CN205025201U - Multi -functional prefabricated assembly type structure's construction rail - Google Patents

Multi -functional prefabricated assembly type structure's construction rail Download PDF

Info

Publication number
CN205025201U
CN205025201U CN201520708683.6U CN201520708683U CN205025201U CN 205025201 U CN205025201 U CN 205025201U CN 201520708683 U CN201520708683 U CN 201520708683U CN 205025201 U CN205025201 U CN 205025201U
Authority
CN
China
Prior art keywords
construction
fence
fixed
rail
wall body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520708683.6U
Other languages
Chinese (zh)
Inventor
龙莉波
王美华
郁凤兵
李卫红
马跃强
席金虎
高伟
赵波
何飞
施贵宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Real Estate Co., Ltd.
Original Assignee
Shanghai Construction No 2 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN201520708683.6U priority Critical patent/CN205025201U/en
Application granted granted Critical
Publication of CN205025201U publication Critical patent/CN205025201U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

To current prefabricated assembly type structure's construction rail, need trompil on prefabricated wallboard, cause the problem of harm to the wholeness of prefabricated wallboard, provide a multi -functional prefabricated assembly type structure's construction rail, the rail of should being under construction includes: transverse connection spare, a plurality of being fixed in vertical connecting piece on the transverse connection spare, connection piece, pre -buried buried bolt in advance, fastening bolt, nut, a plurality of U type card and a plurality of rail monomer on prefabricated wall body, transverse connection spare sets up in the top of prefabricated wall body, and the lower part of connection piece is through buried bolt is fixed in advance, and it is fixed that fastening bolt is passed through on the upper portion of connection piece, and rail monomer lower part both sides are equipped with respectively and supply vertical connecting piece male jack, and the free upper portion of adjacent rail is passed through U type card and is connected fixedly. Utilizing on the wallboard the fixed construction of original buried bolt in advance to enclose and blocking, can avoid trompil on the wallboard, and possess easy dismounting, advantage that the efficiency of construction is high, still applicable in job site road rail simultaneously, the usable range extensively.

