CN109534143A - A kind of change of current field valve module hoisting fixture - Google Patents

A kind of change of current field valve module hoisting fixture Download PDF

Info

Publication number
CN109534143A
CN109534143A CN201811151464.7A CN201811151464A CN109534143A CN 109534143 A CN109534143 A CN 109534143A CN 201811151464 A CN201811151464 A CN 201811151464A CN 109534143 A CN109534143 A CN 109534143A
Authority
CN
China
Prior art keywords
valve module
lifting
change
current field
bridge joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811151464.7A
Other languages
Chinese (zh)
Inventor
刘恒
许东杰
庞亚娟
王胜坤
程铁汉
高树同
苑国旗
刘双阳
李凯
宋继光
卢姗
李刚
马书豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Ping Da Da Technology Development Co Ltd
Henan High Voltage Electrical Research Institute Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Pinggao Group Co Ltd
Original Assignee
Beijing Ping Da Da Technology Development Co Ltd
Henan High Voltage Electrical Research Institute Co Ltd
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Pinggao Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Ping Da Da Technology Development Co Ltd, Henan High Voltage Electrical Research Institute Co Ltd, State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd, Pinggao Group Co Ltd filed Critical Beijing Ping Da Da Technology Development Co Ltd
Priority to CN201811151464.7A priority Critical patent/CN109534143A/en
Publication of CN109534143A publication Critical patent/CN109534143A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries

Abstract

The present invention relates to a kind of change of current field valve module hoisting fixtures.The change of current field valve module hoisting fixture includes two lifting beams of parallel interval setting, interval is equipped at least two lifting legs below each lifting beam, the height for lifting leg is higher than the height of all devices in the valve module of quasi- lifting, it lifts and is equipped with terminal pad below leg, terminal pad is equipped with for the locking hole with the connecting hole cooperation carried on valve module, two lifting beams are linked together by bridging beam, and bridge joint beam is equipped with the mounting hole for installing hanging ring.Change of current field valve module hoisting fixture of the present invention can solve the problem of device stress damage deformation in the valve module being easy to appear when the valve module lifting operation of change of current field.

