CN203095387U - Large wind generating set cabin cover side plate hanger - Google Patents
Large wind generating set cabin cover side plate hanger Download PDFInfo
- Publication number
- CN203095387U CN203095387U CN201220691444.0U CN201220691444U CN203095387U CN 203095387 U CN203095387 U CN 203095387U CN 201220691444 U CN201220691444 U CN 201220691444U CN 203095387 U CN203095387 U CN 203095387U
- Authority
- CN
- China
- Prior art keywords
- nacelle cover
- hanger
- side plate
- cantilever
- generating set
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000000034 method Methods 0.000 description 6
- 230000005484 gravity Effects 0.000 description 5
- 238000009434 installation Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000011152 fibreglass Substances 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
本实用新型具体公开了一种大型风力发电机组机舱罩侧板吊具,包括两根悬臂梁和一根横梁,所述的悬臂梁通过竖直梁与横梁连接,所述的悬臂梁分别与竖直梁和横梁垂直,且两个悬臂梁分别设于横梁的两端,在所述的横梁顶端设有吊耳,在两个悬臂梁上设置有连接板。本实用新型结构简单,操作方便,设计平稳,生产效率高,并且可以实现风力发电机组大批量生产。
The utility model specifically discloses a hanger for the side panel of the nacelle cover of a large-scale wind power generating set, which comprises two cantilever beams and a crossbeam. The straight beam and the cross beam are vertical, and two cantilever beams are respectively arranged at both ends of the cross beam, lifting lugs are arranged on the top of the cross beam, and connecting plates are arranged on the two cantilever beams. The utility model has the advantages of simple structure, convenient operation, stable design and high production efficiency, and can realize mass production of wind power generating sets.
Description
技术领域 technical field
本实用新型涉及一种大型风力发电机组机舱罩侧板吊具,特别是风力发电机组机舱罩侧板吊具。 The utility model relates to a hanger for the side plate of the nacelle cover of a large wind power generating set, in particular to a hanger for the side plate of the nacelle cover of the wind power generating set.
背景技术 Background technique
随着世界范围内风能技术的迅猛发展和市场需求的扩大,风力发电机组的设计趋于大型化、多样化,同样,机舱罩的设计也不可避免地向大型化、多样化方向发展。而机舱罩多为玻璃钢制品,体积较大,柔性大,材料特殊,没有专用吊具,之前的吊装方法是用吊带吊装机舱罩连接法兰,吊运与安装过程由于找不准重心容易倾覆,操作难度大,很难保证其在吊运过程处于水平状态,而且很容易损坏机舱罩连接法兰,从而导致机舱罩安装困难,吊带安装时需要多人辅助并且高空作业,存在很大的安全隐患。 With the rapid development of wind energy technology and the expansion of market demand in the world, the design of wind turbines tends to be large and diversified. Similarly, the design of nacelle cover will inevitably develop in the direction of large and diverse. The nacelle cover is mostly made of glass fiber reinforced plastics, which is bulky, flexible, and made of special materials. There is no special lifting device. The previous hoisting method is to use slings to hoist the connecting flange of the nacelle cover. During the lifting and installation process, it is easy to overturn due to the inaccurate center of gravity. The operation is difficult, and it is difficult to ensure that it is in a horizontal state during the lifting process, and it is easy to damage the connecting flange of the nacelle cover, which makes the installation of the nacelle cover difficult. The installation of the sling requires multiple people to assist and work at high altitude, which poses a great safety hazard .
实用新型内容 Utility model content
为了改变现有的这种状况,减轻工人的劳动强度,提高工作效率,本实用新型打破了传统吊具的设计思路,提出了一种大型风力发电机组机舱罩侧板吊具。 In order to change the existing situation, reduce the labor intensity of workers, and improve work efficiency, the utility model breaks the design idea of the traditional spreader and proposes a hanger for the side plate of the nacelle cover of a large-scale wind power generating set.
