CN203097421U - Building construction retaining wall - Google Patents

Building construction retaining wall Download PDF

Info

Publication number
CN203097421U
CN203097421U CN 201220724815 CN201220724815U CN203097421U CN 203097421 U CN203097421 U CN 203097421U CN 201220724815 CN201220724815 CN 201220724815 CN 201220724815 U CN201220724815 U CN 201220724815U CN 203097421 U CN203097421 U CN 203097421U
Authority
CN
China
Prior art keywords
column
building construction
building operations
retaining wall
horizon bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220724815
Other languages
Chinese (zh)
Inventor
龚雪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Kai Tuo Development In Science And Technology Co Ltd
Original Assignee
Chongqing Kai Tuo Development In Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Kai Tuo Development In Science And Technology Co Ltd filed Critical Chongqing Kai Tuo Development In Science And Technology Co Ltd
Priority to CN 201220724815 priority Critical patent/CN203097421U/en
Application granted granted Critical
Publication of CN203097421U publication Critical patent/CN203097421U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

The utility model belongs to the technical field of building construction, and particularly relates to an assembling type building construction retaining wall. The building construction retaining wall comprises a stand column, a horizontal rod which is connected on the stand column and a protective plate which is connected on the horizontal rod. The building construction retaining wall is characterized in that the stand column is of a trapezoid shape and is formed by two parallel steel pipes and a plurality of cross steel plates which are parallel to the steel pipes in a welded mode, the horizontal rod is perpendicular to the plane of the stand column, a connecting base which is of an inverted pi shape and is matched with inner pipes of the parallel steel pipes in an socket connection mode is arranged on the bottom of the stand column, and an anchoring bolt hole is formed in the bottom of the connecting base. According to the building construction retaining wall, mounting is convenient, overall rigidity is large, the protecting effect is strong, and recycling can be achieved.

Description

The building operations enclosing
Technical field
The utility model belongs to technical field of building construction, is specifically related to a kind of assembled architecture construction guard fender.
Background technology
When building operations, need set up the building operations enclosing usually and keep apart with road or zone of action with construction area and outside, with protection pedestrains safety, beautify surrounding environment simultaneously.
Building operations enclosing commonly used at present has two kinds, a kind of is brick enclosure wall, another kind of color steel fence, and it respectively has following pluses and minuses: 1, brick enclosure wall belongs to the rigidity enclosing, adopt common brick building to form, its whole rigidity is relatively poor, is easy to cause the part to collapse under external force, protective action is very weak, used in addition fragment of brick has the concrete that is difficult to remove owing to sticking, and also is difficult to usually reuse, and wastes bigger; 2, the color steel enclosing is that some color steels are fixed on the enclosing that forms on the frame shape steel pipe frame with series connection such as iron wires, though it can be reused, but because frame shape steel pipe frame is difficult for being fixed on the ground usually, hardened ground particularly, when running into big windage or impacting, usually cause integral body to collapse or the column bending, protective action is not strong.
The utility model content
The technical problems to be solved in the utility model provide a kind of easy for installation, integral rigidity is big, protective action is strong and the building operations fence that can be recycled.
In order to solve the problems of the technologies described above, the utility model provides a kind of building operations fence, include column, be connected the horizon bar on the column and be connected protected apron on the horizon bar, described column is a scalariform, constitute by two parallel steel tube and the some horizontal steel plate welding that is parallel to steel pipe, described horizon bar is perpendicular to the column plane, and the column bottom is provided with a shape of falling π that cooperates with the interior pipe grafting of parallel steel tube and is connected base, connects the base bottom and is provided with the anchor bolt hole.
During installation, at first will connect base by bolt anchoring to ground, the parallel steel tube with column is plugged into the connection base then, horizon bar is connected on the column again, protected apron is fixed on the horizon bar to get final product at last.
Adopt the building operations fence of technique scheme to have following advantage: 1, because it is structure is fairly simple, therefore easy for installation; 2, because column has adopted slice structure, its bending resistance is good, and column is fixed on the ground by connecting base, therefore is difficult for toppling, and as seen its integral rigidity is big, and protective action is strong; 3, owing to adopted the mode that flexibly connects, so it is detachable and recycle.
As preferred version, consider the protection requirements and the cost input of building operations fence, limiting described protected apron is color steel, veneer.
As preferred version, consider that the building operations fence is attacked by rainwater usually, corrosion may take place if gathered water in the steel pipe, therefore the bottom of described connection base and column is provided with drain hole.
As preferred version, for convenience with horizon bar fixedly in the vertical rod, described horizontal steel plate bilateral symmetry is provided with L shaped bending plate, and bending plate is provided with the C shape steel bushing of connection horizon bar.
Further, consider the plane that protected apron may be protruded in the column outside, cause column partly to be difficult for directly isolating, therefore be provided with the protective cover that is connected on two side protective plates in the described column outside by protected apron.
Description of drawings
Fig. 1 is the schematic top plan view of the utility model building operations fence;
Fig. 2 is the uprights separation structure schematic diagram of the utility model building operations fence.
The specific embodiment
Below in conjunction with drawings and Examples technical solutions of the utility model are further specified:
As depicted in figs. 1 and 2, the utility model provides a kind of building operations fence, include column, be connected the horizon bar 2 on the column and be connected color steel 3 on the horizon bar 2, column is a scalariform, constitute by two parallel steel tube 11 and some horizontal steel plate 12 welding that are parallel to steel pipe, horizontal steel plate 12 bilateral symmetry are provided with L shaped bending plate 15, bending plate 15 is provided with the C shape steel bushing 16 that connects horizon bar 2, horizon bar 2 is perpendicular to the column plane, the column outside is provided with the protective cover 4 that is connected to the arc on the both sides color steel 3, the column bottom is provided with a shape of falling π that cooperates with the endoporus grafting of parallel steel tube and is connected base 13, connect base 13 bottoms and be provided with the anchor bolt hole, parallel steel tube 11 bottoms that connect base 13 and column are provided with drain hole 17.
Above-described only is preferred implementation of the present utility model; should be understood that; for a person skilled in the art; under the prerequisite that does not break away from the utility model structure; can also make some distortion and improvement,, simply change the connected mode of horizon bar and horizontal steel plate as simply replacing color steel with veneer; these also should be considered as protection domain of the present utility model, and these can not influence effect and practical applicability that the utility model is implemented.

