CN203871745U - Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line - Google Patents

Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line Download PDF

Info

Publication number
CN203871745U
CN203871745U CN201420202991.7U CN201420202991U CN203871745U CN 203871745 U CN203871745 U CN 203871745U CN 201420202991 U CN201420202991 U CN 201420202991U CN 203871745 U CN203871745 U CN 203871745U
Authority
CN
China
Prior art keywords
load
fastening
steel pipe
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420202991.7U
Other languages
Chinese (zh)
Inventor
张森
马宁
宋丽
雷宏阳
朱海荣
于春宏
袁一文
曲家波
薛丽敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Liaoyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Liaoyang Power Supply Co of State Grid Liaoning Electric Power Co Ltd
Priority to CN201420202991.7U priority Critical patent/CN203871745U/en
Application granted granted Critical
Publication of CN203871745U publication Critical patent/CN203871745U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本实用新型涉及220kV线路钢管杆带电更换直线绝缘子所用双吊点杆头卡具,包括承力上横梁、紧固下横梁和紧固螺栓,承力上横梁与紧固下横梁上各开有两个可调式长孔,承力上横梁1的两端均设置有U形槽,U形槽上连接有螺栓形成工具悬挂点,紧固螺栓的数量为两个,两个紧固螺栓分别依次穿过紧固下横梁与承力上横梁上的可调式长孔将承力上横梁与紧固下横梁连接在一起。本实用新型可在带电线路上开展,提高了供电可靠性。适用所有大跨越、单导线及复导线的钢管杆输电线路使用,提高了通用性。本实用新型安装在钢管杆横担头部的同时,也有效地增加了带电导线对地距离、空气间隙、增强了绝缘工器具的绝缘系数及绝缘水平,提高了安全性。

The utility model relates to a double-suspension-point pole-head fixture used for live replacement of linear insulators on steel pipe poles of 220kV lines. Two adjustable long holes, both ends of the load-bearing upper beam 1 are provided with U-shaped grooves, the U-shaped grooves are connected with bolts to form tool suspension points, the number of fastening bolts is two, and the two fastening bolts are respectively inserted in sequence The load-bearing upper beam and the fastening lower beam are connected together through adjustable long holes on the fastening lower beam and the load-bearing upper beam. The utility model can be carried out on live lines, which improves the reliability of power supply. It is suitable for all steel pipe pole transmission lines with large spans, single conductors and multiple conductors, which improves the versatility. When the utility model is installed on the head of the cross-arm of the steel pipe rod, it also effectively increases the distance between the live wire and the ground, the air gap, enhances the insulation coefficient and insulation level of the insulating tool, and improves the safety.

Description

220kV线路钢管杆带电更换直线绝缘子所用双吊点杆头卡具220kV line steel pipe rod live replacement linear insulator used double suspension point rod head fixture

技术领域 technical field

本实用新型涉及一种供输电线路钢管杆带电更换直线绝缘子所专用承力工具,尤其是涉及一种220kV线路钢管杆带电更换直线绝缘子所用双吊点杆头卡具。 The utility model relates to a special load-bearing tool for replacing linear insulators with steel pipe rods of power transmission lines, in particular to a double-suspension rod head fixture for live replacement of linear insulators with steel pipe rods for 220kV lines.

背景技术 Background technique

钢管杆的线路有着外形美观、占地面积小、杆塔材料不易丢失等优点,但是也存在造价高、维护不便、运输不便等缺点,近几年在输电线路中有所应用,但不是十分广泛,只有少数地区或特殊需要时才架设此类输电线路。传统带电作业安装、维护所用的绝缘工器具及操作方法并没有及时更新到新的标准。特别是需要在钢管杆横担头部悬挂吊点时,由于钢管杆类似长方体构件简洁,横担头部光滑且没有安装孔,带电操作难以展开。 The line of steel pipe pole has the advantages of beautiful appearance, small footprint, and not easy to lose the tower material, but it also has disadvantages such as high cost, inconvenient maintenance, and inconvenient transportation. It has been used in transmission lines in recent years, but not very widely. Such transmission lines are only erected in a few areas or when there are special needs. The insulation tools and operating methods used in the installation and maintenance of traditional live work have not been updated to the new standard in time. Especially when it is necessary to hang the lifting point at the head of the steel pipe rod cross arm, because the steel pipe rod is similar to a cuboid component, the head of the cross arm is smooth and there is no installation hole, so it is difficult to launch the live operation.