为解决现有技术存在的缺点,本实用新型采用的技术方案如下: For solving the shortcoming that prior art exists, the technical scheme that the utility model adopts is as follows:
一种大型风力发电机组机舱罩侧板吊具,包括两根悬臂梁和一根横梁,所述的悬臂梁通过竖直梁与横梁连接,所述的悬臂梁分别与竖直梁和横梁垂直,且两个悬臂梁分别设于横梁的两端,在所述的横梁顶端设有吊耳,在两个悬臂梁上设置有连接板。 A hanger for the side panel of the nacelle cover of a large wind power generating set, comprising two cantilever beams and a crossbeam, the cantilever beams are connected to the crossbeam through vertical beams, the cantilever beams are perpendicular to the vertical beams and the crossbeam respectively, And the two cantilever beams are respectively arranged at the two ends of the crossbeam, the top of the crossbeam is provided with lifting lugs, and the two cantilever beams are provided with connecting plates.
所述的悬臂梁为能伸缩型的。 The cantilever beam is retractable.
所述的吊耳包括三个,在横梁的中心位置处设有一个吊耳,在中心位置的两侧又各设一个吊耳,所述的三个吊耳均为多孔吊耳。 The lifting lugs include three, one lug is set at the center of the beam, and another lug is set on both sides of the center. The three lifting lugs are all porous lifting lugs.
所述的悬臂梁通过一个矩形装置及紧固螺栓与竖直梁连接。 The cantilever beam is connected with the vertical beam through a rectangular device and fastening bolts.
所述的悬臂梁能在矩形装置内活动。 The cantilever beam can move within the rectangular device.
所述的连接板上设有多个螺纹孔。 The connecting plate is provided with a plurality of threaded holes.
本实用新型的有益效果是: The beneficial effects of the utility model are:
机舱罩侧板吊具的连接板与机舱罩侧板预埋件相连,通过调节吊带与吊耳孔的配合位置,可以实现机舱罩的平衡,通过吊带与吊车相连,悬臂梁设计成可伸缩式,由紧定螺栓固定位置。由于不同厂家机舱罩在结构上设计有些微差别,机舱罩侧板预埋件尺寸上也有一定偏差,这样设计的可调节式吊梁在吊装时只需调节悬臂梁的长度和吊带与吊耳连接的位置,就可以使机舱罩实现水平吊装,吊具安装便捷,节约了时间,降低了劳动强度。并且该工装上部横梁上设有对称可调节吊耳,通过寻找机舱罩侧板重心调整吊点,可以保证机舱罩侧板吊运过程处于水平状态。悬臂梁也设计成可伸缩式,用于调整侧板吊装过程的平稳。这样该工装可以同时满足机舱罩左、右侧吊装,只需要改变吊耳位置即可。结构简单,操作方便,设计平稳,生产效率高,并且可以实现风力发电机组大批量生产。 The connecting plate of the nacelle side panel hanger is connected with the embedded part of the nacelle side panel, and the balance of the nacelle cover can be realized by adjusting the matching position of the sling and the lifting eye hole, and it is connected with the crane through the sling. The position is fixed by the set screw. Due to the slight difference in the structural design of the nacelle cover of different manufacturers, there is also a certain deviation in the size of the embedded parts of the side panel of the nacelle cover. The adjustable suspension beam designed in this way only needs to adjust the length of the cantilever beam and the connection between the suspension strap and the lifting lug during hoisting. position, the nacelle cover can be hoisted horizontally, and the spreader is conveniently installed, saving time and reducing labor intensity. In addition, symmetrical adjustable lifting lugs are provided on the upper beam of the tooling. By finding the center of gravity of the side panel of the nacelle cover and adjusting the lifting point, it can be ensured that the side panel of the nacelle cover is in a horizontal state during hoisting. The cantilever beam is also designed to be telescopic, which is used to adjust the stability of the side plate hoisting process. In this way, the tooling can be hoisted on the left and right sides of the nacelle cover at the same time, and only need to change the position of the lifting lug. The structure is simple, the operation is convenient, the design is stable, the production efficiency is high, and the mass production of wind power generators can be realized.