Description

A kind of change of current field valve module hoisting fixture
Technical field
The present invention relates to a kind of change of current field valve module hoisting fixtures.
Background technique
For the requirement for meeting HVDC transmission system high voltage, high current, converter valve, mixing in high voltage direct current converter field The equipment such as formula high voltage DC breaker are made of the power electronic devices series, parallel of substantial amounts;For convenience of assembling and overhaul, Generally use modularized design, i.e., by certain amount, function is identical, the consistent power electronic devices of model constitute one it is independent Functional unit --- valve module, then converter valve, hybrid high voltage DC breaker are constituted by multiple valve module units.For valve mould The lifting work of block is still realized at present using traditional hanging belt Hoisting Program, in hoisting process, it is easy to valve occur In module centre-of gravity shift, valve module situations such as device stress damage deformation.
Summary of the invention
The object of the present invention is to provide a kind of change of current field valve module hoisting fixtures, make for solving the lifting of change of current field valve module The problem of device stress damage deformation in valve module is easy to appear when industry.
To achieve the above object, change of current field valve module hoisting fixture of the present invention uses following technical scheme: this is changed Flow field valve module hoisting fixture includes two lifting beams of parallel interval setting, and interval is equipped at least two below each lifting beam A lifting leg, the height for lifting leg are higher than the height of all devices in the valve module of quasi- lifting, are equipped with terminal pad below lifting leg, Terminal pad is equipped with for the locking hole with the connecting hole cooperation carried on valve module, and two lifting beams are connected to by bridging beam Together, bridge joint beam is equipped with the mounting hole for installing hanging ring.
The beneficial effects of the present invention are: by the change of current field, valve module hoisting fixture is hung to quasi- hanging valve mould when lifting valve module At block, the change of current field valve module hoisting fixture is fixed with quasi- hanging valve module by terminal pad, because the change of current field valve mould is fast The height of the lifting leg of hoisting fixture is higher than the height of all devices in valve module, so change of current field valve module slinger pretends When in increasing a shield above valve module, and the change of current field valve module hoisting fixture is rigid structure, and change of current field The hanging ring installation point of valve module hoisting fixture is located at the top of the change of current field valve module hoisting fixture, so lifting in hoisting process Band will not be touched with the device on valve module, and the device in valve module can be damaged to avoid hanging belt.
Further, the position of bridge joint beam installation is corresponding with the installation lifting position of leg below lifting beam.
Beneficial effect improved in this way is: because the terminal pad below lifting leg is connect with quasi- hanging valve module, lifting The link position stress of leg and lifting beam is larger, here by the installation of bridge joint beam, can become to avoid lifting beam because stress is excessive Shape.
Further, bridging the mounting hole on beam has multiple, all mounting holes edge bridge joint beam length direction arranged for interval.
Beneficial effect improved in this way is: when on-site hoisting valve module, can change in conjunction with the position of centre of gravity of valve module with this The position of centre of gravity of flow field valve module hoisting fixture can guarantee that valve module is lifting to select different mounting holes to install hanging ring Stationarity in the process.
Further, bridge joint beam and lifting beam releasable connection.
Beneficial effect improved in this way is: the change of current field valve module hoisting fixture when not in use, can will bridge joint beam tear open Get off, all bridge joint beams set placement, and all lifting beams for being equipped with lifting leg set placement, can save parking space.
Further, bridge joint beam and lifting beam pass through bolt releasable connection.
Beneficial effect improved in this way is: be bolted it is easy for installation, and can increase pretightning force with prevent bridge joint beam It is loosened with lifting beam.
Further, bridge beam section be it is I-shaped, for install hanging ring mounting hole be located at bridge joint beam top one Side.
Beneficial effect improved in this way is: the bridge joint beam bending resistance of I-shaped cross-section is strong, can be improved the change of current field valve The structural strength of module hoisting tooling, and facilitate the connection of bridge joint beam and lifting beam.
Detailed description of the invention
Fig. 1 is the usage state diagram of the embodiment 1 of change of current field valve module hoisting fixture of the present invention;
Fig. 2 is the structural schematic diagram of the embodiment 1 of change of current field valve module hoisting fixture of the present invention;
In attached drawing: 1- valve module, 2- hoisting fixture, 3- lifting beam, 4- bridge beam, and 5- lifts leg, 6- terminal pad, 7- reinforcing rib Plate, 8- mounting hole, 9- bolt, 10- locking hole, 11- connection structure.
Specific embodiment
Specific embodiments of the present invention will be further explained with reference to the accompanying drawing.
As depicted in figs. 1 and 2, the embodiment 1 of change of current field valve module hoisting fixture of the present invention includes parallel interval Two lifting beams 3 being arranged, the distance between two lifting beams 3 are according to the laterally adjacent connection structure 11 on valve module 1 Spacing is set, and lower section welding three lifting legs 5 of installation of each lifting beam 3, lifting beam 3 is equipped with 5 link position of leg is lifted Stiffener plate 7, to increase the change of current field valve module slinger i.e. described in the claims of hoisting fixture 2(hoisting fixture 2 Dress) structural strength, adjacent lifting the distance between leg 5 is according to the spacing of the longitudinally adjacent connection structure 11 on valve module 1 It sets, lifting leg 5 makes the hoisting fixture 2 have certain altitude, lifts and is welded with terminal pad 6 below leg 5, and terminal pad 6 is side Shape structure, terminal pad 6 are equipped with for the locking hole 10 with the connecting hole cooperation in the connection structure 11 on valve module 1.At it In his embodiment, the quantity of the lifting leg on each lifting beam may not also be three, only need to be according to the valve module actually lifted On connection structure quantity come be arranged lifting leg quantity;The shape of terminal pad is also possible to circular discs or other shapes Disk body, if lifting leg can be welded above, and can correspond to the connecting hole in the connection structure on valve module come arrange lock Tieholen, while will not also conflict with the other structures in valve module;Above-mentioned lifting leg can also be installed by other forms It below lifting beam, is such as bolted, the welding steel above lifting leg, is provided with bolt hole on steel plate, is opened below lifting beam There is corresponding bolt hole, is connected the two by bolt.
Lifting beam 3 is that section is I-shaped long beam, and the top of two lifting beams 3 passes through there are three the removable installations of bolt 9 Bridge beam 4, the section of bridge joint beam 4 be also it is I-shaped, the lower part of the top of lifting beam 3 and bridge joint beam 4 is correspondingly provided with bolt hole, two A lifting beam 3 and three bridge joint beams 4 form frame structure together, and the position that bridge joint beam 4 is installed is lifted with installation below lifting beam 3 The position of leg 5 is corresponding, and the side on bridge joint 4 top of beam is equipped with the mounting hole 8 that a row is used to install hanging ring.In other embodiments In, the section of lifting beam and bridge joint beam may not be I-shaped, such as can be square tube, equally can satisfy requirement;Bridge beam It is also possible to other modes with lifting beam to connect, as pin shaft connects;Above-mentioned bridge joint beam top can also open up two in two sides simultaneously Mounting hole is arranged, equally can satisfy requirement;The link position of above-mentioned bridge joint beam and lifting beam can not also be with the position of lifting leg It is corresponding.
Hoisting fixture 2 described in the present embodiment 1 makes in terminal pad 6 in use, the hoisting fixture 2 is hung on valve module 1 Locking hole 10 it is corresponding with the connecting hole in the connection structure 11 on valve module 1, blending bolt locking, according to the weight of valve module 1 The center of gravity of the heart and the hoisting fixture 2 itself selects suitable ring mounting hole 8, guarantees that valve module 1 steadily lifts by crane.