实用新型内容 Utility model content

本实用新型要解决的技术问题是提供一种220kV线路钢管杆带电更换直线绝缘子所用双吊点杆头卡具。该卡具安装在钢管杆横担头部,用其悬挂承力绝缘工具转移导线的垂直荷载以达到线路带电时即可操作的目的。 The technical problem to be solved by the utility model is to provide a double-suspension-point rod-head fixture for live replacement of linear insulators on 220kV line steel pipe rods. The fixture is installed on the head of the cross-arm of the steel pipe rod, and the vertical load of the wire is transferred by suspending the load-bearing insulating tool to achieve the purpose of being operable when the line is electrified.

为了解决现有技术存在的问题,本实用新型采用的技术方案是: In order to solve the problems existing in the prior art, the technical solution adopted by the utility model is:

220kV线路钢管杆带电更换直线绝缘子所用双吊点杆头卡具,包括有:承力上横梁、紧固下横梁和紧固螺栓,所述的承力上横梁与紧固下横梁上各开有两个可调式长孔,承力上横梁1的两端均设置有U形槽,U形槽上连接有螺栓形成工具悬挂点,紧固螺栓的数量为两个,两个紧固螺栓分别依次穿过紧固下横梁与承力上横梁上的可调式长孔将承力上横梁与紧固下横梁连接在一起。 220kV line steel pipe pole live replacement of linear insulators with double suspension point rod head clamps, including: load-bearing upper beam, fastening lower beam and fastening bolts, the load-bearing upper beam and fastening lower beam are respectively opened Two adjustable long holes, both ends of the load-bearing upper beam 1 are provided with U-shaped grooves, and bolts are connected to the U-shaped grooves to form tool suspension points. The number of fastening bolts is two, and the two fastening bolts are in turn The load-bearing upper beam and the fastening lower beam are connected together through the adjustable long holes on the fastening lower beam and the load-bearing upper beam.

所述的承力上横梁的长度比紧固下横梁长100mm。 The length of the load-bearing upper beam is 100mm longer than the fastening lower beam.

本实用新型所具有的优点与效果是: The advantages and effects that the utility model has are:

1、本实用新型改变了以往需停电才可完成的作业项目,可在带电线路上开展,提高了供电可靠性 1. The utility model has changed the operation items that need to be completed only after power failure in the past, and can be carried out on the live line, which improves the reliability of power supply

2、本实用新型可适应本地区所有220KV输电线路钢管杆横担头部的安装,适用所有大跨越、单导线及复导线的钢管杆输电线路使用,提高了通用性 2. The utility model can be adapted to the installation of the head of the steel pipe pole cross arm of all 220KV transmission lines in the region, and is suitable for all steel pipe pole transmission lines with large spans, single conductors and multiple conductors, which improves the versatility

3、本实用新型安装在钢管杆横担头部的同时,也有效地增加了带电导线对地距离、空气间隙、增强了绝缘工器具的绝缘系数及绝缘水平,提高了安全性  3. When the utility model is installed on the head of the cross-arm of the steel pipe pole, it also effectively increases the distance between the live wire and the ground, the air gap, enhances the insulation coefficient and insulation level of the insulating tool, and improves the safety.

4、本实用新型在停电线路上使用时可改善由于滑车吊点过低而造成绝缘子安装困难、系扣及解扣困难。 4. When the utility model is used on a power outage line, it can improve insulator installation difficulties, fastening and unfastening difficulties caused by the low lifting point of the pulley.

附图说明 Description of drawings

    图1为本实用新型的整体结构示意图; Figure 1 is a schematic diagram of the overall structure of the utility model;

    图2为本实用新型使用状态参考图。 Figure 2 is a reference diagram of the usage state of the utility model.