附图说明 Description of drawings
图1是本实用新型实施使用状态示意图; Fig. 1 is a schematic diagram of the implementation and use state of the utility model;
图2是本实用新型实施示意图; Fig. 2 is the implementation schematic diagram of the utility model;
图中 1.第一吊耳,2.横梁,3.竖直梁,4.悬臂梁,5.连接板,6.紧定螺栓,7. 第二吊耳,8第三吊耳,9.机舱罩,10.机舱罩侧板重心线,11机舱罩侧板吊具,12 吊带。 In the figure 1. First lifting eye, 2. Beam, 3. Vertical beam, 4. Cantilever beam, 5. Connecting plate, 6. Set bolt, 7. Second lifting eye, 8 Third lifting eye, 9. Nacelle cover, 10. nacelle cover side plate center of gravity line, 11 nacelle cover side plate hanger, 12 sling.
具体实施方式 Detailed ways
下面结合附图,对本实用新型进行详细说明: Below in conjunction with accompanying drawing, the utility model is described in detail:
机舱罩侧板吊具11包括两根悬臂梁和一根横梁2,悬臂梁4通过竖直梁3与横梁2连接,且悬臂梁4分别与竖直梁3和横梁2垂直,两个悬臂梁4分别设于横梁2的两端,在所述的横梁2顶端设有三个吊耳,在横梁2的中心位置处设有第一吊耳1,在中心位置的两侧又各设第二吊耳7和第二吊耳8,且三个吊耳均为多孔吊耳。在两个悬臂梁4上设置有连接板5。悬臂梁4通过一个矩形装置和紧固螺栓与竖直梁3连接。悬臂梁4能在矩形装置内活动。连接板5上设有多个螺纹孔。所述的悬臂梁4为能伸缩型的。
The nacelle cover
本实用新型的空间上多个方向可调节的吊具,这样可以显著缩短机舱罩的吊装时间,采用一种实用新型的吊装方式解决了机舱罩无法平吊和安装的难题。 The multi-direction adjustable hoisting device of the utility model can significantly shorten the hoisting time of the nacelle cover, and adopts a utility model hoisting method to solve the problem that the nacelle cover cannot be hoisted and installed flat.
如图2所示,三个吊耳采用的是对称可调节式,既能满足不同厂家设计的机舱罩9差别,又可以实现左、右侧吊装。悬臂梁4采用可伸缩式,由紧定螺钉固定位置,也满足了不同厂家设计机舱罩9预埋件的差别。具体实施方式如图1所示:用吊车通过两根吊带12及卸扣与吊耳连接,一根吊带12与横梁2端部的第二吊耳7或第三吊耳8连接,另一根吊带12与横梁2中间的第一吊耳1连接,调节两根吊带的位置使得机舱罩9前后水平,重心与机舱罩侧板重心线10重合。连接板5与机舱罩9侧板中间两个预埋件连接,带紧螺母,调节悬臂梁4可伸缩的长度,使得机舱罩9左右平稳,由紧定螺栓紧固,然后吊放机舱罩9侧板到装配位置,将剩余前后两个机舱罩9预埋件与整机连接,拆下工装,吊走,再紧固这两个预埋件,从而完成机舱罩9的吊装工作。若需要吊装另外一侧机舱罩9,则需把一根与横梁2端部吊耳连接的吊带换到另一端对称位置即可,这样就可以实现另一侧吊装。
As shown in Figure 2, the three lifting lugs are symmetrical and adjustable, which can not only meet the differences of nacelle covers 9 designed by different manufacturers, but also realize left and right lifting. Cantilever beam 4 adopts telescopic type, is fixed in position by set screw, also satisfied the difference of different manufacturer's
本实用新型吊装方式有效地实现了机舱罩的水平吊装,节约了吊具的安装时间,消除了安全隐患,同时降低了劳动强度,提高了生产效率。 The hoisting method of the utility model effectively realizes the horizontal hoisting of the nacelle cover, saves the installation time of the sling, eliminates potential safety hazards, reduces labor intensity, and improves production efficiency.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201220691444.0U CN203095387U (en) | 2012-12-14 | 2012-12-14 | Large wind generating set cabin cover side plate hanger |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201220691444.0U CN203095387U (en) | 2012-12-14 | 2012-12-14 | Large wind generating set cabin cover side plate hanger |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203095387U true CN203095387U (en) | 2013-07-31 |
Family
ID=48846808
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201220691444.0U Expired - Lifetime CN203095387U (en) | 2012-12-14 | 2012-12-14 | Large wind generating set cabin cover side plate hanger |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203095387U (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104925665A (en) * | 2015-07-02 | 2015-09-23 | 太原重工股份有限公司 | Hoisting device special for test run and beam mechanism of hoisting device |
