A sleeve-type combination tool for fastening and draining wire clips Download PDFInfo
- Publication number
- CN203674624U CN203674624U CN201320809813.6U CN201320809813U CN203674624U CN 203674624 U CN203674624 U CN 203674624U CN 201320809813 U CN201320809813 U CN 201320809813U CN 203674624 U CN203674624 U CN 203674624U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- handle
- nut
- reduced
- fastening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000008878 coupling Effects 0.000 claims description 6
- 238000010168 coupling process Methods 0.000 claims description 6
- 238000005859 coupling reaction Methods 0.000 claims description 6
- 238000004080 punching Methods 0.000 claims 3
- 230000007547 defect Effects 0.000 abstract description 13
- 230000005540 biological transmission Effects 0.000 abstract description 10
- 238000010438 heat treatment Methods 0.000 abstract description 10
- 239000012211 strain insulator Substances 0.000 abstract 1
- 238000000034 method Methods 0.000 description 7
- 230000005611 electricity Effects 0.000 description 4
- 238000012423 maintenance Methods 0.000 description 4
- 230000005684 electric field Effects 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000020169 heat generation Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
Description
技术领域 technical field
本实用新型属于输电线路带电检修技术领域,涉及一种带电检修工器具。本实用新型涉及架空输电线路的带电检修,尤其是针对单回耐张塔(杆)引流线夹发热间接作业及同塔多回垂直排列方式的架空输电线路引流线夹发热缺陷的带电处理,为一种架空输电线路带电检修工具。 The utility model belongs to the technical field of live maintenance of transmission lines, and relates to a live maintenance tool. The utility model relates to the live maintenance of overhead transmission lines, especially for the indirect operation of single-circuit tension tower (rod) drainage wire clamp heating defects and the live treatment of the heating defects of overhead power transmission line drainage wire clamps in the same tower multi-circuit vertical arrangement mode. The utility model relates to a live maintenance tool for an overhead power transmission line.
背景技术 Background technique
随着经济的快速发展,电网规模的不断扩大,架空输电线路随之增多、输电线路负荷随之增大,线路引流线夹发热的缺陷越来越多。如果供电企业要提高供电可靠性,就必须对带电消除引流线夹发热缺陷的处理方式进行优化。目前,引流线夹发热缺陷处理有两种方式,第一种为等电位作业人员进入强电场进行作业;第二种为紧急停电后,作业人员进行处理。第一种作业方式,因为采用等电位方法进行处理,等电位作业人员必须进出强电场,安全风险高、劳动强度大、成本高、效率低;第二种作业方式,紧急停电进行处理,降低供电可靠率,增大电网风险。针对以上两种作业方式的弊端,同时,为缩短作业时间,提高工作效率,降低作业安全风险,需要研制出一种既能避免停电处理,又能采用带电方式来处理此项缺陷的工具。 With the rapid development of the economy and the continuous expansion of the scale of the power grid, the number of overhead transmission lines increases, the load of transmission lines increases, and the defects of line drainage clamps heating are more and more. If the power supply enterprise wants to improve the reliability of power supply, it is necessary to optimize the treatment method for eliminating the heating defect of the drain wire clamp when it is live. At present, there are two ways to deal with the heating defect of the drain wire clip. The first is that the equipotential workers enter the strong electric field to work; the second is that the workers deal with it after an emergency power failure. The first operation method, because the equipotential method is used for processing, the equipotential operation personnel must enter and exit the strong electric field, which has high safety risks, high labor intensity, high cost, and low efficiency; the second operation method uses emergency power outages to reduce power supply Reliability rate increases power grid risk. In view of the disadvantages of the above two operation methods, and at the same time, in order to shorten the operation time, improve work efficiency, and reduce the risk of operation safety, it is necessary to develop a tool that can not only avoid power outage processing, but also use live mode to deal with this defect.
发明内容 Contents of the invention
本实用新型的目的正是为了克服上述现有技术存在的缺陷而提供一种带电紧固引流线夹组合工具,从而解决了现有技术中存在的问题。 The purpose of the utility model is to provide a combination tool for fastening and draining wire clamps with electricity in order to overcome the above-mentioned defects in the prior art, thereby solving the problems in the prior art.
