CN203113369U CN 201320113247 CN201320113247U CN203113369U CN 203113369 U CN203113369 U CN 203113369U CN 201320113247 CN201320113247 CN 201320113247 CN 201320113247 U CN201320113247 U CN 201320113247U CN 203113369 U CN203113369 U CN 203113369U
Authority
CN
China
Prior art keywords
steel pipe
positioning disk
main pipe
positioning plate
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320113247
Other languages
Chinese (zh)
Inventor
陈平
陈志忠
张梓飞
郑军
崔国强
吴时勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YIXING HUAYUAN ELECTRIC POWER CONSTRUCTION CO Ltd
YIXING POWER SUPPLY COMPANY JIANGSU ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Original Assignee
YIXING HUAYUAN ELECTRIC POWER CONSTRUCTION CO Ltd
YIXING POWER SUPPLY COMPANY JIANGSU ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YIXING HUAYUAN ELECTRIC POWER CONSTRUCTION CO Ltd, YIXING POWER SUPPLY COMPANY JIANGSU ELECTRIC POWER Co Ltd, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd filed Critical YIXING HUAYUAN ELECTRIC POWER CONSTRUCTION CO Ltd
Priority to CN 201320113247 priority Critical patent/CN203113369U/en
Application granted granted Critical
Publication of CN203113369U publication Critical patent/CN203113369U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Investigating Or Analyzing Materials By The Use Of Electric Means (AREA)

Abstract

The utility model relates to a rapid-formed 10KV steel pipe rod metal foundation which is used for fast repairing a power distribution network, and belongs to the technical field of high-voltage electricity transmission. The rapid-formed 10KV steel pipe rod metal foundation comprises an upper positioning plate and a lower positioning plate. The upper ends of a plurality of bases are connected with a base plate through bolts and are fixed through nuts on the bases. A main pipe body is welded in the center of the base plate, connecting plates are welded on two sides of the main pipe body, and the lower ends of the connecting plates are welded on the base plate. The upper positioning plate and the lower positioning plate are connected at the upper end and the middle of the main pipe body respectively. A plurality of double-head screw rods are connected between the upper positioning plate and the lower positioning plate. The rapid-formed 10KV steel pipe rod metal foundation is simple, compact and reasonable in structure, the requirement for laying out wires in short time can be met, related emergency maintenance engineering and engineering in special time are not affected by a cement curing period, emergency maintenance is accelerated, electricity can be transmitted in advance, the reliability of operating of the distribution network is improved, and emergency maintenance cost is effectively reduced.