Description

A kind of construction fence of multifunctional precast assembled architecture
Technical field
The utility model relates to construction fence technical field, particularly a kind of construction fence of multifunctional precast assembled architecture.
Background technology
In the work progress of prefabrication, often need to take appropriate measures to ensure the site safety in work progress and workmanship.At present, conventional way of going along with sb. to guard him mainly contains and sets up scaffold and on body of wall, set up plug-in overhanging type construction fence.Set up scaffold not only to need to waste a large amount of raw material, increase the cost of construction, also can take a large amount of construction plant, also larger to ambient influnence; And, set up in process at scaffold, in order to can fixing feet hand cradle, will perforate on prefabricated wallboard toward contact, this can the globality of heavy damage body of wall and aesthetic property, affects the quality of precast wall body.Overhanging type construction is enclosed to block and in setting up, is compared setting up of scaffold simplify to some extent, but in order to be fixed fence, needs perforate on prefabricated prefabricated panel equally, causes damage to the globality of body of wall.
Therefore; one how is provided not need on the wall perforate again; the globality of body of wall can be protected; and in concrete construction easy accessibility, saving resource, is beneficial to environment; also be applicable to common job site road fence simultaneously; easy popularization, the construction fence of the multifunctional precast assembled architecture that usable range is wide is this area technical problem urgently to be resolved hurrily.
Utility model content
For the construction fence of existing prefabrication; need perforate on prefabricated prefabricated panel; to the hurtful problem of the globality of prefabricated panel; the purpose of this utility model is the construction fence providing a kind of multifunctional precast assembled architecture; make use of original pre-embedded bolt on prefabricated panel to fix construction and enclose and block; the globality of body of wall can be protected; and there is easy accessibility, saving resource, be beneficial to the advantage of environment; also be applicable to common job site road fence simultaneously; easy popularization, usable range is wide.
The utility model solves the technical scheme that its technical problem adopts:
A kind of construction fence of multifunctional precast assembled architecture, comprise: a transverse connection, some vertical connectors be fixed on described transverse connection, brace, be embedded in the pre-embedded bolt on precast wall body in advance, fastening bolt, some nuts, some U-shaped cards and some fence monomers, described transverse connection is arranged at the top of described precast wall body, the bottom of described brace is fixed with corresponding nut by described pre-embedded bolt, the top of described brace is fixed with corresponding nut by described fastening bolt, the both sides, bottom of described fence monomer are respectively equipped with the jack inserted for described vertical connector, the top of adjacent pens monomer is connected and fixed by described U-shaped card.
Preferably, in the construction fence of above-mentioned multifunctional precast assembled architecture, described transverse connection is channel-section steel.
Preferably, in the construction fence of above-mentioned multifunctional precast assembled architecture, described vertical connector is round steel.
The beneficial effects of the utility model are as follows:
The construction fence of multifunctional precast assembled architecture of the present utility model, make use of wallboard set bolt pre-buried on prefabricated panel and fixes construction fence, take full advantage of the original set bolt of precast wall body, avoid and again punch when fixing construction fence.And construction fence quality of the present utility model is light, installation and removal are simple fast, and versatility is high; The recycling rate of waterused of material is high, has very large positive role to the promotion in integral construction time limit.
The channel-section steel being welded with round steel utilizes pre-embedded bolt and brace to be fixed on precast wall body by the utility model, then construction fence is directly inserted on the round steel of location, the U-shaped card of upper position between fence is fixed, and makes the construction fence globality after installing higher.In addition, the brace of fixing construction fence can realize when the precast wall body lifting of next stage the location to precast wall body position, substantially increasing the accuracy of precast wall body lifting.
Accompanying drawing explanation
Fig. 1 is the structural facades figure of construction fence one embodiment of the utility model multifunctional precast assembled architecture;
Fig. 2 is the vertical cross-sectional schematic in A portion of Fig. 1;
Fig. 3 is the vertical cross-sectional schematic in B portion of Fig. 1;
Fig. 4 is the connection diagram of upper and lower precast wall body.
In figure: the vertical connector of 1-transverse connection, 2-, 3-brace, 4-precast wall body, 5-pre-embedded bolt, 6-fastening bolt, 7-nut, 8-U type card, 9-fence monomer, 10-pad.
Detailed description of the invention
Be described in further detail below in conjunction with the construction fence of the drawings and specific embodiments to a kind of multifunctional precast assembled architecture that the utility model proposes.According to explanation below and claims, advantage of the present utility model and feature will be clearer.Below by cited embodiment by reference to the accompanying drawings, technology contents of the present utility model and feature will be described in detail.Need to illustrate in addition, accompanying drawing all adopts the form that simplifies very much and all uses non-ratio accurately, only in order to object that is convenient, aid illustration the utility model embodiment lucidly.