| CN105067364A (en) * | 2015-08-21 | 2015-11-18 | 东方电气风电有限公司 | Overall strength test method and device for wind driven generator |
| CN107792775A (en) * | 2017-11-25 | 2018-03-13 | 苏州金牛精密机械有限公司 | A kind of multipoint hoisting mechanism |
| CN109534143A (en) * | 2018-09-29 | 2019-03-29 | 平高集团有限公司 | A kind of change of current field valve module hoisting fixture |
| CN109665433A (en) * | 2017-10-17 | 2019-04-23 | 中车株洲电力机车研究所有限公司 | A kind of engine room cover suspender |
-
2012
- 2012-12-14 CN CN201220691444.0U patent/CN203095387U/en not_active Expired - Lifetime
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104925665A (en) * | 2015-07-02 | 2015-09-23 | 太原重工股份有限公司 | Hoisting device special for test run and beam mechanism of hoisting device |
| CN105067364A (en) * | 2015-08-21 | 2015-11-18 | 东方电气风电有限公司 | Overall strength test method and device for wind driven generator |
| CN109665433A (en) * | 2017-10-17 | 2019-04-23 | 中车株洲电力机车研究所有限公司 | A kind of engine room cover suspender |
| CN107792775A (en) * | 2017-11-25 | 2018-03-13 | 苏州金牛精密机械有限公司 | A kind of multipoint hoisting mechanism |
| CN109534143A (en) * | 2018-09-29 | 2019-03-29 | 平高集团有限公司 | A kind of change of current field valve module hoisting fixture |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203095387U (en) | Large wind generating set cabin cover side plate hanger | |
| CN203095401U (en) | Clasp type rolling-over hoisting tail lug fixture | |
| CN201999655U (en) | Conversion device connecting tower crane and self-jacking construction platform | |
| CN204737609U (en) | European style hoist girder connection structure | |
| CN206233122U (en) | For bridge cantilever construction with Hanging Basket movable tower crane | |
| CN206308702U (en) | A kind of portable basis of derrick crane | |
| CN204384725U (en) | A kind of heavy in section, large-tonnage box-type member upset frock | |
| CN202245670U (en) | Special detachable hoisting point device for double-fed wind generating set base | |
| CN202609775U (en) | Lifting copper hook for electrolytic copper foil production | |
| CN203855294U (en) | Lifting structure of box-type substation | |
| CN203781677U (en) | Trial mass device of crane | |
| CN203715156U (en) | Convenient crane | |
| CN204823664U (en) | Adjustable combination hoist | |
| CN204873489U (en) | Large -scale bridge crane girder inner structure | |
| CN203568661U (en) | Built-in tail-sliding lifting lug | |
| CN204022293U (en) | A kind of crane beam constructional device | |
| CN201635229U (en) | A keel hanger | |
| CN203333153U (en) | Detachable hoisting appliance for chord member of large-scale truss | |
| CN205367453U (en) | Wind generating set main frame upset hoist | |
| CN203570516U (en) | Hoisting tool of vertical type cabin of wind driven generator | |
| CN204577970U (en) | The integral hoisting of a kind of Novel armored formula metal switch cabinet | |
| CN206267536U (en) | A kind of steel column material distributing machine | |
| CN203295022U (en) | Assembling and hoisting device for radiator chamber of locomotive | |
| CN205687400U (en) | A kind of power transmission shaft lifting accessory appliance | |
| CN105345342B (en) | A kind of welding robot walking guide rail base |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20130731 |
|
| CX01 | Expiry of patent term |