Claims (6)

1. a kind of change of current field valve module hoisting fixture, characterized in that two lifting beams including parallel interval setting, each lifting Interval is equipped at least two lifting legs below beam, and the height of the lifting leg is higher than all devices in the valve module of quasi- lifting Highly, terminal pad is equipped with below the lifting leg, the terminal pad is equipped with for cooperating with the connecting hole carried on valve module Locking hole, described two lifting beams link together by bridging beam, and the bridge joint beam is equipped with peace for installing hanging ring Fill hole.
2. change of current field valve module hoisting fixture according to claim 1, characterized in that it is described bridge joint beam installation position with The position of installation lifting leg is corresponding below lifting beam.
3. change of current field valve module hoisting fixture according to claim 1 or 2, characterized in that the installation on the bridge joint beam There are multiple, all mounting holes edge bridge joint beam length direction arranged for interval in hole.
4. change of current field valve module hoisting fixture according to claim 1 or 2, characterized in that the bridge joint beam and described Hanging beam releasable connection.
5. change of current field valve module hoisting fixture according to claim 4, characterized in that the bridge joint beam and the lifting beam Pass through bolt releasable connection.
6. change of current field valve module hoisting fixture according to claim 1, characterized in that the section of the bridge joint beam is I-shaped Shape, the mounting hole are located at the side on bridge joint beam top.
CN201811151464.7A 2018-09-29 2018-09-29 A kind of change of current field valve module hoisting fixture Pending CN109534143A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811151464.7A CN109534143A (en) 2018-09-29 2018-09-29 A kind of change of current field valve module hoisting fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811151464.7A CN109534143A (en) 2018-09-29 2018-09-29 A kind of change of current field valve module hoisting fixture

Publications (1)

Publication Number Publication Date
CN109534143A true CN109534143A (en) 2019-03-29

Family

ID=65841409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811151464.7A Pending CN109534143A (en) 2018-09-29 2018-09-29 A kind of change of current field valve module hoisting fixture

Country Status (1)