Description

Rapid shaping 10kV steel pipe pole metal basis
Technical field
The utility model relates to a kind of rapid shaping 10kV steel pipe pole metal basis, is used for repairing electric distribution network fast specifically, belongs to the high-tension electricity transmission technique field.
Background technology
Along with the high speed development of national economy, power delivery networks enlarges rapidly, and power department is more and more higher to the management expectancy of electrical network, and the loss that power failure causes more and more becomes and is difficult to bear.Therefore for guaranteeing to realize the power supply reliability target, improve client's satisfaction rate, must realize that electric distribution network rushes to repair fast.
Electric distribution network is the important component part of power system, and it is the important step that directly links to each other with the user and distribute electric energy to the user, and its security reliability directly affects the national economic development and living standards of the people.According to incompletely statistics, China user have a power failure in the fault 80% since distribution network failure cause.Therefore, how to improve electric distribution network power supply reliability level and just have very important practical significance.The reliability level of electric distribution network is reflected by frequency of power cut and each power off time, therefore improves repairing quality and the efficient of distribution operation, shortens the repairing time to greatest extent, has very important meaning for promoting power supply reliability with service high-quality level.
According to power distribution rush-repair situation analysis in the past, when repairing work includes steel pipe pole, double ender, owing to can come into operation after the service time that all must reach certain is built on the basis of shaft tower, can only water by the time that underpin satisfies curing time after (being generally 28 days) could the vertical rod stringing, finishes repairing work.Basis defects liability period time length is just given our repairing work and is had the engineering of special time requirement to bring very big inconvenience, has also influenced power supply reliability.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned weak point, thereby provide a kind of rapid shaping 10kV steel pipe pole metal basis, can satisfy the requirement of finishing stringing work in the short time, make the engineering of relevant salvaging and special time requirement not be subjected to the influence of cement conservation phase, electric power feeding time improves the distribution reliability of operation ahead of time.
The technical scheme that provides according to the utility model, rapid shaping 10kV steel pipe pole metal basis comprises a plurality of bases that are arranged side by side, it is characterized in that: also comprise positioning disk and following positioning disk, a plurality of bases upper end connects base plate by bolt, and fastening by the base nut.Base plate center welding main pipe, the main pipe both sides are welded to connect plate, and the junction plate lower end is welded on the base plate.Last positioning disk and following positioning disk are connected to main pipe upper end and middle, connect a plurality of double threaded screws between last positioning disk and the following positioning disk.
Further, a plurality of floors of welding between junction plate and the base plate.
Further, the double threaded screw upper end is fastening by top nut, and the double threaded screw lower end is fastening by lower nut.
Further, weld upper reinforcing plate between last positioning disk and the main pipe.
Further, weld lower reinforcing plate between following positioning disk and the main pipe.
Further, a plurality of double threaded screws are parallel to each other.
Further, a plurality of stirrups of welding between a plurality of double threaded screws.
Compared with the prior art the utility model has the following advantages:
The utility model is simple in structure, compact, reasonable; Can satisfy the requirement of finishing stringing work in the short time, make the engineering of relevant salvaging and special time requirement not be subjected to the influence of cement conservation phase, improve repairing speed, electric power feeding time improves the distribution reliability of operation ahead of time; Effectively reduce emergency repair cost.
Description of drawings
Fig. 1 is the utility model front view.
Fig. 2 is the utility model lateral view.
Fig. 3 is the utility model vertical view.
Positioning disk, 5-main pipe, 6-base plate, 7-floor, 8-base, 9-bolt, 10-upper reinforcing plate, 11-lower reinforcing plate, 12-top nut, 13-lower nut, 14-base nut, 15-junction plate under the last positioning disk of description of reference numerals: 1-, 2-double threaded screw, 3-stirrup, the 4-.
The specific embodiment
Embodiment during following the utility model is incited somebody to action by reference to the accompanying drawings is further described:
Shown in Fig. 1 ~ 3, the utility model mainly comprises a plurality of bases 8 that are arranged side by side, and base 8 adopts concreting, and a plurality of bases 8 upper ends connect base plate 6 by bolt 9, and fastening by base nut 14.
Base plate 6 centers welding main pipe 5, main pipe 5 both sides are welded to connect plate 15, and junction plate 15 lower ends are welded on the base plate 6.The a plurality of floors 7 of welding between described junction plate 15 and the base plate 6, a plurality of floors 7 play strengthens fixing effect.
The utility model also comprises positioning disk 1 and following positioning disk 4, and last positioning disk 1 and following positioning disk 4 are connected to main pipe 5 upper ends and centre.Described going up connects a plurality of double threaded screws 2 between positioning disk 1 and the following positioning disk 4, double threaded screw 2 upper ends are fastening by top nut 12, and double threaded screw 2 lower ends are fastening by lower nut 13.
Described going up welded upper reinforcing plate 10 between positioning disk 1 and the main pipe 5, welding lower reinforcing plate 11 between following positioning disk 4 and the main pipe 5, and upper reinforcing plate 10 and lower reinforcing plate 11 play the effect of strengthening intensity.
Described a plurality of double threaded screw 2 is parallel to each other, and a plurality of stirrups 3 of welding between a plurality of double threaded screws 2 are further strengthened the intensity that connect by stirrup 3.
The utility model is simple in structure, convenient in enormous quantities the manufacturing, in use, only it need be embedded in the heatable adobe sleeping platform, positioning disk 1 is connected and fixed steel pipe pole on the upper end, can construct fast, can satisfy the requirement of finishing stringing work in the short time, make the engineering of relevant salvaging and special time requirement not be subjected to the influence of cement conservation phase, improve repairing speed, electric power feeding time improves the distribution reliability of operation ahead of time; Effectively reduce emergency repair cost.