图中:承力上横梁1、紧固下横梁2、可调式长孔3、可调式长孔4、紧固螺栓5、U形槽11、孔7、螺栓12。 In the figure: load-bearing upper beam 1, fastening lower beam 2, adjustable long hole 3, adjustable long hole 4, fastening bolt 5, U-shaped groove 11, hole 7, bolt 12.

具体实施方式 Detailed ways

    下面结合附图对本实用新型作进一步详述: Below in conjunction with accompanying drawing, the utility model is described in further detail:

 如图1、2所示,本实用新型220kV线路钢管杆带电更换直线绝缘子所用双吊点杆头卡具包括有:承力上横梁1和紧固下横梁2,所述的承力上横梁1的两侧开有两个等距可调式长孔3,用于调整紧固螺栓所需安装的位置及适应钢管杆横担头的宽度。承力上横梁1的两端各设置有一个U形槽11,U形槽11的两侧开有孔7,螺栓12穿过孔7后通过螺母固定住形成工具悬挂点。工具悬挂点用于悬挂绝缘工具,是本卡具中受力最大的构件。所述的紧固下横梁2水平放置在钢管杆横担头部下层,其上开有两个等距可调式长孔4以适应钢管杆横担头的宽度。紧固螺栓5的数量为两个,两个紧固螺栓分别依次穿过紧固下横梁与承力上横梁上的可调式长孔将承力上横梁与紧固下横梁连接在一起,使本发明牢固的座落在钢管杆横担头部。两个紧固螺栓5垂直穿入紧固下横梁与承力上横梁的可调式长孔内使本套卡具保持平衡,用于承载来自操作中产生的不平衡拉力。水平放置在钢管杆横担头部上层,用于承载来自导线所有的垂直荷载。 As shown in Figures 1 and 2, the utility model 220kV line steel pipe rod live replacement linear insulator used double suspension point rod head fixture includes: load-bearing upper beam 1 and fastening lower beam 2, the load-bearing upper beam 1 There are two equidistant adjustable slotted holes 3 on both sides, which are used to adjust the position where the fastening bolts need to be installed and adapt to the width of the steel pipe rod cross-arm head. A U-shaped groove 11 is respectively arranged at both ends of the load-bearing upper beam 1, and a hole 7 is arranged on both sides of the U-shaped groove 11. After the bolt 12 passes through the hole 7, it is fixed by a nut to form a tool suspension point. The tool suspension point is used to hang the insulated tool, which is the most stressed component in this fixture. The fastening lower crossbeam 2 is horizontally placed on the lower layer of the steel pipe rod cross-arm head, and two equidistant adjustable long holes 4 are opened on it to adapt to the width of the steel pipe rod cross-arm head. The number of fastening bolts 5 is two, and the two fastening bolts respectively pass through the adjustable long holes on the fastening lower beam and the load-bearing upper beam to connect the load-bearing upper beam and the fastening lower beam, so that the The invention is firmly seated on the head of the cross-arm of the steel pipe pole. Two fastening bolts 5 are vertically penetrated into the adjustable long holes of the fastening lower crossbeam and the load-bearing upper crossbeam to keep the set of clamps in balance, and are used to bear the unbalanced tension generated during operation. Placed horizontally on the upper layer of the cross-arm head of the steel pipe pole, it is used to bear all the vertical loads from the wires.

   所述的承力上横梁1的长度比紧固下横梁长100mm。 The length of the load-bearing upper beam 1 is 100mm longer than the fastening lower beam.