Refer to Fig. 1 to Fig. 3, wherein, Fig. 1 is the structural facades figure of construction fence one embodiment of the utility model multifunctional precast assembled architecture; Fig. 2 is the assembling schematic diagram of the vertical cross-sectional schematic in A portion of Fig. 1 and precast wall body and transverse connection, connection arrangement; Fig. 3 is the vertical cross-sectional schematic in B portion of Fig. 1 and the connection diagram of precast wall body and lateral connection.Present embodiments provide a kind of construction fence of multifunctional precast assembled architecture, comprise: a transverse connection 1, some vertical connectors 2 be fixed on described transverse connection 1, brace 3, be embedded in the pre-embedded bolt 5 on precast wall body 4 in advance, fastening bolt 6, some nuts 7, some U-shaped cards 8 and some fence monomers 9, described transverse connection 1 is arranged at the top of described precast wall body 4, the bottom of described brace 3 is fixed with corresponding nut 7 by described pre-embedded bolt 5, the top of described brace 3 is fixed with corresponding nut 7 by described fastening bolt 6, the both sides, bottom of described fence monomer 9 are respectively equipped with the jack (sign) inserted for described vertical connector 2, the top of adjacent pens monomer 9 is connected and fixed by described U-shaped card 8.On the one hand, it is fixing that the present embodiment utilizes the pre-embedded bolt 5 be embedded in advance on precast wall body 4 to realize fence monomer 9, decreases existingly to punch the infringement caused to prefabricated mast body 4 for fixing fence monomer 9, protects globality and the integrality of prefabricated mast body.On the other hand, because the bottom of described brace 3 is fixed by described pre-embedded bolt 5, the top of described brace 3 is fixed by described fastening bolt 6, the both sides, bottom of described fence monomer 9 utilize jack sleeve to be located on vertical connector 2, the top of adjacent pens monomer 9 is connected and fixed by described U-shaped card 8, thus it is convenient under making construction fence that dismounting is installed, can recycle, save resource, environmentally friendly, also be applicable to common job site road fence, easily promote, usable range is wide simultaneously.
Preferably, in the construction fence of above-mentioned multifunctional precast assembled architecture, described transverse connection 1 is channel-section steel, and channel-section steel has enough intensity, and cost is lower.
In addition, the jack sleeve for the ease of the both sides, bottom by described fence monomer 9 is located on vertical connector 2, and preferably, in the construction fence of above-mentioned multifunctional precast assembled architecture, described vertical connector 2 is round steel.
Please continue to refer to Fig. 1 to Fig. 3, the construction method of the construction fence of the multifunctional precast assembled architecture of the present embodiment, comprises the steps:
Step one: place described transverse connection 1 above the precast wall body 4 of having constructed.In the present embodiment, described transverse connection 1 is channel-section steel.
Step 2: utilize the nut 7 of the pre-embedded bolt 5 and correspondence be embedded in advance on precast wall body 4 to be fixed on described precast wall body 4 by brace 3, and by the nut 7 of set bolt 6 and correspondence, brace 3 is fixedly connected with transverse connection.The utility model utilizes pre-embedded bolt 5 to fix described junction plate 3; and then fix described transverse connection 1 and fence monomer 9; can avoid as fixing fence monomer 9 punches on precast wall body 4; realize under the prerequisite not destroying precast wall body 4; fixing fence monomer 9; protect the integrality of precast wall body 9, improve the application life of precast wall body 9.
Step 3: the jack sleeve of the bottom of fence monomer 9 is located on vertical connector 2, the top of adjacent pens monomer 9 is fixedly connected with by U-shaped card 8.Described U-shaped card 8 is for making U-shaped pipe.The utility model utilizes vertical connector 2 to fix the bottom of fence monomer 9, U-shaped card 8 is utilized to fix the top of fence monomer 9, the globality of the construction fence after installing can be made higher on the one hand, on the other hand, the utilization of vertical connector 2, U-shaped card 8 and pre-embedded bolt 5, set bolt 6, all makes construction fence convenient disassembly, and construction fence is recycled, save material, reduce construction cost.
Preferably, in the construction method of the construction fence of above-mentioned multifunctional precast assembled architecture, the locator that described brace can be installed as next section of precast wall body 4, as shown in Figure 4.After this layer of precast wall body 4 has been constructed, carry out in the precast wall body 4 i.e. construction of upper strata precast wall body of next stage, Demolition Construction fence limit, limit can be installed by new precast wall body 4, because the construction of Demolition Construction and the new precast wall body 4 of construction fence can synchronously be carried out, thus save a large amount of durations, effectively improve efficiency of construction.
In sum, the construction fence of multifunctional precast assembled architecture of the present utility model, make use of wallboard set bolt pre-buried on prefabricated panel and fix construction fence, take full advantage of the original set bolt of precast wall body, avoid and again punch when fixing construction fence.And construction fence quality of the present utility model is light, installation and removal are simple fast, and versatility is high; The recycling rate of waterused of material is high, has very large positive role to the promotion in integral construction time limit.And the utility model utilizes pre-embedded bolt, fastening bolt and nut, vertical connector and U-shapedly fastens construction fence, not only make construction fence easy accessibility, and can be that construction fence can be reused, all can be general with construction plant road fence, widely applicable.
In addition, the channel-section steel being welded with round steel utilizes pre-embedded bolt and brace to be fixed on precast wall body by the utility model, then directly be inserted into by construction fence on the round steel of location, the U-shaped card of the upper position between fence is fixed, and makes the construction fence globality after installing higher.In addition, the brace of fixing construction fence can realize when the precast wall body lifting of next stage the location to precast wall body position, substantially increasing the accuracy of precast wall body lifting.
Foregoing description is only the description to the utility model preferred embodiment; any restriction not to the utility model scope; any change that the those of ordinary skill in the utility model field does according to above-mentioned disclosure, modification, all belong to the protection domain of claims.