Claims (7)

1. rapid shaping 10kV steel pipe pole metal basis, comprise a plurality of bases (8) that are arranged side by side, it is characterized in that: also comprise positioning disk (1) and following positioning disk (4), a plurality of bases (8) upper end connects base plate (6) by bolt (9), and fastening by base nut (14); Base plate (6) center welding main pipe (5), main pipe (5) both sides are welded to connect plate (15), and junction plate (15) lower end is welded on the base plate (6); Last positioning disk (1) and following positioning disk (4) are connected to main pipe (5) upper end and middle, connect a plurality of double threaded screws (2) between last positioning disk (1) and the following positioning disk (4).
2. rapid shaping 10kV steel pipe pole metal as claimed in claim 1 basis is characterized in that: welding a plurality of floors (7) between described junction plate (15) and the base plate (6).
3. rapid shaping 10kV steel pipe pole metal as claimed in claim 1 basis, it is characterized in that: described double threaded screw (2) upper end is fastening by top nut (12), and it is fastening that lower nut (13) is passed through in double threaded screw (2) lower end.
4. rapid shaping 10kV steel pipe pole metal as claimed in claim 1 basis, it is characterized in that: described going up between positioning disk (1) and the main pipe (5) welded upper reinforcing plate (10).
5. rapid shaping 10kV steel pipe pole metal as claimed in claim 1 basis is characterized in that: weld lower reinforcing plate (11) between described positioning disk (4) down and the main pipe (5).
6. rapid shaping 10kV steel pipe pole metal as claimed in claim 1 basis, it is characterized in that: described a plurality of double threaded screws (2) are parallel to each other.
7. rapid shaping 10kV steel pipe pole metal as claimed in claim 1 basis is characterized in that: welding a plurality of stirrups (3) between described a plurality of double threaded screws (2).
CN 201320113247 2013-03-13 2013-03-13 Rapid-formed 10KV steel pipe rod metal foundation Expired - Fee Related CN203113369U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320113247 CN203113369U (en) 2013-03-13 2013-03-13 Rapid-formed 10KV steel pipe rod metal foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320113247 CN203113369U (en) 2013-03-13 2013-03-13 Rapid-formed 10KV steel pipe rod metal foundation

Publications (1)

Publication Number Publication Date
CN203113369U true CN203113369U (en) 2013-08-07

Family

ID=48893732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320113247 Expired - Fee Related CN203113369U (en) 2013-03-13 2013-03-13 Rapid-formed 10KV steel pipe rod metal foundation

Country Status (1)

Country Link
CN (1) CN203113369U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147459A (en) * 2013-03-13 2013-06-12 江苏省电力公司宜兴市供电公司 Rapidly formed 10kV steel pipe pole metal foundation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147459A (en) * 2013-03-13 2013-06-12 江苏省电力公司宜兴市供电公司 Rapidly formed 10kV steel pipe pole metal foundation

Similar Documents

Publication Publication Date Title
CN203674624U (en) Sleeve-type combination tool for live-line jumper clamp fastening
CN203113369U (en) Rapid-formed 10KV steel pipe rod metal foundation
CN203800477U (en) Clamping tool used for electriferous replacement of first insulator of power transmission line tension single chain at wire side
CN204258155U (en) Electric transmission line hot-line adds split pin, closed pin specific purpose tool
CN203871745U (en) Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line
CN201570808U (en) Device for simultaneously replacing two strings of strain insulators
CN202764001U (en) Annular concrete pole prestress inward-tension device
CN209277668U (en) A kind of reinforced electric wire cross-arm
CN203113874U (en) Rapid-formed 10KV steel pipe rod metal foundation base
CN201438617U (en) Electric lifting tool for linear insulator string on ZM tower
CN203859448U (en) Special tool for righting two-gang board during live working on double bundle conductor
CN103147459A (en) Rapidly formed 10kV steel pipe pole metal foundation
CN203119391U (en) Rapid prototype 10kV steel pipe pole metal based positioning plate
CN102683915A (en) Quick joint for high-tension cables
CN201857793U (en) Iron tower provided with bird repeller
CN204230763U (en) A kind of 10kV overhead distribution electrical verification operation insulating bar
CN207553725U (en) A kind of longitudinal steel bracket for being suitable for high altitude localities power transmission tower composite conductor cross-arm
CN103573005B (en) Composite material pole tower reinforcement device and reinforcement method thereof
CN202658866U (en) High altitude gate type rack maintenance platform
CN202925981U (en) 750kV composite material cross arm
CN203361736U (en) Temporary reinforcement device for electric pole
CN201853968U (en) Single-hook insulating yoke plate
CN207195093U (en) A kind of prestressed concrete head tower tower segments conversion equipment
CN202111441U (en) Nut fastener of suspension clamp of alive circuit
CN203430132U (en) Insulating cross arm

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130807

Termination date: 20190313

CF01 Termination of patent right due to non-payment of annual fee