CN203361736U (en) | Temporary reinforcement device for electric pole | |
CN201853968U (en) | Single-hook insulating yoke plate | |
CN207195093U (en) | A kind of prestressed concrete head tower tower segments conversion equipment | |
CN202111441U (en) | Nut fastener of suspension clamp of alive circuit | |
CN203430132U (en) | Insulating cross arm |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130807 Termination date: 20190313 |
|
CF01 | Termination of patent right due to non-payment of annual fee |