Claims (5)

1. building operations enclosing, include column, be connected the horizon bar on the column and be connected protected apron on the horizon bar, it is characterized in that: described column is a scalariform, constitute by two parallel steel tube and the some horizontal steel plate welding that is parallel to steel pipe, described horizon bar is perpendicular to the column plane, the column bottom is provided with a shape of falling π that cooperates with the interior pipe grafting of parallel steel tube and is connected base, connects the base bottom and is provided with the anchor bolt hole.
2. building operations enclosing according to claim 1 is characterized in that: described protected apron is color steel, veneer.
3. building operations enclosing according to claim 1 is characterized in that: the bottom of described connection base and column is provided with drain hole.
4. building operations enclosing according to claim 1 is characterized in that: described horizontal steel plate bilateral symmetry is provided with L shaped bending plate, and bending plate is provided with the C shape steel bushing that connects horizon bar.
5. building operations enclosing according to claim 4 is characterized in that: the described column outside is provided with the protective cover that is connected on two side protective plates.
CN 201220724815 2012-12-26 2012-12-26 Building construction retaining wall Expired - Fee Related CN203097421U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220724815 CN203097421U (en) 2012-12-26 2012-12-26 Building construction retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220724815 CN203097421U (en) 2012-12-26 2012-12-26 Building construction retaining wall

Publications (1)

Publication Number Publication Date
CN203097421U true CN203097421U (en) 2013-07-31

Family

ID=48848833

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220724815 Expired - Fee Related CN203097421U (en) 2012-12-26 2012-12-26 Building construction retaining wall

Country Status (1)

Country Link
CN (1) CN203097421U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107587785A (en) * 2017-10-31 2018-01-16 安吉晶圣光伏发电有限公司 A kind of construction safety screen
CN113482440A (en) * 2021-06-28 2021-10-08 中国一冶集团有限公司 Assembled fender

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107587785A (en) * 2017-10-31 2018-01-16 安吉晶圣光伏发电有限公司 A kind of construction safety screen
CN113482440A (en) * 2021-06-28 2021-10-08 中国一冶集团有限公司 Assembled fender

Similar Documents

Publication Publication Date Title
CN204138210U (en) A kind of regularization tower crane service platform and escape way
CN203097421U (en) Building construction retaining wall
CN206737563U (en) A kind of construction guard fender quickly assembled
CN102720347B (en) Scaffold tool type wall connecting piece and construction method thereof
CN204663021U (en) Detachablely face limit early warning movable rail device
CN204023422U (en) A kind of assembling Coping Construction operating platform
CN203081037U (en) Combined construction site enclosed barrier
CN203201164U (en) Tool type guard bar for construction site
CN212613885U (en) Recyclable protective enclosing wall for building construction
CN105113851B (en) A kind of construction fence and its construction method of multifunctional precast assembled architecture
CN203361676U (en) Temporary protective guard for building construction
CN209482826U (en) A kind of foundation-free assembling type enclosing shield
CN204402144U (en) A kind of color steel enclosing
CN102650157A (en) Detachable anchor device for cantilever section steel beam
CN207469752U (en) A kind of venthole non-dismantling formwork
CN204920452U (en) Hang dress formula building site and enclose fender system
CN207568333U (en) A kind of economic and environment-friendly, repeatable assembled steel enclosing and enclosing component
CN202214967U (en) Portable column construction hanging frame
CN205025201U (en) Multi -functional prefabricated assembly type structure's construction rail
CN204644867U (en) A kind of bridge Assembled fence
CN210368631U (en) Steel pipe sleeve stiffening structure for steel bridge deck stainless steel guardrail stand column
CN205089058U (en) Constructon site fence
CN204370826U (en) A kind of building operations safety barrier
CN205276288U (en) Prestressing force shaped steel integrated configuration
CN204983914U (en) Building site encloses for fender fender rod and encloses fender

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130731

Termination date: 20131226