Claims (3)

1. the construction fence of a multifunctional precast assembled architecture, it is characterized in that, comprise: a transverse connection, some vertical connectors be fixed on described transverse connection, brace, be embedded in the pre-embedded bolt on precast wall body in advance, fastening bolt, some nuts, some U-shaped cards and some fence monomers, described transverse connection is arranged at the top of described precast wall body, the bottom of described brace is fixed with corresponding nut by described pre-embedded bolt, the top of described brace is fixed with corresponding nut by described fastening bolt, the both sides, bottom of described fence monomer are respectively equipped with the jack inserted for described vertical connector, the top of adjacent pens monomer is connected and fixed by described U-shaped card.
2. the construction fence of multifunctional precast assembled architecture according to claim 1, is characterized in that: described transverse connection is channel-section steel.
3. the construction fence of multifunctional precast assembled architecture according to claim 1, is characterized in that: described vertical connector is round steel.
CN201520708683.6U 2015-09-14 2015-09-14 Multi -functional prefabricated assembly type structure's construction rail Expired - Fee Related CN205025201U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520708683.6U CN205025201U (en) 2015-09-14 2015-09-14 Multi -functional prefabricated assembly type structure's construction rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520708683.6U CN205025201U (en) 2015-09-14 2015-09-14 Multi -functional prefabricated assembly type structure's construction rail

Publications (1)

Publication Number Publication Date
CN205025201U true CN205025201U (en) 2016-02-10

Family

ID=55257744

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520708683.6U Expired - Fee Related CN205025201U (en) 2015-09-14 2015-09-14 Multi -functional prefabricated assembly type structure's construction rail

Country Status (1)

Country Link
CN (1) CN205025201U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113851A (en) * 2015-09-14 2015-12-02 上海建工二建集团有限公司 Multifunctional prefabricated assembled building construction fence and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113851A (en) * 2015-09-14 2015-12-02 上海建工二建集团有限公司 Multifunctional prefabricated assembled building construction fence and construction method thereof
CN105113851B (en) * 2015-09-14 2017-11-28 上海建工二建集团有限公司 A kind of construction fence and its construction method of multifunctional precast assembled architecture

Similar Documents

Publication Publication Date Title
CN204326698U (en) A kind of protective fence of dimension adjustable
CN205025201U (en) Multi -functional prefabricated assembly type structure's construction rail
CN204781441U (en) Assembled reinforced concrete wallboard frame construction
CN105113851A (en) Multifunctional prefabricated assembled building construction fence and construction method thereof
CN203583859U (en) Embedded bolt anchoring device for fixing cantilever I-shaped steel in building construction
CN204039857U (en) A kind of floor type hardening of concrete roads plate of efficient laying
CN204418654U (en) For the aluminum alloy pattern plate between body of wall
CN204243696U (en) Novel electric checking bollard
CN203213137U (en) Steel raft foundation for installing steel structure roof
CN203808541U (en) Tool guardrail for use on H-beams
CN202925495U (en) Highway protective guard base with self-weight chain structure and protective guard adopting protective guard base
CN102535303B (en) Temporary emergency road surface equipment
CN102383613B (en) Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device
CN204238443U (en) A kind of detachable suspension column fastening devices
CN203097421U (en) Building construction retaining wall
CN203361170U (en) Supporting upright column pile for building foundation pit support
CN204168448U (en) A kind of base station fixture
CN202321919U (en) Metallic framework structure of escalator
CN202299185U (en) Primary and secondary purline structure for mounting solar PV glass
CN204185997U (en) A kind of constructability installs the steel structure column of wallboard
CN104612166A (en) Combined supporting device and method for hole wall supporting
CN203896262U (en) Ground screen type photovoltaic bracket fixed by cable-stayed lock
CN203452367U (en) Builder jack fixing device capable of being reused
CN203135365U (en) Cable trench earthing device
CN203834504U (en) Structure of basement reverse construction method tower crane foundation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Long Libo

Inventor after: He Fei

Inventor after: Shi Guibao

Inventor after: Zhu Longkui

Inventor after: Wang Meihua

Inventor after: Yu Fengbing

Inventor after: Li Weihong

Inventor after: Ma Yueqiang

Inventor after: Xi Jinhu

Inventor after: Gao Wei

Inventor after: Zhao Bo

Inventor before: Long Libo

Inventor before: Shi Guibao

Inventor before: Wang Meihua

Inventor before: Yu Fengbing

Inventor before: Li Weihong

Inventor before: Ma Yueqiang

Inventor before: Xi Jinhu

Inventor before: Gao Wei

Inventor before: Zhao Bo

Inventor before: He Fei

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20160601

Address after: 200120 Shanghai city Pudong New Area Fushan Road No. 33

Patentee after: Shanghai Construction No.2 (Group) Co., Ltd.

Patentee after: Shanghai Construction Real Estate Co., Ltd.

Address before: 200120 Shanghai city Pudong New Area Fushan Road No. 33

Patentee before: Shanghai Construction No.2 (Group) Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160210

Termination date: 20190914