Claims (2)

  1. Used pair of suspension centre bar head jig of 1.220kV power line steel tuble pole electrified replacing linear insulator, it is characterized in that including: load entablature, fastening sill and fastening bolt, on described load entablature and fastening sill, respectively have two adjustable slotted holes, the two ends of load entablature 1 are provided with U-lag, on U-lag, be connected with bolt and form instrument hitch point, the quantity of fastening bolt is two, and two fastening bolts link together load entablature and fastening sill through the adjustable slotted hole on fastening sill and load entablature respectively successively.
  2. 2. used pair of suspension centre bar head jig of 220kV power line steel tuble pole electrified replacing linear insulator according to claim 1, the fastening bottom rail beam length of the Length Ratio 100mm of the load entablature described in it is characterized in that.
CN201420202991.7U 2014-04-24 2014-04-24 Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line Expired - Lifetime CN203871745U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420202991.7U CN203871745U (en) 2014-04-24 2014-04-24 Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420202991.7U CN203871745U (en) 2014-04-24 2014-04-24 Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line

Publications (1)

Publication Number Publication Date
CN203871745U true CN203871745U (en) 2014-10-08

Family

ID=51652667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420202991.7U Expired - Lifetime CN203871745U (en) 2014-04-24 2014-04-24 Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line

Country Status (1)

Country Link
CN (1) CN203871745U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103928867A (en) * 2014-04-24 2014-07-16 国家电网公司 220kV line steel pipe rod live replacement linear insulator used double suspension point rod head fixture
CN104362544A (en) * 2014-11-17 2015-02-18 国家电网公司 Pulley type tower head clamp
CN105846356A (en) * 2016-06-07 2016-08-10 国家电网公司 Ground wire lifting fixture of steel tube tower for power transmission line
CN107947015A (en) * 2017-11-30 2018-04-20 国家电网公司 Tension-resistant rod live replacing device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103928867A (en) * 2014-04-24 2014-07-16 国家电网公司 220kV line steel pipe rod live replacement linear insulator used double suspension point rod head fixture
CN104362544A (en) * 2014-11-17 2015-02-18 国家电网公司 Pulley type tower head clamp
CN105846356A (en) * 2016-06-07 2016-08-10 国家电网公司 Ground wire lifting fixture of steel tube tower for power transmission line
CN107947015A (en) * 2017-11-30 2018-04-20 国家电网公司 Tension-resistant rod live replacing device

Similar Documents

Publication Publication Date Title
CN203871745U (en) Double-hoisting-point rod head fixture for live changing of linear insulator on steel pipe pole of 220kV line
CN204552245U (en) A kind of extra-high voltage direct-current tangent tower of wire vertical arrangement
CN207251148U (en) A kind of 10kv overhead transmission lines insulation brace rod
CN205565511U (en) Change insulators cross arm fixture for operation with two steel pipe poles that return of tower
CN203850723U (en) Integral unreeling pulley and cable unreeling pulley node
CN103928867A (en) 220kV line steel pipe rod live replacement linear insulator used double suspension point rod head fixture
CN102916372B (en) 10kV multi-circuit lines on the same pole mesophase spherule wire lifting instrument
CN102191874B (en) Insulating cross arm with movable arc grooves
CN203871746U (en) Rod head fixture used for live change of linear insulator on steel pipe pole of 66kV line
CN202039638U (en) Lead screw lifting type insulating cross arm
CN205141528U (en) Three angle steel mounts
CN201438617U (en) Electric lifting tool for linear insulator string on ZM tower
CN204732751U (en) On-load tap-changer of transformer service kit
CN204651789U (en) The special hanger of hot-line insulator string replacement
CN204517271U (en) A kind of for the special bearing tool of power transmission line steel pipe rod replacing insulator under electrified
CN203617651U (en) Steady and reliable abacus connector
CN105024303A (en) Universal combined-type hot-line wire-lifting device
CN206099164U (en) A combined tool for live replacement of UHV double-circuit tension insulators on the same tower
CN204205418U (en) A kind of bracing wire Rapid manufacturing device of high
CN103825222A (en) Tool for changing 220kV narrow base tower strain insulator string with charges
CN204167794U (en) Insulation stringing fixed mount
CN207069439U (en) 4 × " one leads 2 " wires-erecting pulley hangers
CN207150030U (en) Fixture for the only cross-arm shaft tower replacing insulator under electrified of 110kV straight lines
CN206432624U (en) Transmission line tangent tower first insulator changes instrument
CN202026037U (en) Clamping device for replacing multifunctional suspended insulator string cross-arm side armour clamp

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20141008