本实用新型要解决的问题是:现有技术不能实现对单回耐张塔(杆)引流线夹发热间接作业及同塔多回垂直排列方式的架空输电线路引流线夹发热缺陷进行带电处理。 The problem to be solved by the utility model is that the existing technology cannot realize the electrification treatment of the heating defect of the drainage wire clip of the single-circuit tension tower (rod) and the heating defect of the overhead transmission line vertically arranged in the same tower with multiple circuits.
本实用新型所采用的技术方案是:一种带电紧固引流线夹套筒式组合工具,本实用新型特征是,包括套筒扳手、套筒、联接组件和绝缘操作杆;其中:套筒扳手由手柄、位于手柄一端的闭合式螺母扳,以及位于手柄另一端的墩头构成;套筒一端设有内螺母孔,另一端设有外螺母;联接组件由夹具、联接在夹具一侧上的穿心螺栓、螺母构成;绝缘操作杆由杆身和位于杆身一端、小于杆身横截面形状、开设有螺栓连接孔的夹紧头构成;连接结构为,联接组件的夹具卡住套筒扳手的墩头,夹具一侧上的紧固孔穿入穿心螺栓并采用螺母旋紧穿心螺栓;套筒的外螺母段套入套筒扳手的闭合式螺母扳内形成组合工具。 The technical scheme adopted by the utility model is: a sleeve-type combined tool for fastening and draining wire clips with electricity. It consists of a handle, a closed nut wrench at one end of the handle, and a pier head at the other end of the handle; one end of the sleeve is provided with an inner nut hole, and the other end is provided with an outer nut; It is composed of through-hole bolts and nuts; the insulating operating rod is composed of a shaft and a clamping head located at one end of the shaft, which is smaller than the cross-sectional shape of the shaft and has a bolt connection hole; the connection structure is that the clamp of the connecting component clamps the socket wrench The fastening hole on one side of the fixture penetrates the through-bolt and the nut is used to tighten the through-bolt; the outer nut section of the sleeve is inserted into the closed nut wrench of the socket wrench to form a combined tool.
本实用新型工具是在在套筒扳手手柄处安装固定的夹具,与绝缘操作杆组装连接后,对引流线夹螺栓进行带电紧固的一种新工具。带电紧固引流线夹组合工具利用杠杆传递原理将套筒扳手的力臂转向并延长,使人员只需站立在铁塔上就能对长距离的螺栓进行紧固。采用此工具能避免人员进入强电场,降低了作业风险;减少了作业人数,降低了成本和作业人员的劳动强度。 The tool of the utility model is a new tool for carrying out electrified fastening of the drainage wire clip bolts after installing and fixing the fixture at the handle of the socket wrench and assembling and connecting with the insulating operating rod. The combination tool for fastening and draining clamps with electricity uses the principle of lever transmission to turn and extend the moment arm of the socket wrench, so that personnel can fasten long-distance bolts only by standing on the iron tower. The use of this tool can prevent personnel from entering the strong electric field, reducing the operation risk; reducing the number of operators, reducing the cost and labor intensity of the operators.
本实用新型的有益效果是:本实用新型工具将解决单回耐张引流线夹发热间接作业及同塔多回垂直排列方式的架空输电线路带电引流线夹发热缺陷的处理。利用此工具进行带电引流线夹发热缺陷处理,减少了作业人员和工器具的投入、降低了作业人员的劳动强度及作业风险、提高了效率、降低了成本,同时提高了供电可靠率、减少了停电次数。 The beneficial effects of the utility model are: the tool of the utility model will solve the indirect operation of single-circuit tension-resistant drain wire clip heating and the processing of the heat generation defect of the overhead power transmission line live drainage wire clip in the same tower multi-circuit vertical arrangement mode. Using this tool to deal with the heating defects of live drainage wire clips reduces the investment of operators and tools, reduces the labor intensity and operation risks of operators, improves efficiency, and reduces costs. At the same time, it improves the reliability of power supply and reduces Number of outages.