Country Link
CN (1) CN109534143A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201010422Y (en) * 2007-02-13 2008-01-23 方锡康 Container high-foot sling
CN101596672A (en) * 2009-06-30 2009-12-09 中国西电电气股份有限公司 A kind of valve support assembling tool of suspension type converter valve
CN202936086U (en) * 2012-11-30 2013-05-15 陕西通力专用汽车有限责任公司 Novel hanger device of automobile cab
CN203095387U (en) * 2012-12-14 2013-07-31 北车风电有限公司 Large wind generating set cabin cover side plate hanger
CN203199868U (en) * 2012-12-20 2013-09-18 济南吉利汽车有限公司 Instrument desk assembly carrying lifting appliance
CN204324680U (en) * 2014-11-28 2015-05-13 中广核工程有限公司 Spent fuel storage rack suspender
CN105775980A (en) * 2016-05-05 2016-07-20 仲宇 Spreader for transferring supporting plate of engine
CN205653030U (en) * 2016-05-23 2016-10-19 北京环境特性研究所 Hoist and mount frame of low scattering carrier
CN207390798U (en) * 2016-12-12 2018-05-22 中电普瑞电力工程有限公司 A kind of converter valve hanging apparatus
CN108609473A (en) * 2016-12-12 2018-10-02 中电普瑞电力工程有限公司 A kind of converter valve hanging apparatus

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201010422Y (en) * 2007-02-13 2008-01-23 方锡康 Container high-foot sling
CN101596672A (en) * 2009-06-30 2009-12-09 中国西电电气股份有限公司 A kind of valve support assembling tool of suspension type converter valve
CN202936086U (en) * 2012-11-30 2013-05-15 陕西通力专用汽车有限责任公司 Novel hanger device of automobile cab
CN203095387U (en) * 2012-12-14 2013-07-31 北车风电有限公司 Large wind generating set cabin cover side plate hanger
CN203199868U (en) * 2012-12-20 2013-09-18 济南吉利汽车有限公司 Instrument desk assembly carrying lifting appliance
CN204324680U (en) * 2014-11-28 2015-05-13 中广核工程有限公司 Spent fuel storage rack suspender
CN105775980A (en) * 2016-05-05 2016-07-20 仲宇 Spreader for transferring supporting plate of engine
CN205653030U (en) * 2016-05-23 2016-10-19 北京环境特性研究所 Hoist and mount frame of low scattering carrier
CN207390798U (en) * 2016-12-12 2018-05-22 中电普瑞电力工程有限公司 A kind of converter valve hanging apparatus
CN108609473A (en) * 2016-12-12 2018-10-02 中电普瑞电力工程有限公司 A kind of converter valve hanging apparatus

Similar Documents

Publication Publication Date Title
CN205668917U (en) A kind of electric power overhaul hoistable platform
CN109534143A (en) A kind of change of current field valve module hoisting fixture
CN109024316A (en) A kind of bridge beam body lifting system being mounted on bridge pier
CN109811643A (en) Steel anchor beam structure and its installation method
CN209583386U (en) Prefabricated part hanging tool and Lift-on/Lift-off System
CN113071984A (en) Hoisting device and hoisting method
CN220766259U (en) Lifting appliance
CN103439135B (en) The test mass module of overhead travelling crane and the method for composite test load thereof
CN210653315U (en) Frame cross beam assembly
CN210665065U (en) General test bed of fast-assembling quick-release engine
CN202957494U (en) Transformer maintenance low-fixing high-hanging device
CN203878957U (en) Protective screen module unit
CN207348571U (en) Multistage linking pylon
CN208345571U (en) Engine rooms of wind power generators suspender
CN205838399U (en) A kind of band waist rope jib
CN204961467U (en) Quick erection joint locking device of structure
CN201694728U (en) Lifting appliance for lifting top of gas cabinet
CN109835831A (en) A kind of Novel tower crane carry operation platform
CN209666811U (en) Automobile engine lifting lug assembly
CN219950199U (en) Multi-hanging-point self-balancing hanging device
CN205210270U (en) Earthing switch predelivery test device
CN216134250U (en) Wire installation component of composite cross arm
CN215106954U (en) Elevator well connection structure
CN215989768U (en) High-voltage power distribution cabinet
CN216613753U (en) Roof beam hoist and mount that convenient scene was installed and removed uses hoist

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190329