附图说明 Description of drawings
图1是本实用新型拆开后各部件示意图; Fig. 1 is a schematic diagram of each component after the utility model is disassembled;
图2是本实用新型的组装立体结构示意图。 Fig. 2 is a schematic diagram of the assembled three-dimensional structure of the utility model. the
图中,套筒扳手(1)、手柄(1.1)、闭合式螺母扳(1.2)、墩头(1.3)、套筒(2)、内螺母孔(2.1)、外螺母(2.2)、绝缘操作杆(3)、杆身(3.1)、螺栓连接孔(3.2)、夹紧头(3.3)、夹具(4)、穿心螺栓(4.1)、螺母(4.2)紧固孔(5)。 In the figure, socket wrench (1), handle (1.1), closed nut wrench (1.2), pier head (1.3), sleeve (2), inner nut hole (2.1), outer nut (2.2), insulation operation Rod (3), shaft (3.1), bolt connection hole (3.2), clamping head (3.3), clamp (4), through-hole bolt (4.1), nut (4.2) fastening hole (5).
具体实施方式 Detailed ways
见图1,图2,一种带电紧固引流线夹套筒式组合工具,本实用新型特征是,包括套筒扳手1、套筒2、联接组件和绝缘操作杆3;其中:套筒扳手1由手柄1.1、位于手柄一端的闭合式螺母扳1.2,以及位于手柄另一端的墩头1.3构成;套筒一端设有内螺母孔2.1,另一端设有外螺母2.2;联接组件由夹具4、联接在夹具4一侧上的穿心螺栓4.1、螺母4.2构成;绝缘操作杆3由杆身3.1和位于杆身一端、小于杆身横截面形状、开设有螺栓连接孔3.2的夹紧头3.3构成;连接结构为,联接组件的夹具卡4住套筒扳手1的墩头1.3,夹具一侧上的紧固孔5穿入穿心螺栓4.1并采用螺母4.2旋紧穿心螺栓;套筒2的外螺母段套入套筒扳手的闭合式螺母扳1.2内形成组合工具。
See Fig. 1 and Fig. 2, a sleeve-type combination tool for fastening and draining wire clamps with electricity, the utility model is characterized in that it includes a
本实施例将夹具上的连接孔设置为两个,采用两套穿心螺栓、螺母紧固套筒扳手的墩头形成组合工具。 In this embodiment, two connecting holes are provided on the fixture, and two sets of through-hole bolts and nuts are used to fasten the pier head of the socket wrench to form a combined tool. the
本实施例的组装方式是:套筒扳手组合工具,将绝缘操作杆两端旋口依次组装,穿心螺栓与夹具一端连接组装在绝缘操作杆顶端的夹紧头上,夹具另一端与套筒扳手手柄端的墩头固定连接,套筒套入安装在套筒扳手内。 The assembly method of this embodiment is: a socket wrench combination tool, assemble the screw holes at both ends of the insulating operating rod in sequence, connect the through-hole bolt with one end of the clamp and assemble it on the clamping head at the top of the insulating operating rod, and connect the other end of the clamp with the sleeve The pier head at the handle end of the wrench is fixedly connected, and the sleeve is inserted and installed in the socket wrench.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320809813.6U CN203674624U (en) | 2013-12-11 | 2013-12-11 | A sleeve-type combination tool for fastening and draining wire clips |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320809813.6U CN203674624U (en) | 2013-12-11 | 2013-12-11 | A sleeve-type combination tool for fastening and draining wire clips |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203674624U true CN203674624U (en) | 2014-06-25 |
Family
ID=50970879
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201320809813.6U Expired - Lifetime CN203674624U (en) | 2013-12-11 | 2013-12-11 | A sleeve-type combination tool for fastening and draining wire clips |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203674624U (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104410022A (en) * | 2014-11-19 | 2015-03-11 | 国家电网公司 | Wire clamp diverter of ground potential installation equipment |
| CN105071294A (en) * | 2015-08-26 | 2015-11-18 | 国网新疆电力公司疆南供电公司 | Ratchet wrench for high-voltage power transmission line |
| CN108988208A (en) * | 2018-08-02 | 2018-12-11 | 刘少广 | A kind of earth potential live benefit dress power line conductive line side bolt and nut operational instrument |
| CN110601072A (en) * | 2019-09-27 | 2019-12-20 | 国网辽宁省电力有限公司盘锦供电公司 | Charged balance bar |
| CN112518644A (en) * | 2020-11-30 | 2021-03-19 | 国网青海省电力公司黄化供电公司 | Single-rod electrified bolt fastening tool |
| CN114976997A (en) * | 2022-05-30 | 2022-08-30 | 国网上海市电力公司 | High-voltage drainage wire clamp and special electrified mounting tool thereof |
| CN115473159A (en) * | 2022-08-22 | 2022-12-13 | 云南电网有限责任公司昆明供电局 | Auxiliary tool for fastening drainage wire clamp in electrified mode |
-
2013
- 2013-12-11 CN CN201320809813.6U patent/CN203674624U/en not_active Expired - Lifetime
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104410022A (en) * | 2014-11-19 | 2015-03-11 | 国家电网公司 | Wire clamp diverter of ground potential installation equipment |
| CN104410022B (en) * | 2014-11-19 | 2017-01-18 | 国家电网公司 | Wire clamp diverter of ground potential installation equipment |
| CN105071294A (en) * | 2015-08-26 | 2015-11-18 | 国网新疆电力公司疆南供电公司 | Ratchet wrench for high-voltage power transmission line |
| CN108988208A (en) * | 2018-08-02 | 2018-12-11 | 刘少广 | A kind of earth potential live benefit dress power line conductive line side bolt and nut operational instrument |
| CN110601072A (en) * | 2019-09-27 | 2019-12-20 | 国网辽宁省电力有限公司盘锦供电公司 | Charged balance bar |
| CN110601072B (en) * | 2019-09-27 | 2025-02-07 | 国网辽宁省电力有限公司盘锦供电公司 | Electric balance bar |
| CN112518644A (en) * | 2020-11-30 | 2021-03-19 | 国网青海省电力公司黄化供电公司 | Single-rod electrified bolt fastening tool |
| CN114976997A (en) * | 2022-05-30 | 2022-08-30 | 国网上海市电力公司 | High-voltage drainage wire clamp and special electrified mounting tool thereof |
| CN115473159A (en) * | 2022-08-22 | 2022-12-13 | 云南电网有限责任公司昆明供电局 | Auxiliary tool for fastening drainage wire clamp in electrified mode |
| CN115473159B (en) * | 2022-08-22 | 2024-04-05 | 云南电网有限责任公司昆明供电局 | A kind of auxiliary tool for fastening drainage wire clamp under power |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203674624U (en) | A sleeve-type combination tool for fastening and draining wire clips | |
| CN103683104A (en) | A ratchet combination tool for live fastening and draining clip | |
| CN205070303U (en) | 750kV circuit block of four strain insulator string tip fixture | |
| CN103368110A (en) | Electric mounting and dismounting construction method for non-bearing-force connection wire clamp | |
| CN203895839U (en) | Bolt fastening device for live-line drainage parallel groove clamp | |
| CN204928025U (en) | An Intelligent Bus Support Structure | |
| CN202534977U (en) | V-shaped clamping apparatus for transposing double insulator strings of power transmission line | |
| CN204258155U (en) | Special tools for adding open pins and closed pins to live transmission lines | |
| CN106300138A (en) | A kind of fixture of live-line replacing strain single insulator | |
| CN203218756U (en) | Special-purpose tool for live-line replacement of disconnecting switch operating mechanism | |
| CN203871745U (en) | Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line | |
| CN203014270U (en) | A triangular connecting plate connector used for a double bundled conductor in a power transmission line | |
| CN203674623U (en) | A ratchet combination tool for live fastening and draining clip | |
| CN103825222B (en) | A kind of charged for replacement 220kV narrow base tower strain insulator string instrument | |
| CN203205770U (en) | V-shaped pull-bar clamp for live replacement of great tensioned strain insulator | |
| CN201312094Y (en) | Trislot parallel groove clamp | |
| CN202622631U (en) | Grounding wire hardware fitting bolt fastening wrench | |
| CN103825223B (en) | Charged for replacement 220KV narrow base tower strain insulator string tool and operational method | |
| CN202050215U (en) | Current-shunt wire clip | |
| CN104253394B (en) | A kind of replacing instrument of strain insulator string | |
| CN203813320U (en) | Tool for live exchange of 220 kV narrow base tower strain insulator string | |
| CN203813334U (en) | Right-angle yoke plate clamp for live exchange of 220 kV strain insulator string | |
| CN206148847U (en) | Change fixture of strain insulator list cluster insulator with electricity | |
| CN202633839U (en) | Special tool for erecting carbon fiber wire | |
| CN204144800U (en) | The special cross-arm card of a kind of ZML type tower |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20140625 |
|
| CX01 | Expiry of patent term |